This document contains an amendment to a solicitation for dredging services and responses to vendor questions. The United States Coast Guard, Civil Engineering Unit - Providence, is seeking dredging of the entrance channel at Coast Guard Station Eaton's Neck in Northport, New York, with an estimated 9,000 cubic yards of material to be removed. The total small business set-aside contract value is estimated between $500,000 to $1,000,000, with a 110-day period of performance ending no later than March 24, 2023. The solicitation number is 70Z0G1-23-B-ABCD0034 and responses are due by January 5, 2023. The amendment provides responses to vendor questions clarifying dredge material disposal site use and equipment transport logistics.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
SIMON W. LEUNG, CONTRACTING OFFICER
The purpose of this amendment is to provide RFIs responses. The due date has not been extended.
All other terms and conditions remain unchanged.
Contracting Officer
USCG CIVIL ENGINEERING UNIT PROVIDENCE
475 Kilvert St., Suite 100
WARWICK, RI 02886
THIS AMENDMENT MUST BE
ACKNOWLEDGED WITH YOUR PROPOSAL
51283PR230000034
70Z0G123BABCD0034
14071986
1 3
12/19/2022
12/06/2022
Continuation Sheet Page 2
RFP 70Z0G123BABCD0034
Amendment 0002
12/19/2022
DREDGE CHANNEL AT USCG STATION EATONS NECK (FY23)
NORTHPORT, NEW YORK (SUFFOLK COUNTY), PSN #14071986
RESPONSES TO RFI QUESTIONS:
Question 3 (Q3): There are conflicting statements in the solicitation regarding disposal areas; are all three disposal areas expected be used as directed by the Government during this specific contract period, or is only the Beacon Farms Disposal Area to be used during this contract?
Response 3 (R3): The Beacon Farms Disposal Area is the sole disposal area to be utilized for this project.
Q4: If multiple disposal sites are required to be utilized, will the contractor be allowed to transport land based equipment over the beach between the different disposal sites?
R4: The Beacon Farms Disposal Area is the sole disposal area to be utilized for this project.
Q5: There are multiple rocks identified in the USCG’s “topobathymetric” survey of the Beacon Farms Disposal Area. Please provide lat/long and pinnacle elevation of each rock identified.
R5: A CAD file of the Topobathymetric Survey will be provided to the Contractor following award.
The CAD file is referenced to the State Plane Coordinate System and can be utilized by the contractor to determine the requested lat/long. Elevation data was not collected for the identified rocks.
Q6: During the 2021 dredge season, it appears that the southernmost tip of the “Sand Spit” was used as an offloading area for dredged materials, and the material was then transported along the beach, presumably by off road haulers or front end loaders. Please confirm that the Contractor would be permitted to use this same method to transport material to the Beacon Farms Disposal Site this contract period.
R6: Upland transport of the dredge material through STA Eatons Neck or other upland routes, including the “Sand Spit”, is not permitted. The referenced stockpiling of dredge material at the southern tip of the “Sand Spit” during the 2021 dredge was a special exception issued by the NYSDEC. Material was reloaded onto barges afterwards for transport to the disposal area (i.e., no upland transport).
Stockpiling is not permitted for this year’s dredge.
Q7: Please provide previous locations where land based rubber tire equipment has been transferred to the beach disposal area from land, if any. Specifications only state that metal tracked vehicles must be transported by barge to the disposal area, but rubber tire and rubber track equipment is allowed to
Continuation Sheet Page 3 traverse the beach outside the disposal area. Transfer of rubber tire construction equipment by land is preferable as it is safer and more cost effective than transfer by barge.
R7: Land-based equipment for the use of spreading material at the Beacon Farms Disposal Area shall be transported via barge or other water based vessel. Upland access is prohibited, regardless of tracked or rubber tire equipment.
Q8: The Beacon Farms Disposal Site is verified to have numerous rocks and boulders along its shoreline and is exposed to Long Island Sound with no protection from wind and waves, making this a dangerous area to walk machinery off of barges. Contractor requests an exception to allow for transfer of tracked equipment to land in the sheltered waters adjacent to the Sand Spit where it is safe to do so, understanding the equipment would immediately transit to or from the disposal site, for purposes of mobilization and demobilization.
R8: Land-based equipment may be transferred from barge at the Beacon Farms Disposal Area only.
Q9: It is stated in the specifications that the required production rate is “300 CY per day”. Is this to be interpreted as an average of 300 CY per day across the entire period of performance, or is this the required production rate per each working day, not including Sundays, holidays, or adverse weather delays?
R9: The 300 CY per day production rate shall be the average rate for each working day, not including Sundays, Holidays, or adverse weather days. Please note the dredge cut-off date listed in the contract documents and permits.
- End of Responses to RFI Questions –
ALL OTHER TERMS AND CONDITIONS REMAIN UNCHANGED