This is a request for proposal from the US Agency for International Development Malawi seeking proposals to construct 18 community day secondary schools across Malawi. USAID anticipates awarding up to four firm fixed price contracts divided into four lots based on geographical areas.

Lots A1 and A2 comprise two large lots of 19-20 schools each set aside for Malawian firms. Lots B1 and B2 comprise two small lots of six schools each open to international competition but requiring the prime contractor be a Malawian firm. Offerors may bid on one or both lots in either group. The contracts cover a 25-month period of performance including 13 months for construction and a 12-month warranty period. Proposals are due by the date specified in Section L and will remain valid for 120 days. USAID may award the two group A lots to one or two separate offerors and will award the two group B lots to two separate offerors.

View the file

Other files for this federal contract opportunity

Other files attached to Secondary Education Expansion for Development (SEED) Rural Group 2 Activity, newest first.
File Type Posted
J.2 Lot B2_Therere_Amendment 02.pdf PDF
J.2 Lot B1_Chunzu_Amendment 02.pdf PDF
J.2 Lot A2_Mlindi_Amendment 02.pdf PDF
J.2 Lot A2_Kalira_Amendment 02.pdf PDF
J.2 Lot A2_Mkombe_Amendment 02.pdf PDF
J.2 Lot A2_Tambala_Amendment 02.pdf PDF
J.2 Lot A2_Dzundu_Amendment 02.pdf PDF
J.2 Lot A2_Nthulu_Amendment 02.pdf PDF
J.2 Lot A1 _Kanyazuka_Amendment 02.pdf PDF
J.2 Lot A1 _Mayoka_Amendment 02.pdf PDF
J.2 Lot A1 _Bula_Amendment 02.pdf PDF
J.2 _Utility Drawings_Amendment 02.pdf PDF
J.2 Lot B1_Kazira_Amendment 02.pdf PDF
J.2 Lot A2_Chitimbe_Amendment 02.pdf PDF
J.2 Lot A1 _Chuba_Amendment 02.pdf PDF
SRG2 Pre-Bid Meeting Presentation_Final.pdf PDF
L3.B (Template 3.B) - Past Performance Questionnaire.docx DOCX document
J6 NKHATABAY ESMP REPORT.pdf PDF
J6 NENO ESMP REPORT.pdf PDF
J6 NTCHEU ESMP REPORT.pdf PDF
J6 THYOLO ESMP REPORT.pdf PDF
J4 Lot A2 SEED BOQ UNPRICED.xls XLS spreadsheet
J.2 Site Packages Lot B2 SEED_Mulonda.pdf PDF
J.2 Site Packages Lot B1 SEED_Kazira.pdf PDF
J.2 Site Packages Lot B1 SEED_Lipunga.pdf PDF
J.2 Site Packages Lot B1 SEED_Gumulira.pdf PDF
J.2 Site Packages Lot A2 SEED_Lulanga.pdf PDF
J.2 Site Packages Lot A1 SEED_Chuba.pdf PDF
J.2 Site Packages Lot A1 SEED_Bundi.pdf PDF
J2 SEED Procurement_Utility Drawings.pdf PDF
RFP No. 72061222R00005 SEED Rural Group 2.pdf PDF
J6 DOWA ESMP REPORT.pdf PDF
L1.B (Template 1.B) - Financial Questionnaire.docx DOCX document
L1.C (Template 1.C) - Surety Form.docx DOCX document
J10 Bank Guarantee Template SRG2 final.pdf PDF
J8. PM Plan Template SRG2 FINAL.docx DOCX document
J6 MANGOCHI ESMP REPORT.pdf PDF
J6 NSANJE ESMP REPORT.pdf PDF
J4 Lot A1 SEED BOQ UNPRICED.xls XLS spreadsheet
J4 Lot B2 SEED BOQ UNPRICED.xls XLS spreadsheet
J.2 Site Packages Lot B2 SEED_Therere.pdf PDF
J.2 Site Packages Lot A2 SEED_Khotekhote.pdf PDF
J.2 Site Packages Lot A2 SEED_Chiwambe.pdf PDF
J.2 Site Packages Lot A2 SEED_Luwalika.pdf PDF
J.2 Site Packages Lot A2 SEED_Mandimba.pdf PDF
J.2 Site Packages Lot A2 SEED_Mlindi.pdf PDF
J.2 Site Packages Lot A2 SEED_Kalira.pdf PDF
J.2 Site Packages Lot A2 SEED_Demera.pdf PDF
J.2 Site Packages Lot A2 SEED_Mkombe.pdf PDF
J.2 Site Packages Lot A2 SEED_Mtimabi.pdf PDF
Show all 50

Secondary Education Expansion for Development (SEED) Rural Group 2 Activity has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED)

NSANJE - BWANGU

PLOTTED: 6/10/2022 3:41:23 AM Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_G-001.DWG

THE CONTENTS OF THIS DOCUMENT ARE THE SOLE RESPONSIBILITY OF

THE CONTRACTOR AND DO NOT NECESSARILY REFLECT THE VIEWS OF

USAID OR THE UNITED STATES GOVERNMENT.

THE DRAWINGS CONTAINED HEREIN WERE DEVELOPED BY TETRA TECH

INC, MARLBOROUGH, MA UNDER CONTRACT NO. AID-OAA-I-15-00052,

TASK ORDER NO. 72061219F00002.

TETRA TECH

SEED CONTRACT MANAGEMENT CONSULTANT

SEED RURAL GROUP 2 CONSTRUCTION SERVICES

LOT B2

LATITUDE: -16.764443°

LONGITUDE: 35.047123°

AMENDMENT 02

10 JUNE 2022

FOR PROCUREMENT 23 FEBRUARY 2022

AutoCAD SHX Text

GENERAL NOTES:

1. THESE DRAWINGS AND THE TECHNICAL

SPECIFICATIONS TOGETHER DESCRIBE THE WORK TO

BE PERFORMED. IN THE CASE OF CONFLICT BETWEEN

THE DRAWINGS AND THE SPECIFICATIONS, THE

REQUIREMENTS OF THE SPECIFICATIONS SHALL TAKE

PRECEDENCE.

2. IN CASE OF CONFLICT WITHIN THE DRAWINGS, THE

FOLLOWING PRECEDENCE SHALL APPLY: SCHEDULES

AND NOTES OVER LARGE-SCALE GRAPHICAL DETAILS

OVER SMALL-SCALE GRAPHICAL DETAILS.

3. ANY DISCREPANCY DISCOVERED WITHIN THE PLANS

AND SPECIFICATIONS SHALL BE BROUGHT TO THE

ATTENTION OF THE ENGINEER OR USAID USING

PROCEDURES DEFINED IN THE CONTRACT.

4. LEVELS AND DIMENSIONS SHALL BE CHECKED BEFORE

ANY WORK COMMENCES.

5. ANY MENTION OF APPROVAL REQUIREMENTS BY THE

ENGINEER SHALL BE CONSTRUED TO MEAN APPROVAL

IN ACCORDANCE WITH THE REQUIREMENTS OF THE

CONTRACT. APPROVAL THAT REQUIRES A SHOP

DRAWING OR SUBMITTAL MUST BE DONE IN

ACCORDANCE WITH THE CONTRACT.

6. THE ENGINEER SHALL BE GIVEN AT LEAST 24 HOURS

NOTICE OF WORK PLANNED OR IN-PLACE AND

REQUIRING INSPECTION OR TESTING. THE ENGINEER

MAY AT THEIR DISCRETION ON A CASE-BY-CASE BASIS

REQUIRE ADDITIONAL NOTICE WHERE ADDITIONAL

TRAVEL TIME IS REASONABLY REQUIRED.

7. CONTRACTOR SHALL INSTALL AND MAINTAIN

CONSTRUCTION PERIMETER FENCE AND PROVIDE

24-HOUR SITE SECURITY FOR THE DURATION OF THE

CONSTRUCTION PERIOD OF PERFORMANCE. THE FINAL

ALIGNMENT OF THE CONSTRUCTION PERIMETER FENCE

SHALL BE CONFIRMED WITH THE ENGINEER PRIOR TO

INSTALLATION.

8. THE CONTRACTOR SHALL ESTABLISH A CONSTRUCTION

ACCESS ROAD OR ROADS AS SHOWN ON THE PLANS

AND ALIGNMENT AGREED WITH THE ENGINEER. THE

CONTRACTOR MUST COORDINATE WITH THE

COMMUNITY ON THE OFF-SITE ACCESS ROUTE (ROAD

CONNECTING THE PROJECT PROPERTY WITH PUBLIC

ROAD). THE COMMUNITY IDENTIFIED THE ACCESS

ROUTE DURING DESIGN AS INDICATED IN THE

DRAWINGS, HOWEVER, THE CONTRACTOR SHALL

CONFIRM AND OBTAIN PERMISSION FROM COMMUNITY.

9. THE CONSTRUCTION GATE TO THE SITE SHALL BE AT

THE PROJECT PROPERTY LIMITS AND NOT ON

NEIGHBORING PROPERTIES.

10.PROJECT SIGN BOARD, TRAFFIC CONTROL SIGNAGE,

HEALTH AND SAFETY SIGNAGE, AND OTHER NOTICES

REQUIRED DURING CONSTRUCTION MUST BE INSTALLED

AND MAINTAINED AT EACH SITE BY THE CONTRACTOR

FOR THE DURATION OF THE PROJECT. ALL

CONSTRUCTION SIGNAGE MUST BE REMOVED AT

DEMOBILIZATION UNLESS OTHERWISE INSTRUCTED BY

THE ENGINEER.

11.A SHOP DRAWING OF THE PROJECT SIGN BOARD SHALL

BE SUBMITTED FOR USAID APPROVAL PRIOR TO

FABRICATION AND INSTALLATION. THE SHOP DRAWING

SHALL FOLLOW THE PROJECT SIGN BOARD TEMPLATE

PROVIDED IN THE DRAWINGS. THE ENGINEER MUST

APPROVE LOCATION OF PROJECT SIGN BOARD

12.THE CONTRACTOR SHALL INSTALL A SCHOOL PLAQUE

ON THE SCIENCE CLASSROOM, OR OTHER LOCATION

SPECIFIED BY USAID; USAID WILL PROVIDE THE PLAQUE

FOR EACH SCHOOL.

13.SANITATION FACILITIES MUST BE PROVIDED AND

MAINTAINED ON SITE FOR CONTRACTOR'S AND

SUBCONTRACTOR PERSONNEL AT EACH SITE

THROUGHOUT THE CONSTRUCTION PERIOD OF

PERFORMANCE.

14.NO BURNING OF WASTE OR ANY MATERIAL IS ACCEPTED

ON SITE PER MALAWI ENVIRONMENT PROTECTION

AUTHORITY(MEPA) GUIDELINES.

15.THE CONTRACTOR MUST COORDINATE WITH

COMMUNITY FOR USE OF ANY EXISTING BOREHOLE(S)

NEAR THE SITE, IF ANY. CONTRACTOR IS RESPONSIBLE

TO REPAIR ANY DAMAGE TO THE EXISTING

BOREHOLE(S) CAUSED BY CONTRACTOR USE.

CONTRACTOR RESPONSIBLE FOR ANY WATER USAGE

FEE.

GENERAL SITE CONDITION NOTES:

1. SITE CONDITIONS MAY VARY FROM THE DRAWINGS.

CONTRACTOR MUST FAMILIARIZE THEMSELVES WITH

EXISTING SITE CONDITIONS AND NOTIFY USAID OF

SIGNIFICANT VARIATIONS. MINOR MODIFICATIONS TO

SITE LAYOUT AND ORIENTATION OF BUILDING, LATRINES

AND BOREHOLE SHALL BE DONE AT NO ADDITIONAL

COST TO USAID. ANY MODIFICATION MUST BE

APPROVED BY THE ENGINEER.

2. TRIAL PITS WERE EXCAVATED DURING DESIGN PHASE

TO 2.5 M DEPTH BELOW EXISTING GRADING. GENERAL

SOIL CONDITIONS OBSERVED ARE NOTED IN THE

SITE-SPECIFIC EXISTING CONDITIONS SHEETS.

3. BENCHMARKS AND PROPERTY CORNERS WERE

SURVEYED PRIOR TO CONSTRUCTION. THE

CONTRACTOR MAY BE REQUIRED TO RE-ESTABLISH THE

BENCHMARK AS PART OF THE SETTING OUT AND SITE

LAYOUT WORK AT NO ADDITIONAL COST TO USAID.

GENERAL SETTING OUT & SITE LAYOUT NOTES:

1. NO SURVEY BEACONS, BENCHMARKS OR BOUNDARY

PEGS AND THE LIKE MAY BE REMOVED OR DAMAGED IN

ANY WAY BY THE CONTRACTOR OR ANY ONE ON SITE.

2. THE MAJOR GRIDLINES AS WELL AS THE OVERALL

OUTLINE OF ALL THE WORKS MUST BE SET OUT

ACCORDING TO THE ENGINEERS DRAWINGS, AND

WRITTEN APPROVAL BY THE ENGINEER MUST BE GIVEN

AS PERMISSION TO PROCEED WITH ANY WORKS. ANY

DISCREPANCIES OR AMBIGUITIES RELATING TO THE

ABOVEMENTIONED MUST BE BROUGHT TO THE

ATTENTION OF THE ENGINEER IMMEDIATELY BY MEANS

OF A RFI (REQUEST FOR INFORMATION).

3. TOLERANCES, UNLESS OTHERWISE INDICATED ON

SPECIFICATIONS AND/OR DRAWINGS, WILL BE TO LEVEL

II ACCORDING TO S.A.B.S. 1200.

4. CONTRACTOR SHALL LAYOUT THE SITE FOLLOWING THE

DRAWINGS AND IN COORDINATION WITH USAID. THE

CONTRACTOR MAY BE REQUIRED TO MAKE MINOR

MODIFICATIONS TO BUILDING, LATRINE AND BOREHOLE

ORIENTATION AT NO ADDITIONAL COST TO THE

CONTRACT, DURING SETTING OUT OF THE SITE LAYOUT

IF DEEMED NECESSARY BY USAID BASED ON EXISTING

CONDITIONS ON THE SITE OR OTHER CONSTRAINTS.

MINOR LAYOUT ADJUSTMENTS MAY TAKE PLACE TO

AVOID CUTTING TREES OR VEGETATION. ADJUSTMENTS

WILL BE DONE IN A MANNER NOT TO INCREASE

EARTHWORK OR PROJECT COST.

