DEPARTMENT OF HOMELAND SECURITY
UNITED STATES COAST GUARD
SHORE INFRASTRUCTURE LOGISTICS CENTER
SPECIFICATIONS FOR
REPAIR ATON WOODS HOLE (FY24 CPOP) DEMO ATON WH (FY24 DPOP)
Revised Final DESIGN
June 2025
PSN: 18632375
AT VARIOUS
USCG DISTRICT 1
WOODS HOLE
LT Lydia VanWinkle David Glass, PE
DESIGN PROJECT MANAGER BRANCH CHIEF
_____Michael P. Carosotto, PE_____
TECHNICAL DIRECTOR
by direction of the
COMMANDING OFFICER
UNITED STATES COAST GUARD
CIVIL ENGINEERING UNIT PROVIDENCE
475 KILVERT STREET, SUITE 100
WARWICK, RHODE ISLAND 02886
12/16/2024
Repair ATON Woods Hole (FY24 CPOP) Demo ATON WH (FY24 DPOP) PSN 18632375
PROJECT TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
00 01 15 02/11, CHG 1: 08/14 LIST OF DRAWINGS
DIVISION 01 - GENERAL REQUIREMENTS
01 11 00 08/15, CHG 2: 08/21 SUMMARY OF WORK
01 14 00 11/11 WORK RESTRICTIONS
01 32 00 02/15 CONSTRUCTION SCHEDULE/SCHEDULE OF
VALUES
01 33 00 08/18 SUBMITTAL PROCEDURES
01 35 29 04/06 SAFETY AND OCCUPATIONAL HEALTH
REQUIREMENTS
01 42 00 02/19 SOURCES FOR REFERENCE PUBLICATIONS
01 50 00 05/18 TEMPORARY CONSTRUCTION FACILITIES AND
CONTROLS
01 57 19 11/15 TEMPORARY ENVIRONMENTAL CONTROLS
01 77 00 08/11 CLOSEOUT PROCEDURES
01 78 23 05/20 OPERATION AND MAINTENANCE DATA
DIVISION 02 - EXISTING CONDITIONS
02 41 00 05/10 DEMOLITION
DIVISION 03 - CONCRETE
03 01 32 11/09 CONCRETE REHABILITATION
03 20 00.01 05/14 CONCRETE ANCHORS AND DOWELS
03 31 29.01 09/99 CONCRETE
DIVISION 05 - METALS
05 05 23.16 05/14 STRUCTURAL WELDING
05 12 00 05/14 STRUCTURAL STEEL
DIVISION 06 - WOOD, PLASTICS, AND COMPOSITES
06 13 33 11/16 MARINE TIMBERWORK
DIVISION 09 - FINISHES
09 01 90.50 05/09, CHG 1: 08/17 PREPARATION OF HISTORIC WOOD AND METAL
SURFACES FOR PAINTING
09 90 00 02/21 PAINTS AND COATINGS
09 97 13.26 01 07/22 COATING OF STEEL WATERFRONT STRUCTURES
DIVISION 10 - SPECIALTIES
10 99 02 09/10 SAFETY CLIMB SYSTEM
DIVISION 31 - EARTHWORK
31 62 16.16 11/11 STEEL PILES
31 62 16.17 11/11 ROCK SOCKETED STEEL PIPE PILES
DIVISION 35 - WATERWAY AND MARINE CONSTRUCTION
PROJECT TABLE OF CONTENTS Page 1
35 13 10 12/09 INSTALLATION OF NAVIGATIONAL LIGHT STRUCTURES
PROJECT TABLE OF CONTENTS Page 2
APPENDICES
Appendix A - Barnstable Conservation Commission Order of Conditions Appendix B - Falmouth Conservation Commission Order of Conditions Appendix C - Harwich Conservation Commission Order of Conditions Appendix D - MassDEP Water Quality Certification Appendix E - U.S. Army Corps of Engineers Environmental Permit
-- End of Project Table of Contents --
SECTION TABLE OF CONTENTS
DIVISION 00 - PROCUREMENT AND CONTRACTING REQUIREMENTS
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
1.2 CONTRACT DRAWINGS
1.3 SUPPLEMENTARY DRAWINGS
1.3.1 Reference Drawings
-- End of Section Table of Contents --
DOCUMENT 00 01 15 Page 1
DOCUMENT 00 01 15
LIST OF DRAWINGS
02/11, CHG 1: 08/14
PART 1 GENERAL
1.1 SUMMARY
This section lists the drawings for the project pursuant to contract clause "DFARS 252.236-7001, Contract Drawings, Maps, and Specifications."
1.2 CONTRACT DRAWINGS
Contract drawings are as follows:
SHEET ID SHEET
NO
LEVEL
II/SITE
DESIGNATION
SITE SHEET TITLE
G-001 01 - ALL COVER SHEET
G-002 02 - ALL GENERAL NOTES
CD201H 03 H COLLIER LEDGE ISOLATED
DANGER VAIS
EXISTING/DEMOLITION
CD201I 04 I SOUTHWEST ROCK DAYBEACON EXISTING/DEMOLITION
SD201A 05 A BROADWAY DAYBEACON LIGHT 3 EXISTING/DEMOLITION
S-201A 06 A BROADWAY DAYBEACON LIGHT 3 GENERAL ARRANGEMENT
S-501A 07 A BROADWAY DAYBEACON LIGHT 3 DETAILS - 1 OF 2
S-502A 08 A BROADWAY DAYBEACON LIGHT 3 DETAILS - 2 OF 2
SD201B 09 B FALMOUTH INNER HARBOR LIGHT
EXISTING/REPAIR
SD201C 10 C NANTUCKET EAST BREAKWATER
LIGHT 3
EXISTING/REPAIR
S-201C 11 C NANTUCKET EAST BREAKWATER
LIGHT 3
GENERAL ARRANGEMENT
SD201D 12 D NANTUCKET HARBOR RANGE
FRONT LIGHT
EXISTING/DEMOLITION
S-201D 13 D NANTUCKET HARBOR RANGE
FRONT LIGHT
GENERAL ARRANGEMENT
DOCUMENT 00 01 15 Page 2
SHEET ID SHEET
NO
LEVEL
II/SITE
DESIGNATION
SITE SHEET TITLE
SD201E 14 E NANTUCKET HARBOR RANGE REAR
LIGHT
EXISTING/DEMOLITION
S-201E 15 E NANTUCKET HARBOR RANGE REAR
LIGHT
GENERAL ARRANGEMENT
SD201F 16 F CAPE COD EASTERN ENTRANCE
RANGE FRONT LIGHT
EXISTING/DEMOLITION
S-201F 17 F CAPE COD EASTERN ENTRANCE
RANGE FRONT LIGHT
GENERAL ARRANGEMENT
SD201G 18 G CAPE COD EASTERN ENTRANCE
RANGE REAR LIGHT
EXISTING/DEMOLITION
S-201G 19 G CAPE COD EASTERN ENTRANCE
RANGE REAR LIGHT
GENERAL ARRANGEMENT
SD201J 20 J SAQUATUCKET HARBOR EAST
JETTY LIG HT 6
EXISTING/DEMOLITION
1.3 SUPPLEMENTARY DRAWINGS
These supplementary drawings may not be a part of the contract but are included with the drawings for information.
1.3.1 Reference Drawings
The following reference drawings are intended only to show the original construction. Drawings are the property of the Government and shall not be used for any purpose other than that intended by the contract.
SHEET ID SHEET NOLEVEL
II/SITE
DESIGNATION
SITE SHEET TITLE
R-701 21 ALL ALL TOWER REFERENCE - 01
R-702 22 ALL ALL TOWER REFERENCE - 02
R-703 23 ALL ALL TOWER REFERENCE - 03
R-704 24 ALL ALL TOWER REFERENCE - 04
R-705 25 ALL ALL TOWER REFERENCE - 05
DOCUMENT 00 01 15 Page 3
Repai r ATON Woods Hol e ( FY24 CPOP) Demo ATON WH ( FY24 DPOP) PSN 18632375
SHEET I D SHEET NOLEVEL
I I / SI TE
DESI GNATI ON
SI TE SHEET TI TLE
R- 706A 26 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 01
R- 707A 27 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 02
R- 708A 28 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 03
R- 709A 29 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng- 04
R- 710A 30 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 05
R- 711A 31 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 06
R- 712A 32 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 07
R- 713A 33 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 08
R- 714A 34 Br oadway Daybeacon 3
Br oadway Daybeacon 3
Ref er ence Dr awi ng - 09
R- 715A 35 Sout hwest Rock Daybeacon
Sout hwest Rock Daybeacon
Ref er ence Dr awi ng - 10
- - End of Document - -
DOCUMENT 00 01 15 Page 4
SECTI ON TABLE OF CONTENTS
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 11 00
SUMMARY OF WORK
08/ 15, CHG 2: 08/ 21
PART 1 GENERAL
1. 1 WORK COVERED BY CONTRACT DOCUMENTS
1. 1. 1 Pr oj ect Descr i pt i on
1. 1. 2 Locat i on
1. 2 EXI STI NG WORK
1. 3 LOCATI ON OF UNDERGROUND UTI LI TI ES
1. 3. 1 Not i f i cat i on Pr i or t o Excavat i on
1. 4 QUALI TY ASSURANCE
1. 4. 1 Feder al and Ot her Aut hor i t i es Havi ng Jur i sdi ct i on
1. 4. 2 Commi ssi oni ng, Funct i onal Per f or mance Test s
1. 5 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
1. 6 SALVAGE MATERI AL AND EQUI PMENT
1. 7 SUPERVI SI ON
1. 8 PRECONSTRUCTI ON MEETI NG
1. 9 CONSTRUCTI ON KI CKOFF MEETI NG
1. 10 PROJECT COMMUNI CATI ON - CONSTRUCTI ON PROJECT MEETI NGS
1. 11 BUY AMERI CAN ACT COMPLI ANCE
1. 12 BASI S OF DESI GN; AND BRAND NAME OR EQUAL
1. 12. 1 Basi s Of Desi gn
1. 12. 2 Br and Name or Equal
1. 13 I NSPECTI ON
1. 13. 1 Cont r act or ' s Dai l y Log
PART 2 PRODUCTS
PART 3 EXECUTI ON
- - End of Sect i on Tabl e of Cont ent s - -
SECTI ON 01 11 00 Page 1
SECTION 01 11 00
SUMMARY OF WORK
08/15, CHG 2: 08/21
PART 1 GENERAL
1.1 WORK COVERED BY CONTRACT DOCUMENTS
1.1.1 Project Description
The project consists of demolition and structural repair and/or replacement of ten (10) Aid to Navigation (ATON) assets in the Nantucket Sound. The base bid consists of all ATON assets listed below. A Bid Option consists of ATON asset location A.
1.1.2 Location
The work is located in the U.S. Coast Guard District 1 (D1) Area of Operation (AOR). The ATON asset locations are listed below.
A. Broadway Daybeacon 3 (Light List Number - LLNR 15760)
LAT/LONG: 41-31-08.969N, 070-40-47.825W
CHART: 13229
B. Falmouth Inner Harbor Light 1 (LLNR 15110)
LAT/LONG: 41-32-31.440N, 070-36-29.820W
C. Nantucket Harbor East Breakwater Light 3 (LLNR 15150)
LAT/LONG: 41-18-37.058N, 070-06-00.112W
CHART: 13237
D. Nantucket Harbor Range Front Light (LLNR 15160)
LAT/LONG: 41-17-23.529N, 070-05-32.361W
CHART: 13237
E. Nantucket Harbor Range Rear Light (LLNR 15165)
LAT/LONG: 41-17-21.318N, 070-05-31.377W
CHART: 13237
F. Cape Cod Canal Eastern Entrance Range Front Light (LLNR 13080)
LAT/LONG: 41-46-17.748N,070-30-32.526W
CHART: 13229
G. Cape Cod Canal Eastern Entrance Range Rear Light (LLNR 13085)
LAT/LONG: 41-4613.356N, 070-30-42.083W
CHART: 13229
H. Collier Ledge Isolated Danger VAIS (LLNR 14686)
LAT/LONG: 41-35-48.283N, 070-21-04.878W
CHART: 13229
I. Southwest Rock Daybeacon (LLNR 14712)
LAT/LONG: 41-36-26.600N, 070-19-10.745W
SECTION 01 11 00 Page 2
J. Saquat ucket Har bor East Jet t y Li ght 6 ( LLNR 14050)
LAT/ LONG: 41- 39- 48. 640N, 070- 03- 39. 570W
CHART: 13229
1. 2 EXI STI NG WORK
I n addi t i on t o FAR 52. 236- 9 Pr ot ect i on of Exi st i ng Veget at i on, St r uct ur es, Equi pment , Ut i l i t i es, and I mpr ovement s:
a. Remove or al t er exi st i ng wor k i n such a manner as t o pr event i nj ur y or damage t o any por t i ons of t he exi st i ng wor k whi ch r emai n.
b. Repai r or r epl ace por t i ons of exi st i ng wor k whi ch have been al t er ed dur i ng const r uct i on oper at i ons t o mat ch exi st i ng or adj oi ni ng wor k, as appr oved by t he Cont r act i ng Of f i cer . At t he compl et i on of oper at i ons, exi st i ng wor k must be i n a condi t i on equal t o or bet t er t han t hat whi ch exi st ed bef or e new wor k st ar t ed.
1. 3 LOCATI ON OF UNDERGROUND UTI LI TI ES
Obt ai n di ggi ng per mi t s pr i or t o st ar t of excavat i on by cont act i ng t he Cont r act i ng Of f i cer 15 cal endar days i n advance. Scan t he const r uct i on s i t e wi t h el ect r omagnet i c or soni c equi pment , and mar k t he sur f ace of t he gr ound wher e exi st i ng under gr ound ut i l i t i es ar e di scover ed. Ver i f y t he el evat i ons of exi st i ng pi pi ng, ut i l i t i es, and any t ype of under gr ound obst r uct i on not i ndi cat ed or speci f i ed t o be r emoved but i ndi cat ed or di scover ed dur i ng scanni ng i n l ocat i ons t o be t r aver sed by pi pi ng, duct s, and ot her wor k t o be i nst al l ed.
1. 3. 1 Not i f i cat i on Pr i or t o Excavat i on
Not i f y t he Cont r act i ng Of f i cer at l east 48 hour s pr i or t o st ar t i ng excavat i on wor k. Cont act t he l ocal ut i l i t y or Di g Saf e 48 hour s pr i or t o excavat i ng. Cont r act or i s r esponsi bl e f or mar ki ng al l ut i l i t i es not mar ked by t he ut i l i t y or Di g Saf e.
1. 4 QUALI TY ASSURANCE
1. 4. 1 Feder al and Ot her Aut hor i t i es Havi ng Jur i sdi ct i on
Al l wor k shal l be i n compl i ance wi t h Feder al and St at e of Massachuset t s r egul at i ons and r equi r ement s.
1. 4. 2 Commi ssi oni ng, Funct i onal Per f or mance Test s
Commi ssi oni ng act i v i t i es shal l be compl et ed i n accor dance wi t h t he Commi ssi oni ng speci f i cat i ons and r equi r ement s cont ai ned i n t he pl ans and specs.
1. 5 GOVERNMENT- FURNI SHED MATERI AL AND EQUI PMENT
Thi s pr oj ect does not i ncl ude any Gover nment - Fur ni shed Mat er i al and Equi pment .
1. 6 SALVAGE MATERI AL AND EQUI PMENT
I t ems desi gnat ed on t he dr awi ngs f or r euse shal l be car ef ul l y r emoved and st or ed i n a saf e l ocat i on on si t e f or r ei nst al l at i on as di r ect ed by t he
SECTI ON 01 11 00 Page 3
COR.
Cont r act or shal l mai nt ai n pr oper t y cont r ol r ecor ds f or mat er i al or equi pment desi gnat ed as sal vage. Cont r act or ' s syst em of pr oper t y cont r ol may be used i f appr oved by t he Cont r act i ng Of f i cer . Cont r act or shal l be r esponsi bl e f or st or age and pr ot ect i on of sal vaged mat er i al s and equi pment unt i l di sposi t i on by t he COR.
1. 7 SUPERVI SI ON
Have at l east one qual i f i ed super vi sor capabl e of r eadi ng, wr i t i ng, and conver si ng f l uent l y i n t he Engl i sh l anguage on t he j ob s i t e dur i ng wor ki ng hour s. I n addi t i on, i f a Qual i t y Cont r ol ( QC) r epr esent at i ve i s r equi r ed on t he cont r act , t hen t hat i ndi v i dual shal l al so have f l uent Engl i sh communi cat i on ski l l s .
1. 8 PRECONSTRUCTI ON MEETI NG
Af t er awar d of t he cont r act , but pr i or t o commencement of any wor k at t he si t e, meet wi t h t he Cont r act i ng Of f i cer t o di scuss and devel op a mut ual under st andi ng r el at i ve t o t he admi ni st r at i on of t he cont r act f or const r uct i on, saf et y pr ogr am, pr epar at i on of t he schedul e of val ues, shop dr awi ngs and ot her submi t t al s, schedul i ng/ pr ogr ammi ng, and pr osecut i on of t he wor k. Maj or subcont r act or s who wi l l engage i n t he wor k shal l al so at t end.
1. 9 CONSTRUCTI ON KI CKOFF MEETI NG
Af t er awar d of t he cont r act , and when cont r act s f or t he maj or subcont r act or s l i s t ed bel ow have been execut ed by t he pr i me cont r act or , and pr i or t o commencement of any wor k at t he s i t e, meet wi t h t he COR t o di scuss and devel op a mut ual under st andi ng r el at i ve t o wor k r est r i ct i ons, saf et y r equi r ement s and t empor ar y envi r onment al cont r ol s, t empor ar y f aci l i t i es and cont r ol s, pr epar at i on of t he pr oj ect schedul e, shop dr awi ngs and ot her submi t t al s, schedul i ng pr ogr ammi ng i ncl udi ng phasi ng r equi r ement s, c l oseout pr ocedur es and pr osecut i on of t he wor k. Maj or subcont r act or s who wi l l engage i n t he wor k shal l al so at t end.
1. 10 PROJECT COMMUNI CATI ON - CONSTRUCTI ON PROJECT MEETI NGS
Const r uct i on Pr oj ect Meet i ngs ( aka ' Job Meet i ngs' ) wi l l be hel d on a r egul ar basi s at t he pr oj ect l ocat i on t o advi se of t he wor k pl anned f or t he pr oj ect and t o opt i mi ze communi cat i ons wi t h t he const r uct i on t eam and USCG Pr oj ect Manager s. Meet i ngs wi l l t ypi cal l y be convened at t he j ob- si t e.
Par t i c i pat i on v i a conf er ence cal l may be accept abl e f or some at t endees, at t he di scr et i on of t he COR. A schedul e f or t hese meet i ngs wi l l i ni t i al l y be est abl i shed at t he Pr e- Const r uct i on Conf er ence, wi t h dat es and t i mes t o be ar r anged f or t he mut ual conveni ence of al l , t o t he ext ent pr act i cal .
I n addi t i on t o t he Pr i me Cont r act or ' s Pr oj ect Manager , key per sonnel f r om sub- cont r act or s shal l al so at t end. The need f or t hese meet i ngs shal l be at t he di scr et i on of t he U. S. Coast Guar d Const r uct i on Pr oj ect Manager , but i t i s ant i c i pat ed t hat i ni t i al l y , at a mi ni mum, t hese meet i ngs shal l occur mont hl y unt i l al l submi t t al s ar e appr oved. Meet i ngs shal l i ncr ease t o weekl y as t he per i od f or on- si t e const r uct i on appr oaches, and cont i nue on a weekl y basi s unt i l no l onger r equi r ed, at t he di scr et i on of t he COR.
SECTI ON 01 11 00 Page 4
1. 11 BUY AMERI CAN ACT COMPLI ANCE
Al l equi pment pur chased by U. S. Gover nment agenci es must compl y wi t h t he " Buy Amer i can Act " ( BAA) . I n summar y, t hi s means t hat t he equi pment or syst ems i nst al l ed must be made i n t he USA.
1. 12 BASI S OF DESI GN; AND BRAND NAME OR EQUAL
I n gener al , t he Feder al Gover nment does not i ncl ude t he name of manuf act ur er s or model number s t o speci f y var i ous i t ems, equi pment , component s or syst ems. However , s i nce equi pment or ot her i t ems of equal capaci t y i s not necessar i l y avai l abl e i n t he same ar r angement , s i ze, or const r uct i on r equi r ed f or t he speci f i c use or appl i cat i on r equi r ed, manuf act ur er s ' model number s, f i gur es, or ot her " Br and Name" i nf or mat i on or r ef er ences ar e used i n t he Cont r act Document s f or t he conveni ence of t he Gover nment and as a ser vi ce t o bi dder s, i n or der t o gener al l y i dent i f y f eat ur es, per f or mance, and l evel of qual i t y or mat er i al s t o be pr ovi ded.
The i nf or mat i on may appear i n t he speci f i cat i ons, on t he dr awi ngs ( i n t he f or m of dr awi ng not es, schedul es, or ot her s i mi l ar met hods) , or a combi nat i on of t hese met hods.
Use of t he name of a manuf act ur er i n conj unct i on wi t h t he wor ds " or equal " or " Desi gn Basi s" does not i ndi cat e a pr ef er ence f or t hi s equi pment , but r at her t hat t he Gover nment i s not awar e of al l possi bl e or accept abl e sour ces of suppl y f or t he par t i cul ar i t em, but has l ocat ed at l east one sour ce. However , gi ven t he i mpact on t he const r uct i on schedul e, and need f or coor di nat i on dur i ng t hat per i od, t hese t wo condi t i ons have speci f i c meani ngs r el at i ve t o cont r act document r equi r ement s.
1. 12. 1 Basi s Of Desi gn
I t ems speci f i ed wi t hout i dent i f y i ng a manuf act ur er or usi ng " Desi gn Basi s" or " Basi s of Desi gn" may be pr oposed as par t of t he nor mal submi t t al pr ocess.
1. 12. 2 Br and Name or Equal
I t ems speci f i ed wi t h t he wor ds " Br and Name or Equal " ( i nf or mat i on i n squar e br acket s may be a manuf act ur er pl us model number or ser i es of equi pment ) have been so speci f i ed because of t hei r par t i cul ar s i gni f i cance r el at i ve t o successf ul l y achi evi ng desi gn r equi r ement s and i nt ent . When t hi s speci f i cat i on met hod i s used, t he cont r act or shal l , i f s / he woul d l i ke t o use a manuf act ur er / model number ot her t han t hat speci f i ed, i ncl ude a det ai l ed submi t t al f ul l y descr i bi ng t he i t em, i ncl udi ng i t s abi l i t y t o meet or exceed t he r equi r ed sal i ent char act er i st i cs of t he speci f i ed equi pment , wi t h t he bi d mat er i al s submi t t ed, as an al t er nat e manuf act ur er f or eval uat i on as par t of t he bi ddi ng pr ocess. The cont r act or shal l al so f ul l y bear any cost s associ at ed wi t h use of t he al t er nat e equi pment or i t em, i f appr oved ( e. g. , wor k by ot her t r ades, ot her modi f i cat i ons r equi r ed t o achi eve pr oj ect r equi r ement s) .
1. 13 I NSPECTI ON
The Cont r act or shal l keep t he Cont r act i ng Of f i cer or dul y appoi nt ed r epr esent at i ve f ul l y i nf or med of cont r act oper at i ons and pl ans so t hat a r epr esent at i ve may ar r ange t o be pr esent at var i ous t i mes t hat wor k i s bei ng per f or med.
SECTI ON 01 11 00 Page 5
1. 13. 1 Cont r act or ' s Dai l y Log
The Cont r act or shal l compl et e t he USCG Dai l y Log f or m at t he end of each wor ki ng day and del i ver i t t o t he Gover nment I nspect or . The Gover nment I nspect or wi l l at t est t o i t s accur acy by i ni t i al i ng t he f or m and f or war di ng t hat f or m t o CEU Pr ovi dence. The f or m wi l l be pr ovi ded t o t he Cont r act or by t he Cont r act i ng Of f i cer ' s Repr esent at i ve.
PART 2 PRODUCTS
Not used.
PART 3 EXECUTI ON
Not used.
- - End of Sect i on - -
SECTI ON 01 11 00 Page 6
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 11
PART 1 GENERAL
1. 1 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 1. 1 Act i v i t y Regul at i ons
1. 1. 2 Wor ki ng Hour s
1. 1. 3 Wor k Out si de Regul ar Hour s
1. 2 SECURI TY REQUI REMENTS
1. 2. 1 Ar eas Not Cover ed by Cont r act
PART 2 PRODUCTS
PART 3 EXECUTI ON
SECTI ON 01 14 00 Page 1
SECTI ON 01 14 00
WORK RESTRI CTI ONS
11/ 11
PART 1 GENERAL
1. 1 CONTRACTOR ACCESS AND USE OF PREMI SES
1. 1. 1 Act i v i t y Regul at i ons
Ensur e t hat Cont r act or per sonnel empl oyed on t he act i v i t y become f ami l i ar wi t h and obey Act i v i t y r egul at i ons i ncl udi ng saf et y, f i r e, t r af f i c and secur i t y r egul at i ons. Keep wi t hi n t he l i mi t s of t he wor k and avenues of i ngr ess and egr ess. Do not ent er any r est r i ct ed ar eas unl ess r equi r ed t o do so and unt i l c l ear ed f or such ent r y. The Cont r act or ' s equi pment shal l be conspi cuousl y mar ked f or i dent i f i cat i on. Cont r act or t o abi de by al l per t i nent r ul es and r egul at i ons as di ct at ed by pr i vat e pr oper t y owner s.
Cape Cod Canal Range Fr ont and Range Rear Li ght s ar e l ocat ed on pr i vat e pr oper t y. Coor di nat e al l act i v i t i es wi t h pr oper t y owner .
1. 1. 2 Wor ki ng Hour s
Regul ar wor ki ng hour s must consi st of an 8 1/ 2 hour per i od est abl i shed by t he Cont r act i ng Of f i cer Monday t hr ough Fr i day, excl udi ng Gover nment hol i days.
1. 1. 3 Wor k Out si de Regul ar Hour s
Wor k out si de r egul ar wor ki ng hour s r equi r es Cont r act i ng Of f i cer appr oval .
Make appl i cat i on 15 cal endar days pr i or t o such wor k t o al l ow ar r angement s t o be made by t he Gover nment f or i nspect i ng t he wor k i n pr ogr ess, gi v i ng t he speci f i c dat es, hour s, l ocat i on, t ype of wor k t o be per f or med, cont r act number and pr oj ect t i t l e. Based on t he j ust i f i cat i on pr ovi ded, t he Cont r act i ng Of f i cer may appr ove wor k out si de r egul ar hour s. Dur i ng per i ods of dar kness, t he di f f er ent par t s of t he wor k must be l i ght ed i n a manner appr oved by t he Cont r act i ng Of f i cer . Make ut i l i t y cut over s af t er nor mal wor ki ng hour s or on Sat ur days, Sundays, and Gover nment hol i days unl ess di r ect ed ot her wi se.
1. 2 SECURI TY REQUI REMENTS
1. 2. 1 Ar eas Not Cover ed by Cont r act
The Cont r act or wi l l not be per mi t t ed t o ent er bui l di ngs or ar eas not cover ed by t he wor k i ncl uded i n t hi s cont r act , except by pr i or appr oval of t he Cont r act i ng Of f i cer of t he f aci l i t y .
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
Not Used.
SECTI ON 01 14 00 Page 2
SECTI ON 01 14 00 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 32 00
CONSTRUCTI ON SCHEDULE/ SCHEDULE OF VALUES
02/ 15
PART 1 GENERAL
1. 1 SUBMI TTALS
1. 2 CONSTRUCTI ON SCHEDULE
1. 3 UPDATED SCHEDULES
PART 2 PRODUCTS
PART 3 EXECUTI ON
3. 1 PROGRESS UPDATES
3. 1. 1 Gener al
3. 1. 2 Modi f i cat i ons
SECTI ON 01 32 00 Page 1
SECTI ON 01 32 00
CONSTRUCTI ON SCHEDULE/ SCHEDULE OF VALUES
02/ 15
PART 1 GENERAL
1. 1 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or al l submi t t al s. Submi t t he f ol l owi ng i n accor dance wi t h Sect i on 01 33 00 SUBMI TTAL PROCEDURES:
SD- 01 Pr econst r uct i on Submi t t al s
Const r uct i on Schedul e/ Schedul e of Val ues
1. 2 CONSTRUCTI ON SCHEDULE
At t he Pr e- Const r uct i on Conf er ence, submi t a Const r uct i on Schedul e and Schedul e of Val ues i n accor dance wi t h FAR Cl ause 52. 236. 15. The Schedul e of Val ues shal l be based on t he act ual br eakdown of t he bi d pr i ce. The cost of i nsur ance shal l not be l i s t ed as a separ at e i t em but i ncl uded as par t of each i t em of wor k. The act ual cost of Bonds may be pai d as t he f i r st pr ogr ess payment when a r ecei pt f r om t he bondi ng company i s pr esent ed t o t he Cont r act i ng Of f i cer . For cont r act s under $25, 000, a Schedul e of Val ues i s not r equi r ed. I n addi t i on, keep t he Gover nment I nspect or i nf or med dai l y of t he expect ed del i ver y dat es f or maj or pi eces of equi pment and mat er i al s.
Const r uct i on Schedul e and Schedul e of Val ues shal l be i ncor por at ed i nt o one f or m whi ch cl ear l y i ndi cat es t he st ar t and compl et i on dat es and uni t val ue of al l maj or wor k component s. The sampl e f or m pr ovi ded i n t hi s sect i on may be used. Opt i onal f or ms may be used pr ovi ded t hey i ncl ude, at a mi ni mum, al l i nf or mat i on conveyed on t he sampl e f or m.
Const r uct i on Schedul e/ Schedul e of Val ues f or m shal l i ncor por at e at a mi ni mum t he f ol l owi ng act i v i t i es:
a. Bonds
b. Mobi l i zat i on
c. Demobi l i zat i on
d. Pr e- Const r uct i on Submi t t al s
e. Wor k Act i v i t i es f . I n- Pr ogr ess Submi t t al s
g. Fi nal Gover nment I nspect i on
h. Cl ose- Out Submi t t al s; i . e. Test i ng Bal anci ng Repor t s, War r ant i es, Oper at i on and Mai nt enance Manual s, Post ed I nst r uct i ons i . As- Bui l t Dr awi ngs j . Fact or s whi ch Const i t ut e Pot ent i al I nt er r upt i ons t o St at i on Oper at i ons
Pr e- Const r uct i on Submi t t al s ar e t hose act i v i t i es whi ch encompass t he obt ai ni ng, submi ssi on, r evi ew and appr oval of submi t t al s necessar y pr i or t o t he st ar t of t he r el at ed si t e wor k. Cont r act or shal l annot at e al l such act i v i t i es i nt o t he pr ogr ess schedul e wi t h t hei r f or ecast ed t i me per i ods.
These act i v i t y per i ods shal l not be excl usi ve of t he cont r act per f or mance per i od. No si t e wor k shal l commence unt i l t he r espect i ve submi t t al s have
SECTI ON 01 32 00 Page 2 been appr oved.
The val ue of al l maj or wor k component s wi t hi n t he pr oj ect shal l be i dent i f i ed on t he Const r uct i on Schedul e/ Schedul e of Val ues on a uni t quant i t y and uni t cost basi s, e. g. number of squar es and cost per squar e of r oof i ng, number of l i neal f eet and cost per l i neal f oot of condui t , number of panel s and cost per panel et c. Lump sum i t ems shal l onl y be pai d f or when 100% compl et e.
The Const r uct i on Schedul e/ Schedul e of Val ues as appr oved by t he Gover nment i s not a subst i t ut e f or quant i t i es conveyed by t he speci f i cat i on and dr awi ngs and t hose r equi r ed f or a compl et e j ob. Omi ssi ons and er r or s on t he Const r uct i on Schedul e/ Schedul e of Val ues ar e t he r esponsi bi l i t y of t he Cont r act or .
Payment s wi l l not be made unt i l t he schedul e of pr i ces has been submi t t ed t o and appr oved by t he Cont r act i ng Of f i cer .
1. 3 UPDATED SCHEDULES
Updat e t he const r uct i on schedul e and equi pment del i ver y schedul e at mont hl y i nt er val s or when schedul e has been r evi sed. Ref l ect any changes occur r i ng s i nce t he l ast updat e. Submi t copi es of t he pur chase or der s and conf i r mat i on of t he del i ver y dat es as di r ect ed.
PART 2 PRODUCTS
Not Used.
PART 3 EXECUTI ON
3. 1 PROGRESS UPDATES
3. 1. 1 Gener al
A r evi sed Const r uct i on Schedul e/ Schedul e of Val ues shal l be i ssued by t he Cont r act or on a mont hl y basi s. I n addi t i on, any r evi s i ons t o t he Const r uct i on Schedul e/ Schedul e of Val ues, such as modi f i cat i ons or del ays, shal l be r ef l ect ed by Cont r act or submi ssi on of an updat ed Const r uct i on Schedul e/ Schedul e of Val ues.
3. 1. 2 Modi f i cat i ons
When a modi f i cat i on i s i ssued by t he Gover nment , r ecor d t he modi f i cat i on as t he l ast act i v i t y of t he Const r uct i on Schedul e/ Schedul e of Val ues and i ncl ude t he val ue of t he modi f i cat i on. Adj ust t he Schedul e of Val ues t o r ef l ect t he i ncl usi on of t he modi f i cat i on. Revi se t he Const r uct i on Schedul e por t i on of t he f or m t o annot at e t he pr ogr ess change. Ent er al l modi f i cat i ons i n t hi s manner i n sequent i al or der .
SECTI ON 01 32 00 Page 3
DI VI SI ON 01 - GENERAL REQUI REMENTS
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18
PART 1 GENERAL
SUMMARY
Submi t t al I nf or mat i on
Pr oj ect Type
Submi ssi on of Submi t t al s
DEFI NI TI ONS
Submi t t al Descr i pt i ons ( SD)
Appr ovi ng Aut hor i t y
Wor k
SUBMI TTALS
FORWARDI NG SUBMI TTALS
Over ni ght Shop Dr awi ng Submi t t al s
PREPARATI ON
Tr ansmi t t al For m
I dent i f y i ng Submi t t al s
Submi t t al For mat
SECTI ON 01 33 00 Page 1
For mat of SD- 01 Pr econst r uct i on Submi t t al s
For mat f or SD- 02 Shop Dr awi ngs
Dr awi ng I dent i f i cat i on
For mat of SD- 03 Pr oduct Dat a
Pr oduct I nf or mat i on
St andar ds
Dat a Submi ssi on
For mat of SD- 04 Sampl es
Sampl e Char act er i st i cs
Sampl e I ncor por at i on
Compar i son Sampl e
For mat of SD- 05 Desi gn Dat a
For mat of SD- 06 Test Repor t s
For mat of SD- 07 Cer t i f i cat es
For mat of SD- 08 Manuf act ur er ' s I nst r uct i ons
St andar ds
For mat of SD- 09 Manuf act ur er ' s Fi el d Repor t s
For mat of SD- 11 Cl oseout Submi t t al s
Sour ce Dr awi ngs f or Shop Dr awi ngs
SECTI ON 01 33 00 Page 2
Sour ce Dr awi ngs
Ter ms and Condi t i ons
El ect r oni c Fi l e For mat
QUANTI TY OF SUBMI TTALS
Number of SD- 01 Pr econst r uct i on Submi t t al Copi es
Number of SD- 02 Shop Dr awi ng Copi es
Number of SD- 03 Pr oduct Dat a Copi es
Number of SD- 04 Sampl es
Number of SD- 05 Desi gn Dat a Copi es
Number of SD- 06 Test Repor t Copi es
Number of SD- 07 Cer t i f i cat e Copi es
Number of SD- 08 Manuf act ur er ' s I nst r uct i ons Copi es
Number of SD- 09 Manuf act ur er ' s Fi el d Repor t Copi es
Number of SD- 10 Oper at i on and Mai nt enance Dat a Copi es
Number of SD- 11 Cl oseout Submi t t al s Copi es
I NFORMATI ON ONLY SUBMI TTALS
PROJECT SUBMI TTAL REGI STER AND DATABASE
Submi t t al Management
Desi gn- Bi d- Bui l d Submi t t al Regi st er
Pr econst r uct i on Use of Submi t t al Regi st er
SECTI ON 01 33 00 Page 3
Cont r act or Use of Submi t t al Regi st er
Appr ovi ng Aut hor i t y Use of Submi t t al Regi st er
Act i on Codes
Gover nment Revi ew Act i on Codes
Gover nment Revi ew Act i on Codes
Cont r act or Act i on Codes
Cont r act or Act i on Codes
Del i ver y of Copi es
VARI ATI ONS
Consi der i ng Var i at i ons
Pr oposi ng Var i at i ons
War r ant i ng t hat Var i at i ons ar e Compat i bl e
Revi ew Schedul e Ext ensi on
SCHEDULI NG
Revi ewi ng, Cer t i f y i ng, and Appr ovi ng Aut hor i t y
Const r ai nt s
QC Or gani zat i on Responsi bi l i t i es
Gover nment Revi ewed Desi gn
GOVERNMENT APPROVI NG AUTHORI TY
Revi ew Not at i ons
SECTI ON 01 33 00 Page 4
DI SAPPROVED SUBMI TTALS
APPROVED SUBMI TTALS
APPROVED SAMPLES
WI THHOLDI NG OF PAYMENT
STAMPS
PART 2 PRODUCTS
PART 3 EXECUTI ON
ATTACHMENTS:
ENG For m 4025- R
Appendi x A - Submi t t al Regi st er
SECTI ON 01 33 00 Page 5
SECTI ON 01 33 00
SUBMI TTAL PROCEDURES
08/ 18
PART 1 GENERAL
1. 1 SUMMARY
1. 1. 1 Submi t t al I nf or mat i on
The Cont r act i ng Of f i cer may r equest submi t t al s i n addi t i on t o t hose speci f i ed when deemed necessar y t o adequat el y descr i be t he wor k cover ed i n t he r espect i ve sect i ons. Each submi t t al i s t o be compl et e and i n suf f i c i ent det ai l t o al l ow r eady det er mi nat i on of compl i ance wi t h cont r act r equi r ement s.
Uni t s of wei ght s and measur es used on al l submi t t al s ar e t o be t he same as t hose used i n t he cont r act dr awi ngs.
1. 1. 2 Pr oj ect Type
The Cont r act or ' s Qual i t y Cont r ol ( CQC) Syst em Manager ar e t o check and appr ove al l i t ems bef or e submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken. Pr oposed devi at i ons f r om t he cont r act r equi r ement s ar e t o be cl ear l y i dent i f i ed. I ncl ude wi t hi n submi t t al s i t ems such as:
Cont r act or ' s, manuf act ur er ' s, or f abr i cat or ' s dr awi ngs; descr i pt i ve l i t er at ur e i ncl udi ng ( but not l i mi t ed t o) cat al og cut s, di agr ams, oper at i ng char t s or cur ves; t est r epor t s; t est cyl i nder s; sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ; cer t i f i cat i ons; war r ant i es; and ot her such r equi r ed submi t t al s.
The Cont r act or and t he Desi gner of Recor d ( DOR) , i f appl i cabl e, ar e t o check and appr ove al l i t ems bef or e submi t t al and st amp, s i gn, and dat e i ndi cat i ng act i on t aken. Pr oposed devi at i ons f r om t he cont r act r equi r ement s ar e t o be cl ear l y i dent i f i ed. I ncl ude wi t hi n submi t t al s i t ems such as: Cont r act or ' s, manuf act ur er ' s, or f abr i cat or ' s dr awi ngs;
descr i pt i ve l i t er at ur e i ncl udi ng ( but not l i mi t ed t o) cat al og cut s, di agr ams, oper at i ng char t s or cur ves; t est r epor t s; t est cyl i nder s;
sampl es; O&M manual s ( i ncl udi ng par t s l i s t ) ; cer t i f i cat i ons; war r ant i es;
and ot her such r equi r ed submi t t al s.
1. 1. 3 Submi ssi on of Submi t t al s
Schedul e and pr ovi de submi t t al s r equi r i ng Gover nment appr oval bef or e acqui r i ng t he mat er i al or equi pment cover ed t her eby. Pi ck up and di spose of sampl es not i ncor por at ed i nt o t he wor k i n accor dance wi t h manuf act ur er ' s Saf et y Dat a Sheet s ( SDS) and i n compl i ance wi t h exi st i ng l aws and r egul at i ons.
1. 2 DEFI NI TI ONS
1. 2. 1 Submi t t al Descr i pt i ons ( SD)
Submi t t al r equi r ement s ar e speci f i ed i n t he t echni cal sect i ons. Exampl es and descr i pt i ons of submi t t al s i dent i f i ed by t he Submi t t al Descr i pt i on ( SD) number s and t i t l es f ol l ow:
SECTI ON 01 33 00 Page 6
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al s t hat ar e r equi r ed pr i or t o or commenci ng wi t h t he st ar t of wor k on si t e. Submi t t al s t hat ar e r equi r ed pr i or t o or at t he st ar t of const r uct i on ( wor k) or t he next maj or phase of t he const r uct i on on a mul t i phase cont r act .
Pr econst r uct i on Submi t t al s i ncl ude schedul es and a t abul ar l i s t of l ocat i ons, f eat ur es, and ot her per t i nent i nf or mat i on r egar di ng pr oduct s, mat er i al s, equi pment , or component s t o be used i n t he wor k.
Li st Of Pr oposed Subcont r act or s
Li st Of Pr oposed Pr oduct s
Basel i ne Net wor k Anal ysi s Schedul e ( NAS)
Submi t t al Regi st er
Schedul e Of Pr i ces
Acci dent Pr event i on Pl an
Heal t h And Saf et y Pl an
Wor k Pl an
Qual i t y Cont r ol ( QC) Pl an
Envi r onment al Pr ot ect i on Pl an
SD- 02 Shop Dr awi ngs
Dr awi ngs, di agr ams and schedul es speci f i cal l y pr epar ed t o i l l ust r at e some por t i on of t he wor k.
Di agr ams and i nst r uct i ons f r om a manuf act ur er or f abr i cat or f or use i n pr oduci ng t he pr oduct and as ai ds t o t he Cont r act or f or i nt egr at i ng t he pr oduct or syst em i nt o t he pr oj ect .
Dr awi ngs pr epar ed by or f or t he Cont r act or t o show how mul t i pl e syst ems and i nt er di sci pl i nar y wor k wi l l be coor di nat ed.
SD- 03 Pr oduct Dat a
Cat al og cut s, i l l ust r at i ons, schedul es, di agr ams, per f or mance char t s, i nst r uct i ons and br ochur es i l l ust r at i ng s i ze, physi cal appear ance and ot her char act er i st i cs of mat er i al s, syst ems or equi pment f or some por t i on of t he wor k.
Sampl es of war r ant y l anguage when t he cont r act r equi r es ext ended pr oduct war r ant i es.
SD- 04 Sampl es
Col or sampl es f r om t he manuf act ur er ' s st andar d l i ne ( or cust om col or sampl es i f speci f i ed) t o be used i n sel ect i ng or appr ovi ng col or s f or t he pr oj ect .
SECTI ON 01 33 00 Page 7
SD-05 Design Data
Design calculations, mix designs, analyses or other data pertaining to a part of work.
SD-06 Test Reports
Report signed by authorized official of testing laboratory that a material, product or system identical to the material, product or system to be provided has been tested in accord with specified requirements. Unless specified in another section, testing must have been within three years of date of contract award for the project.
Report that includes findings of a test required to be performed on an actual portion of the work or prototype prepared for the project before shipment to job site.
Report that includes finding of a test made at the job site or on sample taken from the job site, on portion of work during or after installation.
Investigation reports
Daily logs and checklists
Final acceptance test and operational test procedure
SD-07 Certificates
Statements printed on the manufacturer's letterhead and signed by responsible officials of manufacturer of product, system or material attesting that the product, system, or material meets specification requirements. Must be dated after award of project contract and clearly name the project.
Document required of Contractor, or of a manufacturer, supplier, installer or Subcontractor through Contractor. The document purpose is to further promote the orderly progression of a portion of the work by documenting procedures, acceptability of methods, or personnel qualifications.
Text of posted operating instructions.
SD-08 Manufacturer's Instructions
Preprinted material describing installation of a product, system or material, including special notices and (SDS)concerning impedances, hazards and safety precautions.
SD-11 Closeout Submittals
Documentation to record compliance with technical or administrative requirements or to establish an administrative mechanism.
Submittals required for Guiding Principle Validation (GPV) or Third Party Certification (TPC).
Special requirements necessary to properly close out a construction
SECTION 01 33 00 Page 8 cont r act . For exampl e, Recor d Dr awi ngs and As- Bui l t dr awi ngs. Al so, submi t t al r equi r ement s necessar y t o pr oper l y c l ose out a maj or phase of const r uct i on on a mul t i - phase cont r act .
1. 2. 2 Appr ovi ng Aut hor i t y
Ci vi l Engi neer i ng Uni t Pr ovi dence Cont r act i ng Of f i cer .
1. 2. 3 Wor k
As used i n t hi s sect i on, on- si t e and of f - s i t e const r uct i on r equi r ed by cont r act document s, i ncl udi ng l abor necessar y t o pr oduce submi t t al s, const r uct i on, mat er i al s, pr oduct s, equi pment , and syst ems i ncor por at ed or t o be i ncor por at ed i n such const r uct i on. I n except i on, excl udes wor k t o pr oduce SD- 01 submi t t al s.
1. 3 SUBMI TTALS
Gover nment appr oval i s r equi r ed f or al l submi t t al s. Submi t t he f ol l owi ng i n accor dance wi t h t hi s sect i on.
SD- 01 Pr econst r uct i on Submi t t al s
Submi t t al Regi st er
Schedul e submi t t al s f or t hese i t ems t hr oughout t he cour se of const r uct i on as pr ovi ded; do not wai t unt i l c l oseout .
1. 4 FORWARDI NG SUBMI TTALS
1. 4. 1 Over ni ght Shop Dr awi ng Submi t t al s
Send submi t t al s v i a over ni ght expr ess mai l ser vi ce. Al l cost s associ at ed wi t h t he over ni ght expr ess mai l ser vi ce ar e bor ne by t he Cont r act or .
Cost s associ at ed wi t h t he over ni ght expr ess mai l of submi t t al s r el at ed t o pr oposed submi t t al var i ances of r esubmi t t al s necessar y as a r esul t of noncompl i ant or i ncompl et e Cont r act or submi t t al s ar e t he r esponsi bi l i t y of t he Cont r act or .
1. 5 PREPARATI ON
1. 5. 1 Tr ansmi t t al For m
Tr ansmi t each submi t t al , except sampl e i nst al l at i ons and sampl e panel s, t o t he of f i ce of t he appr ovi ng aut hor i t y usi ng t he t r ansmi t t al f or m pr escr i bed by t he Cont r act i ng Of f i cer . I ncl ude al l i nf or mat i on pr escr i bed by t he t r ansmi t t al f or m and r equi r ed i n par agr aph I DENTI FYI NG SUBMI TTALS.
Use t he submi t t al t r ansmi t t al f or ms t o r ecor d act i ons r egar di ng sampl es.
Use t he ENG For m 4025- R t r ansmi t t al f or m f or submi t t i ng bot h Gover nment - appr oved and i nf or mat i on- onl y submi t t al s. Submi t i n accor dance wi t h t he i nst r uct i ons on t he r ever se si de of t he f or m. These f or ms wi l l be f ur ni shed t o t he Cont r act or . Pr oper l y compl et e t hi s f or m by f i l l i ng out al l t he headi ng bl ank spaces and i dent i f y i ng each i t em submi t t ed.
Exer ci se speci al car e t o ensur e pr oper l i s t i ng of t he speci f i cat i on par agr aph and sheet number of t he cont r act dr awi ngs per t i nent t o t he dat a submi t t ed f or each i t em.
SECTI ON 01 33 00 Page 9
1. 5. 2 I dent i f y i ng Submi t t al s
The Cont r act or ' s Qual i t y Cont r ol Manager must pr epar e, r evi ew and st amp submi t t al s, i ncl udi ng t hose pr ovi ded by a subcont r act or , bef or e submi t t al t o t he Gover nment .
I dent i f y submi t t al s, except sampl e i nst al l at i ons and sampl e panel s, wi t h t he f ol l owi ng i nf or mat i on per manent l y adher ed t o or not ed on each separ at e component of each submi t t al and not ed on t r ansmi t t al f or m. Mar k each copy of each submi t t al i dent i cal l y, wi t h t he f ol l owi ng:
a. Pr oj ect t i t l e and l ocat i on
b. Const r uct i on cont r act number
c. Dat es of t he dr awi ngs and r evi s i ons
d. Name, addr ess, and t el ephone number of Subcont r act or , suppl i er , manuf act ur er , and any ot her Subcont r act or associ at ed wi t h t he submi t t al
e. Sect i on number of t he speci f i cat i on by whi ch submi t t al i s r equi r ed f . Submi t t al descr i pt i on ( SD) number of each component of submi t t al
g. For a r esubmi ssi on, add al phabet i c suf f i x on submi t t al descr i pt i on, f or exampl e, submi t t al 18 woul d become 18A, t o i ndi cat e r esubmi ssi on
h. Pr oduct i dent i f i cat i on and l ocat i on i n pr oj ect
1. 5. 3 Submi t t al For mat
1. 5. 3. 1 For mat of SD- 01 Pr econst r uct i on Submi t t al s
When t he submi t t al i ncl udes a document t hat i s t o be used i n t he pr oj ect , or i s t o become par t of t he pr oj ect r ecor d, ot her t han as a submi t t al , do not appl y t he Cont r act or ' s appr oval st amp t o t he document i t sel f , but t o a separ at e sheet accompanyi ng t he document .
Pr ovi de dat a i n t he uni t of measur e used i n t he cont r act document s.
1. 5. 3. 2 For mat f or SD- 02 Shop Dr awi ngs
Pr ovi de shop dr awi ngs not l ess t han 8 1/ 2 by 11 i nches nor mor e t han 30 by 42 i nches, except f or f ul l - s i ze pat t er ns or t empl at es. Pr epar e dr awi ngs t o accur at e s i ze, wi t h scal e i ndi cat ed, unl ess anot her f or m i s r equi r ed.
Ensur e dr awi ngs ar e sui t abl e f or r epr oduct i on and of a qual i t y t o pr oduce cl ear , di st i nct l i nes and l et t er s, wi t h dar k l i nes on a whi t e backgr ound.
a. I ncl ude t he namepl at e dat a, s i ze, and capaci t y on dr awi ngs. Al so i ncl ude appl i cabl e f eder al , mi l i t ar y, i ndust r y, and t echni cal soci et y publ i cat i on r ef er ences.
b. Di mensi on dr awi ngs, except di agr ams and schemat i c dr awi ngs. Pr epar e dr awi ngs demonst r at i ng i nt er f ace wi t h ot her t r ades t o scal e. Use t he same uni t of measur e f or shop dr awi ngs as i ndi cat ed on t he cont r act dr awi ngs. I dent i f y mat er i al s and pr oduct s f or wor k shown.
Pr esent shop dr awi ngs si zed 8 1/ 2 by 11 i nches as par t of t he bound vol ume f or submi t t al s. Pr esent l ar ger dr awi ngs i n set s. Submi t an el ect r oni c
SECTI ON 01 33 00 Page 10 copy of dr awi ngs i n PDF f or mat .
1. 5. 3. 2. 1 Dr awi ng I dent i f i cat i on
I ncl ude on each dr awi ng t he dr awi ng t i t l e, number , dat e, and r evi s i on number s and dat es, i n addi t i on t o i nf or mat i on r equi r ed i n par agr aph
I DENTI FYI NG SUBMI TTALS.
Number dr awi ngs i n a l ogi cal sequence. Each dr awi ng i s t o bear t he number of t he submi t t al i n a uni f or m l ocat i on next t o t he t i t l e bl ock. Pl ace t he Gover nment cont r act number i n t he mar gi n, i mmedi at el y bel ow t he t i t l e bl ock, f or each dr awi ng.
Reser ve a bl ank space, no smal l er t han t wo i nches on t he r i ght - hand si de of each sheet f or t he Gover nment di sposi t i on st amp.
1. 5. 3. 3 For mat of SD- 03 Pr oduct Dat a
Pr esent pr oduct dat a submi t t al s f or each sect i on as a compl et e, bound vol ume. I ncl ude a t abl e of cont ent s, l i s t i ng t he page and cat al og i t em number s f or pr oduct dat a.
I ndi cat e, by pr omi nent not at i on, each pr oduct t hat i s bei ng submi t t ed;
i ndi cat e t he speci f i cat i on sect i on number and par agr aph number t o whi ch i t per t ai ns.
1. 5. 3. 3. 1 Pr oduct I nf or mat i on
Suppl ement pr oduct dat a wi t h mat er i al pr epar ed f or t he pr oj ect t o sat i sf y t he submi t t al r equi r ement s wher e pr oduct dat a does not exi st . I dent i f y t hi s mat er i al as devel oped speci f i cal l y f or t he pr oj ect , wi t h i nf or mat i on and f or mat as r equi r ed f or submi ssi on of SD- 07 Cer t i f i cat es.
Pr ovi de pr oduct dat a i n uni t s used i n t he Cont r act document s. Wher e pr oduct dat a ar e i ncl uded i n pr epr i nt ed cat al ogs wi t h anot her uni t , submi t t he di mensi ons i n cont r act document uni t s, on a separ at e sheet .
1. 5. 3. 3. 2 St andar ds
Wher e equi pment or mat er i al s ar e speci f i ed t o conf or m t o i ndust r y or t echni cal - soci et y r ef er ence st andar ds of such or gani zat i ons as t he Amer i can Nat i onal St andar ds I nst i t ut e ( ANSI ) , ASTM I nt er nat i onal ( ASTM) , Nat i onal El ect r i cal Manuf act ur er ' s Associ at i on ( NEMA) , Under wr i t er s Labor at or i es ( UL) , or Associ at i on of Edi son I l l umi nat i ng Compani es ( AEI C) , submi t pr oof of such compl i ance. The l abel or l i s t i ng by t he speci f i ed or gani zat i on wi l l be accept abl e evi dence of compl i ance. I n l i eu of t he l abel or l i s t i ng, submi t a cer t i f i cat e f r om an i ndependent t est i ng or gani zat i on, compet ent t o per f or m t est i ng, and appr oved by t he Cont r act i ng Of f i cer . St at e on t he cer t i f i cat e t hat t he i t em has been t est ed i n accor dance wi t h t he speci f i ed or gani zat i on' s t est met hods and t hat t he i t em compl i es wi t h t he speci f i ed or gani zat i on' s r ef er ence st andar d.
1. 5. 3. 3. 3 Dat a Submi ssi on
Col l ect r equi r ed dat a submi t t al s f or each speci f i c mat er i al , pr oduct , uni t of wor k, or syst em i nt o a s i ngl e submi t t al t hat i s mar ked f or choi ces, opt i ons, and por t i ons appl i cabl e t o t he submi t t al . Mar k each copy of t he pr oduct dat a i dent i cal l y. Par t i al submi t t al s wi l l not be accept ed f or
SECTI ON 01 33 00 Page 11 expedi t i on of t he const r uct i on ef f or t .
Submi t t he manuf act ur er ' s i nst r uct i ons bef or e i nst al l at i on.
1. 5. 3. 4 For mat of SD- 04 Sampl es
1. 5. 3. 4. 1 Sampl e Char act er i st i cs
Fur ni sh sampl es i n t he f ol l owi ng si zes, unl ess ot her wi se speci f i ed or unl ess t he manuf act ur er has pr epackaged sampl es of appr oxi mat el y t he same si ze as speci f i ed:
a. Sampl e of Equi pment or Devi ce: Ful l s i ze.
b. Sampl e of Mat er i al s Less Than 2 by 3 i nches: Bui l t up t o 8 1/ 2 by 11 i nches.
c. Sampl e of Mat er i al s Exceedi ng 8 1/ 2 by 11 i nches: Cut down t o 8 1/ 2 by 11 i nches and adequat e t o i ndi cat e col or , t ext ur e, and mat er i al var i at i ons.
d. Sampl e of Li near Devi ces or Mat er i al s: 10 i nch l engt h or l engt h t o be suppl i ed, i f l ess t han 10 i nches. Exampl es of l i near devi ces or mat er i al s ar e condui t and handr ai l s.
e. Sampl e Vol ume of Nonsol i d Mat er i al s: Pi nt . Exampl es of nonsol i d mat er i al s ar e sand and pai nt .
f . Col or Sel ect i on Sampl es: 2 by 4 i nches. Wher e sampl es ar e speci f i ed f or sel ect i on of col or , f i ni sh, pat t er n, or t ext ur e, submi t t he f ul l set of avai l abl e choi ces f or t he mat er i al or pr oduct speci f i ed. Si zes and quant i t i es of sampl es ar e t o r epr esent t hei r r espect i ve st andar d uni t .
g. Sampl e Panel : 4 by 4 f eet .
h. Sampl e I nst al l at i on: 100 squar e f eet .
1. 5. 3. 4. 2 Sampl e I ncor por at i on
Reusabl e Sampl es: I ncor por at e r et ur ned sampl es i nt o wor k onl y i f so speci f i ed or i ndi cat ed. I ncor por at ed sampl es ar e t o be i n undamaged condi t i on at t he t i me of use.
Recor di ng of Sampl e I nst al l at i on: Not e and pr eser ve t he not at i on of any ar ea const i t ut i ng a sampl e i nst al l at i on, but r emove t he not at i on at t he f i nal c l ean- up of t he pr oj ect .
1. 5. 3. 4. 3 Compar i son Sampl e
Sampl es Showi ng Range of Var i at i on: Wher e var i at i ons i n col or , f i ni sh, pat t er n, or t ext ur e ar e unavoi dabl e due t o nat ur e of t he mat er i al s, submi t set s of sampl es of not l ess t han t hr ee uni t s showi ng ext r emes and mi ddl e of r ange. Mar k each uni t t o descr i be i t s r el at i on t o t he r ange of t he var i at i on.
When col or , t ext ur e, or pat t er n i s speci f i ed by nami ng a par t i cul ar manuf act ur er and st y l e, i ncl ude one sampl e of t hat manuf act ur er and st y l e, f or compar i son.
SECTI ON 01 33 00 Page 12
1. 5. 3. 5 For mat of SD- 05 Desi gn Dat a
Pr ovi de desi gn dat a and cer t i f i cat es on 8 1/ 2 by 11 i nch paper . Pr ovi de a bound vol ume f or submi t t al s cont ai ni ng numer ous pages.
1. 5. 3. 6 For mat of SD- 06 Test Repor t s
Pr ovi de r epor t s on 8 1/ 2 by 11 i nch paper i n a compl et e bound vol ume.
By pr omi nent not at i on, i ndi cat e each r epor t i n t he submi t t al . I ndi cat e t he speci f i cat i on number and par agr aph number t o whi ch each r epor t per t ai ns.
1. 5. 3. 7 For mat of SD- 07 Cer t i f i cat es
Pr ovi de desi gn dat a and cer t i f i cat es on 8 1/ 2 by 11 i nch paper . Pr ovi de a bound vol ume f or submi t t al s cont ai ni ng numer ous pages.
1. 5. 3. 8 For mat of SD- 08 Manuf act ur er ' s I nst r uct i ons
Pr esent manuf act ur er ' s i nst r uct i ons submi t t al s f or each sect i on as a compl et e, bound vol ume. I ncl ude t he manuf act ur er ' s name, t r ade name, pl ace of manuf act ur e, and cat al og model or number on pr oduct dat a. Al so i ncl ude appl i cabl e f eder al , mi l i t ar y, i ndust r y, and t echni cal - soci et y publ i cat i on r ef er ences. I f suppl ement al i nf or mat i on i s needed t o c l ar i f y t he manuf act ur er ' s dat a, submi t i t as speci f i ed f or SD- 07 Cer t i f i cat es.
Submi t t he manuf act ur er ' s i nst r uct i ons bef or e i nst al l at i on.
1. 5. 3. 8. 1 St andar ds
Wher e equi pment or mat er i al s ar e speci f i ed t o conf or m t o i ndust r y or t echni cal - soci et y r ef er ence st andar ds of such or gani zat i ons as t he Amer i can Nat i onal St andar ds I nst i t ut e ( ANSI ) , ASTM I nt er nat i onal ( ASTM) , Nat i onal El ect r i cal Manuf act ur er ' s Associ at i on ( NEMA) , Under wr i t er s Labor at or i es ( UL) , or Associ at i on of Edi son I l l umi nat i ng Compani es ( AEI C) , submi t pr oof of such compl i ance.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .