RFP 74330224R0048 Questions and Answer (Misc Qs).pdf
PDF 132 KB Posted
- Attached to
- Fiber Direct Internet Access
- Solicitation number
- 74330225R0048
- Issued by
- Not on record
About this file
This document is a Request for Proposal (RFP) Questions and Answers document for Fiber Dedicated Internet Access Services (RFP #74330225R0048). The document addresses six key questions from potential contractors regarding service level agreements (SLAs), contract transition, installation costs, bandwidth requirements, and site-specific details. Key clarifications include: ABMC expects contractors to propose SLAs based on their capabilities, the contract transition period between April and July 2026 is intended as a backup phase, ABMC will be responsible for asbestos removal, and the 10 GB bandwidth is only intended for special events like Memorial Day and D-Day commemorations. The RFP covers internet services for 30 global sites, with bandwidth varying based on staff size and local carrier options, and includes specific requirements for events at American Battle Monuments Commission (ABMC) sites worldwide, such as the Normandy American Cemetery and North Africa American Cemetery.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pre-Proposal Conference.pdf | ||
| ABMC Rack Locations with Coordinates.xlsx | XLSX spreadsheet | |
| A2 - Blank Pricing Worksheet - Amended 20250529.xlsx | XLSX spreadsheet | |
| RFP 74330224R0048 Questions and Answers (Round 2).pdf | ||
| PWS Changes Overview.pdf | ||
| A2 - Blank Pricing Worksheet - Amended 20250519.xlsx | XLSX spreadsheet | |
| RFP A1 Instructions Letter.pdf | ||
| PWSv2_Fiber Dedicated Internet Access.pdf | ||
| RFP 74330224R0048 Questions and Answers (First Round).pdf | ||
| A2 - Blank Pricing Worksheet.xlsx | XLSX spreadsheet | |
| RFP Instructions Letter.pdf | ||
| A3 - Questions and Answer Template.xlsx | XLSX spreadsheet | |
| A1 - PWS.pdf | ||
| A4 - NDA.docx | DOCX document |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Request for Proposal 74330225R0048
RFP # 74330225R0048 Fiber Dedicated Internet Access Services Miscellaneous Questions
RFP Reference Document Question ABMC Response 1 PWS & Pricing Sheet The SLA provided in the PWS does not seem to align with the SLA in the pricing worksheet. Where SLA in the PWS states a 99.9% uptime on CLIN 0006 and 0008, the Pricing Worksheet under Column I shows a Contractor SLA (Target 99.5% or Higher). Can the agency confirm what SLA should be met?
Contractor shall propose SLA for each site based on its current capabilities and annotate this as the company sees fit in the pricing sheet. ABMC prefers to have an enforceable SLA backed by Contractor’s confidence and capabilities, and does NOT require the same SLA at all sites. ABMC also does NOT require a diverse second circuit.
2 PWS The RFP requires all locations transitioned to new service by April 15, 2026. The existing contract expires July 2026. Will there be a period of parallel operations between April and July?
Yes, that period is intended as a backup phase for both ABMC and awardee, however realistically and preferrably we do not do any work in the weeks and days leading up to Memorial Day 2026 (all sites), and D-Day 82 (Normandy American Cemetery).
3 CLIN 0002 of PWS In order to provide a FFP for this CLIN, there needs to be a uniform set of assumptions. For instance, if asbestos is encountered, who is responsible for removal? What if wall thickness is greater than standard? Does this apply to both Inside and Outside Plant? Will Site Survey results allow modification of CLIN 002? Is ABMC seeking a FFP which is a bottom line Not to Exceed total price per site or is ABMC seeking a set of metrics based on standard expectations?
1) ABMC would be responsible for asbestos removal
2) Contractors shall assume that walls thickess vary
3) PWS requires a good faith estimate for CLIN 2 and CLIN 3 per unit cost.
For instance, North Africa site (Tunisia American Cemetery) may require all new cablings, while the other 29 locations should be able to reuse existing fiber cabling.
4) Costs should be separate but standard for inside and outside wiring.
4 PWS Besides D-Day, Memorial Day, and Veterans Day, can ABMC provide a list of events for each country in the past year that required temporary bandwidth expansion?
In the past year, ABMC also commemorated Battle of the Bulge 80 and Manila 80th Liberation. This requirement is based on significance of historical events, therefore it may not be possible to list all upcoming events.
However, once the contract is awarded, ABMC will provide an annual list of planned events (for examples DDay 85, Manila 85, Battle of the Bulge 85, etc.)
Request for Proposal 74330225R0048
5 CLIN 0006 of PWS and Pricing Worksheet It appears that ABMC is seeking 10 GB capacity at each site but will only utilize the full 10 Gb at special events. The Pricing Table only specifies "Target Bandwidth"; however the description under CLIN 005 in the PWS indicates that bandwidths at each site will be determined by ABMC. Under CLIN 006 does ABMC expect to be billed for the full 10 GB as a MRC, or will billing be based on a lower bandwidth (which is heretofore unspecified in the RFP) under normal operations and pay a temporary 10 GB upgrade charge under CLIN 008 for special events? Can ABMC clarify how this is supposed to be reflected in the Pricing Table?
ABMC doesnot expect to pay for 10Gb MRC, it is only intended for special events.
As stated in the PWS, ABMC expects the MRC to reflect a best value based on number of staff at each site AND bandwidth options available from the local carrier.
6 Pricing Worksheet Can coordinates to the Corozal American Cemetary be provided?
Latitude: 8.988383 / N 8 degrees 59'18.18"Longitude: -79.572950 / W 79 degrees 34'22.619