7357362 DrawingsAsOne SIGNED.pdf
PDF 6 MB Posted
- Solicitation number
- N400857357362
About this file
This document appears to be a set of drawings and general notes related to a federal contract opportunity. The key details are:
The drawings are for "Site Prep for Installation of New H-53 Shaft Balancers" at Fleet Readiness Center East (FRCE), Building 4224. This procurement is restricted to the Civil Paving MACC contractors. The scope of work and any applicable drawings are provided in the attached documents. General notes cover topics such as demolition requirements, piping labeling, welding qualifications, environmental and safety considerations, and recycling procedures. The project is located within Operable Unit 1, which has specific soil handling and dewatering requirements. Overall, this document provides technical details and guidance for the planned construction activities under the referenced federal contract opportunity.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment 0002 7357362.pdf | ||
| Amendment 0001 7357362.pdf | ||
| RFP 7357362.pdf | ||
| 7357362 SpecsAsOne SIGNED.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
9/24/2024
SYMBOL LEGEND
12'-0"
X
LOCATION
�COORDINATE-
\ A-XXX
SHEET
IDENTIFICATION
A1
\ A-XXX ;
STAIR
103A
. DIMENSIONS SHOWN THUSLY ARE TO THE ,
FACE OF THE ELEMENT BEING DIMENSIONED
(WALL, FRAME, ETC)
EMPLOYEE NUMBER
KEYNOTE TAG
ROOM DESIGNATION
COLUMN LINE DESIGNATION
DOOR DESIGNATION
...-... SECTION MARK
NORTH ARROW
l
1 ENLARGED PLAN / DETAIL MARK
J
I I
GENERAL NOTES:
1.
2.
3.
4.
5.
6.
CONDITIONS SHOWN ARE BASED ON EXISTING PLANS AND FIELD OBSERVATION WITHOUT DEMOLITION.
AFTER DEMOLITION, AN CLARIFICATION REQUIRED TO DETERMINE SCOPE OF WORK MUST BE BROUGHT TO
THE ATTENTION OF THE CONSTRUCTION MANAGER.
DIMENSIONS SHOWN ARE AN APPROXIMATE. FIELD VERIFY ALL DIMENSIONS AND SITE CONDITIONS PRIOR TO
PROCURING MATERIALS OR COMMENCING WORK.
EQUIPMENT, PIPING, WALLS, AND SYSTEMS NOTED FOR DEMOLITION SHALL BE REMOVED AND DISPOSED OF BY THE CONTRACTOR, UNLESS NOTED OTHERWISE. DEMOLITION SHALL INCLUDE ASSOCIATED SUPPORTS, ANCHOR BOLTS AND OTHER APPURTENANCES.
WHERE DUCTWORK, PIPING, WIRING, BOLTS, FOUNDATIONS, ETC ARE REMOVED AND NOT REINSTALLED, PATCH ALL HOLES IN WALLS, FLOOR, AND CEILING WITH LIKE MATERIAL.
LABEL PIPE SYSTEMS PER THE AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A13.1, SCHEME FOR THE IDENTIFICATION OF PIPING SYSTEMS. CONTACT THE COR FOR ANY DEVIATION FROM THE ASME A13.1
PRIOR TO CONSTRUCTION.
ROOFING WORK MUST BE PERFORMED BY A ROOFING CONTRACTOR CERTIFIED BY THE EXISTING ROOF
SYSTEM MANUFACTURER. WORK PERFORMED ON THE ROOF MUST NOT VOID THE EXISTING ROOF
WARRANTY.
7. DUST GENERATED FROM THE DEMOLITION WORK MUST BE CONTAINED.
8. EXISTING EQUIPMENT CONTAINING A PLANT ACCOUNT TAG THAT IS DEMOLISHED PER THESE DRAWINGS
WILL REMAIN THE PROPERTY OF FRC EAST, CHERRY POINT, NC. THE PLANT ACCOUNTED EQUIPMENT MUST BE REMOVED AND TRANSPORTED BY THE CONTRACTOR TO THE DEPOT'S USED OIL BERM/SHELTER, (TO STRUCTURE NO. 4466) FOR DECONTAMINATION AND DISPOSAL BY THE GOVERNMENT. IN ADDITION, THE
CONTRACTOR SHALL REMOVE EQUIPMENT PLANT ACCOUNT TAGS AND GIVE TAGS TO THE FRCE
CONSTRUCTION MANAGER FOR PLANT ACCOUNTING PURPOSES. THE PLANT ACCOUNT TAG IS USUALLY A SILVER METAL TAG, APPROXIMATELY 3/4 INCH X 2 INCHES. THE TAG IS MARKED "US NAVY PROPERTY" AND
HAS AN ELEVEN DIGIT NUMBER LOCATED BENEATH A BAR CODE.
9. EQUIPMENT LOADS MUST NOT BE ADDED TO A BUILDING ROOF WITHOUT PRIOR APPROVAL FROM THE
CONSTRUCTION MANAGER.
10. PRESSURE SYSTEM WELDS (PIPING, PRESSURE VESSELS, TANKS, HEAT EXCHANGERS, ETC.) MUST BE ACCOMPLISHED BY WELDERS CERTIFIED PER THE MOST RECENT EDITION OF ASME BPVC SEC IX, "WELDING, BRAZING, AND FUSING QUALIFICATIONS".
11. BEFORE BURNING / WELDING / SOLDERING, OBTAIN A PERMIT FROM THE MCAS CHERRY POINT FIRE DEPARTMENT (252-466-2241). A FIRE WATCH SHALL BE MAINTAINED BOTH DURING AND AT LEAST 30 MINUTES
AFTER BURNING / WELDING / SOLDERING WORK.
12. OCCUPIED SPACE MUST BE CLEANED AT THE COMPLETION OF EACH WORK PERIOD. REMOVE AND DISPOSE
OF SCRAP MATERIALS AND THOROUGHLY CLEAN THE CONSTRUCTION AREA DAILY.
13. DISPOSE OF DEBRIS, RUBBISH, SCRAP, AND OTHER UNSALVAGEABLE MATERIALS IN ACCORDANCE WITH
CONTRACT DOCUMENTS. STORAGE AND/OR BURNING OF REMOVED ITEMS IS PROHIBITED.
14. THE CONTRACTOR MUST CORRECT AT HIS OWN EXPENSE, DAMAGES TO WORK OR MATERIALS IN PLACE ON THE PREMISES, OR INCLUDED IN THIS CONTRACT, DURING THE EXECUTION OF THIS CONTRACT.
15. COMPLETE FORM 13700/202 (PLANT EQUIPMENT CHECKLIST) FOR EACH NEW PIECE OR EQUIPMENT AND SEND
THE COMPLETED FORMS TO THE CONSTRUCTION MANAGER.
16. PROVIDE EQUIPMENT MANUALS (INCLUDING OPERATIONS, MAINTENANCE, SPARE PARTS LIST, AND
ILLUSTRATED PARTS BREAKDOWN) IN ACCORDANCE WITH CONTRACT DOCUMENTS.
17. DO NOT SCALE DRAWINGS FOR SHOP DRAWINGS.
RECYCLING NOTES:
1. DISPOSE OF THE FOLLOWING MATERIALS AT THE FRC EAST RECYCLING FACILITY: STEEL, ALUMINUM, BRASS, COPPER (WIRE), MAGNESIUM, HIGH TEMPERATURE STEEL, COMPOSITE/FIBERGLASS, PLASTIC DRINK BOTTLES, PLASTIC TOOL BOX INSERTS, SCRAP ELECTRONICS, TONER CARTRIDGES, UNPAINTED/UNTREATED LUMBER AND CRATES, CARDBOARD ONLY, X-RAY FILM, KIRKSITE, LEAD, STAINLESS STEEL, AND TIRES. FRC EAST RECYCLING
CENTER B4785 IS LOCATED BEHIND B4225.
2. THE FOLLOWING MATERIALS ARE NOT ACCEPTED AT THE FRC EAST RECYCLING FACILITY: WOODEN FURNITURE OF ANY KIND, PACKING MATERIAL, PLASTIC OF ANY KIND (OTHER THAN THOSE MENTIONED IN NOTE 2), PAINTED OR TREATED LUMBER, BOXES CONSISTING OF BOTH CARDBOARD AND WOOD, REFRIGERATORS, PLANT ACCOUNTED EQUIPMENT NOT PROCESSED THROUGH CAN 1375, RUBBER FLOOR MATS, GENERAL REFUSE AND
CARDBOARD SHIPPING TUBES.
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021.
I
ENVIRONMENTAL NOTES:
1. NOTIFY THE CONTRACTING OFFICER REPRESENTATIVE WHEN THE PROJECT INCLUDES INSTALLATION OF
EQUIPMENT THAT MAY REQUIRE AN AIR PERMIT OR REMOVAL OF EQUIPMENT CURRENTLY LISTED ON THE EXISTING FRC EAST AIR PERMIT. NOTIFICATION MUST OCCUR PRIOR TO EQUIPMENT INSTALLATION/REMOVAL.
2. IF A HAZARDOUS CHEMICAL (MATERIAL) AS DEFINED UNDER 29 CFR 1910.1200 FOR THE INSTALLATION, TESTING, OR OPERATION OF INSTALLED MACHINERY IS REQUIRED, THE CONTRACTOR MUST RECEIVE APPROVAL FROM THE CONTRACTING OFFICER REPRESENTATIVE PRIOR TO ANY OF THAT MATERIAL BEING BROUGHT ON SITE. SUBMIT
IN WRITING THE FOLLOWING:
2.1. SAFETY DATA SHEET (SOS), QUANTITY, INTENDED USE, AND OTHER INFORMATION THAT MAY BE REQUIRED.
MAINTAIN COPIES OF ALL SOS ON SITE THROUGHOUT THE PROJECT.
2.2. ENSURE CONTRACTOR EMPLOYEES UNDERSTAND HOW TO LOCATE A SOS. COMPLETE FRC EAST FORM
5090/20 AND PROVIDE TO THE CONTRACTING OFFICER REPRESENTATIVE.
3. HAZARDOUS WASTE GENERATED MUST BE STORED, HANDLED AND DISPOSED IN ACCORDANCE WITH FEDERAL HAZARDOUS WASTE LAWS FOUND AT 40 CFR 260-268. CONTACT THE CONTRACTING OFFICER REPRESENTATIVE
FOR ADDITIONAL INSTRUCTION.
4. THIS SITE IS WITHIN THE BOUNDARIES OF OPERABLE UNIT 1 (OU1) AND IS WITHIN OR NEAR KNOWN AREAS OF SOIL CONTAMINATION. IF EARTH IS DISTURBED IT SHOULD BE TREATED AS CONTAMINATED. SEE DETAILS WITHIN
THE CONTRACT DOCUMENTS FOR ADDITIONAL INFORMATION.
5. FOR CONNECTIONS TO OR MODIFICATION OF EXISTING DRAINS OR DRAINAGE SYSTEMS (E.G. SANITARY SEWER, INDUSTRIAL SEWER, OR STORM SEWER), CONTACT THE CONTRACTING OFFICER REPRESENTATIVE FOR
APPROVAL OF THE CONNECTION AND FINAL DISCHARGE LOCATION.
6. CONNECTION TO THE POTABLE WATER SYSTEM MAY BE PERFORMED USING A BACKFLOW PREVENTOR.
INSTALLATION OF BACKFLOW PREVENTION ASSEMBLIES MUST BE ON THE LIST OF APPROVED ASSEMBLIES BY THE UNIVERSITY OF SOUTHERN CALIFORNIA FOUNDATION OF CROSS-CONTROL AND HYDRAULIC RESEARCH (USC FCCC HR) AND SHALL BE IN COMPLIANCE WITH THE INTERNATIONAL PLUMBLING CODE (IPC) SECTION 608. NOTIFY THE LOCAL CROSS-CONNECTION OPERATOR IN RESPONSIBLE CHARGE (ORC) AUTHORITY VIA THE COR WHEN INSTALLATION IS COMPLETE. THE BACKFLOW PREVENTION ASSEMBLY MUST THEN BE TESTED AND CERTIFIED BY
THE LOCAL AUTHORITY.
SPECIAL ENVIRONMENTAL NOTES:
1. THIS PROJECT IS LOCATED WITHIN THE DEFINED LIMITS OF OPERABLE UNIT 1. THIS OPERABLE UNIT HAS A RECORD OF
DECISION (ROD) THAT REQUIRES CERTAIN REPORTING ACTIONS BE COMPLETED IN ORDER TO BE IN COMPLIANCE WITH THE ROD. NO DEWATERING ACTIVITIES CAN OCCUR IN THESE AREAS WITHOUT PRIOR WRITTEN APPROVAL. SEE
SPECIFICATIONS SECTION 01 14 00 'WORK RESTRICTIONS".
2. SPECIFICATION SECTION 31 23 00.00 "EXCAVATION AND FILL" OUTLINES THE REQUIREMENTS FOR HANDLING SUSPECTED
CONTAMINATED SOILS AND ALL FILL MATERIALS IMPORTED TO THE BASE.
OCCUPATIONAL SAFETY & HEALTH NOTES:
1. ASBESTOS MATERIAL AND LEAD-BASED PAINT TESTING HAS BEEN PERFORMED ON EXISTING AREAS OF WORK.
SEE THE SPECIFICATION FOR ASBESTOS MATERIAL AND LEAD-BASED PAINT REPORT RESULTS. CONTRACTOR IS RESPONSIBLE FOR THE APPROPRIATE STANDARD OF CARE REGARDING THE HANDLING OF ANY MATERIALS
FOUND TO BE HAZARDOUS AND THE PROTECTION OF PERSONS FROM EXPOSURE.
2. COMPLY WITH SAFETY AND OCCUPATIONAL CODE REQUIREMENTS INCLUDING; ANSI A10.32 PERSONAL FALL PROTECTION, EM 385-1-1 SAFETY AND HEALTH REQUIREMENTS, 29 CFR 1910 OCCUPATIONAL SAFETY AND HEALTH STANDARDS, 29 CFR 1926 SAFETY AND HEALTH REGULATIONS FOR CONSTRUCTION, 29 CFR 1926.500 FALL PROTECTION, P-307 MANAGEMENT OF WEIGHT HANDLING EQUIPMENT, NFPA 70 NATIONAL ELECTRIC CODE, AND
NFPA 70E STANDARD FOR ELECTRICAL SAFETY REQUIREMENTS FOR EMPLOYEE WORKPLACES.
SECURITY NOTES:
1. WORK IS WITHIN THE FRC EAST SECURITY ZONE. OBTAIN SECURITY BADGES IN ACCORDANCE WITH CONTRACT
DOCUMENTS.
FLEET RF.ADTNESS CENTER
O&AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
CFC C. I U·-I1(
',F'/J \' f-FIIR'
•.H .. cADRO
/P='i'•,)\/[[J . P.'°J.:RC, F/\:_-_: -,L,,.JJ l'R 1-=:1J I\IC·: n_ -:_!�iJj::
SH:JP: ·Y _\ .�1 I:;,,,_,:.;:: ,::::,c:::J,391 C u_
C;_ 1-
- (J) ::: Ll]
I f-u_ f-
' f-
� C)
LL
c_
CL U:::
� (y· C 11 I u (_) f <l f-' (J) u_ -i----'. == ,:; <f
,f
I-z w w
M in w z a:
LL
I-z w
G-002 w I-
I-w a..
w
C!)
w _J _J
L)
'f)
I
S-001
ST
RU
CT
UR
AL
N
OT
ES
12908203
A. WILLIAMS
A. WILLIAMS
J. PADRO
AS NOTED
ABBREVIATIONS
ARCH
APPROX.
CM
DIAMETER
DIMS
E.O.C.
EX.
FFE
FT
MAX
MIN
MPH
O.C.
PCF
PSF
PSI
SEC
S.O.G
SQ FT
TYP
T.O.C
ARCHITECTURAL
APPROXIMATELY
CENTERLINE
CONSTRUCTION MANAGER
DIAM
DIMENSIONS
EDGE OF CONCRETE
EXISTING
FINISHED FLOOR ELEVATION
FOOT
MAXIMUM
MINIMUM
MILES PER HOUR
ON CENTER
POUNDS PER CUBIC FOOT
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
SECOND
SLAB-ON-GRADE
SQUARE FOOT
TYPICAL
TOP OF CONCRETE
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021.
1. NO PIPES OR DUCTS WILL BE PLACED IN STRUCTURAL MEMBERS UNLESS SPECIFICALLY DETAILED OR
APPROVED BY THE ENGINEER & CONTRACTING OFFICER.
2. REFER TO ARCHITECTURAL DRAWINGS FOR THE FOLLOWING:
2.1. A. SIZE AND LOCATION OF ALL DOOR AND WINDOW OPENINGS, UNLESS OTHERWISE NOTED.
2.2. SIZE AND LOCATION OF INTERIOR AND EXTERIOR NON-BEARING PARTITIONS.
2.3. SIZE AND LOCATION OF CURBS, FLOOR DRAINS, SLOPES, DEPRESSED AREAS, CHANGES IN LEVEL, RAMPS, CHAMFERS, GROOVES, INSERTS, ETC., EXCEPT AS SHOWN.
2.4. SIZE AND LOCATION OF FLOOR AND ROOF OPENINGS, EXCEPT AS SHOWN. FLOOR AND ROOF FINISHES. E. STAIR FRAMING AND DETAILS, EXCEPT AS SHOWN. F. G. DIMENSIONS NOT SHOWN ON
STRUCTURAL DRAWINGS.
3. REFER TO MECHANICAL, PLUMBING, AND ELECTRICAL DRAWINGS FOR THE FOLLOWING:
3.0.1. PIPE RUNS, SLEEVES, HANGERS, TRENCHES, SLAB OPENINGS, ETC., EXCEPT AS SHOWN OR
NOTED.
3.0.2. ELECTRICAL CONDUITS, BOXES, OUTLETS. CONCRETE INSERTS FOR ELECTRICAL, MECHANICAL
AND PLUMBING FIXTURES.
3.0.3. SIZE AND LOCATION OF MACHINE AND EQUIPMENT BASES, ANCHOR D. BOLTS, ETC. ASTM REFERENCES ARE FROM THE LATEST ISSUE AND LATEST REVISION, UNLESS OTHERWISE NOTED.
4. INVESTIGATE THE SITE DURING CLEARING AND EXCAVATION FOR UNSUITABLE CONDITIONS, UNCONSOLIDATED AND UNDOCUMENTED FILLS, BURIED STRUCTURES, UTILITIES, ETC., AND IMMEDIATELY NOTIFY THE ARCHITECT/ENGINEER & CONTRACTING OFFICER OF ANY SITE CONDITIONS NOT REFLECTED ON THE DRAWINGS OR DIFFERENT FROM MAXIMUM OR MINIMUM DIMENSIONS INDICATED, INCLUDING CONFLICT IN GRADES, ADVERSE SOIL CONDITIONS, GROUNDWATER PRESENT, DEEPENED FOOTINGS, UNCOVERED AND
UNEXPECTED UTILITY LINES, ETC.
5. CONSTRUCTION MATERIALS, IF PLACED ON STRUCTURAL MEMBERS, WILL BE SPREAD OUT SUCH THAT THE
LOADING DOES NOT EXCEED THE DESIGN LIVE LOADS. PROVIDE SHORING AND BRACING WHERE
CONSTRUCTION LOADING EXCEEDS THE DESIGN STRENGTH OF THE STRUCTURAL MEMBERS OR THE
STRUCTURAL STRENGTH HAS NOT BEEN ATTAINED OR THE STRUCTURE IS NOT COMPLETE.
6. DETERMINE THE LOCATION OF UTILITY SERVICES IN AREAS TO BE EXCAVATED BEFORE BEGINNING EXCAVATION. EXERCISE EXTREME CAUTION IN EXCAVATING AND TRENCHING. DAMAGE CAUSED AS A RESULT OF FAILING TO EXACTLY LOCATE AND PRESERVE EXISTING UNDERGROUND UTILITIES IS THE
RESPONSIBILITY OF THE CONTRACTOR.
7. THE CAD DRAWING FILES ARE THE PROPERTY OF NAVFAC AND WILL NOT BE RELEASED TO THE
CONTRACTOR OR SUBCONTRACTOR FOR THEIR USE.
8. STRUCTURAL DRAWINGS WILL BE USED IN CONJUNCTION WITH ARCHITECTURAL. DRAWINGS.
9. THIS SITE IS WITHIN THE BOUNDARIES OF OPERABLE UNIT 1 (OU1) AND IS WITHIN OR NEAR
KNOWN AREAS OF SOIL CONTAMINATION. IF EARTH IS DISTURBED IT SHOULD BE TREATED AS
CONTAMINATED. SEE DETAILS WITHIN THE CONTRACT DOCUMENTS FOR ADDITIONAL
INFORMATION.
GENERAL
3"
2" 1 1/2"
1 1/2" 3/4"
CONCRETE CAST AGAINST AND PERMANENTLY EXPOSED TO EARTH:
CONCRETE EXPOSED TO EARTH OR WEATHER:
NO.6 THROUGH NO.18 BAR
NO.5 BAR, W31 OR D31 WIRE, AND SMALLER
CONCRETE NOT EXPOSED TO WEATHER AND NOT IN CONTACT WITH GROUND:
NO.14 AND NO.18 BAR
NO.11 BAR AND SMALLER
1. DETAILING, FABRICATION AND ERECTION OF REINFORCING BARS WILL BE IN ACCORDANCE WITH ACI MANUAL OF STANDARD PRACTICE FOR DETAILING REINFORCED CONCRETE STRUCTURES, ACI 315-LATEST
ADOPTED EDITION.
2. ALL REINFORCING WILL BE ADEQUATELY SUPPORTED TO PREVENT DISPLACEMENT BY CONCRETE
PLACEMENT OR WORKERS.
3. ALL REINFORCING BARS EXCEPT BARS TO BE WELDED WILL CONFORM TO THE "STANDARD SPECIFICATION FOR DEFORMED BILLET STEEL BARS FOR CONCRETE REINFORCEMENT", ASTM A615 GRADE 60. BARS TO BE
WELDED WILL CONFORM TO ASTM A706.
4. WELDING OF REINFORCING BARS TO BE IN ACCORDANCE WITH "STRUCTURAL WELDING
CODE-REINFORCING STEEL", AWS D1.4. REINFORCING STEEL TO BE WELDED WILL HAVE A MAXIMUM CARBON EQUIVALENT (CE) OF 0.75. SPECIAL INSPECTION IS REQUIRED. TESTING IS REQUIRED FOR ALL
WELDS THICKER THAN 5/16".
5. WHERE CONTINUOUS BARS ARE CALLED OUT IN FOOTINGS, SPLICES MAY BE USED. WHERE BARS ARE
SHOWN SPLICED, THEY MAY RUN CONTINUOUS AT CONTRACTOR'S OPTION.
6. ALL REINFORCING BAR BENDS WILL BE MADE COLD.
7. UNLESS OTHERWISE SHOWN, WALL VERTICAL REINFORCING WILL BE POSITIONED AT THE CENTER OF THE
WALL.
8. DOWELS BETWEEN FOOTINGS AND WALLS WILL BE THE SAME GRADE, SIZE, AND SPACING AS VERTICAL
REINFORCING.
9. SLAB ON GRADE REINFORCEMENT WILL BE POSITIONED AT MID-DEPTH.
10. SHOP DRAWINGS FOR SIZE AND LAYOUT OF REINFORCING REBARS ARE REQUIRED WHEN NOTED IN THE
LIST OF REQUIRED SHOP DRAWINGS.
REINFORCING STEEL
ALL REINFORCING BARS WILL BE PROVIDED WITH THE FOLLOWING CONCRETE COVER:
EPOXY ANCHORS
1. ADHESIVE ANCHOR INSTALLATIONS WILL COMPLY WITH MANUFACTURER'S WRITTEN INSTRUCTIONS AND
SPECIFICATIONS, INCLUDING ICC-ES REPORTS.
THE FOLLOWING INSTRUCTIONS ARE MINIMUM REQUIREMENTS AND DO NOT SUPERCEDE ANY INSTRUCTIONS OR
REQUIREMENTS FROM THE CONTRACTOR'S SELECTED MANUFACTURER.
2. DUST WILL BE BLOWN FROM THE HOLE WITH COMPRESSED AIR TO ENSURE PROPER ANCHOR SEATING DEPTH AND TO PROVIDE A CLEAN BONDING SURFACE. ADDITIONALLY, THE HOLE WILL BE BRUSHED WITH A
NYLON BRUSH THEN BLOWN AGAIN WITH COMPRESSED AIR.
3. ADHESIVE WILL ONLY BE APPLIED TO DRY SURFACES.
4. BASE MATERIAL TEMPERATURE MUST BE 40°F OR ABOVE AT TIME OF INSTALLATION. FOR BEST RESULTS, MATERIAL SHOULD BE 70°F-80°F.
5. WHEN INSTALLING EPOXY ANCHORS INTO MASONRY, ANCHORS WILL BE NSTALLED IN SOLID GROUTED
CELLS ONLY.
6. CHEMICAL ANCHOR SYSTEMS:
6.1. CONCRETE: USE ONLY ADHESIVE ANCHOR SYSTEMS THAT HAVE BEEN ISSUED AN ICC-ES REPORT IN ACCORDANCE WITH PROVISIONS OF OF ICC-ES AC308. ANCHOR SYSTEM SHOULD BE APPROVED FOR USE IN CRACKED CONCRETE AND SEISMIC DESIGN CATEGORIES A-F PER SECTION 2.0 OF THE ICC-ES EVALUATION SERVICES REPORT. ANCHOR SYSTEM WILL BE INSTALLED PER REQUIREMENTS OF THE
ICC-ES EVALUATION SERVICES REPORT FOR SPECIFIC ANCHOR, AND AS REQUIRED BY THE
MANUFACTURER.
6.2. GROUT-FILLED MASONRY UNITS: USE ONLY ADHESIVE ANCHOR SYSTEMS THAT HAVE BEEN ISSUED AN ICC-ES REPORT IN ACCORDANCE WITH PROVISIONS OF ISS-ES AC58. ANCHOR SYSTEMS WILL BE
INSTALLED PER REQUIREMENTS OF ICC-ES EVALUATION SERVICES REPORT FOR THE SPECIFIC
ANCHOR, AND AS REQUIRED BY THE MANUFACTURER.
7. ANCHOR RODS: RODS WILL BE ASTM A36 THREADED RODS WITH ASTM A563 GRADE A NUTS AND ANSI B18.22.1 TYPE A WASHERS, UNLESS OTHERWISE NOTED. ANCHORS DESIGNATED AS ASTM A193 GRADE B7
THREADED RODS WILL USE ASTM A563 GRADE DH HEAVY HEX NUTS AND ASTM F436 WASHERS.
8. REINFORCEMENT BARS: ASTM A615 GRADE 60 STEEL.
9. REMOVE GREASE, OIL, RUST AND ANY OTHER LAITANCE FROM RODS AND DOWELS PRIOR TO
INSTALLATION.
10. SPECIAL INSPECTION REQUIREMENTS WILL BE DICTATED BY SECTION 4.0 OF THE ICC-ES EVALUATION SERVICES REPORT. ANY SPECIAL INSPECTION WILL VERIFY ANCHOR TYPE, ANCHOR DIMENSIONS, CONCRETE TYPE, CONCRETE COMPRESSIVE STRENGTH, HOLE DIMENSIONS, ANCHOR SPACINGS, EDGE
DISTANCES, SLAB THICKNESS, ANCHOR EMBEDMENT, AND TIGHTENING TORQUE.
DESIGN LIVE LOADS USED IN THE DESIGN OF THIS STRUCTURE ARE AS FOLLOWS:
1. UNIFORM LIVE LOADS:
ROOF: 20 PSF
EQUIPMENT PADS: PER EQUIPMENT MANUFACTURER'S MINIMUM DEPTH
2. WIND LOADS:
WIND VELOCITY (3 SEC GUST) 139 MPH
IMPORTANCE FACTOR I = 1.0, BUILDING CATEGORY II
WIND EXPOSURE CATEGORY: C
INTERNAL PRESSURE COEFFICIENT: +/- 0.55 (PARTIALLY ENCLOSED)
COMPONENTS AND CLADDING: WIND PRESSURE TO BE USED FOR DESIGN OF EXTERIOR
COMPONENTS AND CLADDING MATERIALS NOT SPECIFICALLY DESIGNED ON THESE
DRAWINGS MUST BE 50 PSF.
SNOW LOADS:
GROUND SNOW LOAD: 10 PSF
SEISMIC LOADS:
IMPORTANCE FACTOR: 1.0
0-2 SECOND SPECTRAL RESPONSE, S5 = 16%g 1-0 SECOND SPECTRAL RESPONSE, S1 = 7%g
SOIL SIDE CLASS = D (ASSUMED)
SLAB ON GRADE
OTHER CONCRETE
MIN. f'c
4,000 psi 4,500 psi
1. PROVIDE CONSTRUCTION OR CONTROL JOINTS IN SLAB ON GRADE AS SHOWN ON PLANS UNLESS SPECIFIED OTHERWISE. LOCATION OF JOINTS NOT SPECIFICALLY INDICATED WILL BE REVIEWED BY THE
STRUCTURAL ENGINEER & CONTRACTING OFFICER PRIOR TO PLACING REINFORCING STEEL.
2. NON-SHRINK GROUT WILL BE FROM A PRODUCT THAT SPECIFIES A MINIMUM COMPRESSIVE STRENGTH AT 28 DAYS OF 7,000 psi PER ASTM C109. GROUTING OF BASE PLATES PRIOR TO PLUMBING OF COLUMN IS NOT
PERMITTED.
3. PROJECTING CORNERS OF SLABS, BEAMS, WALLS, COLUMNS, ETC., WILL BE FORMED WITH A 3/4" CHAMFER
OR TOOLED EDGE, UNLESS OTHERWISE NOTED.
1. CEMENT WILL CONFORM TO ASTM C150, TYPE II / V
2. AGGREGATES FOR NORMAL WEIGHT CONCRETE WILL CONFORM TO ASTM C33, 1 1/2" MAXIMUM SIZE.
3. ADMIXTURES MAY NOT BE USED WITHOUT PRIOR APPROVAL OF THE ENGINEER & CONTRACTING OFFICER. ADMIXTURES USED TO INCREASE THE WORKABILITY OF THE CONCRETE WILL NOT REDUCE THE STRENGTH OF CONCRETE. FLY ASH (POZZOLAN) IF PERMITED BY SPECIFICATIONS WILL NOT EXCEED
25% FOR SLAB ON GRADE AND 25% FOR ALL OTHER CONCRETE.
4. THE MIX DESIGN, INCLUDING PROPORTIONS OF MATERIALS FOR A ONE YARD BATCH, WILL BE SUBMITTED TO THE ENGINEER OF RECORD & CONTRACTING OFFICER FOR REVIEW PRIOR TO ORDERING
CONCRETE.
5. READY-MIX CONCRETE WILL BE MIXED AND DELIVERED IN ACCORDANCE WITH ASTM C94.
6. ALL REINFORCING BARS AND INSERTS WILL BE SECURED IN PLACE PRIOR TO PLACING CONCRETE.
7. NON-STRUCTURAL STEEL MEMBERS EMBEDDED IN CONCRETE WILL BE GALVANIZED OR PAINTED. ALL
DAMAGED GALVANIZED AREAS WILL BE REPAIRED PRIOR TO EMBEDMENT.
8. CONCRETE WILL HAVE A MAXIMUM DRY DENSITY OF 150 pcf.
9. MINIMUM CONCRETE COMPRESSIVE STRENGTHS AT 28 DAYS.
CONCRETE
1. UFC 3-310-01, STRUCTURAL ENGINEERING
DESIGN CRTIERIA:
DESIGN LOADS:
4. ALL CONCRETE WHICH DURING THE LIFE OF THE STRUCTURE WILL BE SUBJECT TO FREEZING TEMPERATURES WHILE WET, WILL HAVE A WATER CEMENT RATIO NOT EXCEEDING 0.45 BY WEIGHT AND WILL CONTAIN ENTRAINED AIR PER ACI 613. SUCH CONCRETE WILL INCLUDE EXTERIOR SLABS, PERIMETER
FOUNDATIONS, EXTERIOR CURBS, ETC.
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
AutoCAD SHX Text 96916
SHAFT SHOP
SAW CUT AND REMOVE PORTION OF EXISTING CONCRETE SLAB.
KEYNOTES
GENERAL NOTES
EXISTING
DEMOLITION/REMOVE
EDGE OF EXISTING CONCRETE PAD
EXISTING DOWELED CONSTRUCTION JOINT
LEGEND
STRUCTURAL FLOOR PLAN - DEMOLITION
SCALE: 1/4"=1'-0" N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
0 5' 1/4" = 1'-0"
10'
GRAPHIC SCALE
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
15'-8"
6'- 3"
6'-3"
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
SD101
ST
RU
CT
UR
AL
F
LO
OR
P
LA
N
- D
EM
OL
IT
IO
N
12908204
A. WILLIAMS
A. WILLIAMS
M. RICE
AS NOTED
M
N
P
8 7 6
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021.
WORK LOCATION
AT MINIMUM, DEMOLISH CONCRETE TO THIS EDGE
OF EXISTING CONCRETE PAD
T.O.C AT 0'-0"
1. FOR GENERAL NOTES REFER TO SHEET G-002 AND S-001.
2. REFER TO G-002 FOR ENVIRONMENTAL NOTES.
3. DATUM FFE AT 0'-0".
4. EXISTING SLAB REINFORCEMENT AND UNDER SLAB UTILITIES MUST BE
LOCATED PRIOR TO COMMENCING WORK.
