Schedule of Services.xls

XLS spreadsheet 39 KB Posted

Attached to
USCGC DILIGENCE FY25 AA
Solicitation number
70Z8025QMECP0009
Issued by

About this file

This is a pricing schedule spreadsheet for a dockside availability (maintenance period) for the USCGC DILIGENCE (WMEC-210A) planned for FY2025. The schedule includes definite work items focused on aviation-related maintenance and services, including cleaning and inspecting aviation fuel tanks, load testing the 28V DC helicopter power supply and 400Hz power supply, renewing windspeed transmitters, calibrating fuel flow meters, inspecting helicopter talon grids, preserving fuel tanks and helicopter operating areas, and replacing the whistle timer. The pricing template includes spaces for a composite labor rate, GFP reporting, and travel/per diem costs. It also contains provisions for over-and-above/growth work, with an estimated 506 hours of labor and $19,500 in material costs that would require contractor markup pricing, though these quantities are noted as estimates that may be exceeded through contract modifications.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC DILIGENCE (WMEC-210A) DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Tanks, Aviation Fuel Service, Clean And InspectJOB
D-00228 Volt DC Helo Power Supply, Load TestJOB
D-003400 Hz Power Supply (FCX Systems Inc), Load TestJOB
D-004Windspeed Transmitter, Anemometer, RenewJOB
D-005Flow Meter (Aviation Fuel), CalibrateJOB
D-006Helo Talon Grids, Inspect and TestJOB
D-007Tanks, Aviation Fuel Service, Preserve, PartialJOB
D-008Decks, Helicopter Operating Areas, PreserveJOB
D-009Whistle Timer, ReplaceJOB
O-00AComposite Labor RateHour
D-00BGFP ReportNSPEANSP
D-00CTravel and PerdiemJOB
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items
Over and Above/Growth Work
The Labor Rates and Material Markup/Handling Fee will used throughout the life of the contract if growth work is added to the scope of the contract. If Over and Above/Growth Work is issued, these items will be awarded at the quantities needed via a contract modification. The values shown are an estimate only and may be exceeded at the unit prices offered. The total extended price for both CLINs below are being used solely for the purposes of evaluating price.
**Fill in the sections highlighted below:
OA/G-001Over and Above/Growth Labor RateHour506$0.00
OA/G-002Over and Above/Growth Material Markup/Handling Fee$19,500.00Percent$0.00
Total Evaluated Price of Over and Above/Growth$0.00

&C(10/9/2024) Draft-1 - Page &P of &N

File details come from the government source that posted it. Updated .