This document is an addendum to a state and local contract opportunity for the Hayesville Sewer Pump Station and Water Improvements project in Salem, Oregon. The project is jointly managed by the City of Salem and Marion County. The addendum makes changes to the bid form and bid supplements, contract times, special provisions, technical specifications, permits, and contract drawings. Key changes include revisions to sewer service lateral measurement, manhole construction and payment, flowable fill requirements for abandoned water lines, and updates to various equipment and electrical specifications. The closing date for proposals is October 12, 2021 at 2:30 pm.

The project has an engineer's estimate range of $3.75M to $4.25M. Funding sources and requirements are not explicitly stated. The addendum does not mention any set-asides or incumbents. Bidders are required to acknowledge receipt and acceptance of the addendum with their proposal submission.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Addendum (10/4/21; 4:07 PM) Page 1

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

CONTRACT NUMBER: 212079 DATE OF ADDENDUM: October 5, 2021

PROJECT NUMBER: 717101 CLOSING DATE: October 12, 2021

TIME: 2:30 p.m.

CITY OF SALEM, OREGON

CONTRACTS AND PROCUREMENT DIVISION

PUBLIC WORKS DEPARTMENT

ADDENDUM NUMBER: 1

FOR THE HAYESVILLE SEWER PUMP STATION AND WATER IMPROVEMENTS

Addendum Number 1 to the above-mentioned project for the City of Salem, Oregon, is a part of the contract documents, and as such, supersedes anything within the specifications with which it may conflict.

CHANGES TO THE BID FORM AND BID SUPPLEMENTS:

Remove pages 00410-3 through 00410-10 and replace with the enclosed Bid Form and Bid

Supplements, pages 00410-3 ADD-1 through 00410-10 ADD-1.

CHANGES TO THE FORM OF AGREEMENT

ARTICLE 4—CONTRACT TIMES

Milestone No. 1—Delete the text of this Milestone definition and replace with the following:

Milestone No. 1 shall be defined as completion of all Work within the public Right-of- Way related to the waterline improvements, including commissioning, all post connections, private services, and filling of abandoned AC waterline.

Milestone No. 1 Date………………………………………………………May 13, 2022

CHANGES TO THE SPECIAL PROVISIONS:

Section 170—Execution Requirements

Payment

170.90 Lump Sum Basis—Add the following text to the end of this subsection:

Additional Financial Surety shall include all project limits associated with the County Major

Construction Application/Permit. Permit costs shall be paid by the Contract unless otherwise specified. Permit costs shall be considered incidental to associated work.

Addendum (10/4/21; 4:07 PM) Page 2

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

Section 270—Trench Resurfacing

Construction

270.40 General

(i) Temporary Trench Resurfacing—Delete the text of this item and replace with the following:

Temporary patching (2-inch thick, Level 2, ½-inch dense graded Hot Mixed Asphalt Concrete) of trenches will be required at a minimum of every five working days. Trenches backfilled with aggregate to the roadway surface shall be maintained daily. If complaints develop or if directed by the agency having jurisdiction over the work within their ROWs, temporary patching may be required more often.

Section 385—Miscellaneous Portland Cement Concrete (PCC)/Aggregate Base Structures

385.90 Payment—Delete the table in this subsection of the SCS and replace with the

Pay Items Unit of Measure

Remove and Replace Sidewalk with 4 inches PCC over 2 inches of 1"-0 Aggregate Base

Sq. Yd.

Remove and Replace Driveway with 6 inches PCC over 2 inches of 1"-0 Aggregate Base

Sq. Yd.

Section 411—Sanitary Pressure Sewer Forcemain Pipe and Fittings

Materials

411.20 Polyvinyl Chloride (PVE) Pipe, Fittings—Delete the text of this subsection.

411.22 Restrained Joints—Delete the text of the first sentence of this subsection of the SCS and replace with the following:

Joint restraint may be obtained using specified joint restraint pipe or by the use of joint restraint gaskets or mechanical joint restraint devices. Joint restraint gaskets and ductile iron pipe shall be by the same manufacturer.

Addendum (10/4/21; 4:07 PM) Page 3

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

Section 412—Underground Utility Locating System

412.26 Tracer Wire Access Boxes—Delete the text of the last sentence of this subsection of the SCS and replace with the following:

Trace wire access boxes shall be Copperhead SnakePit (per the details shown on the Drawings) or approved equal.

