17.a ABSTRACT OF OFFERS IFB 70Z0G126BCGA003NP.pdf

PDF 276 KB Posted

Attached to
MAJOR REPAIRS BOILER PLANT
Solicitation number
70Z0G126BCGA003NP
Issued by

About this file

This is an Abstract of Offers for a construction solicitation issued by the U.S. Coast Guard (USCG) Civil Engineering Unit in Providence, Rhode Island. Solicitation number 70Z0G126BCGA003NP was issued on February 11, 2026, and opened on March 19, 2026. The project involves major repairs to the boiler plant at the U.S. Coast Guard Academy in New London, Connecticut (PSN 21590583). Ten amendments were issued prior to the bid opening date.

The solicitation consists of one base item and four optional items structured as lump sum (LS) contracts. Base Item 1 covers the primary boiler plant repairs, while optional items address Highland Tank Containment Renovations, Exterior Brick Masonry and Lintel Renovations, Exterior Stair/Wall and Paving Renovations, and Force Sewer Main Relocation. Eleven offers were received from contractors including Classic Site Solutions, Inc.; Campbell Construction Group, LLC; K2 Contracting Group LLC; Structural Engineering Group; Imperial Construction & Electric Inc.; Henry General Contractors, Inc.; Excell Construction Corp.; The netmeg companies, inc.; SARAZIN General Contractors, Inc.; Doyon Technical Services LLC; and Diversity Construction Group, LLC. All bidders provided 20% bid security and acknowledged receipt of ten amendments. Total lump sum bids for all items (0001-0005) ranged from $1,886,000.00 to $3,744,069.66. The government estimate for the combined base and optional items was $1,510,072.00 (without profit). Contracting Officer Simon W. Leung certified the abstract on March 19, 2026.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ABSTRACT OF OFFERS - CONSTRUCTION

1. SOLICITATION NUMBER

70Z0G126BCGA003NP

2. DATE ISSUED

02/11/2026

DATE OPENED

03/19/2026

PAGE OF PAGES

1 4

4. ISSUING OFFICE

USCG CEU PROVIDENCE

475 KILVERT STREET SUITE 100

WARWICK, RI 02886

I CERTIFY that I have opened, read, and recorded on this abstract all offers received in response to this solicitation.

NAME AND TITLE OF CERTIFYING OFFICIAL (TYPE)

Simon W. Leung, USCG Contracting Officer

SIGNATURE

DATE SIGNED

03/19/2026

5. PROJECT TITLE

MAJOR REPAIRS BOILER PLANT AT U.S. COAST

GUARD ACADEMY, NEW LONDON, CT, PSN 21590583

8. GOVERNMENT ESTIMATE

(Check A, B or C and complete D, E, and F)

9. OFFERS

NO. 1 NO. 2

A. HIRED LABOR

A. OFFEROR

Classic Site Solutions, Inc.

A. OFFEROR

Campbell Construction Group, LLC

B. REASONABLE

CONTRACT

(Without Profit)

B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20%

6. NUMBER OF AMENDMENTS ISSUED

0001 through 0010 X

C. REASONABLE

CONTRACT

(Including profit)

C. AMENDMENTS ACKNOWLEDGED

7A.

ITEM

NO.

7B. DESCRIPTION OF OFFERED ITEM 7C. EST.

QUANTITY

D.

UNIT

E. UNIT

PRICE

F. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Base Item 1 LS $703,077.00 $989,419.00 $826,249.00

0002 Option Item 1 - Highland Tank Containment Renovations 1 LS $264,068.00 450,000.00 320,443.00

0003 Option Item 2 - Exterior Brick Masonry and Lintel Renovations 1 LS $100,107.00 130,000.00 71,787.00

0004 Option Item 3 - Exterior Stair, Wall and Paving Renovations 1 LS $247,678.00 240,000.00 818,000.00

0005 Option Item 4 - Force Sewer Main Relocation 1 LS $195,142.00 148,000.00 245,000.00

Total Lump Sum (Items 0001 thru 0005) $1,510,072.00 $1,957,419.00 $2,281,479.00

ABSTRACT OF OFFERS – CONSTRUCTION

CONTINUATION SHEET

70Z0G126BCGA003NP

PAGE OF PAGES

2 4

INSTRUCTIONS – Attach this form to OF-1419, Abstract of Offers – Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF-1419. Use additional OF-1419’s for contract items in excess of 14 and attach additional Continuation Sheets (OF-1419A) as needed.

MAJOR REPAIRS BOILER PLANT

AT U.S. COAST GUARD ACADEMY,

NEW LONDON, CT, PSN 21590583

4. OFFERS (Continued)

NO. 3 NO. 4 NO. 5 NO. 6

A. OFFEROR

K2 Contracting Group LLC

A. OFFEROR

Structural Engineering Group

A. OFFEROR

Imperial Construction & Electric Inc.

A. OFFEROR

Henry General Contractors, Inc.

B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20%

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Base Item 1 LS $1,006,427.25 $885,780.68 $794,920.00 $797,771.00

Option Item 1 - Highland Tank Containment Renovations

1 LS 186,905.74 132,075.20 393,483.00 369,794.00

Option Item 2 - Exterior Brick Masonry and Lintel Renovations

1 LS 344,315.44 202,364.00 270,708.00 112,230.00

Option Item 3 - Exterior Stair, Wall and Paving Renovations

1 LS 328,000.97 501,888.52 454,512.00 306,203.00

Option Item 4 - Force Sewer Main Relocation

1 LS 374,244.11 1,721,917.50 472,377.00 694,090.00

Total Lump Sum (Items 0001 thru 0005)

$2,239,893.51 $3,744,069.66 $2,386,000.00 $2,280,088.00

70Z0G126BCGA003NP

PAGE OF PAGES

3 4

INSTRUCTIONS – Attach this form to OF-1419, Abstract of Offers – Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF-1419. Use additional OF-1419’s for contract items in excess of 14 and attach additional

NEW LONDON, CT, PSN 21590583

4. OFFERS (Continued)

NO. 7 NO. 8 NO. 9 NO. 10

A. OFFEROR

Excell Construction Corp.

A. OFFEROR

The netmeg companies, inc.

A. OFFEROR

SARAZIN General Contractors, Inc.

A. OFFEROR

Doyon Technical Services

LLC

B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20% B. BID SECURITY (Type and amount)

20%

3. CONTRACT ITEMS

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

C. AMENDMENTS ACKNOWLEDGED

A.

ITEM

NO.

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Base Item 1 LS $1,343,617.23 $917,711.00 $639,000.00 $1,116,070.00

Option Item 1 - Highland Tank Containment Renovations

1 LS 320,400.46 267,000.00 269,000.00 203,174.00

Option Item 2 - Exterior Brick Masonry and Lintel Renovations

1 LS 581,975.81 341,000.00 163,000.00 123,527.00

Option Item 3 - Exterior Stair, Wall and Paving Renovations

1 LS

0.00 Due to

overlapping Scope 3 & 4 are Combined

811,000.00 643,000.00 384,775.00

Option Item 4 - Force Sewer Main

1 LS 820,503.91 287,000.00 172,000.00 334,245.00

$3,066,497.42 $2,623,711.00 $1,886,000.00 $2,161,791.00

70Z0G126BCGA003NP

PAGE OF PAGES

4 4

INSTRUCTIONS – Attach this form to OF-1419, Abstract of Offers – Construction, when more than 2 offers are received on a construction project. Each Continuation Sheet will accommodate 14 contract items to conform to the number of items which can be entered on the OF-1419. Use additional OF-1419’s for contract items in excess of 14 and attach additional

NEW LONDON, CT, PSN 21590583

4. OFFERS (Continued)

NO. 11 NO. 12 NO. 13 NO. 14

A. OFFEROR

Diversity Construction Group, LLC

A. OFFEROR

B. BID SECURITY (Type and amount)

20%

3. CONTRACT ITEMS

A.

ITEM

NO.

C.

UNIT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

D. UNIT

PRICE

E. ESTIMATED

AMOUNT

0001 Base Item 1 LS $688,000.00

Option Item 1 - Highland Tank Containment Renovations

1 LS 228,000.00

Option Item 2 - Exterior Brick Masonry and Lintel Renovations

1 LS 320,000.00

Option Item 3 - Exterior Stair, Wall and Paving Renovations

1 LS 365,000.00

Option Item 4 - Force Sewer Main

1 LS 502,000.00

$2,103,000.00

Simon W. Leung, USCG Contracting Officer
03/19/2026
$195,142.00
245,000.00
ABSTRACT OF OFFERS – CONSTRUCTION
CONTINUATION SHEET
$2,239,893.51
$3,744,069.66
ABSTRACT OF OFFERS – CONSTRUCTION
CONTINUATION SHEET
$3,066,497.42
$2,623,711.00
ABSTRACT OF OFFERS – CONSTRUCTION
CONTINUATION SHEET
$2,103,000.00
2026-03-19T15:47:51-0400
LEUNG.SIMON.W.1242822982

File details come from the government source that posted it. Updated .