5. TEMPORARILY SEAL EXISTING FLOOR DRAINS TO PREVENT CONCRETE
AND OTHER CONSTRUCTION DEBRIS FROM ENTERING DRAINS. SEAL
MUST REMAIN TILL WORK IS COMPLETE.
'-4
EX. FLOOR DRAIN
(TYP)
06 AUG 2024
FINAL
DIVISION APPROVED WHEN
SIGNED
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
SHAFT SHOP
TYP. 4 SIDES
TYP. 3 SIDES
PROVIDE 10" THICKENED CONCRETE EQUIPMENT PAD. SEE SECTION
A1/S-501 FOR DETAILS.
PROVIDE DOWELED CONSTRUCTION JOINT. DOWELS SPACED AT 12" O.C.
MAXIMUM AND 8" MINIMUM CLEARANCE FROM EDGE OF SLAB.
OUTLINE OF BALANCE MACHINE EQUIPMENT (NIC) AND TYPICAL ANCHORS
(NIC).
PROVIDE ISOLATION JOINT ALONG WALL AND CONCRETE EQUIPMENT
PAD. SEE DETAIL C3/S-501.
KEYNOTES
1. FOR GENERAL NOTES REFER TO SHEET G-002 AND S-001.
2. REFER TO G-002 FOR ENVIRONMENTAL NOTES.
3. DATUM FFE AT 0'-0".
4. EXISTING SLAB REINFORCEMENT AND UNDER SLAB UTILITIES MUST BE
LOCATED PRIOR TO COMMENCING WORK.
5. TEMPORARILY SEAL EXISTING FLOOR DRAINS TO PREVENT CONCRETE
AND OTHER CONSTRUCTION DEBRIS FROM ENTERING DRAINS. SEAL
MUST REMAIN TILL WORK IS COMPLETE.
6. LOCATION OF EQUIPMENT PAD REINFORCEMENT MUST BE
COORDINATED WITH EQUIPMENT MANUFACTURER.
GENERAL NOTES
EXISTING
CONSTRUCTION
EDGE OF EXISTING CONCRETE PAD
EXISTING DOWELED CONSTRUCTION JOINT
LEGEND
STRUCTURAL FLOOR PLAN - CONSTRUCTION
SCALE: 1/4"=1'-0"
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021.
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
0 5' 1/4" = 1'-0"
10'
GRAPHIC SCALE
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
S-101
ST
RU
CT
UR
AL
F
LO
OR
P
LA
N
- C
ON
ST
RU
CT
IO
N
12908205
A. WILLIAMS
A. WILLIAMS
M. RICE
AS NOTED
A1 S-501
M
N
P
8 7 6
WORK LOCATION
15'-8"
6'- 3"
TYP.
'-4
6'-3"
EX. FLOOR DRAIN
(TYP)
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
FF EL
SEE PLAN
1 MIN.
NOTES:
1. HOLES DRILLED THROUGH EXISTING CONCRETE MUST BE APPROXIMATELY 1/8 INCH GREATER IN DIAMETER THAN THE DOWELS AND DOWELS SHOULD BE BONDED TO THE DRILLED HOLES WITH EPOXY
RESIN GROUT
2. ENSURE THAT DOWELS DO NOT EXTEND INTO THE MOUNTING AREA FOR THE NEW EQUIPMENT AS
SHOWN IN PLAN VIEW
3. SET OTHER SIDE OF DOWEL IN FRESH CONCRETE
0 6" 1' 2' 1" = 1'-0"
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021.
A1 CONCRETE SECTION
1"=1'-0"
S-501
ST
RU
CT
UR
AL
D
ET
AI
LS
12908206
A. WILLIAMS
A. WILLIAMS
M. RICE
AS NOTED
T = CONCRETE THICKNESS
A3 DOWELED CONSTRUCTION JOINT DETAIL (TYP)
SCALE: NOT TO SCALE
DRILL AND EPOXY
GROUT DOWEL
T/
PAINT AND OIL
END OF DOWEL
CONCRETE
NOTES:
1. HOLES DRILLED INTO EXISTING CONCRETE MUST BE APPROXIMATELY 1/8 INCH GREATER IN
DIAMETER THAN THE DOWELS AND DOWELS SHOULD BONDED TO THE DRILLED HOLES WITH
EPOXY RESIN GROUT.
2. SET OTHER SIDE OF DOWEL IN NEW CONCRETE.
3. DOWEL SIZE AND SPACING: SEE PLAN.
SEE NOTES FOR
SIZE AND SPACING
T
POURED JOINT SEALANT
SEALANT RESERVOIR:
WIDTH = 1/2"
DEPTH = 1.0 TO 1.5 TIMES THE WIDTH
APPLY BONDBREAKER TO BOTTOM OF RESERVOIR
TOP OF SEALANT WILL BE 1/8" BELOW TOP OF CONCRETE
1/2 DOWEL LENGTH
EXISTING
CONCRETE
MATCH ELEVATIONS
OF ADJACENT CONCRETE
MATCH ELEVATIONS
OF ADJACENT CONCRETE
DOWELED CONSTRUCTION JOINT
SEE DETAIL A3 THIS SHEET
EXISTING CONCRETE
SLAB-ON-GRADE
CONCRETE EQUIPMENT PAD
WWF 6 X 6, W2.9/W2.9
COORDINATE REQUIRED DEPTH WITH
EQUIPMENT MANUFACTURER
15 MIL VAPOR BARRIER
CONTINUOUS UNDER CONCRETE EQUIPMENT PAD
COMPACTED AGGREGATE BASE COURSE
#57 GRANITE STONE
EXISTING SUBGRADE
COMPACT
6"
2" MI
N.
C3 ISOLATION JOINT DETAIL
SCALE: NOT TO SCALE
BOND BREAKER TAPE
OR BACKER ROD
EXISTING VERTICAL STRUCTURE
1/2 INCH THICK
JOINT MATERIAL
POURED JOINT SEALANT
SEALANT RESERVOIR:
WIDTH = 1/2"
DEPTH = 1.0 TO 1.5 TIMES THE WIDTH
TOP OF SEALANT WILL BE 1/8" BELOW TOP OF PAVEMENT
CONCRETE
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
LEGEND & ABBREVIATIONS
ABOVE FINISHED FLOOR
COMPRESSED AIR
DOWN
POUNDS PER SQUARE INCH
TYPICAL
AFF
CA
DN
PSI
TYP.
P-001
NO
TE
S, LE
GE
ND
A
ND
A
BB
RE
VI
AT
IO
NS
PL
UM
BI
NG
12908210
R. REES
R. VELAZQUEZ
J. PADRO
AS NOTED
PLUMBING NOTES
EXISTING PIPING AND EQUIPMENT SHOWN IS BASED ON EXISTING PLANS AND FIELD OBSERVATION WITHOUT DEMOLITION. AFTER DEMOLITION, ANY CLARIFICATION REQUIRED TO DETERMINE SCOPE OF WORK MUST BE
BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER.
DIMENSIONS SHOWN ARE AN APPROXIMATE. FIELD VERIFY ALL EXISTING CONDITIONS PRIOR TO ORDERING
MATERIAL AND COMMENCING WORK.
REMOVAL OF ITEMS MUST INCLUDE ASSOCIATED HANGERS, ANCHOR BOLTS AND OTHER APPURTENANCES.
COORDINATE LOCATION OF ALL EQUIPMENT, FIXTURES & PIPING WITH ALL OTHER TRADES.
CLEAN, PRIME, FINISH PAINT AND IDENTIFY INSULATED AND UN-INSULATED PIPING IN ACCORDANCE WITH ANSI/ASME 13.1 TO INDICATE CONTENTS AND DIRECTION OF FLOW. INSTALL COMMERCIALLY AVAILABLE SEMI-RIGID WRAP AROUND PIPE LABELS SUCH AS "DURALABEL" OR APPROVED EQUIVALENT. LOCATE LABELS AT 20 FEET INTERVALS, ON EACH SIDE OF WALL OR FLOOR PENETRATIONS, AT BRANCH TAKE-OFFS FROM MAINS AND AS CLOSE
AS POSSIBLE TO EACH POINT OF SYSTEM USE.
IT IS THE INTENTION OF THESE DRAWINGS TO COVER ALL WORK & MATERIAL FOR A COMPLETE FIRST CLASS INSTALLATION. ANY EQUIPMENT, PLUMBING FIXTURE, TRIM HARDWARE &/OR DEVICES USUALLY UTILIZED IN THE CLASS OF WORK, THOUGH NOT SPECIFICALLY MENTIONED OR SHOWN ON THE DRAWINGS, BUT WHICH MAY BE NECESSARY FOR THE SATISFACTORY COMPLETION OF THE WORK (AS DETERMINED BY THE GOVERNMENT) SHALL
BE FURNISHED & INSTALLED BY THE CONTRACTOR AS PART OF HIS TOTAL WORK.
INSTALL ALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S RECOMMENDATIONS & ALL APPLICABLE LISTING
REQUIREMENTS.
EXISTING TO REMAIN
DEMOLISH / NEW
PIPE TURN DOWN (DN)
PIPE CAP
BALL VALVE
BALL VALVE IN VERTICAL
TEE-DN
PIPE CONTINUES
TIE-IN-POINT
DEMOLITION WORK LIMIT
QUICK CONNECT
FILTER/REGULATOR
PRESSURE GAGE
DETAIL
SHEET WHERE DETAIL IS SHOWN
C1 P-501
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
SCHENCK BALANCING
MACHINE
SHAFT SHOP
CO
NT
RO
LL
ER
X
BENCH
30 X 120
BENCH
36 X 72
BE
NC
H
X
TA
BL
E
X
HK-40 HIGH SPEED
BALANCE MACHINE
3/4 " C
A
8' -0"
A
FF
3/4" CA @ 9'-0" AFF
3/4" CA @ 9'-0" AFF
1/2 " C
A
8' -0"
A
FF
1/2" CA @ 8'-0" AFF
DEMOLISH COMPRESSED AIR PIPING TO POINT INDICATED.
DEMOLISH BOOSTER PUMP AND ASSOCIATED PIPING.
KEYNOTES
APPLIES TO THIS SHEET ONLY
N
B4224 WORK LOCATION
SCALE: NOT TO SCALE
PD101
PL
UM
BI
NG
F
LO
OR
P
LA
N
- D
EM
OL
IT
IO
N
12908211
R. REES
R. VELAZQUEZ
J. PADRO
AS NOTED
PLUMBING FLOOR PLAN - DEMOLITION
SCALE: 1/4"=1'-0"
0 5' 1/4" = 1'-0"
10'
GRAPHIC SCALE
WORK LOCATION
P
N
M
7 6
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
SHAFT SHOP
C1 P-501
C3 P-501
A1 P-501
1/2" CA @ 8'-0" AFF
1/2 " C
A
8' -0"
A
FF
1/2 " C
A
9' -0"
A
FF
1/2 " C
A
9' -0"
A
FF
1/2" CA @ 8'-0" AFF
1/2" CA @ 9'-0" AFF
A3 P-501
A3 P-501
A3 P-501
CONNECT NEW COMPRESSED AIR. MATCH EXISTING SUPPORT
STRUCTURE FOR NEW PIPING, SEE ELECTRICAL DRAWING E-502/A3.
CONNECT NEW COMPRESSED AIR FOR FUTURE EQUIPMENT. USE
ELECTRICAL SUPPORT STRUCTURE TO ATTACH NEW PIPING, SEE
ELECTRICAL DRAWING E-501/A3.
KEYNOTES
SCALE: NOT TO SCALE
P-101
PL
UM
BI
NG
F
LO
OR
P
LA
N
- C
ON
ST
RU
CT
IO
N
12908212
R. REES
R. VELAZQUEZ
PLUMBING FLOOR PLAN - CONSTRUCTION
SCALE: 1/4"=1'-0"
0 5' 1/4" = 1'-0"
10'
GRAPHIC SCALE
WORK LOCATION
P
N
M
7 6
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
CA @ 9'-0" AFF
CA @ 4' AFF (TYP.)
CA @ 9'-0" AFF
1/2" CA @ 9'-0"AFF
1/2" CA @ 9'-0" AFF
PLUMBING ISOMETRIC
SCALE: NOT TO SCALEC1
P-501
PL
UM
BI
NG
D
ET
AI
L -
IS
OM
ET
RI
C
12908213
R. REES
R. VELAZQUEZ
J. PADRO
AS NOTED
PLUMBING ISOMETRIC
SCALE: NOT TO SCALEC3
PLUMBING ISOMETRIC
SCALE: NOT TO SCALEA1
1/ 2"
D
RI
P
LE
G W
/ V
AL
VE
1/2"Ø CAP
BALL VALVE (TYP.)
1/ 2"
Ø
CA
A3 DETAIL - CA POINT OF USE STATION
SCALE: NOT TO SCALE
FILTER AND PRESSURE
REGULATOR. 0-125 PSIG
PRESSURE RANGE ADJUSTMENT,
5 MICRONS FILTER, 90 SCFM,
MANUAL DRAIN PLUG
P
PRESSURE INDICATOR, 125 PSI
MAX. OPERATING PRESSURE, 2"
Ø DIAL
9"
℄ @ 36" AFF
℄ @ 60" AFF
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
AutoCAD SHX Text
DEPARTMENT OF THE NAVY
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A
AutoCAD SHX Text B
AutoCAD SHX Text C
AutoCAD SHX Text D
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
CONSTR. CONTR. NO.
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
NAVFAC DRAWING NO.
AutoCAD SHX Text
NAVAL FACILITIES ENGINEERING COMMAND
AutoCAD SHX Text
DES
AutoCAD SHX Text
DRW
AutoCAD SHX Text
SYM
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
DATE
AutoCAD SHX Text
APPR
AutoCAD SHX Text
DRAWFORM REVISION: 24 JULY 2019
AutoCAD SHX Text
CHK
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FOR COMMANDER NAVFAC
AutoCAD SHX Text
OF
AutoCAD SHX Text
CP FEAD WO:
AutoCAD SHX Text
FRCE WO:
AutoCAD SHX Text
REVIEWED
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
FAC PLAN PROJ NO:
AutoCAD SHX Text
SHOP:
AutoCAD SHX Text
CAGE CODE:
AutoCAD SHX Text
FACILITIES INFRASTRUCTURE PLANNING & ENGINEERING BRANCH
AutoCAD SHX Text
MCAS CHERRY POINT, NC
AutoCAD SHX Text
U.S. MARINE CORPS AIR STATION, CHERRY POINT, NC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PROJECT STATION
AutoCAD SHX Text
A. PAU
AutoCAD SHX Text
J. PADRO
AutoCAD SHX Text
PE-22035
AutoCAD SHX Text 7357362
AutoCAD SHX Text
YA90005
AutoCAD SHX Text 94315
FL
E
E T
R E
A D
IN
E
S S
C E
N
TE
R E
A S
T
D E
S
IG
N L
A Y
O U
T
FO
R N
E W
H -5
3K E
Q U
IP
M
E N
T
06 AUG 2024
FINAL
DIVISION APPROVED
WHEN SIGNED
DISTRIBUTION STATEMENT D: DISTRIBUTION AUTHORIZED TO THE DEPARTMENT OF DEFENSE (DOD) AND U.S. DOD CONTRACTORS ONLY, VULNERABILITY INFORMATION, AUTHORIZATION DATE: SEE TITLE BLOCK DIGITAL SIGNATURE; OTHER REQUESTS SHALL BE REFERRED TO FLEET READINESS CENTER EAST, FACILITIES AND PLANT
PLANNING DIVISION (JC21000), CHERRY POINT NC 28533-0021. E-001
EL
EC
TR
IC
AL
N
OT
ES
, L
EG
EN
DS
A
BB
RE
VI
AT
IO
NS
12908214
E. LOVE
E. LOVE
J. PADRO
AS NOTED
ELECTRICAL DEMOLITION NOTES
GENERAL: DEMOLITION DRAWINGS ARE BASED ON EXISTING PLANS
AND FIELD INVESTIGATION PRIOR TO DEMOLITION.
CIRCUITING BEING REMOVED: EXISTING CIRCUITING BEING REMOVED
MUST BE REMOVED BACK TO THE LAST ACTIVE DEVICE OR PANEL.
WHEN REMOVING CIRCUITING TO THE PANEL, TURN OFF CIRCUIT
BREAKER AND LABEL CIRCUIT AS "SPARE"
CIRCUITING TO REMAIN: EXISTING CIRCUITING TO REMAIN MUST BE
REROUTED OR RECONNECTED, AS REQUIRED, WHERE AFFECTED BY
NEW WORK IN ORDER TO MAINTAIN CONTINUITY OF THE CIRCUIT.
REUSE OF EXISTING CIRCUITRY: EXISTING CIRCUITRY SERVING
LIGHTING FIXTURES AND/OR RECEPTACLES FOR A GIVEN AREA MUST
BE REUSED TO THE FULLEST EXTENT POSSIBLE TO SERVE THE NEW
LAYOUT. PROVIDE CIRCUIT MODIFICATIONS INDICATED OR AS
OTHERWISE REQUIRED TO MAINTAIN THE CONTINUITY OF EXISTING
CIRCUITS THAT REMAIN.
EXISTING CONDUIT: ALL EXISTING CONDUITS AND WIRING THAT WILL
NOT BE REUSED MUST BE REMOVED WHERE THEY WILL BE EXPOSED
UPON COMPLETION OF NEW WORK. EXISTING CONDUIT TO REMAIN
CONCEALED IN WALLS MUST BE ABANDONED. EXISTING CONDUIT TO
REMAIN BELOW FLOOR SLAB MUST BE CUT OFF ONE INCH BELOW
ROUGH FLOOR AND GROUTED FLUSH. ALL EXISTING WIRING IN
CONDUITS BEING ABANDONED MUST BE DISCONNECTED FROM
POWER SOURCE AND REMOVED.
REPAIR DAMAGE: EXERCISE CARE IN REMOVAL OF DEMOLITION ITEMS.
REPAIR, AT NO ADDITIONAL COST TO THE OWNER, ANY DAMAGE
CAUSED TO EXISTING CONSTRUCTION AND/OR EQUIPMENT TO
REMAIN.
ASSOCIATED APPURTENANCES: REMOVE ALL ELECTRICAL
APPURTENANCES (DISCONNECTS, STARTERS, WIRING, CONDUIT, ETC.)
ASSOCIATED WITH EQUIPMENT BEING REMOVED BY OTHERS.
KNOCKOUT PLUGS AND COVERS: ALL CONDUIT REMOVED MUST BE
REMOVED IN ITS ENTIRETY, INCLUDING FITTINGS, MOUNTING DEVICES,
MOUNTING HARDWARE, ETC. PROVIDE CONDUIT PLUGS AND BLANKS
FOR ALL OPENINGS CREATED BY THE REMOVAL OF CONDUIT. PROVIDE
BLANK COVER PLATES FOR ALL OPENED OUTLET BOXES CREATED BY
THE REMOVAL OF EQUIPMENT AND/OR DEVICES
DEMOLISHED MATERIALS: ALL MATERIALS REMOVED UNDER
DEMOLITION, NOT BEING RELOCATED OR DESIGNATED BEING TURNED
OVER TO THE OWNER, MUST BECOME THE PROPERTY OF THE
CONTRACTOR AND MUST BE REMOVED COMPLETELY FROM THE SITE.
SCHEDULE OUTAGES: ALL WORK AND ALL POWER OUTAGES IN THE
EXISTING BUILDING MUST BE SCHEDULED 28 DAYS IN ADVANCE AT
TIMES COORDINATED WITH THE CONTRACTING OFFICER.
NOTIFICATION: NOTIFY THE CONTRACTING OFFICER PRIOR TO
TURNING OFF ANY CIRCUITS.
GENERAL: UNLESS SPECIFICALLY INDICATED OTHERWISE, ALL WORK
SHOWN ON ELECTRICAL DRAWINGS IS NEW WORK BEING PROVIDED
UNDER THIS CONTRACT.
COORDINATION: COORDINATE AND COOPERATE WITH ALL TRADES ON
THE PROJECT. THE CONTRACTOR MUST REVIEW ALL CONTRACT
DOCUMENTS INCLUDING CIVIL, STRUCTURAL, ARCHITECTURAL
DRAWINGS AND SPECIFICATIONS. CONTRACTOR MUST COORDINATE
AND ADJUST ACCORDINGLY AS DIRECTED BY THE CONTRACTING
OFFICER.
AS-BUILT DRAWINGS: SECURE AN EXTRA SET OF ELECTRICAL
DRAWINGS BEING KEPT ON SITE AND MARK, DAILY, THE DRAWINGS IN
RED AS THE PROJECT PROGRESSES IN ORDER TO KEEP AN
ACCURATE RECORD OF ALL DEVIATIONS BETWEEN THE WORK SHOWN
ON THE DRAWINGS AND THE WORK WHICH IS ACTUALLY INSTALLED.
THESE MARKED DRAWINGS MUST REFLECT ANY AND ALL CHANGES
AND REVISIONS TO THE ORIGINAL DESIGN WHICH EXISTS IN THE
COMPLETED WORK. DELIVER THE MARKED DRAWINGS TO THE
ENGINEER AT PROJECT CLOSE-OUT.
TESTS: TEST ALL WIRING FOR CONTINUITY AND GROUNDS BEFORE
CONNECTING ANY FIXTURES OR DEVICES. PERFORM INSULATION
RESISTANCE TESTS ON ALL WIRING #6 OR LARGER TO INSURE THAT
ALL PORTIONS ARE FREE FROM SHORT-CIRCUITS AND GROUNDS.
INSPECTIONS: ARRANGE ALL NECESSARY INSPECTIONS. DELIVER ALL
REQUIRED INSPECTION CERTIFICATES TO THE CONTRACTING
OFFICER.
GROUNDING: PROVIDE GROUNDING IN ACCORDANCE WITH THE NEC
FOR THE ENTIRE ELECTRICAL SYSTEM INCLUDING EQUIPMENT
FRAMES CONDUITS, SWITCHES, CONTROLLERS, WIRE-WAYS, NEUTRAL
CONDUCTORS, AND OTHER EQUIPMENT. PROVIDE A GROUNDING
CONDUCTOR IN ALL POWER CONDUITS.
LABELS: PROVIDE LABELS FOR ALL BUSDUCT BREAKERS,
PANELBOARDS, CABINETS, SAFETY SWITCHES, MOTOR-DISCONNECT
SWITCHES, AND MOTOR CONTROLLERS. LABELS MUST BE MACHINE
ENGRAVED, LAMINATED PLASTIC, PERMANENTLY ATTACHED WITH
SELF-TAPPING SCREWS OR RIVETS. DO NOT USE SELF-ADHESIVE
LABELS. LABEL MUST INDICATE EQUIPMENT DESIGNATION AND
ASSOCIATED PANEL AND CIRCUIT THAT SERVES IT. REFER TO
LABELING DETAILS ON E-501.
COVERPLATE LABELING: LABEL ALL COVERPLATES PER DETAIL ON
SHEET E-501, IDENTIFYING CIRCUIT NUMBER AND PANELBOARD OF
CIRCUITS.
J-BOX LABELING: LABEL ALL JUNCTION BOXES WITH PERMANENT
MARKER IDENTIFYING CIRCUIT NUMBER AND PANELBOARD OF
CIRCUITS WITHIN.
PANEL DIRECTORY: PROVIDE TYPEWRITTEN PANELBOARD
DIRECTORY CARD IN EACH PANELBOARD WITH CIRCUIT LOAD
INFORMATION AND ROOM NUMBER CLEARLY IDENTIFIED. USE ACTUAL
ROOM NUMBERS IN THE BUILDING, NOT THE ROOM NUMBERS SHOWN
ON THE CONTRACT DRAWINGS, AS THEY ARE OFTEN DIFFERENT.
CONDUCTORS AND MATCHING LUGS: IN SITUATIONS WHERE
CONDUCTOR SIZES AND/OR QUANTITIES OF PARALLEL SETS HAVE
BEEN INCREASED DUE TO VOLTAGE DROP OR FOR OTHER REASONS,
CONTRACTOR MUST PROVIDE THE APPROPRIATE LUG
SIZES/QUANTITIES WITHIN THE EQUIPMENT CONNECTED
(SWITCHBOARD, PANELBOARD, DISCONNECT SWITCH, TRANSFER
SWITCH ETC.) TO PERMIT SATISFACTORY CONNECTION OF THE
INDICATED CONDUCTORS. WHERE SUFFICIENT LUG SIZES AND/OR
QUANTITIES CANNOT BE PROVIDED TO ACCOMMODATE THE
CONDUCTORS INDICATED, THEN PROVIDE REDUCING ADAPTERS, PIN
TERMINALS, OR A JUNCTION BOX TO SPLICE LARGER CONDUCTORS
TO APPROPRIATELY SIZED SMALLER CONDUCTORS TO FIT INTO THE
LUGS PROVIDED. ALL CONDUCTORS MUST BE SIZED IN ACCORDANCE
WITH THE NEC.
MOTOR COORDINATION: MOTORS, MOTOR STARTERS, CONTROLLERS,
INTEGRAL DISCONNECT SWITCHES, AND CONTACTORS MUST BE
PROVIDED WITH THEIR RESPECTIVE PIECES OF EQUIPMENT BY THE
EQUIPMENT SUPPLIER. COMMUNICATE WITH THE TRADES PROVIDING
THE EQUIPMENT, VERIFYING ALL REQUIREMENTS, PROVIDE ALL
ELECTRICAL CONNECTIONS REQUIRED THEREIN, AND INSTALL MOTOR
STARTERS.
MOTOR DISCONNECTS: ALL MOTORS MUST HAVE DISCONNECTING
MEANS.
MOTOR FUSE PROTECTION: WHERE FUSE PROTECTION IS
SPECIFICALLY REQUIRED BY THE EQUIPMENT MANUFACTURER,
PROVIDE FUSED SWITCHES IN LIEU OF NON-FUSED SWITCHES OR IN
LIEU OF ENCLOSED CIRCUIT BREAKERS, OR OTHER DEVICES
INDICATED.
CONNECTION DETAILS: SECURE APPROVED SHOP DRAWINGS
SHOWING WIRING DIAGRAMS, ROUGH-IN AND HOOK UP DETAILS FROM
OTHER INVOLVED CONTRACTORS FOR EQUIPMENT WHICH MUST BE
CONNECTED ELECTRICALLY.
COORDINATION DETAILS: MECHANICAL EQUIPMENT WILL BE
FURNISHED AND INSTALLED BY THE MECHANICAL CONTRACTOR. THE
LOCATIONS SHOWN ON THE ELECTRICAL DRAWINGS ARE
APPROXIMATE. COORDINATE WITH THE MECHANICAL CONTRACTOR TO
DETERMINE THE EXACT LOCATION OF EACH PIECE OF EQUIPMENT
AND DETERMINE THE EXACT ROUGH-IN AND CONNECTION
REQUIREMENTS.
WORKING CLEARANCE: COORDINATE FINAL LOCATIONS OF
ELECTRICAL EQUIPMENT WITH MECHANICAL DUCTWORK, PIPING ETC.
AND ASSURE WORKING CLEARANCE REQUIRED BY NEC WILL BE MET.
SUFFICIENT ACCESS AND WORKING SPACE MUST BE PROVIDED AND
MAINTAINED AROUND ELECTRICAL EQUIPMENT AS REQUIRED BY THE
NATIONAL ELECTRICAL CODE. CONTRACTOR MUST COORDINATE FINAL
LOCATION OF EQUIPMENT PROVIDED AND INSTALLED BY OTHER
TRADES.
STARTER MOUNTING: WHERE AN INDIVIDUALLY MOUNTED SAFETY
SWITCH, STARTER OR CIRCUIT BREAKER IS SHOWN ADJACENT TO ITS
RESPECTIVE LOAD AND NOT MOUNTED ON A WALL, PROVIDE ALL
SUPPORTS, BRACKETS, ANCHORING, ETC. NECESSARY TO PROPERLY
SUPPORT THE DEVICE.
LIGHTING ARRANGEMENT: ARRANGE LIGHTING FIXTURES IN
ACCORDANCE WITH THE ARCHITECTURAL REFLECTED CEILING PLANS.
LIGHTING COORDINATION: COORDINATE LIGHTING FIXTURES WITH
GRILLES, DIFFUSERS, SPRINKLER HEADS, AND ACCESS PANELS, ETC.
PROVIDE FIXTURE MOUNTING BRACKETS, ACCESSORIES, PLASTER
FRAMES, ETC.. SUITABLE FOR THE CEILING TYPES INDICATED ON THE
ARCHITECTURAL PLANS.
MATERIAL COORDINATION: VERIFY CEILING AND WALL
CONSTRUCTION AND MATERIAL PRIOR TO ORDERING LIGHT FIXTURES
OR OTHER DEVICES TO INSURE PROPER FIXTURE OR DEVICE IS
FURNISHED TO MATCH CONSTRUCTION.
MOUNTING HEIGHTS: MOUNTING HEIGHTS INDICATED ARE FROM THE
FINISHED FLOOR TO THE CENTERLINE OF THE WIRING DEVICE UNLESS
OTHERWISE NOTED. MOUNTING HEIGHTS OF LIGHTING FIXTURES ARE
TO THE BOTTOM OF THE FIXTURE UNLESS OTHERWISE NOTED.
DEVICE LOCATIONS: COORDINATE LOCATIONS OF SWITCHES,
RECEPTACLES, AND TELE/DATA OUTLETS WITH OTHER WALL
MOUNTED DEVICES SUCH AS THERMOSTATS AND CONTROL STATIONS.
FIRE STOPPING: FOR ANY WALL OR FLOOR PENETRATIONS THROUGH
FIRE-RATED STRUCTURES PROVIDE FIRE-STOPPING TO SEAL ALL THE
PENETRATIONS AFTER THE CONDUIT HAS BEEN INSTALLED. FIRE
STOPPING FOR PENETRATIONS MUST BE UL APPROVED PER THE
PENETRATION MADE IN ORDER TO MAINTAIN FIRE-RATED INTEGRITY
OF THE STRUCTURE.
CLEAN UP: ON PROJECT CLOSE-OUT CLEAN ALL ELECTRICAL DEVICES,
LIGHTING FIXTURES AND LENSES, AND REMOVE ALL PAINT SPATTERS
FROM DEVICES, FIXTURES AND PLATES. REPLACE ALL INOPERATIVE
FIXTURES.
FIRE ALARM COORDINATION: THE ELECTRICAL CONTRACTOR MUST
COORDINATE WITH THE FIRE ALARM SYSTEM PROVIDER AND PROVIDE
POWER CONNECTIONS TO ALL COMPONENTS WHETHER SHOWN OR
NOT. MANUFACTURERS REQUIRE VARYING QUANTITIES OF POWER
CONNECTIONS FOR EQUIPMENT LIKE EXPANDER PANELS AND POWER
SUPPLIES. THESE DEVICES ARE DEPENDENT UPON THE SPECIFIC
MANUFACTURERS SYSTEM. THE FIRE ALARM SYSTEM SUPPLIER MUST
NOTIFY THE OTHER APPROPRIATE SUB-CONTRACTORS ABOUT THESE
REQUIREMENTS AND CONNECTION MUST BE PROVIDED AS PART OF
THE PROJECT.
ABBREVIATIONS
A AMPERE
AFF ABOVE FINISHED FLOOR
AIC AMPERE INTERRUPTING CAPACITY
BFC BELOW FINISHED CEILING
C CONDUIT
CKT CIRCUIT
CB CIRCUIT BREAKER
EBU EMERGENCY BATTERY UNIT
EF EXHAUST FAN
EQUIP EQUIPMENT
ETR EXISTING TO REMAIN
EXIST EXISTING
FLA FULL LOAD AMPS
GFI GROUND FAULT INTERRUPTER
GND GROUND
HP HORSE POWER/HEAT PUMP
KAIC THOUSAND AMPERE
INTERRUPTING CAPACITY
KVA KILO-VOLT-AMPERES
KW KILO-WATTS
LTG LIGHTING
MCA MINIMUM CIRCUIT AMPS
MCB MAIN CIRCUIT BREAKER
MFR MANUFACTURER
MTD MOUNTED
NEC NATIONAL ELECTRICAL CODE
NF NON-FUSED
NIC NOT IN CONTRACT
NTS NOT TO SCALE
P POLE
PNL PANEL
PNLBD PANELBOARD
PH PHASE
RECEPT RECEPTACLE
REQ'D REQUIRED
TYP TYPICAL
UON UNLESS OTHERWISE NOTED
V VOLT
W WATTS/WIRE
WP WEATHERPROOF
GENERAL ELECTRICAL NOTES
LIGHTING FIXTURE. SURFACE MOUNTED
LIGHTING FIXTURE TYPE SYMBOL. SEE LIGHTING FIXTURE DETAILS.
TOGGLE SWITCH, 20A, 120/277V, 46" AFF UON
JUNCTION BOX
MOTOR CONNECTION
ELECTRICAL PANELBOARD
ELECTRICAL CIRCUIT RUN IN CONDUIT AND CIRCUIT HOMERUN TO
PANELBOARD (PANEL AND CIRCUIT DESIGNATION AS INDICATED). AS A
MINIMUM CONDITION, EACH SINGLE PHASE CIRCUIT MUST…
This is the start of the file's text. The full file is on GovTribe.