412.91 Lump Sum Items

(a) Tracer, Locate Wire & Tracer, Locate Boxes, Complete—Add the following text to the end of this item of the SCS:

Trench excavation and backfill shall be considered incidental to the bid item. Surface restoration to be paid for by separate bid items per Section 270.

Section 413—Cathodic Protection System for Buried Piping

413.20 Magnesium Anodes—Delete the table of this subsection of the SCS and replace with the following:

Component Composition by Weight

Aluminum 0.01 percent maximum

Manganese 0.5 percent to 1.3 percent

Copper 0.02 percent maximum

Silicon 0.05 percent maximum

Iron 0.03 percent maximum

Nickel 0.001 percent maximum

Others each 0.05 percent maximum

Others Total 0.30 percent maximum

Magnesium Remainder

413.91 Lump Sum Items

(a) Corrosion Protection System, Complete—Add the following to the end of this item of the SCS:

Trench excavation and backfill shall be considered incidental to the bid item. Surface restoration to be paid for by separate bid items per Section 270.

Addendum (10/4/21; 4:07 PM) Page 4

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

Section 415—Sanitary Sewer Services

Measurement

—Delete the text of this subsection of the SCS and replace with the following:

415.80 Sanitary Sewer Services—The Replacement of Sewer Service Laterals will be measured on the unit basis, per each, by actual count of completed sanitary sewer services.

Section 420—Manholes

—Add the following new subsections to this section of the SCS:

420.26⸺72-inch Diameter Manhole (A DWG C1.4)—See Drawings.

420.27⸺96-inch Diameter Manhole (B DWG C1.4)—See Drawings.

420.28⸺48-inch Diameter Manhole (C DWG C1.4)—See Drawings.

420.29⸺72-inch Diameter Manhole (D DWG C1.4)—See Drawings.

420.30⸺48-inch Diameter Manhole (STA 40+20 DWG FM1.8)—See Drawings.

420.31⸺48-inch Diameter Manhole (STA 41+05.39 DWG FM1.8)—See Drawings.

—Add the following new subsections to this section of the SCS:

420.41⸺72-inch Diameter Manhole (A DWG C1.4)—See Drawings.

420.42⸺96-inch Diameter Manhole (B DWG C1.4)—See Drawings.

420.43⸺48-inch Diameter Manhole (C DWG C1.4)—See Drawings.

420.44⸺72-inch Diameter Manhole (D DWG C1.4)—See Drawings.

420.45⸺48-inch Diameter Manhole (STA 40+20 DWG FM1.8)—See Drawings.

420.46⸺48-inch Diameter Manhole (STA 41+05.39 DWG FM1.8)—See Drawings.

Addendum (10/4/21; 4:07 PM) Page 5

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

420.80 Lump Sum Basis—Delete the text of this subsection of the SCS and replace with the

(See Drawings)

(a) 72-inch Diameter Manhole (A DWG C1.4), Complete

(b) 96-inch Diameter Manhole (B DWG C1.4), Complete

(c) 48-inch Diameter Manhole (C DWG C1.4), Complete

(d) 72-inch Diameter Manhole (D DWG C1.4), Complete

(e) 48-inch Diameter Manhole (STA 40+20 DWG FM1.8), Complete

(f) 48-inch Diameter Manhole (STA 41+05.39 DWG FM1.8), Complete

—Add the following new subsection to this section of the SCS:

420.90 Lump Sum Items—Payment for all materials, labor, and equipment required to complete the installation of manholes will be paid at the lump sum price listed in the Schedule of Pay Items.

Payment shall include excavation, backfill, pipe, fittings, manhole, manhole frame and cover, flat tops, anti-floatation bases, coring, inside drop assemblies, and all other incidentals necessary to install manholes complete, as shown in the drawings.

Section 530—Hydrant Assemblies

530.43—No work shall be performed on a private fire service without prior coordination with private property owner. Contractor must coordinate with property owner/occupants and provide

24 hours advanced notice prior to work commencement.

530.91 Fire Service—The accepted quantity will be paid for on the basis of lump sum for “Fire

Service” in the schedule of pay items. Payment will be payment in full for all work included to furnish and install private fire service from mainline tee to private service connection, as shown in the drawings, including all cost for auxiliary valves and valve boxes, fittings, and the lateral pipe needed to connect to existing private fire service, needed thrust restraints, excavation, compacted backfill, curb and sidewalk removal and replacement, coordination with private fire service owner, and all other incidentals necessary to complete the work as specified.

