This document provides an Environmental Mitigation and Monitoring Plan (EMMP) template for the construction of two USAID residences in Gaborone, Botswana. The EMMP identifies environmental aspects and potential impacts from project activities including site establishment, demolition of existing structures, and site works and building construction. Mitigation measures are proposed for impacts such as asbestos pollution, noise, dust, erosion, spills, waste management, impacts to fauna and flora, use of fill material and water, and worker health and safety. Monitoring indicators and responsibilities are defined for each measure. The purpose of the EMMP is to ensure appropriate mitigation is incorporated and monitored during project implementation.

The related federal contract opportunity is a solicitation to demolish two existing USAID residences and construct two new staff residences in Gaborone, Botswana. The solicitation number is 72067419R00024 and was issued by the US Agency for International Development South Africa. The description notes the solicitation has been amended to respond to questions and update attachments. No further details are provided on response dates, award dates, pricing or other contract terms.

J.06 Environmental Mitigation and Management Plan Template

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENVIRONMENTAL MITIGATION AND MONITORING PLAN (EMMP)

Project/Activity Data

Project/Activity Name:
Construction of two USAID houses in Botswana
Geographic Location(s) (Country/Region):
Gaborone, Botswana, Southern Africa
Implementation Start/End Dates:
September 2019 – September 2020
Contract/Award Number:
TBD
Implementing Partner(s):
TBD
Tracking ID:
Not Applicable
Tracking ID/link of Related IEE:
Not Applicable
Tracking ID/link of Other, Related Analyses:
Not Applicable

Organizational/Administrative Data Implementing Operating Unit(s):

(e.g. Mission or Bureau or Office)

USAID Southern Africa

Lead BEO Bureau:
Africa Bureau
Prepared by:
Leonie Jacobs
Date Prepared:
07/02/2019
Submitted by:
Leonie Jacobs
Date Submitted:
07/02/2019

Environmental Compliance Review Data

Analysis Type:
EMMP
Additional Analyses/Reporting Required:
EMMR

[Add others as appropriate]

Purpose Environmental Mitigation and Monitoring Plans (EMMPs) are required for USAID-funded projects when the 22CFR216 documentation governing the project (e.g. the Initial Environmental Examination (IEE)) imposes mitigation measures on at least one project or activity. EMMPs ensure that the ADS 204 requirements for incorporating and monitoring appropriate mitigative measures into project or activity design. Responsibility for developing the EMMP lies with USAID, but EMMPs are usually prepared by the Implementing Partner (IP). EMMPs are typically conducted after the IEE is complete, though they may be completed as part of the IEE. EMMPs are a vehicle for translating applicable IEE conditions and mitigation measures into specific, implementable, and verifiable actions.

An EMMP is an action plan that clearly defines:

1. Mitigation measures. Actions that reduce or eliminate potential negative environmental impacts resulting directly or indirectly from a particular project or activity, including environmental limiting factors that constrain development.

2. Monitoring indicators.[footnoteRef:1] Criteria that demonstrate whether mitigation measures are suitable and implemented effectively. [1: Note: Monitoring indicators differ from performance indicators, which are the measures that USAID uses to detect progress towards the results included in a Results Framework.]

3. Monitoring/reporting frequency. Timeframes for appropriately monitoring the effectiveness of each specific action.

4. Responsible parties. Appropriate, knowledgeable positions assigned to each specific action.

USAID Approval of EMMP [The routing process and associated signature blocks may be customized by Bureau or Mission. Please follow Bureau- or Mission-specific guidance. Include signature blocks in accordance with Bureau and/or Mission policy. At a minimum include the noted required signatures. Add other signatures as necessary.] Approval:

[NAME], Activity Manager/A/COR [required]

Date

Clearance:

[NAME], Mission Environmental Officer [as appropriate]

Date

Clearance:

[NAME], Regional Environmental Advisor [as appropriate]

Date

Concurrence:

[NAME], ________ Bureau Environmental Officer [as appropriate]

Date

DISTRIBUTION: [Distribution lists may be customized by Bureau or Mission. Please follow Bureau- or Mission-specific guidance.]

1.0 Project/Activity Summary

The activity entails the demolition of two existing USAID-owned residences and construction of two new staff residences in Gaborone, Botswana.

The construction activities include:

· Demolition of house at 3064 Marakanelo Way, Gaborone, Botswana

· Demolition of house at 2483 Tshekedi Crescent, Gaborone, Botswana

· Construction of new boundary wall and gatehouse at 2483 Tshekedi Crescent, Gaborone, Botswana

· Construction of two new residences at 2483 Tshekedi Crescent, Gaborone, Botswana Construction activities at each residence include:

· Site Clearance

· Installation of soil drainage and water reticulation

· Construction of screen walls

· Construction of swimming pool

· Construction of driveways and communal roadway entrance

· Construction of double-storey residence with a floor area of approximately 540m2.

· Installation and establishment of landscaping

BUREAU/MISSION/Project USAID 216 ACRO Template Version 2, March 2018

BUREAU/MISSION/PROJECT

USAID 216 EMMP Template Version 2, March 2018

3.0 EMMP Table for CONSTRUCTION OF TWO USAID RESIDENCES IN GABORONE

Project/Activity/Sub-Activity
Identified Environmental Aspects or Impacts
Mitigation Measure(s)

Include: Responsible party, timing of mitigation with the project life cycle.

Monitoring Indicator(s)
Monitoring and Reporting Frequency
Responsible Parties

Activity Category 1: Site establishment

Site Ablutions
Provide adequate number of ablution facilities on site. Ensure regular cleaning and servicing.
Agreement and service records from supplier.
Weekly
Site supervisor

Activity Category 2: Demolition of existing structures

Asbestos pollution
To mitigate the effect of possible asbestos pollution from demolition activities.
Noise Annoyance
Noise to be managed primarily though administrative and equipment controls during the construction phase.
Complaints from adjacent premises or community.
Daily
Site supervisor
Excessive Dust
Dust issues to be managed by emission control at source, and administration controls during works.
Complaints from adjacent premises or community.
Daily
Site supervisor
Building rubble generated by demolition and subsequent building activities
To minimize the production of building rubble waste generated by demolition activities, Contractor should identify reusable and recyclable materials and describe the process in the Contractor Environmental Management plan.
Monthly reports.
Monthly
Site supervisor

Activity Category 3: Site works and building works

Noise Annoyance
Noise to be managed primarily though administrative and equipment controls during the construction phase.
Complaints from adjacent premises or community.
Daily
Site supervisor
Dust
Dust issues to be managed by emission control at source, and administration controls during works.
Complaints from adjacent premises or community.
Daily
Site supervisor
Erosion
Ensure that direct disturbances are limited to the works area and that secondary impacts do not impact adjacent areas.
Significant riling of soil rainfall events.
After significant rainfall episodes
Site supervisor
Oil and noxious substances
Spills of noxious substances to be minimized. Appropriate training and resources for spill response to be provided.
Statistics indicated on monthly SHEQ reports
Daily inspection

Monthly reporting Site supervisor

Housekeeping and Wastes
Minimize environmental impacts through appropriate controls.
% volume full of waste bins/time to next service
Daily inspection of work site.
Site supervisor
Fauna
To minimize the impact of fauna.
No injury or death caused to fauna.
Daily inspection of works site.
Site supervisor
Native vegetation
To minimize the disturbance to existing flora and minimize the introduction and/or spread of weed species
No disturbance to existing flora outside of work area.
Daily inspection of work site and site boundary.
Site supervisor
Import of fill material from commercial sources
Avoid importation of fill material from unauthorized commercial sources.
Lack/Presence of mining certificate from commercial quarry used
After each fill material delivery.
Site supervisor
Use of water for construction purposes
Ensure water used for construction purposes is obtained from authorized sources
Documentation proving origin of supply
After each delivery
Site supervisor
Worker management
Minimize adverse impact on the health and wellbeing of workers employed on the construction site by providing good working conditions, protecting workers’ labor rights and not expose workers to unnecessary health and safety risks. Full mitigation measures to be set out in the project health and safety plan.
No incidents reported in Health and Safety report.
Monthly report.
Site supervisor

OFFEROR TO ADDRESS EACH IDENTIFIED ENVIRONMENTAL ASPECT ACCORDING TO THE AREAS IDENTIFIED IN THE SAMPLE SHEET BELOW.

EXCESSIVE DUST

Objective(s)
1. To minimize the impacts of dust on the surrounding areas.
Management Strategy
Dust issues managed principally by emission controls at source, and administrative controls during works.
Responsibility
Timing
Control(s)
Area to be disturbed minimized as far as possible. Areas to be cleared approved by Project Manager.

Where dust is identified as an issue, dust control measures will be implemented. These will primarily be the use of water carts but may include surface treatments.

Vehicle movements controlled (Traffic Management Plan) and kept on established tracks and haul roads.

Dust awareness issues in environmental induction process.

Site supervisor
Daily
Performance Indicator(s)
No complaints from adjacent premises and/or community.

Site supervisor

Daily

Monitoring
Daily inspection of work sites to occur, including:

· Visual check for dust crossing the site boundaries

· Visual check of high potential dust areas such as stockpiles, and operational areas.

Site supervisor

Daily

Reporting
Any complaints or incidents to be reported to USAID project manager.

Site supervisor

Within 24 hours of incident

Corrective Action(s)
Investigate cause of excessive dust.

Implement corrective measures immediately (e.g. water carts) Implement corrective measures prior to the recommencement of site works Implement administrative controls if required, such as rescheduling of dust generating activities to more favorable weather conditions.

Site supervisor

As soon as excessive dust is observed.