5. CONTRACTOR SHALL MAINTAIN SEPARATION BETWEEN

PROPOSED SEED RURAL BUILDINGS AND ANY

EXISTING/ABANDONED BUILDINGS ON SITE. THE

CONTRACTOR SHALL PROTECT EXISTING STRUCTURES

ON SITE UNLESS IDENTIFIED FOR REMOVAL.

6. TREES WITHIN THE GRADING LIMITS ARE TO BE

REMOVED UNLESS THE SITE GRADING CAN BE DONE

WITHOUT SIGNIFICANT IMPACT TO THE TREES. ALL

TREES TO BE REMOVED MUST BE CONFIRMED BY THE

ENGINEER PRIOR TO CUTTING THE TREE. THE INTENT IS

TO MINIMIZE REMOVAL OF TREES, SHRUBS, AND

VEGETATION TO THE EXTENT FEASIBLE TO COMPLETE

THE WORK. TREES AND ROOTS MUST BE REMOVED

FROM AND AROUND ALL PROPOSED BUILDING

LOCATIONS. TREES TO BE REMOVED MUST BE

IDENTIFIED AND MARKED BY THE CONTRACTOR PRIOR

TO REMOVAL

7. SHOULD THE CONTRACTOR ENCOUNTER HARD ROCK

DURING TRIAL PIT EXPLORATION FOR THE LATRINE PITS,

THE CONTRACTOR SHALL NOTIFY USAID AND DESCRIBE

THE CONDITIONS. TOGETHER WITH USAID, THE

CONTRACTOR MUST IDENTIFY A NEW LOCATION FOR

THE LATRINE THAT MEETS THE SITE LAYOUT

CONDITIONS OF OFFSET BETWEEN BUILDINGS,

DISTANCE FROM WATER SOURCES, AND DOWNWIND OF

CLASSROOMS. LATRINE TEST PITS SHALL BE

CONSIDERED INCIDENTAL TO LATRINE CONSTRUCTION.

8. THE CONTRACTOR MUST PROVIDE TOOLS AND

EQUIPMENT TO EXCAVATE WEATHERED ROCK FOUND IN

PIT LATRINES AND/OR BUILDING FOUNDATIONS.

MECHANICAL TOOLS AND EQUIPMENT MAY BE

REQUIRED AT SOME OF THE SITES TO COMPLETE

LATRINE PIT EXCAVATION.

9. SHOULD A LATRINE LOCATION NEED TO BE CHANGED,

LATRINES SHALL BE PLACED AT LEAST 30 METERS FROM

EXISTING AND/OR PROPOSED BOREHOLES AND AN

ACCEPTABLE DISTANCE FROM BUILDINGS.

10.CONTRACTOR SHALL COORDINATE LOCATION OF THE

LATRINE RAMPS WITH USAID AND SHALL TAKE INTO

ACCOUNT THE SITE DRAINAGE, GRADING, AND

ACCESSIBILITY.

11.TOPSOIL IN THE COMPACTED EARTHEN PATHWAY SHALL

BE REMOVED AND REPLACED WITH THE LOWEST

PLASTICITY MATERIAL AVAILABLE ON-SITE.

12.ALIGNMENT OF THE COMPACTED EARTHEN PATHWAY

AND ACCESS ROAD MAY BE ADJUSTED TO AVOID

CUTTING TREES TO THE EXTENT AGREED BY THE

ENGINEER.

13.CONTRACTOR SHALL PERFORM ANY DEWATERING

REQUIRED TO PROPERLY COMPLETE THE WORK.

DEWATERING DISCHARGE MUST BE DONE IN A MANNER

THAT DOESN'T POLLUTE DOWNSTREAM WATER BODIES

OR CAUSE EROSION.

14.THE PROPOSED BOREHOLE SHALL BE DRILLED AND

WELL DEVELOPED TO THE DEPTH SPECIFIED IN THE

BOQ. THE CONTRACTOR SHALL CONDUCT A YIELD TEST

FOR EACH NEW BOREHOLE IN ACCORDANCE WITH THE

CONTRACT AND SPECIFICATIONS.

15.SOAKAWAY PITS SHALL BE CONSTRUCTED AT

CLASSROOM LATRINES AND AT TEACHER HOUSES.

LOCATION OF SOAKAWAY PITS TO BE CONFIRMED

DURING SETTING OUT.

16.THE MAXIMUM ALLOWABLE LONGITUDINAL SLOPE OF

CONCRETE WALKWAYS IS 5%. CONTRACTOR SHALL

VERIFY COMPLIANCE WITH THIS MAXIMUM DURING SITE

LAYOUT OR DURING ANY ADJUSTMENT TO SITE LAYOUT.

17.TOPSOIL UNDER PROPOSED CONCRETE WALKWAYS

SHALL BE REMOVED AND THE WALKWAY SHALL BE

PLACED DIRECTLY ON SUITABLE SUBSOIL OR ON A

MINIMUM OF 60 CM OF SUITABLE COMPACTED

EMBANKMENT.

GENERAL SITE GRADING, DRAINAGE AND EARTHWORK NOTES:

1. ALL FOUNDATION EXCAVATIONS ARE TO BE INSPECTED

AND APPROVED BY THE ENGINEER BEFORE FIXING

STEEL REINFORCING AND BEFORE CASTING CONCRETE.

2. WHERE SUITABLE FOUNDING MATERIAL IS NOT

ENCOUNTERED AT THE DEPTH SHOWN ON THE

FOUNDATION DRAWINGS, EXCAVATION IS TO PROCEED

TO A DEPTH AS APPROVED BY THE ENGINEER ON SITE.

COMPENSATION FOR ANY ADDITIONAL EXCAVATION

SHALL BE AS ALLOWED FOR IN THE CONTRACT.

3. FOUNDATION OVER EXCAVATION SHALL BE BACKFILLED

TO PLAN LEVEL WITH LEAN CONCRETE IF SO ORDERED

BY THE ENGINEER.

4. ALL EARTH FILL UNDER STRUCTURE FOUNDATIONS AND

SLABS ON GRADE SHALL BE PLACED IN LOOSE LAYERS

NOT EXCEEDING 200MM AND COMPACTED TO MIN 95%

AASHTO-T99(STANDARD PROCTOR) OR APPROVED

EQUIVALENT METHODOLOGY.(STRUCTURAL BACKFILL

MUST BE APPROVED BY USAID PRIOR TO DELIVERY TO

SITE. SOIL SAMPLE TEST MUST BE CONDUCTED AND

DEEMED ACCEPTABLE BY USAID PRIOR TO USE AS

STRUCTURAL BACKFILL)

5. EXPANSIVE SOIL WITHIN 80CM OF THE BOTTOM OF THE

FOOTINGS AND/OR WITHIN 140CM OF THE BOTTOM OF

SLAB ON GRADE SHALL BE REMOVED AND REPLACED

WITH APPROVED FILL MATERIAL. REFER TO CONTRACT

REQUIREMENTS.

6. CONTRACTOR SHALL ROUGH GRADE THE SITE READY

FOR BUILDING CONSTRUCTION AND ACCESS ROUTE.

7. ALL BUILDINGS SHALL BE CONSTRUCTED ON CUT OR

FULLY COMPACTED, APPROVED, BACKFILL MATERIAL.

COMPACTION SHALL MEET THE REQUIREMENTS AND

TESTING INCLUDED IN THE TECHNICAL SPECIFICATIONS.

8. CONTRACTOR SHALL MINIMIZE DISTURBANCE TO

PROPERTY AREA THAT IS NOT INCLUDED IN THE

GRADING LIMITS.

9. CONTRACTOR SHALL MINIMIZE REMOVAL OF TOPSOIL,

VEGETATION, AND TREES TO THE EXTENT FEASIBLE IN

GRADING THE SITE AND COMPLETING CONSTRUCTION.

10.DRAINAGE FEATURES MUST BE INSTALLED ON CUT

MATERIAL. IF NOT INSTALLED ON CUT MATERIAL, THE

AREA SHALL BE APPROVED BACKFILL MATERIAL

COMPACTED PER THE TECHNICAL SPECIFICATIONS.

11.DRAINAGE FEATURES AND SITE GRADING MUST BE

COORDINATED TO ENSURE STORMWATER FLOWS AWAY

FROM BUILDINGS, ACROSS THE SITE, AND TO AN

OFFSITE LOCATION AS SHOWN IN THE DRAWINGS.

CONTRACTOR MAY BE REQUIRED TO ADJUST LOCATION

OF DRAINAGE FEATURES TO FIT WITH THE FINAL SITE

GRADES.

12.FOR ANY GRADING OR TEMPORARY WORK REQUIRED

OUTSIDE PROJECT PROPERTY LIMITS, THE

CONTRACTOR MUST OBTAIN TEMPORARY PERMISSION

FROM NEIGHBORING PROPERTY TO COMPLETE THE

WORK.

13.CONTRACTOR MUST MINIMIZE DISTURBANCE OF AREA

WITHIN 30 METERS OF A SWAMP OR WETLAND.

14.LATRINE ROOF DRAINAGE (RUNOFF) SHALL BE

COLLECTED AND CONVEYED ALONG THE REAR OF EACH

LATRINE. SEE FACILITY PACKAGE DETAILS FOR WORK

TO BE DONE TO THE CONCRETE SLAB THAT RUNOFF

FLOWS AWAY FROM EACH LATRINE AND NOT INTO THE

LATRINE PIT.

GENERAL EROSION AND SEDIMENT CONTROL/SLOPE

STABILITY NOTES:

1. CONTRACTOR SHALL INSTALL TEMPORARY EROSION

AND SEDIMENT (E&S) CONTROL MEASURES AS

SPECIFIED IN THE DRAWINGS AND TECHNICAL

SPECIFICATIONS. THE E&S MEASURES MUST BE

MAINTAINED FOR THE DURATION OF THE

CONSTRUCTION PERIOD OF PERFORMANCE AND SHALL

BE REMOVED DURING DEMOBILIZATION.

2. CONTRACTOR IS RESPONSIBLE TO CONTROL RAINFALL

RUNOFF AND EROSION ON SITE DURING CONSTRUCTION

THROUGH PERMANENT OR TEMPORARY DIVERSION,

CHECK DAMS, SLOPE STABILITY, AND NATURAL

CHANNELS.

3. CONTRACTOR SHALL INSTALL LONG TERM EROSION

AND SEDIMENT CONTROL MEASURES AS SPECIFIED IN

THE DRAWINGS AND TECHNICAL SPECIFICATIONS.

4. THE CONTRACTOR SHALL PROTECT SLOPES FOR

EROSION BY MINIMIZING STEEPNESS OF THE SLOPE,

REPLACE VEGETATION, AND PLANT NEW VEGETATION

PER THE TECHNICAL SPECIFICATIONS. THE

CONTRACTOR IS RESPONSIBLE TO WATER AND

MAINTAIN GRASS SPRIGGING AND OTHER PLANTS

PLANTED UNDER THIS CONTRACT.

5. CONTRACTOR SHALL PROVIDE AND PLANT TREES AT A

LOCATION SPECIFIED BY USAID AND THE COMMUNITY.

THE CONTRACTOR IS RESPONSIBLE TO WATER AND

MAINTAIN THE TREES IN ACCORDANCE WITH THE

TECHNICAL SPECIFICATIONS. REFER TO THE CONTRACT

FOR NUMBER OF TREE SEEDLINGS TO BE PLANTED PER

EACH MATURE TREE CUT.

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:41:32 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_G-020.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

M R

H

JT

M

SP

M

-0 6-

SE

ED

_B O

N D

O _C

-1

.D W

G

G-020

N

SA

N

JE

BW

AN

G U

IN

D

EX

O

F D

R

AW

IN

G

S

G

EN

ER

AL

N O

TE

S

INDEX OF DRAWINGS

SHEET REF.

NUMBER

ISSUE

STATUS TITLE

GENERAL DRAWINGS

G-001 1 COVER SHEET

G-020 1 INDEX OF DRAWINGS & GENERAL NOTES

CIVIL DRAWINGS

C-100 SURVEY

C-101 EXISTING CONDITIONS AND DEMOLITION

C-102 EXISTING CONDITIONS AND DEMOLITION

C-111 1 OVERALL SITE LAYOUT

C-112 1 SITE LAYOUT

C-113 1 SITE LAYOUT

C-121 1 GRADING AND DRAINAGE

C-122 1 GRADING AND DRAINAGE

C-131 1 EROSION CONTROL AND STABILIZATION

C-132 1 EROSION CONTROL AND STABILIZATION

AutoCAD SHX Text

BG1

BG2

BG3

BG4

BG5

BM1

BM2

° 5

7'

1.2

119° 55' 10" 68.52

150° 39' 50"

37.04

7°

8'

0"

2.

252° 17' 10"178.83

2°

8'

0"

5.

° 4 9'

0"

.2

ANTHILL (TYP)

FOOTBALL

PITCH

GULLY

172.50

5.

7.

7.

175.00

177.50

0.

172.5017 5.

172.50

172.50

172.50

2.

2.

170.00

172.50

2.

2.

170.00

2.

175.00

5.

172.50

172.50

172.50

BWANGU PROPOSED SCHOOL SITE

NSANJE DISTRICT

AREA:48,561 m² AREA: 11.9996 ACRES(4.8561 ha)

TREE (TYP)

SURVEYED PROPERTY LIMITS

172.00

171.50 170.00

170.50

4.

4.

3.

3.

5.

6.

6.

177.00

173.00

173.50

174.00

174.50

EXISTING ROADWAY

APPROXIMATELY 120M

FROM PROPERTY BOUNDARY

TO BE USED AS ACCESS

ROUTE

THE SITE IS COVERED WITH SCATTERED

BRUSH, BUSHES AND SMALL DIAMETER TRESS

ROCK (TYP)

1:750

150 30 75m

NORTH ARROW

N

BARSCALE

SURVEY PLAN

1:750

G .C

M

BS

M

BS

-0 7-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-100

N

SA

N

JE

BW

AN

G U

SU

R

VE

Y

PL

AN

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE (LARGE)

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD/FOOTPATH

ROCKS

ANTHILL

PLOT

BOUNDARY/BENCHMARKS

NAME EASTINGS NORTHINGS ELEVATIONS

BM1 718222.676 8145388.413 172.048

BG1 718282.069 8145354.235 172.661

BM2 718300.214 8145321.948 173.003

BG2 718273.228 8145111.672 176.848

BG3 718102.880 8145057.265 172.448

BG4 718085.039 8145201.937 171.889

BG5 718117.708 8145279.579 172.847

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 6:58:23 PM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-100.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

1144.00

1144.50

BM1

BM2

° 5

7'

1.2

119° 55' 10"68.52

150° 39' 50"

37.04

PROTECT FOOTBALL

PITCH, AVOID DAMAGE

DURING CONSTRUCTION

PHASE

172.50

172.50

2.

170.00

170.00

2.

172.50

172.50

172.50

2.

170.00

170.00

2.

172.50

171.50

170.00

170.50

TP-2 (WEATHERED ROCK

AT 1.2m)

PROJECT GRADING

LIMITS

PROTECT TREE (TYP)

PROTECT

TREE (TYP)

EXISTING FOOTPATH

(SEE NOTE 7)

1:750

150 30 75m

NORTH ARROW

N

BARSCALE

EXISTING CONDITIONS

AND DEMO

1:750

G .C

M

BS

M

BS

-0 7-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-101

N

SA

N

JE

BW

AN

G U

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

AN

D D

EM

O

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD/FOOTPATH

ROCKS

ANTHILL

PLOT

BOUNDARY/BENCHMARKS

NAME EASTINGS NORTHINGS ELEVATIONS

BM1 718222.676 8145388.413 172.048

BG1 718282.069 8145354.235 172.661

BM2 718300.214 8145321.948 173.003

BG2 718273.228 8145111.672 176.848

BG3 718102.880 8145057.265 172.448

BG4 718085.039 8145201.937 171.889

BG5 718117.708 8145279.579 172.847

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 6:58:33 PM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-101.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

1144.00

1144.50

GENERAL NOTES

GRADING LIMITS

PROJECTS LIMITS

TRIAL PIT

MATCHLINESEE SHEETMATCHLINE C-101

1. REFER TO GENERAL NOTES FOR TREE REMOVAL INCLUDING

CONFIRMATION FROM THE SUPERVISING ENGINEER

2. TREE REMOVAL INCLUDES ROOT REMOVAL AND

BACKFILL/COMPACTION.

3. CONTRACTOR TO CONFIRM WITH ENGINEER LOCATION OF

MATERIAL AND CONSTRUCTION EQUIPMENT LAY DOWN AREA.

4. ALL TRIAL PITS SHOULD BE BACKFILLED WITH SELECTED ON SITE

MATERIAL

5. PROJECT LIMIT LINE SHALL COINCIDE WITH SITE CONSTRUCTION

FENCE(SITE HOARDING)

6. THE CONTRACTOR SHALL LIMIT DISTURBANCE TO EXISTING SITE

BEYOND GRADING LIMITS UNLESS APPROVED BY THE ENGINEER,

THE INTENT IS TO CONFINE CONSTRUCTION ACTIVITIES WITHIN

PROJECT LIMITS

7. EXISTING FOOTPATHS PASSING THROUGH THE PROJECTS LIMITS

SHALL BE RELOCATED BY THE SCHOOL MANAGEMENT AND

COMMUNITY

8. CONTRACTOR SHALL OBTAIN TEMPORARY PERMISSION FROM

NEIGHBORING PROPERTY OWNER TO COMPLETE MINOR

GRADING WORK OUTSIDE SCHOOL PROPERTY BOUNDARY

BG4

BG5

7°

8'

0"

2.

2°

8'

0"

5.

° 4

9'

0"

.2

ANTHILL (TYP)

5.

7.

177.50

2.

50172.50

2.

5.

172.50

5.

7.

177.50

2.

50172.50

2.

2.

175.00

5.

172.50

172.00 171.50

170.00

4.

4.

3.

3.

5.

6.

6.

177.00

173.00

173.50

174.00

174.50

TP-1 (ROCK AT 1m)

TP-3 (GRAVELLY ELASTIC

SILT WITH SAND)

TP-4 (GRAVELLY ELASTIC

SILT WITH SAND)

TP-5 (GRAVELLY ELASTIC

SILT)

PROJECT LIMITS

PROJECT GRADING

LIMITS

PROJECT GRADING

LIMITS

EXISTING ROADWAY

APPROXIMATELY 120M

FROM PROPERTY BOUNDARY

TO BE USED AS ACCESS

ROUTE

LEGEND

MAJOR CONTOURS

MINOR CONTOURS

TREE

SURVEYED PROPERTY LIMITS

BOUNDARY BEACON

BENCHMARK

ROAD/FOOTPATH

ROCKS

ANTHILL

PLOT

BOUNDARY/BENCHMARKS

NAME EASTINGS NORTHINGS ELEVATIONS

BM1 718222.676 8145388.413 172.048

BG1 718282.069 8145354.235 172.661

BM2 718300.214 8145321.948 173.003

BG2 718273.228 8145111.672 176.848

BG3 718102.880 8145057.265 172.448

BG4 718085.039 8145201.937 171.889

BG5 718117.708 8145279.579 172.847

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 2/23/2022 6:58:35 PM

F0

A1

F

EB

R

U

AR

Y

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-101.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

F

EB

FO

R

P R

O C

U R

EM

EN

T

TE

TR

A

TE

C H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

1144.00

1144.50

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EXISTING CONDITIONS

AND DEMO

1:400

G .C

M

BS

M

BS

-0 7-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-102

N

SA

N

JE

BW

AN

G U

EX

IS

TI

N

G C

O N

D

IT

IO

N

S

AN

D D

EM

O

GENERAL NOTES

1. REFER TO GENERAL NOTES FOR TREE REMOVAL INCLUDING

CONFIRMATION FROM THE SUPERVISING ENGINEER

2. TREE REMOVAL INCLUDES ROOT REMOVAL AND

BACKFILL/COMPACTION.

3. CONTRACTOR TO CONFIRM WITH ENGINEER LOCATION OF

MATERIAL AND CONSTRUCTION EQUIPMENT LAY DOWN AREA.

4. ALL TRIAL PITS SHOULD BE BACKFILLED WITH SELECTED ON SITE

MATERIAL

5. PROJECT LIMIT LINE SHALL COINCIDE WITH SITE CONSTRUCTION

FENCE(SITE HOARDING)

6. THE CONTRACTOR SHALL LIMIT DISTURBANCE TO EXISTING SITE

BEYOND GRADING LIMITS UNLESS APPROVED BY THE ENGINEER,

THE INTENT IS TO CONFINE CONSTRUCTION ACTIVITIES WITHIN

PROJECT LIMITS

7. EXISTING FOOTPATHS PASSING THROUGH THE PROJECTS LIMITS

SHALL BE RELOCATED BY THE SCHOOL MANAGEMENT AND

COMMUNITY

8. CONTRACTOR SHALL OBTAIN TEMPORARY PERMISSION FROM

NEIGHBORING PROPERTY OWNER TO COMPLETE MINOR

GRADING WORK OUTSIDE SCHOOL PROPERTY BOUNDARY

GRADING LIMITS

PROJECTS LIMITS

TRIAL PIT

MATCHLINE SEE SHEET MATCHLINEC-101

AutoCAD SHX Text COMPLETE NECESSARY CLEARING AND GRADING TO COMPLETE ACCESS ROAD TO EXISTING ROADWAY. FINAL ALIGNMENT SHALL MINIMISE TREE CUTTING TO EXTENT POSSIBLE

AutoCAD SHX Text

PROPOSED PROJECT SIGN BOARD

PROPOSED TRAFFIC SIGN

BG3

BG4

BG5

BM1

BM2

° 5

7'

1.2

119° 55' 10" 68.52

150° 39' 50"

37.04

7°

8'

0"

2.

252° 17' 10"178.83

2°

8'

0"

5.

° 4 9'

0"

.2

172.50

5.

7.

7.

175.00

177.50

0.

172.5017 5.

172.50

172.50

172.50

2.

2.

170.00

172.50

2.

2.

170.00

2.

175.00

5.

172.50

172.50

172.50

172.00

171.50 170.00

170.50

4.

4.

3.

3.

5.

6.

6.

177.00

173.00

173.50

174.00

174.50

P-BH

TEACHER

HOUSING LATRINE

TEACHER

HOUSING LATRINE

TEACHER

LATRINE

SCIENCE

CLASSROOM CLASSROOM BLOCK

CLASSROOM

BLOCK

COMPACTED

EARTHEN

PATHWAY

EARTHEN

ACCESS ROAD

CONCRETE

SIDEWALK

TEACHER

HOUSING

EARTHEN

ACCESS ROAD MATCHLINE C-112

C-113

STUDENT LATRINE

(MALE)

COMPACTED

EARTHEN

PATHWAY

CONNECT TO

EXISTING

ROADWAY

APPROXIMATELY

120METRES FROM

SITE BOUNDARY

TEACHER

LATRINE

STUDENT LATRINE

(FEMALE)

COMPACTED

EARTHEN

PATHWAY

1 1

1:750

150 30 75m

NORTH ARROW

N

BARSCALE

OVERALL SITE PLAN

1:750

G C

PG PG

-1 0-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-111

N

SA

N

JE

BW

AN

G U

O

VE

R

AL

L

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:40:48 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-111.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

1. THIS SHEET IS INTENDED FOR OVERALL SITE ORIENTATION WITH

EXISTING & PROPOSED FEATURES

GENERAL NOTE

° 5

7'

1.2

119° 55' 10"68.52 150° 39' 50"

37.04

P-BH

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

EARTHEN

ACCESS ROAD

N 718226.8487 E 8145351.9455

N 718226.8487 E 8145341.1455

N 718274.1668 E 8145351.9455

N 718274.1668 E 8145341.1455

N 718199.9500 E 8145300.2700

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

SITE PLAN

1:400

G C

PG PG

-0 9-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-112

N

SA

N

JE

BW

AN

G U

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:40:57 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-112.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

GENERAL NOTES

LEGEND

1. CONTRACTOR TO INSTALL TEMPORARY CONSTRUCTION FENCE

ALONG PROJECT LIMITS.

2. DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED

3. DURING SETTING OUT OF BUILDINGS, CONFIRM LOCATION OF

EACH BUILDING WITH ENGINEER PRIOR TO FOUNDATION

EXCAVATION

4. COMPLETE TRIAL PIT AT PROPOSED LATRINE LOCATION TO

CHECK FOR HARD ROCK

5. PROVIDE DIAMETER 110mm CLASS 6 UPVC PIPE CONNECTING TO

THE SOAKAWAYS FROM GULLY BOXES OR PIT LATRINES AS

REQUIRED LAID AT A SLOPE OF 1 % MINIMUM

6. REFER TO STANDARD DETAILS FOR TEACHER HOUSE SOAKAWAY

LAYOUT

7. UNLESS OTHERWISE NOTED, TIE PROPOSED DRIVEWAY TO THE

PROMINENT OFF SITE ACCESS POINT

8. SEE BOQ FOR PROPOSE BOREHOLE DEPTH

MATCHLINE SEE SHEET MATCHLINEC-113

ROAD

SURVEYED PROPERTY LIMITS

PROJECT LIMIT

EXISTING BUILDING

BEACON

TREE

PROPOSED BOREHOLEP-BH

7°

8'

0"

2.

178.83

2°

8'

0"

5.

° 4

9'

0"

.2

SCIENCECLASSROOM

CLASSROOM

BLOCK

TEACHER

LATRINE

STUDENT LATRINE (MALE)

STUDENT LATRINE

(FEMALE)

CLASSROOMBLOCK

EARTHEN

ACCESS ROAD

CONCRETE

SIDEWALK

COMPACTED

EARTHEN

PATHWAY

N 718220.3906 E 8145239.4019

N 718197.8380 E 8145231.1935N 718142.0326

E 8145229.9526

N 718126.8096 E 8145235.4933

SOAKWAY PIT

SOAKWAY PIT

SOAKWAY PIT

GRAVEL PARKING

AREA (TYP)

N 718167.2240 E 8145201.5102

N 718144.6713 E 8145209.7186

CONCRETE

SIDEWALK

COMPACTED

EARTHEN

PATHWAY

COMPACTED

EARTHEN

PATHWAY

CONNECT TO

EXISTING

ROADWAY

APPROXIMATELY

120METRES FROM

SITE BOUNDARY

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

SITE PLAN

1:400

G C

PG PG

-0 9-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-113

N

SA

N

JE

BW

AN

G U

SI

TE

P

LA

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:40:58 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-112.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

GENERAL NOTES

LEGEND

1. CONTRACTOR TO INSTALL TEMPORARY CONSTRUCTION FENCE

ALONG PROJECT LIMITS.

2. DIMENSIONS ARE IN METERS UNLESS OTHERWISE STATED

3. DURING SETTING OUT OF BUILDINGS, CONFIRM LOCATION OF

EACH BUILDING WITH ENGINEER PRIOR TO FOUNDATION

EXCAVATION

4. COMPLETE TRIAL PIT AT PROPOSED LATRINE LOCATION TO

CHECK FOR HARD ROCK

5. PROVIDE DIAMETER 110mm CLASS 6 UPVC PIPE CONNECTING TO

THE SOAKAWAYS FROM GULLY BOXES OR PIT LATRINES AS

REQUIRED LAID AT A SLOPE OF 1 % MINIMUM

6. REFER TO STANDARD DETAILS FOR TEACHER HOUSE SOAKAWAY

LAYOUT

7. UNLESS OTHERWISE NOTED, TIE PROPOSED DRIVEWAY TO THE

PROMINENT OFF SITE ACCESS POINT

8. SEE BOQ FOR PROPOSE BOREHOLE DEPTH

MATCHLINE SEE SHEET MATCHLINEC-112

ROAD

SURVEYED PROPERTY LIMITS

PROPOSED BOREHOLE

PROJECT LIMIT

BEACON

TREE

7'

1.2

119° 55' 10"68.52

150° 39' 50"

37.04

172.50

172.50

2.

170.00

170.00

2.

172.50

172.50

172.50

2.

170.00

170.00

2.

172.50

171.00

170.50

171.00

171.50

S-BH 1

S-BH 2

P-BH

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

172.50

FFE = 173.90

172.00

2.

173.50

FFE = 172.40

171.00

171.50

170.50

170.00

173.00

SITE GRADING

LIMITS

2.

4M 3x300 mm UPVC

DRAIN PIPE WITH

ENDWALL

INV IN =169.80

INV OUT = 169.76

173.50

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

AND PROPERTY

LIMITS

LP

LP

HP

HP

LP

LP

HP

HP

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

GRADING AND

DRAINAGE

1:400

KJKG

S

W C

P

-0

5-

SE

ED

_M

PH

ES

I_

C -1

.D

W G

C-121

N

SA

N

JE

BW

AN

G U

G R

AD

IN

G A

N D

D R

AI

N

AG

E

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:41:05 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-121.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-122

GENERAL NOTES

1. SEE SHEET D-C-503 FOR ROOF DRAINAGE APRON DETAIL.

2. HP AND LP INDICATE THE HIGH POINT AND LOW POINT ALONG

PROPOSED ROOF DRAINAGE APRONS.

3. SPOT ELEVATIONS ARE FOR SITE DRAINAGE.

4. FLOW ARROWS ARE FOR SITE DRAINAGE. FINAL SITE GRADING

SHOULD BE DONE IN ACCORDANCE WITH OVERALL DRAINAGE

PLAN.

5. DRAINAGE PIPE INDICATED ON PLANS WITHOUT SPECIFIC SIZES

OR INVERT INFORMATION SHALL BE 300 MM DIAMETER X 2

METERS LONG MINIMUM. AND PLACED TO SUIT AS-BUILT

GRADES. PROVIDE MINIMUM 1M² RIP-RAP PITCHING AT ALL PIPE

OUTLETS, INCLUDING AT 150 MM ROOF DRAINAGE POINTS.

ENDWALLS ARE NOT REQUIRED.

6. DRAINAGE PIPE WITH INVERT ELEVATIONS SPECIFIED SHALL BE

PROVIDED WITH ENDWALLS. FIELD ADJUST PROPOSED GRADES

TO PROVIDE A MINIMUM OF 30 CM COVER OVER DRAINAGE PIPE

WITH INVERT INFORMATION PROVIDED.

7. SLOPE FOR ALL DRAINAGE PIPE SHALL BE MINIMUM 1.0%.

8. FINISHED GRADES SHALL SLOPE AWAY FROM THE FINISHED

FLOOR OF EACH BUILDING A MINIMUM OF 0.15 M AT 3.0 M (5%)

FROM BUILDING. IF ADJACENT GROUND HAS A CONCRETE PATH,

THE CROSS SLOPE ON THE CONCRETE PATH SHALL BE 2% AWAY

FROM BUILDING.

9. SEE SPECIFICATION DIVISION 31 FOR SITE EXCAVATION,

COMPACTION AND FINISH GRADING REQUIREMENTS.

10. EARTHEN PATHWAYS SLOPE SHALL NOT EXCEED 5%

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

PROPOSED FLOW ARROW

HIGH POINT

LOW POINT

DIVERSION DITCH

HP

LP

1333.00

1333.00

1333.50

1333.50

LEGEND

178.83

2°

8'

0"

5.

° 4

9'

0"

.2

5.

7.

177.50

2.

50172.50

2.

2.

175.00

5.

172.50

5.

7.

177.50

2.

50172.50

2.

2.

175.00

5.

172.50

172.00

171.50

4.

4.

3.

3.

5.

6.

6.

177.00

173.00

173.50

174.00

174.50

2.

SCIENCECLASSROOM

CLASSROOM

BLOCK

TEACHER

LATRINE

STUDENT LATRINE (MALE)

STUDENT LATRINE

(FEMALE)

CLASSROOMBLOCK

174.50

FFE = 173.40

FFE = 173.90

173.00

173.50

172.50

3.

THE CONTRACTOR SHALL

FILL THIS AREA WITH

EXCESS TOPSOIL TO

PROVIDE DRAINAGE

SITE GRADING

LIMITS

FFE = 172.90

172.50

172.50

173.00

FFE = 174.40

4.

FFE = 175.40

FFE = 173.90

2.

171.50

SITE GRADING

LIMITS

TEMPORARY CONSTRUCTION

ACCESS OUTSIDE PROJECT

BOUNDARY

HP

HP

LP

LP

LP

LP

HP

HP

SEE NOTE 5

LP

LP

HP

HP

2.5

173.00

3.

3.

2.

2.

DOUBLE PIPE SEE

NOTE 5

1.0

1.

SEE NOTE 5

171.50

3.

5.

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

GRADING AND

DRAINAGE

1:400

KJKG

S

W C

P

-0

5-

SE

ED

_M

PH

ES

I_

C -1

.D

W G

C-122

N

SA

N

JE

BW

AN

G U

G R

AD

IN

G A

N D

D R

AI

N

AG

E

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:41:07 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-121.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-121

GENERAL NOTES

1. SEE SHEET D-C-503 FOR ROOF DRAINAGE APRON DETAIL.

2. HP AND LP INDICATE THE HIGH POINT AND LOW POINT ALONG

PROPOSED ROOF DRAINAGE APRONS.

3. SPOT ELEVATIONS ARE FOR SITE DRAINAGE.

4. FLOW ARROWS ARE FOR SITE DRAINAGE. FINAL SITE GRADING

SHOULD BE DONE IN ACCORDANCE WITH OVERALL DRAINAGE

PLAN.

5. DRAINAGE PIPE INDICATED ON PLANS WITHOUT SPECIFIC SIZES

OR INVERT INFORMATION SHALL BE 300 MM DIAMETER X 2

METERS LONG MINIMUM. AND PLACED TO SUIT AS-BUILT

GRADES. PROVIDE MINIMUM 1M² RIP-RAP PITCHING AT ALL PIPE

OUTLETS, INCLUDING AT 150 MM ROOF DRAINAGE POINTS.

ENDWALLS ARE NOT REQUIRED.

6. DRAINAGE PIPE WITH INVERT ELEVATIONS SPECIFIED SHALL BE

PROVIDED WITH ENDWALLS. FIELD ADJUST PROPOSED GRADES

TO PROVIDE A MINIMUM OF 30 CM COVER OVER DRAINAGE PIPE

WITH INVERT INFORMATION PROVIDED.

7. SLOPE FOR ALL DRAINAGE PIPE SHALL BE MINIMUM 1.0%.

8. FINISHED GRADES SHALL SLOPE AWAY FROM THE FINISHED

FLOOR OF EACH BUILDING A MINIMUM OF 0.15 M AT 3.0 M (5%)

FROM BUILDING. IF ADJACENT GROUND HAS A CONCRETE PATH,

THE CROSS SLOPE ON THE CONCRETE PATH SHALL BE 2% AWAY

FROM BUILDING.

9. SEE SPECIFICATION DIVISION 31 FOR SITE EXCAVATION,

COMPACTION AND FINISH GRADING REQUIREMENTS.

10. EARTHEN PATHWAYS SLOPE SHALL NOT EXCEED 5%

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

PROPOSED FLOW ARROW

HIGH POINT

LOW POINT

DIVERSION DITCH

HP

LP

1333.00

1333.00

1333.50

1333.50

LEGEND

7'

1.2

119° 55' 10"68.52

150° 39' 50"

37.04

FOOTBALL

PITCH

172.50

172.50

2.

2.

170.00

172.50

170.00

2.

175.00

172.50

BWANGU PROPOSED SCHOOL SITE

NSANJE DISTRICT

AREA:48,561 m² AREA: 11.9996 ACRES(4.8561 ha)

172.50

172.50

2.

2.

170.00

172.50

170.00

2.

175.00

172.50

172.00

171.50

171.00

170.50

171.00

171.50

P-BH

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

TEACHER

HOUSING LATRINE

TEACHER

HOUSING

TEACHER

HOUSING

SOAKWAY PIT

172.50

173.00

172.50

FFE = 173.90

172.00

2.

173.50

FFE = 172.40

171.00

171.50

170.50

170.00

173.00

SITE GRADING

LIMITS

2.

173.50

SITE GRADING

AND PROPERTY

LIMITS

SITE GRADING

AND PROPERTY

LIMITS

LP

LP

HP

HP

LP

LP

HP

HP

1.

171.50

RIPRAP

(2M x 1M)

BWANGU PROPOSED SCHOOL SITE

NSANJE DISTRICT

AREA:48,561 m² AREA: 11.9996 ACRES(4.8561 ha)

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EROSION CONTROL

AND STABILIZATION

1:400

KJM

LM

M

LM

-0

7-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-131

N

SA

N

JE

BW

AN

G U

ER

O

SI

O

N C

O N

TR

O

L

AN

D S

TA

BI

LI

ZA

TI

O

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:41:15 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-131.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-132

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

SILT FENCE

RIP RAP (PITCHING)

SPRIGGING

CHECK DAM

DIVERSION DITCH

1437.00

1433.00

1437.50

1433.50

LEGEND

SF

NOTES

1. RIPRAP PITCHING (100 CM LONG BY 100 CM WIDE) TO BE INSTALLED

AT THE END OF ROOF DRAINAGE APRON OUTLET PIPES FOR

CLASSROOMS. RIPRAP PITCHING (50 CM LONG BY 50 CM WIDE) TO

BE INSTALLED AT THE END OF ROOF DRAINAGE APRON OUTLET

PIPES FOR SCIENCE CLASSROOMS AND TEACHER HOUSING.

252° 17' 10"178.83

2°

8'

0"

5.

° 4

9'

0"

.2

ANTHILL (TYP)

5.

7.

7.

177.50

2.

50172.50

2.

2.

175.00

5.

172.50

5.

7.

7.

177.50

2.

50172.50

2.

2.

175.00

5.

172.50

172.00

171.50

4.

4.

3.

3.

5.

6.

6.

177.00

173.00

173.50

174.00

174.50

2.

SCIENCECLASSROOM

CLASSROOM

BLOCK

TEACHER

LATRINE

STUDENT LATRINE (MALE)

CLASSROOMBLOCK

SOAKWAY PIT

SOAKWAY PIT

SOAKWAY PIT

174.50

FFE = 173.40

FFE = 173.90

173.00

173.50

172.50

3.

SITE GRADING

LIMITS

FFE = 172.90

172.50

172.50

173.00

FFE = 174.40

4.

FFE = 173.90

2.

171.50

SITE GRADING

LIMITS

TEMPORARY CONSTRUCTION

ACCESS OUTSIDE PROJECT

BOUNDARY

HP

HP

LP

LP

LP

LP

HP

HP

LP

LP

HP

HP

2.5

173.00

3.

3.

2.

2.

1.

1.5

171.50

3.

5.

1:400

80 16 40m

NORTH ARROW

N

BARSCALE

EROSION CONTROL

AND STABILIZATION

1:400

KJM

LM

M

LM

-0

7-

SE

ED

_B W

AN

G

U _C

-1

.D W

G

C-132

N

SA

N

JE

BW

AN

G U

ER

O

SI

O

N C

O N

TR

O

L

AN

D S

TA

BI

LI

ZA

TI

O

N

A

B

C

D

E

F

G

2 3 4 5 6 7 8 9 10 11

D

ES

IG

N

ED

B

Y:

D R

AW

N

B Y:

C H

EC

KE

D B

Y:

SU

BM

IT

TE

D B

Y:

SI

ZE

IS

SU

E D

AT

E:

TA

SK

O R

D

ER

N O

C O

N

TR

AC

T

N O

M

AR

K D

ES

C

R

IP

TI

O

N D

AT

E

SHEET ID

PLOTTED: 6/10/2022 3:41:16 AM

F0

A1

J

U N

E

AI

D

-O

AA

-I-

-0

PL

O T

D

AT

E:

FI

LE

N

AM

E:

Z:\SHARED\PROJECTS\127-44525-19001\CAD\SHEETFILES\02_SITE ADAPT\GROUP 2\SOUTH\13_BWANGU\SEED_BWANGU_C-131.DWG

DIM. NOTE

ALL DIMENSIONS

SHOWN IN CALLOUTS

AND/OR NOTES ARE

IN METERS UNLESS

NOTED OTHERWISE

J

U N

AM

EN

D

M

EN

T

TE

TR

A

TE

C

H

THIS PROJECT, MALAWI SECONDARY EDUCATION EXPANSION FOR

DEVELOPMENT (SEED) PROJECT, WAS MADE POSSIBLE BY THE

SUPPORT OF THE AMERICAN PEOPLE THROUGH THE UNITED

STATES AGENCY FOR INTERNATIONAL DEVELOPMENT (USAID) AND

THE PRESIDENT'S EMERGENCY PLAN FOR AIDS RELIEF (PEPFAR).

SE

ED

C M

C

SI

TE

P

AC

KA

G

E

FOR PROCUREMENT

MATCHLINE SEE SHEET MATCHLINEC-131

SITE GRADING LIMITS

EXISTING CONTOUR (MAJOR)

EXISTING CONTOUR (MINOR)

PROPOSED CONTOUR (MAJOR)

PROPOSED CONTOUR (MINOR)

SILT FENCE

RIP RAP (PITCHING)

SPRIGGING

CHECK DAM

DIVERSION DITCH

1437.00

1433.00

1437.50

1433.50

LEGEND

SF

NOTES

1. RIPRAP PITCHING (100 CM LONG BY 100 CM WIDE) TO BE INSTALLED

AT THE END OF ROOF DRAINAGE APRON OUTLET PIPES FOR

CLASSROOMS. RIPRAP PITCHING (50 CM LONG BY 50 CM WIDE) TO

BE INSTALLED AT THE END OF ROOF DRAINAGE APRON OUTLET

PIPES FOR SCIENCE CLASSROOMS AND TEACHER HOUSING.

SEED_Bwangu_G-001-G-001
Sheets and Views
SEED_Bwangu_G-001-G-001
SEED_Bwangu_G-020-G-020
Sheets and Views
SEED_Bwangu_G-020-G-020
SEED_Bwangu_C-100-C-100
Sheets and Views
SEED_Bwangu_C-100-C-100
SEED_Bwangu_C-101-C-101
Sheets and Views
SEED_Bwangu_C-101-C-101
SEED_Bwangu_C-101-C-102
Sheets and Views
SEED_Bwangu_C-101-C-102
SEED_Bwangu_C-111-C-111
Sheets and Views
SEED_Bwangu_C-111-C-111
SEED_Bwangu_C-112-C-112
Sheets and Views
SEED_Bwangu_C-112-C-112
SEED_Bwangu_C-112-C-113
Sheets and Views
SEED_Bwangu_C-112-C-113
SEED_Bwangu_C-121-C-121
Sheets and Views
SEED_Bwangu_C-121-C-121
SEED_Bwangu_C-121-C-122
Sheets and Views
SEED_Bwangu_C-121-C-122
SEED_Bwangu_C-131-C-131
Sheets and Views
SEED_Bwangu_C-131-C-131
SEED_Bwangu_C-131-C-132
Sheets and Views
SEED_Bwangu_C-131-C-132

File details come from the government source that posted it. Updated .