Amend 0001_23KODI8270978_Paving IDIQ.pdf

PDF 233 KB Posted

Attached to
USCG Base Kodiak Paving IDIQ
Solicitation number
70Z08723RKODI8270978
Issued by

View the file

Other files

File Type Posted
Revised__Kodiak_Paving_IDIQ_Price_Schedule.xlsx XLSX spreadsheet
01_18382348_Specs_Attachment 10 Delegation Signatory.pdf PDF
01_18382348_Specs_Attachment 6 Request for variations_sample.pdf PDF
01_18382348_Specs_Attachment 7 Request for Deviation Form_Sample.pdf PDF
01_18382348_Specs_Attachment 1 Request for Payment Form.xlsx XLSX spreadsheet
01_18382348_Specs_Attachment 2 DHS Contractor Release.pdf PDF
01_18382348_Specs_Attachment 11 Base Kodiak Generic EMP_12032021.pdf PDF
01_18382348_Specs_Attachment 5 Submittal Register.pdf PDF
01_18382348_Specs_Attachment 8 Daily Report.pdf PDF
01_18382348_Specs_Attachment 3 Daily Report_sample.xlsx XLSX spreadsheet
01_18382348_Specs_Attachment 4 Submittal Transmittal Form.pdf PDF
01_18382348_Specs_Attachment 9 Test Report Form_Sample.pdf PDF
4_Past Performance Questionnaire.pdf PDF
5_CertCrnt CostPrice Data_PavingIDIQ.pdf PDF
3_WD_AK20230007_Dated_1-6-2023.pdf PDF
7_TO RFP FY23 Polaris_StElias.pdf PDF
18382348_SPECS.pdf PDF
CGPD Vetting Request.pdf PDF
RFP_Kodiak_Paving_IDIQ_4-5-23.pdf PDF
18382348_Drawings.pdf PDF
Ombudsman Program Notice.pdf PDF
1_SOW Section 01 11 00_PN 8270978.pdf PDF
6_SF24-Bid Bond.pdf PDF
WD_AK20230007_Dated_1-6-2023.pdf PDF
Facility Access Instructions (Base Kodiak).pdf PDF
2_Kodiak_Paving_IDIQ_Price Schedule.xlsx XLSX spreadsheet
Show all 26

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP 70Z08723RKODI19582193

USCG Base Kodiak Paving IDIQ

Project No. 8270978

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

4/17/2023 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

8270978

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACT SPECIALIST

USCG, CIVIL ENGINEERING UNIT JUNEAU

709 WEST 9TH STREET, ROOM 817

JUNEAU, AK 99801

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT JUNEAU

709 WEST 9TH STREET, ROOM 817

JUNEAU, AK 99801

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

TOTAL SMALL BUSINESS CONTRACTORS

9A. AMENDMENT OF SOLICITATION NO.

70Z08723RKODI8270978

9B. DATED (SEE ITEM 11)

4/05/2023

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

TASK ORDER REQUEST FOR PROPOSAL NO. PROPOSAL NO. 70Z08723RKODI8270978, PAVING IDIQ

A. This amendment is issued to provide answers to Solicitation Questions 1-26 submitted by prospective contractors.

B. PROPOSAL DUE DATE OF APRIL 26, 2023, AT 10:00 A.M. LOCAL TIME JUNEAU, AK REMAINS UNCHANGED.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR PROPOSAL.

15A. NAME AND TITLE OF SIGNER (Type or Print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

CHERYL A. BERRY, CONTRACTING OFFICER, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

Project No. 8270978

AMEND 0001—Please see REVISED Price Schedule Attached. Ensure you submit the revised price schedule with your proposal submission.

Responses to RFIs from potential contractors:

1. Q: Our striping subcontractor noted that the paint spec (32 17 23 – 2.2.1) calls for waterborne paint. Solvent Based Paint has been desired by Base Kodiak due to our climate, and has been proven to be a superior product, supplying a longer service life.

A: We concur with this change from waterborne paint to solvent-based paint.

2. Q: Asphalt spec section 32 12 16 – 1.3.4 requires multiple tests on the asphalt. Should these costs be included in the paving line items, or would you like to add an additional pavement testing line item?

A: Asphalt and concrete testing should be included under the asphalt and concrete line items.

3. Q: Similarly, to question #2 above, should any concrete tests required be included in the concrete line items, or would you like to add an additional concrete testing line item?

A: Asphalt and concrete testing should be included under the asphalt and concrete line items.

4. Q: What typical mix design shall we use for the concrete line items in the main contract? For workability and strength, we recommend the use a 4500 psi, 0.45 W/C, with no-Fly Ash.

A: This is the mix we list in the specifications.

5. Q: I’ve ordered the bid bond. Per L.7 of the RFP, it appears we can send the bid forms and other paperwork to you electronically, is this correct?

A: Yes, electronic submission is requested.

a. Q: Should we send you the original paperwork in Juneau after the bid?

A: No, electronic submission of proposal and bid bond are acceptable. Awarded contractor will be required to submit hard copy payment & performance bonds for each task order under the IDIQ.

6. Contaminated Soils:

a. Q: Which contaminants do we need to test for – only POL, or should it include PCB, PFOS, PFAS, etc.? This will dictate how we temporarily store any excavated materials while they are being tested.

A: The type of contaminated soils testing needed is dependent on the project proximity to a known contaminated location. This line item is for POL contaminated soils. Other contaminants will be separately negotiated if present based upon known or suspected contamination at a given location.

b. Q: Similarly, do we need to test asphalt millings for any contaminants? If so, which contaminants?

A: Any contaminants testing besides POLs will be separately negotiated if present based upon known or suspected contamination at a given location.

Project No. 8270978

7. Q: Per L.7 of the RFP, “Mobilization and de-mobilization costs are non-pre priced, to be negotiated prior to issuance of task orders. Mobilization and de-mobilization shall not include the costs of establishing a batch plant should that be the technical approach proposed, only mobilization from the batch plant to the site.” Therefore, I assume the costs involved with Line Items #78 (Mob) and #79 (Demob) are meant to be the price for the current Task Order.

A: The line items for Mobilization and Demobilization have been modified to be Batch Plant Mobilization and Batch Plant Demobilization.

1. I’d recommend deleting items #78 & #79 from Attachment #2 and adding these line items to the current Task Order.

8. Q: I have made numerous suggestions on the attached “Attachment 2”. Instead of trying to describe them in this email, please see suggestions noted in the worksheet.

A: This spreadsheet has been reviewed and comments have been incorporated on the attached spreadsheet.

9. Q: I would suggest modifying Attachment 2’s formulas for the multiplication of the Unit Price and the Escalation % Rate. Currently, if you plug in, say 5% for the escalation, it doesn’t represent the proper Option Year’s Unit Rate. To fix it, add 1 (one) to the percentage in the formula (i.e., instead of =E13*F13, it should be =E13*(1+F13)). Or I can just add 100% to all the Escalation Rates. However, you want to handle it is fine by me.

A: Formula has been corrected. Thank you for explaining.

End Q&A

File details come from the government source that posted it. Updated .