Addendum (10/4/21; 4:07 PM) Page 6

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

Section 541—Customer Service Reconnections

541.92 Reconnect Water Service (4705 Lancaster Drive NE)—The accepted quantity will be paid for on the basis of lump sum for Bid Item, Reconnect Water Service (4705 Lancaster Diver

NE), Complete on the schedule of pay items. Payment will be payment in full for all work included to furnish, install, and reconnect water service as shown in the drawings. Reconnection shall include all work including excavation, rock and bolder excavation, compacted backfill, laying and jointing of pipe, fittings and appurtenances, domestic double check assemblies, boxes, and testing, pavement removal and replacement, restoring surface area, removal, restoration, and abandonment of existing vault, double check assembly and service pipe, coordination with private service owner, and all other incidentals necessary to complete the work as specified.

—Add the following new Section to the SCS:

Section 565—Flowable Fill

Description

565.00 Scope—This section covers the filling of abandoned asbestos cement (AC) waterline in-place as shown in the plans, or as directed.

565.20 Materials—Flowable fill shall be used for filling abandoned AC waterline. Flowable fill shall be controlled low-strength material consisting of a fluid mixture of cement, fly ash, aggregate, water and admixtures necessary to provide workable properties. Long-term hardened strength shall be minimum 75 psi to maximum 150 psi at 56 days. Flowable fill shall be non-shrink and self-leveling.

The material for flowable fill shall be combined of the following constituents:

Item Volume (cu. yd.)

Cement (min) 0.010

Fly Ash 0.158

Sand 0.562

Water 0.320

Total 1.050*

*Note that one cubic yard of flowable fill produces more than one cubic yard due to the additional water mix water.

Alternative flowable fill mix designs may be approved by the Engineer.

Addendum (10/4/21; 4:07 PM) Page 7

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

565.40 General—This subsection includes construction sequencing necessary to abandon AC waterline by filling with flowable fill.

565.41 Preparation—Contractor shall notify the Engineer at least 24 hours prior to filling mains.

The filling of abandoned waterline shall occur after full commissioning of the new ductile iron waterline and City Forces have performed all abandonment activities associated with post-connection work. Mains shall not be filled until Contractor verifies existing abandoned services have been kinked or plugged during customer service reconnection.

565.42 Placement—Fill abandon lines by completely filling pipe and any annular void space with flowable fill. Use concrete or grout pumps capable of continuous delivery at planned placement rate. Select fill placement equipment and follow procedure with sufficient safety and care to avoid damage to existing underground utilities and structures. Operate equipment at pressure that will not distort or imperil any portion of work, new, or existing. Have filling operations performed by experienced crews with equipment to monitor density of flowable fill and to control pressure.

Clean placement areas of debris that may hinder fill placement. Remove excessive amounts of sludge and other substances that may degrade performance of fill. Remove free water prior to starting fill placement.

Fill existing AC waterline where shown in plans, where existing AC waterline will be cut and removed, per Section 560, and at locations where AC pipe is encountered during construction activities. These removed sections of pipe may be additional allowable locations for inserting flowable fill.

During placement of flowable fill, compensate for irregularities in pipe, such as obstructions, or broken pipe to ensure no voids remain unfilled. Continuously pump flowable fill into pipe until line is filled end to end.

Place flowable fill under pressure conditions until flowable fill emerges from vent pipes or end of pipe. Pump flowable fill with sufficient pressure to overcome friction to fill pipe from end to end.

565.43 Quality Control—Check flow characteristics and workability of the fill as placement proceeds. Remediate placement of flowable fill which does not fill voids in the pipe, or where voids develop due to excessive shrinkage or bleeding of fill, by using pressure grouting from inside pipe or surface.

560.80 Flowable Fill—The quantities of Flowable Fill accepted will be measured by the linear foot basis as determined by straight line distance between the beginning and end of the pipe being filled.

Addendum (10/4/21; 4:07 PM) Page 8

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

560.90 Flowable Fill—Payment shall be full compensation to complete all work including, but not limited to, acquiring all necessary permits, verifying that all active services have been removed, installation of vent pipes, restoration due to vent pipe installation, and all labor, materials and equipment necessary to place flowable fill, including cleanup following construction.

Pay Items Unit of

Measure

Flowable Fill Lin. Ft.

CHANGES TO THE TECHNICAL SPECIFICATIONS:

DIVISION 9—FINISHES

SECTION 09900

PAINTING

—Remove Part 3 in its entirety and replace with attached revised Section 09900 Part 3.

DIVISION 11—EQUIPMENT AND SYSTEMS

SECTION 11750 SUBMERSIBLE SEWAGE PUMPS & PUMP CONTROL SYSTEM

—Remove this section in its entirety and replace with the attached revised Section 11750.

DIVISON 13—SPECIAL CONSTRUCTION AND PROCEDURES

SECTION 13420 INSTRUMENT

PART 2 PRODUCTS

2.1 EQUIPMENT

2.1.A.4.—Delete 8” and replace with the following:

10”

2.1.A.19.—Delete Promag 5W4C2H-C6ELHP5DUA1KGN+AACB and replace with the

Promag 5W4C2F-C6ELHP5DUA1KGN+AACB

SECTION 13430 BOXES, CONTROL PANELS, AND CONTROL CENTERS

—Remove this section in its entirety and replace with the attached revised Section 13430.

Addendum (10/4/21; 4:07 PM) Page 9

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

DIVISON 16—ELECTRICAL

SECTION 16057 ELECTRICAL SYSTEM ANALYSIS

—Remove this section in its entirety and replace with the attached revised Section 16057.

SECTION 16780 BROADCAST TRANSMISSION AND RECEPTION EQUIPMENT

PART 2 PRODUCTS

2.1 EQUIPMENT

2.1.A.3.—Delete the last two words of text and replace with the following:

2.1.E.6.—Delete the last two words of text and replace with the following:

CHANGES TO PERMITS

Marion County General Land Development and Event Permit Application

—Add LDEP Application to the Permits section of this Red Book.

CHANGES TO THE CONTRACT DRAWINGS:

DRAWING EC1.6

Add drawing EC1.6 for erosion control pursuant to overflow location and addition of Marion

County major erosion control permit. The Marion County Major erosion control permit is part of the Marion County General Land Development and Event Permit Application.

DRAWING D0.3

Revised detail 5410, wye strainer callout. Add Detail 5110 attached.

DRAWING M1.1

—Delete DLT U7301A from keynote #7 and replace with the following:

DTL U7100

DRAWING SR1.1

Revise total pavement restoration area in the right-of-way adjacent to the new pump station site.

Addendum (10/4/21; 4:07 PM) Page 10

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

DRAWING E-09

Added fault current for pad mounted utility transformer.

DRAWING E-24

Added sheet keynotes 3 and 4, conduit from OVF-CP1 to overflow manhole, stainless steel junction box below OVF-CP1, and solar panel to radio antenna pole.

DRAWING I-33A

Add drawing I-33A for pump disconnect panel (JB2) panel layout and elevations.

DRAWING I-34

Added 24VDC charge regulator and sheet keynote 3. Removed 24VDC Power Supply and CB1.

DRAWING W1.1, W1.4, W1.5

Added missing utilities.

DRAWING W1.6

Revise location of water services and added missing utilities

DRAWING W1.7

Relocation of fire hydrant and added missing utilities.

DRAWING W1.10, & W1.12

Details corrections of B2 on W1.10 and B5 on W1.12.

DRAWING W1.19

Add drawing W1.19 filling of abandoned AC waterlines.

ADDITIONAL INFORMATION

—See the attached PGE drawing.

Addendum (10/4/21; 4:07 PM) Page 11

MK/TF:G:\GROUP\ENGINEERING\ADMIN\TEMPLATES\PROJECTS\CONTRACTS\AD BID AWARD\MRG-ADDENDUM.DOCX V.04/10/2015

All other terms, conditions, and specifications within the contract documents shall remain unchanged and in effect in their entirety.

Shawna Self, CPPB, Manager

Contracts and Procurement

All bidders are required to provide evidence of the receipt and acceptance of this Addendum No. 1 with their proposal. Signing in the space provided below and submitting the signed Addendum with the proposal satisfies this requirement.

Receipt acknowledged and conditions agreed to this day of , 20 .

NAME OF FIRM:

SIGNATURE: