Solicitation No. 70Z08526RLREP0009 - STRATTON DS.pdf

PDF 699 KB Posted

Attached to
DOCKSIDE REPAIRS OF CGC STRATTON (WMSL 752)
Solicitation number
70Z08526RLREP0009
Issued by

About this file

This is a Request for Proposal (RFP) for dockside repairs of the USCGC STRATTON (WMSL 752), issued by the U.S. Coast Guard Surface Forces Logistics Center. The solicitation is a 100% small business set-aside with a North American Industry Classification Standard (NAICS) code of 336611 and a size standard of 1,300 employees. The contract will cover dockside repairs to be performed at the Coast Guard Base in Alameda, California during the period of 21 April 2026 through 15 May 2026.

Key details include a proposal submission deadline of 2 January 2026 at 11:00 A.M. PST, with proposals to be submitted via email. The government will evaluate proposals based on technical capability (most important), past performance, and price, using a best value trade-off source selection procedure. Offerors are required to provide a planning document, technical narrative, past performance information, and complete various representations and certifications. A site visit and ship check should be scheduled by 8 December 2025, and contractors must have RAPIDGate credentials for base access. The contract will be a firm fixed-price type with potential for additional growth work as authorized by the Contracting Officer.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30. 52000PR260000795 1

70Z08526RLREP0009

VALERIE RIVERA-CHASE

517-617-2219

70Z085 100

Same as Block #9

USCG Finance Center 1430A Kristina Way Chesapeake, VA 23326

Contractor shall provide DOCKSIDE REPAIRS of USCGC STRATTON (WMSL 752) in accordance with the terms and conditions of the solicitation including the attached specification.

Pricing Sheet is provided as Attachment 1 to this solicitation.

336611

12/05/2025

1/02/2026

2:00 P.M., PST

USCG, Surfaces Forces Logistics Center

CPD2-LREPL

BLDG. 55, 2nd Floor, Coast Guard Alameda Base Alameda, CA 94501

STOCK RECORD (S/R)

STANDARD FORM 1449 (REV. 11/2021) BACK

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

Request for Proposal Solicitation No. 70Z08526RLREP0009 Dockside Repairs of CGC STRATTON (WMSL 752)

CONTINUATION OF SF 1449 – BLOCKS 17a – 25

Block 17a: Offeror shall include company’s name, address, and unique entity identifier number.

Block 17b: REMITTANCE ADDRESS: Payment will be made to the Financial Institution listed in System for Award Management (SAM). To receive award Offeror must be registered in SAM (copy and paste www.sam.gov into search engine).

Block 19 through 24: SEE ATTACHMENT 1, Pricing Sheet

Block 25: ACCOUNTING AND APPROPRIATION DATA: To be included in the contract award document.

ALL OFFERORS ARE RESPONSIBLE FOR VERIFYING THE RECEIPT OF THEIR

PROPOSALS.

GENERAL INFORMATION

This is a solicitation is for commercial services prepared, and will be evaluated and awarded, in accordance with FAR 12.201-01, Simplified Procedures.

No award will be made under this solicitation until funds are available. The Government reserves the right to cancel this solicitation either before or after the opening/closing date.

This solicitation is used as a Request for Proposal under number 70Z08526RLREP0009. This solicitation document and incorporated provisions and clauses are in effect through:

(1) Federal Acquisition Circular FAC 2025-06

(2) Department of Homeland Security Acquisition Regulation (HSAR)

(3) Homeland Security Acquisition Manual (HSAM)

(4) Coast Guard Acquisition Procedures (CGAP)

The applicable North American Industry Classification Standard Code is 336611 – Ship Building and Repairing. The small business size standard is 1,300 employees. This solicitation is issued as a 100% Small Business Set Aside. All responsible small businesses may submit a proposal, which shall be considered by the agency.

To receive an award, the Contractor must be registered in the System for Award Management (SAM) www.sam.gov.

All prospective offerors are urged to visit the cutter and visually inspect each item of work and to become acquainted with local conditions, locations of items and fixtures, removals, replacements, interference, and the nature of work. Interested vendors requesting a ship check must meet facility access requirements for the cutter's home port.

http://www.sam.gov/

Dockside Repairs of CGC STRATTON (WMSL 752)

Site Visit/Ship Check should be scheduled and completed by 12:00 P.M., PST on 08 December 2025.

QUESTIONS AND REQUEST FOR DRAWINGS: Drawings will be made available upon request by email to the Contracting Officer, Valerie Rivera-Chase, at Vaerie.S.Riverachase@uscg.mil. It shall be the obligation of the Offeror to exercise due diligence to discover and to bring to the attention of the Government any ambiguities, inconsistencies, or concerns regarding the information in this solicitation. Requests for clarifications are due no later than 19 December 2025 at 1:00 P.M., Pacific time. See ATTACHMENT 3, Request for Clarification. After this date and time, further requests may not be accepted or answered due to time constraints. Submission of questions and any resulting answers from the Government will not require the Contracting Officer to extend the solicitation closing date. Questions/concerns will be compiled and addressed on a Standard Form 30, Amendment of Solicitation, and will be posted via http://beta.SAM.gov for viewing by all potential Offerors.

However, in accordance with COMDTINST M5260.6A, Management of Scientific and Technical Information (STINFO), please complete and return ATTACHMENT 5, DHS Form 11- 0006 Non-Disclosure Agreement, to Valerie.S.RiveraChase@uscg.mil along with your request for drawings. This form will also allow you to receive any missing or revised drawings applicable to this dockside. In addition, some references listed in the Specification, under "Consolidated List of References," are subject to Export Control limitations or have otherwise restricted distribution and have been deemed "limited access" and "export controlled" packages.

In order to access these documents, vendors must be certified as a US or Canadian contractor by the Joint Certification Program (JCP) administered by the Defense Logistic Information Service (DLIS). Instructions and procedures for being certified by JCP can be found at http://www.dlis.dla.mil/jcp/. Only those vendors that have current certification by JCP will be able to be granted explicit access to these packages by the USCG.

mailto:Vaerie.S.Riverachase@uscg.mil http://beta.sam.gov/ mailto:Valerie.S.RiveraChase@uscg.mil http://www.dlis.dla.mil/jcp/

The clause at FAR 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services (NOV 2023) incorporated by reference is amended as to supplement with the following terms and conditions:

Addendum to FAR 52.212-4 CONTRACT TERMS AND CONDITIONS – COMMERCIAL

ITEMS (NOV 2023)

(1) TIME OF PERFORMANCE: USCGC STRATTON DS FY26 will be available for performance of the work under this contract during the period of 21 April 2026 through 15 May 2026.

(2) PLACE OF PERFORMANCE

All work under this contract will be performed onboard CGC STRATTON at their homeport in Alameda, CA. Currently this requirement is being solicited as a total small business set aside.

(3) FAR 52.204-1 APPROVAL OF CONTRACT (DEC 1989)

This contract is subject to the written approval of the Contracting Officer for SFLC-C&P2-LREPL and shall not be binding until so approved.

(3) FAR 52.232-18, AVAILABILITY OF FUNDS (APR 1984)

Funds are not presently available for this contract. The Government's obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.

(4) FAR 52.252-2 - CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at these addresses:

www.acquisition.gov/far/ http://www.dhs.gov/publication/hsar http://www.acquisition.gov/far/ http://www.dhs.gov/publication/hsar

The following is the summary of applicable FAR & HSAR clauses incorporated by reference:

Clause No. Clause Title Date

FAR 52.203-12 Limitation on Payments to Influence Certain Federal Transaction

JUN 2020

FAR 52.203-17

Contractor Employee Whistleblower Rights and Requirement to Inform Employees of Whistleblower Rights

FAR 52.204-4 Printed or Copied Double-Sided on Postconsumer Fiber Content Paper

MAY 2011

FAR 52.204-13 System for Award Management Maintenance OCT 2018 FAR 52.219-14 Limitations on Subcontracting OCT 2022 FAR 52.219-6 Notice of Total Small Business Set-Aside NOV 2020

FAR 52.223-3 Hazardous Material Identification and Material Safety Data FEB 2021

FAR 52.228-5 Insurance – Work on a Government Installation JAN 1997 FAR 52.229-3 Federal, State, and Local Taxes FEB 2013 FAR 52.242-2 Production Progress Reports APR 1991 FAR 52.242-15 Stop-Work Order AUG 1989 FAR 52.242-17 Government Delay in Work APR 1984 FAR 52.245-1 Government Property Alternate 1 (APR 2012) JAN 2017 FAR 52.245-9 Use and Charges APR 2012 FAR 52.246-4 Inspection of Services – Fixed-Price AUG 1996

FAR 52.247-55 F.O.B. Point for Delivery of Government Furnished Property JUN 2003

HSAR 3052.211-70 Index of Specification DEC 2003

HSAR 3052.222-70 Strikes or Picketing Affecting Timely Completion of the Contract Work DEC 2003

HSAR 3052.222-71 Strikes or Picketing Affecting Access to a DHS facility DEC 2003

HSAR 3052.222-90 Local Hire JUN 2006

HSAR 3052.223-90 Accident and Fire Reporting DEC 2003

Dockside Repairs of CGC STRATTON (WMSL 752)

(5) HSAR 3052.212-70 CONTRACT TERMS AND CONDITIONS

APPLICABLE TO DHS ACQUISITION OF COMMERCIAL ITEMS (JUL 2023)

The Contractor agrees to comply with any provision or clause that is incorporated herein by reference to implement agency policy applicable to acquisition of commercial items or components. The provision or clause in effect is based on the applicable regulation cited on the date the solicitation is issued applies unless otherwise stated herein. The following provisions and clauses are incorporated by reference: [The Contracting Officer should either check the provisions and clauses that apply or delete the provisions and clauses that do not apply from the list. The Contracting Officer may add the date of the provision or clause if desired for clarity.]

(a) Provisions.

3052.216-70 Evaluation of Offers Subject to An Economic Price Adjustment Clause.

3052.219-72 Evaluation of Prime Contractor Participation in the DHS Mentor Protégé Program.

3052.247-70 F.o.B. Origin Information.

Alternate I Alternate II 3052.247-71 F.o.B. Origin Only.

3052.247-72 F.o.B. Destination Only.

(b) Clauses.

3052.203-70 Instructions for Contractor Disclosure of Violations.

3052.204-71 Contractor Employee Access.

Alternate I Alternate II 3052.204-72 Safeguarding of Controlled Unclassified Information.

Alternate I 3052.204-73 Notification and Credit Monitoring Requirements for Personally Identifiable Information Incidents.

3052.205-70 Advertisement, Publicizing Awards, and Releases.

Alternate I 3052.209-73 Limitation on Future Contracting 3052.215-70 Key Personnel or Facilities.

3052.216-71 Determination of Award Fee.

3052.216-72 Performance Evaluation Plan.

3052.216-73 Distribution of Award Fee.

3052.217-91 Performance. (USCG)

Dockside Repairs of CGC STRATTON (WMSL 752)

3052.217-92 Inspection and Manner of Doing Work. (USCG) 3052.217-93 Subcontracts. (USCG) 3052.217-94 Lay Days. (USCG) 3052.217-95 Liability and Insurance. (USCG) 3052.217-96 Title. (USCG) 3052.217-97 Discharge of Liens. (USCG) 12-26-2024 HSAR 52-34 3052.217-98 Delays. (USCG) 3052.217-99 Department of Labor Safety and Health Regulations for Ship Repair.

(USCG)

3052.217-100 Guarantee. (60)(USCG) 3052.219-71 DHS Mentor Protégé Program.

3052.228-70 Insurance.

3052.228-90 Notification of Miller Act Payment Bond Protection. (USCG) 3052.228-91 Loss of or Damage to Leased Aircraft. (USCG) 3052.228-92 Fair Market Value of Aircraft. (USCG) 3052.228-93 Risk and Indemnities. (USCG) 3052.236-70 Special Provisions for Work at Operating Airports.

3052.242-72 Contracting Officer’s Representative.

3052.249-90 Contract Termination. (USCG)

(End of clause)

(6) HSAR 3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS

SUBSTANCES – APPLICABLE LICENSES AND PERMITS (JUN 2006)

The Contractor shall have all licenses and permits required by Federal, state, and local laws to perform hazardous substance(s) removal or disposal services. If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within 30 days after date of award. The Contractor shall provide evidence of said documents to the Contracting Officer or designated Government representative prior to commencement of work under the contract.

(End of clause)

(7) HAZARDOUS WASTE

Contractors performing ship repair work required to comply with FAR 52.223-3, Hazardous Material Identification and Material Safety Data (JAN 1997) Alt I, and as prescribed in SFLC Standard Specification 0000 (series). Disposal of all hazardous wastes shall be performed by the Contractor, and the Contractor shall meet all federal and state requirements. The Contractor is also required to submit an acceptable hazardous waste management plan to the Contracting Officer’s Representative at the arrival

Dockside Repairs of CGC STRATTON (WMSL 752) conference. The plan will be reviewed by the facility hazardous waste manager. An acceptable plan must address, at a minimum, the following requirements:

(a) EPA and local authority hazardous waste generator ID numbers or registration of the Contractors, his transporters, and disposal facilities (TSDFs);

(b) An inventory of all hazardous chemicals, compounds and other agents brought aboard the facility accompanied by their respective Material Safety Data Sheets;

(c) A list of all anticipated hazardous wastes to be generated and a federal/state/local regulation cross reference list for those wastes;

(d) Waste collection and containment procedures;

(e) A hazardous material spill and cleanup plan including tools and materials that will be on hand and readily available to facility containment and cleanup;

(f) Training certification for the Contractor's hazardous waste manager.

The Contractor shall note the local environmental regulations in the city where work will be performed, are more stringent than in many jurisdictions. As with all environmental regulations, it is the Contractor's responsibility to research, prepare for, and comply with, the local and state regulations.

All waste generated under the performance of this contract shall be disposed under the applicable Base Alameda, Alameda, CA EPA hazardous waste generator ID number. The Contractor shall notify the Contracting Officer's Representative (COR) 24 hours prior to any waste removals and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays). All hazardous waste manifests shall be reviewed and signed by Base Alameda, Alameda, CA hazardous waste personnel. Contractor must contact the designated Contracting Officer’s Representative (COR) for any environmental issues.

(9) VOLATILE ORGANIC COMPOUNDS (VOC) REGULATIONS

(a) Contractors are required to comply with federal, state and local VOC compliance laws and regulations. Among other requirements, certain Contractors may also be required to operate pursuant to a Title V permit. The need for such a permit will depend on the provisions of the applicable state’s “State Implementation Plan” (SIP) and the type/quantity of the Contractor’s regulated emissions, including VOCs. Certain SIPs may also mandate certain Contractors to operate under the terms of a compliance plan intended to reduce VOC emissions.

Dockside Repairs of CGC STRATTON (WMSL 752)

(b) Contractors, therefore, must submit the following to the designated Contracting Officer Representative not later than two weeks after contract award:

(1) Copies of any federal, state or local permits required and applicable to the use or application of VOCs at Contractor’s facility or offsite work places;

(2) Copies of any compliance plans required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces.

(c) If no federal, state or local permits or compliance plans are required and applicable to the use or application of VOCs at Contractor’s facility or offsite workplaces, then Contractor shall submit to the designated Contracting Officer’s Representative a letter, notarized under oath, that such documents are not required.

(d) Contractors will submit the following to the designated Contracting Officer’s Representative not later than two weeks after contract award: Data Sheets (MSDS) documents, certificates, specifications or any other manufacturing data verifying the VOC ratings of paints to be applied to the Cutter in accordance with SFLC Standard Specification 0000 and 6310.

(10) ACCESS TO VESSEL

(a) A reasonable number of officers, employees, and associates of the Government, or other Prime Contractors with the Government, and their subcontractors, shall, as authorized by the Contracting Officer, have at all reasonable times, admission to the plant, and access to vessel(s) to perform and fulfill their respective obligations to the Government on a noninterference basis. The Contractor shall make reasonable arrangements with the Government or Contractors of the Government, as shall have been identified and authorized by the Contracting Officer, to be given admission to the cutter’s homeport in CG Base, Alameda, CA and access to the vessel’s office space, work areas, storage or shop areas, or other facilities and spaces, necessary for the performance of their respective responsibilities and reasonable to their performance. All such above personnel shall be required to comply with all Contractor rules and regulations governing personnel at its shipyard, including those relative to safety and security.

(b) The Contractor further agrees, as authorized by the Contracting Officer, to afford to a reasonable number of officers, employees, and associates of bidders on other contemplated work, the same privileges of admission to the Contractor's plant and access to the vessel(s) on a noninterference basis subject to all Contractor rules and regulations governing personnel in its shipyard, including those relative to safety and security.

Dockside Repairs of CGC STRATTON (WMSL 752)

(11) INDEMNIFICATION FOR ACCESS TO VESSELS

Notwithstanding any provision in the "Access to Vessels" clause, or any other clause of the contract, the Contractor agrees to allow officers, employees, and associates of the Government, or other Prime Contractors with the Government and their subcontractors, and officers, employees, and associates of quoters on other contemplated work, admission to the Contractor's facilities and access to the vessel without any further request for indemnification from any party, which has not been previously included in the contract price.

(12) INSPECTIONS

Except as specified elsewhere, the U.S. Coast Guard shall rely on the Contractor to accomplish all inspection and testing needed to ensure that the work conforms to contract quality requirements.

Records of all inspection work by the Contractor shall be kept complete and available to the Government during the term of this contract and for such longer period as may be specified elsewhere in this contract.

The name and telephone number of the assigned U.S. Coast Guard Inspector will be provided after the award of a contract resulting from this solicitation.

(13) GROWTH WORK

(a) The Contractor shall not perform growth work without the Contracting Officer's authorization. Growth work is work within the scope of the contract, which has not been previously priced as a pre-priced work items listed in CLIN 0001(A) & (B).

The Contracting Officer reserves the right to contract for growth work on the basis of a negotiated, firm fixed- price, when it is in the best interest of the Government. Scope of services shall include ship repair and associated support work and may include work that is not currently listed as Definite and Optional Items.

(b) The Contractor shall furnish a price breakdown directly to the Contracting Officer, itemized as required by the Contracting Officer, of any proposal submitted for a contract modification. Unless otherwise directed, the breakdown shall be submitted with the Contractor’s proposal form provided at the arrival conference permitting an analysis of all materials, labor, equipment, subcontract, overhead costs, and profit covering all work involved in the change/modification whether such work was deleted, added or changed. Any amount claimed for subcontracts shall be supported by a separate, similar price breakdown. If the proposal includes a request for a time extension, justification shall be furnished with the proposal.

(c) This clause is to be used in conjunction with the clause COMPOSITE LABOR RATE incorporated into this solicitation. The Contractor is required to have and/or furnish all tools and equipment incidental to each trade. Supplies such as wiping rags, hacksaw blades, sandpaper, welding wire, helium, etc., are also to be furnished by the Contractor. Other materials are to be charged at regular rates and prices currently in effect and as agreed to by the Contracting Officer. Material shall be best commercial quality available except where a precise specification is indicated in which case the specification shall apply, e.g., FEDERAL SPEC.

(15) COMPOSITE LABOR RATE:

The composite labor rate offered shall be the sole labor hour rate used to price the Prime Contractor's direct labor hours for contract changes, i.e. growth work. The Contractor shall not receive any compensation in addition to this rate for the Prime Contractor's direct labor associated with such changes under this contract.

(a) The composite labor hour rate shall represent total compensation for the following:

(1) direct labor wages and salaries;

(2) all employee benefits including, but not limited to, paid leave, supplemental pay, insurance, retirement, savings, and legally required benefits;

(3) other direct costs associated with transit time, delay, disruption, expendable supplies, and equipment;

(4) all indirect costs such as overhead and general and administrative expense;

(5) any port or association fees, rents, or other levies;

(6) profit (fee); and

(7) all direct and indirect costs and profit associated with the following support functions:

Supervision Quality Assurance Planning Engineering Surveyors Worker Transit Time Material Handling Testing Cleaners Guards Estimating Contract Administration Transportation Drivers Fire Watches

Dockside Repairs of CGC STRATTON (WMSL 752)

(b) The composite labor hour rate will be applied to production labor hours only.

Production labor hours include only those hours necessary and reasonable to perform direct production functions and do not include the hours expended on the support functions listed above. This exclusion of support function hours applies whether such support functions are normally charged directly or indirectly by the Contractor's accounting system. These support functions are to be priced into the composite labor rate quoted and shall not be separately compensated.

(c) The Quantity of Composite Labor hours indicated in the Schedule of Items – Prices, is only an estimate and is an Optional Item pursuant to this solicitation. The Estimated Quantity represents the Government’s best estimate of the total number of additional hours that may be required throughout the contract. The Government may elect to exceed this value at the prices stated in the schedule and its discretion during performance of the contract. The inclusion of this item does not obligate the Government to exercise the item nor entitle the Contractor to compensation if not exercised.

(16) DISCOVERIES AND CHANGES TO CONTRACT:

Condition Found Report and Change Requests will be transmitted electronically by using email. The bullets below display the process of how these documents are to be followed for the duration of the contract performance period:

(a) Condition Found Report (CFR) - All readings and inspections are to be taken within 24 hours after the machinery or system is opened. All reports of reading and inspections required by the specifications shall be submitted to the COR in writing using a "Condition Found Report (CFR)" form, within 24 hours after the readings and/or inspections are made.

Promptness in taking and reporting readings is particularly important for underbody work items such as shaft bearing or rudder bearing clearances. Often during the progress of a work item, conditions are discovered by the contractor which are considered abnormal for reasons of safety, expected reliability, health, or habitability.

These conditions must be brought to the attention of the Coast Guard using a CFR.

Details provided by the Contractor in a CFR are important because the CFR may result in a contract change. To speed the contract change progress, the Contractor should include in his/her CFR the following details as a minimum:

(i) A sequential number.

(ii) The contract item which the "CFR" relates to.

(iii) A clear statement, definition, and description of the condition found, including but not limited to frame numbers, part numbers, materials and dimensions as appropriate.

(iv) A proposed or recommended repair to correct the defective condition.

(v) Indicate whether the report requires Cost Guard action, or if it is provided "for info" only. If action is required, indicate the response time required by the Coast Guard and whether or not a contract extension would be needed if the additional work is authorized.

(vi) A space on the form for the Coast Guard to make comments.

(vii) All CFR's will be dated, submitted, and signed by a representative of the Contractor. Contracting Officer’s Representative (COR) will respond to the Contractor’s within 24 hours of receiving a Condition Found Report. A copy of ALL condition found reports shall be retained in the Cutter’s file.

(b) Change Request Process will occur in the following order:

1. Condition Found Report-Generated by the contractor and provided to COR .

2. Condition Report Reply-Generated by the COR and provided to Contractor

3. Change Request- CR and IGE are generated by the COR and entered in the Contract Workbook. COR will assign the Change request number.

4. COR provides copy of Change Request to the Contractor.

5. Contractor’s Proposal- Provided to the KO for the identified tasking on CR

6. Negotiations- If needed, take place to establish pricing

7. Approved Change Request- Forwarded to Contractor and COR by the KO

Change Request will be submitted by the COR to the contractor within 24 hours after responding to the CFR. Contractor must submit proposal to the Contracting Officer within 72 hours receipt of the Change Request.

A modification will be issued to incorporate and implement all changes made by change orders.

(17). CONTRACT DEFICIENCY REPORT

The Contracting Officer or Contracting Officer’s Representative (COR) may issue a Contract Deficiency Report (CDR), SFLC Form PDM-29. The Contractor shall respond in writing within 24 hours of receipt, unless otherwise approved by the Contracting Officer, to the COR. The COR will comment on the Contractor's response and will forward the Deficiency Report and comments to the Contracting Officer, with a copy to the Contractor and Availability Program Manager. The Contracting Officer will render a final determination and provide it to the Contractor and COR in writing.

Dockside Repairs of CGC STRATTON (WMSL 752)

(18) MAINTAINING, REPORTING, AND DISPOSING OF GOVERNMENT

PROPERTY IN THE PERFORMANCE OF A SHIP REPAIR CONTRACT

1. The Government Property Clause incorporated by reference delineates the Contractor's overall responsibility when taking possession of government property in performance of a contract. In performance of this contract the Contractor will be required to properly identify, track and control property within its possession. This includes, a) property furnished by the government (GFP) to the Contractor in conjunction with specific Work Items. These items and their values are listed in the specification,

b) property that is pre-existing in a location that during the course of performance will be replaced or renewed.

2. The items listed in the specification, as government furnished property will be provided in the quantities designated. Government furnished property may be provided in person by an official Coast Guard employee, shipment via commercial carrier, etc.

The Contractor shall sign for all government furnished property using either a DD Form 1149, entitled, “Requisition and Invoice/Shipping Document” or a DD Form 1348, entitled, “Issue Release/Receipt Document”. A copy of the DD 1149 or DD 1348 must be sent within 48 hours of receipt of property, to the designated Government Property Administrator. The name of the individual assigned as Property Administrator will be furnished to the Contractor at time of award. The Contractor shall not take receipt of property that is not listed in the specification, has not been previously identified as becoming part of the contract (via contract modification) or which otherwise cannot be identified. Such irregularities shall be immediately reported to the Property Administrator.

3. The Contractor shall complete the report provided herein, entitled, “Government Property Report”. This report is intended as a living document whereby relevant fields shall be filled in, maintained and kept current at all times. All property described in paragraph 1 (a and b) above shall be reported on the report. At contract completion the Contractor and the Property Administrator shall ensure that all fields are appropriately completed. A signature block is provided at the end of the report for both parties to attest to the report's accuracy and completeness. The Government Property Report shall clearly delineate the complete track that all Government property took over the course of the contract. This completed report must accompany the Contractor's final invoice. Final payment may be delayed, without penalty of interest, until such time as the report is received. A separate copy of the completed report and any final DD 1149s or DD 1348s executed, as a result of carrying out disposition instructions shall be provided to the Property Administrator.

Dockside Repairs of CGC STRATTON (WMSL 752)

4. Pursuant to the Government Property Clause the authority to render disposition instructions of Government property associated with this contract is delegated to the Property Administrator. The Contractor shall comply with all instructions in the contract for the return of government property to the Coast Guard. This includes government property taken off the vessel (shafts, propellers, etc.), government property returned to the vessel (special tools, etc.) or surplus government property not used during performance of the contract.

(19) SECURITY REQUIREMENTS

A. For access to USCG Base Alameda, Alameda, CA, the contractor shall have RAPIDGate credentials. All personnel that need access to the base, such as on-site personnel, subcontractors (including second and third-tier subcontractors) and suppliers will need RAPIDGate credentials. This process must be completed prior to the start of work. Therefore, the Contractor shall begin the RAPIDGate registration process no less than 45 calendar days before on-site work is to commence. For enrollment into the RAPIDGate program for base access privileges, information can be found at www.rapidgate.com or by calling the RAPIDGate program at 1-877-727-4342. Please note that all costs associated with registration and participation in the RAPIDGate Program is at the sole expense of the contractor.

B. The Contractor shall provide a list of all on-site personnel, sub-contractors (including second and third tier subcontractors), and suppliers, to the contracting officer and Contracting Officer’s Representative no less than 30 calendar days before on-site work is to commence. The Contractor shall update this list when changes occur and ensure all personnel satisfy base access standards and have RAPIDGate credentials.

C. Contractor personnel not listed and without RAPIDGate credentials may be denied access to the Coast Guard Facility. Contractor personnel will be restricted to designated working areas. Any personnel violating this policy may lose access to the Coast Guard Facility. Contractor personnel shall have photo identification at all times while working on Coast Guard facilities. Special identification requirements may be needed to obtain the RAPIDGate credentials.

D. Contractor and delivery personnel may be required to present personal photo identification to gain access to a Coast Guard installation. Valid forms of identification are current passport or driver’s license that meet Real ID Act requirements. The Real ID Act of 2005 established minimum security standards for license issuance and production and prohibits Federal agencies from accepting, for certain purposes, driver's licenses and identification cards from states not meeting the Act's minimum standards. Anyone requiring access to a military facility under this contract, to include subcontractors, who holds a driver's license from any state without approved licenses will be required to

Dockside Repairs of CGC STRATTON (WMSL 752) provide identification other than that driver's license to gain access. Government IDs annotated with "Federal Limits Apply" will not be accepted for access purposes. It is the responsibility of the Contractor to ensure that their personnel have federally acceptable personal photo identification and comply with any other requirements for base access.

TWIC and DBIDS identification cards are not sufficient forms of identification for access to Coast Guard Island, Alameda.

E. If identification does not indicate United States citizenship, Coast Guard Security may require proof of the legal right to work in the United States. Contractor and delivery personnel also may be subjected to an immigration status and outstanding criminal warrants check.

F. Contractors shall provide the Contracting Officer’s Representative with 24 hours of advance notice of every delivery to the site (e.g. concrete, lumber, parts, etc.) and provide the company name, delivery person. And phone number of the firm(s) making deliveries. All vehicle access to Government property requires vehicle registration and proof of liability insurance. Otherwise access to the Coast Guard facility may be denied.

Please contact the LRE APM, LTJG David Robbins at (510) 437-6215, or by email at David.A.Robbins@uscg.mil for additional information and processes on base access protocols.

(20) CONTRACTING OFFICER’S AUTHORITY

No oral or written statement of any person other than the Contracting Officer will in any manner or degree modify or otherwise affect the terms of this contract. The Contracting Officer is the only person authorized to approve changes in any of the requirements under this contract, and, notwithstanding any provisions contained elsewhere in this contract, said authority remains solely with the Contracting Officer. In the event the Contractor effects any such change at the direction of any person other than the Contracting Officer, the change will be considered to have been made without authority, and no adjustment will be made in the contract price to cover any increase in cost incurred as a result thereof.

(21) CONTRACTOR PERFORMANCE EVALUATION

The U.S. Coast Guard Surface Forces Logistic Center (SFLC) will monitor and evaluate the successful offeror’s past performance of this contract and prepare a (CPAR) in accordance with FAR Part 42.15. All information contained in this assessment may be used, within the limitations of FAR 42.15, by the government for future source selections and in accordance with FAR 15.304, when past performance is an evaluation factor for award.

mailto:David.A.Robbins@uscg.mil

Dockside Repairs of CGC STRATTON (WMSL 752)

(b) NOTIFICATION: Upon completion of the contract, the contractor will be notified of the assessment. The contractor will be allowed 60 days to respond to the SFLC’s assessment of its performance entered into CPARS. The contractor’s response, if any, will be made part of the CPAR system at https://www.cpars.csd.disa.mil.

(c) INFORMATION: Information included in the CPAR may include, but is not limited to, the contractor’s record of conforming to contract requirements and to standards of good workmanship; the contractor’s record of forecasting and controlling costs; the contractor’s adherence to contract schedules, including the administrative aspects of performance; the contractor’s history of reasonable and cooperative behavior and commitment to customer satisfaction; the contractor’s record of integrity and business ethics, and generally, the contractor’s business-like concern for the interest of the customer.

(d) RELEASE OF DATA: CPARS information is considered business sensitive and will not be released except: (1) to other Federal procurement activities which request it;

(2) when SFLC must release pursuant to a Freedom of Information Act (FOIA) request;

or (3) when prior written consent is requested and obtained from the contractor.

(22) Electronic Submission of Payment Requests (FSMS Awards)

(a) Definitions. As used in these instructions –

(1) “Payment request” means a bill, voucher, invoice, or request for contract financing payment with associated supporting documentation. The payment request must:

comply with the requirements identified in FAR 32.905(b), “Content of Invoices” and the applicable Payment clause included in this contract. In addition, discount offerings and small business status if available shall be stated. If travel was allowable and approved, components in accordance with FAR 31.205-46 shall be provided.

(b) Except as provided in paragraph (c) of this clause, the contractor shall submit payment requests electronically using the Invoice Processing Platform (IPP). Information regarding IPP, including IPP Customer Support contact information, is available at www.ipp.gov or any successor site.

(c) The contractor may submit payment requests using a method other than IPP only when the contracting officer authorizes alternate procedures in writing in accordance with Coast Guard procedures.

(d) If alternate payment procedures are authorized, the contractor shall include a copy of the contracting officer's written authorization with each payment request.

https://www.cpars.csd.disa.mil/ http://www.ipp.gov/

(e) IPP enrollment information is at https://www.uscg.mil/fincen/IPP/.

(23) METHOD OF PAYMENT AND INVOICING INSTRUCTIONS

INVOICE SUBMISSION PROCESS:

1. The Contractor shall prepare a proper invoice IAW FAR clause 52.212-4, and in addition to the information required by FAR 52.212-4(g) as cited in the contract. All invoices shall be itemized to correlate to the Schedule of Supplies/Services.

A. The Government will make payment under this contract based on a percentage or stage of completion. The Contractor may invoice each contract line item (CLIN) as work progresses. The amount invoiced shall be calculated based on those prices stipulated in the contract Schedule of Supplies/Services as follows:

B. CLIN may not be invoiced until the percentage complete reaches 25 percent.

Future invoices for that CLIN have no limitation as to the percentage of completion required before invoicing. (The minimum percentage of completion (25%) to be reached prior to billing each CLIN may be waived by the Contracting Officer on a case-by-case basis for large dollar CLINS.)

C. In addition to the information required by FAR 52.212-4 (g) Invoices shall include:

1) Contract Number, Delivery Order/Task Order Number, DOC Number

2) Name and Address of the Contractor

3) Invoice Number and Invoice Date

4) UEI Number

5) Name of the Contract Specialist and Contracting Officer’s

6) Routing Code: SFLC-2

7) Period of Performance for Work Invoiced

8) Indicate Small Business Status

9) Indicate if Final Invoice, the Contractor’s final invoice submitted under the contract must be marked as follows: “THIS INVOICE CONSTITUTES THE

FINAL INVOICE – UPON PAYMENT OF THIS INVOICE NO OTHER

MONIES ARE DUE UNDER CONTRACT NUMBER” (to be assigned upon contract award).

10) The percentage of completion for each CLIN identified;

11) Vessel name

12) The overall percentage and dollar amount previously billed, currently billed and unbilled, https://www.uscg.mil/fincen/IPP/

13) Shipping and Payment Terms

14) Name, title, phone number, and mailing address of person to be notified in the event of a defective invoice.

All information must be included in an invoice for it to constitute a proper invoice. All improper invoices will be rejected which could delay payment.

2. The Contractor shall forward invoices via e-mail: Kevin.L.Holmes@uscg.mil and send copy to Valerie.S.RiveraChase@uscg.mil or in person to the Contracting Officer’s Technical Representative (COR).

3. The COR shall review and verify invoices, sign the invoice and return the invoice to the

Contractor.

• Invoices for contracts/task orders will be processed in the Invoice Processing Platform (IPP).

• IPP is a secure, web-based service that manages invoicing from award through payment notification.

Submitting invoices through IPP and:

• If there is a COR on the contract:

• Vendor will submit the invoice through IPP.

• The COR will be notified that there is an invoice for them to review in IPP.

• The COR will review the invoice, edit the distributions, if necessary, and approve/reject the invoice.

• If there are multiple distributions (LOAs) on a single CLIN, IPP will use a sequential method to distribute the funds to the 1st distribution until it is fully expended, then move on to the 2nd distribution until it is fully expended, and so on. If the invoice amounts should not be distributed in this manner, the COR can edit the distributions to apply the invoice amounts as needed.

• If the COR does not take action on the invoice within 3 days, a notification will be sent to the KO so the KO can take action on the invoice or work with the COR to get them to take action on the invoice.

• If the vendor will be submitting invoices through IPP and:

• Once the invoice is approved in IPP, it will be sent to FSMS.

• Once in FSMS, the invoice will go directly to the ACO(s) at FINCEN for final approval.

• The FINCEN ACO(s) will perform the final approval of the invoice and notification will be sent to Treasury to make payment to the vendor.

mailto:Kevin.L.Holmes@uscg.mil mailto:Valerie.S.RiveraChase@uscg.mil

Dockside Repairs of CGC STRATTON (WMSL 752)

Who will the vendor work with if they have issues in IPP? For issues with IPP, the vendors will work directly with the IPP Help Desk.

• Toll-free number: 866-973-3131

• Email address: IPPCustomerSupport@fiscal.treasury.gov

• Hours of operation: Monday through Friday (excluding bank holidays) from 8:00 am

- 6:00 pm ET

• FINCEN will send vendor information to IPP. If the vendor is already registered in

IPP, they will not need to take any action. If the vendor is not registered in IPP, they will get 2 emails from IPP with their user ID, password, and instructions on how to finish their registration.

Who will the vendor work with if they have issues with a payment? IPP will contain payment information that is sent from FSMS, but the IPP Help Desk will not be able to assist the vendor with the payment. Based on this, the vendor will need to work with the KO and FINCEN for payment issues.

• FINCEN Customer Service by phone: 757-523-6940

• FINCEN Customer Service by email: FIN-SMB-Customerservice@uscg.mil

• For additional contact information, please see the FINCEN Customer Service web page.

A copy of the invoice and any supporting documentation shall also be e-mailed to the following individuals:

Valerie.S.RiveraChase@uscg.mil and/or Summer.Gould@uscg.mil

Invoices shall only include work that has been incorporated via contract modification.

Only the Contracting Officer is able to authorize work and issue any modifications;

therefore, payments will not be made for any work to which a modification has not been properly executed. Invoices submitted for payment that includes such a request will be reduced by the unmodified amount

NOTE: 10% OF THE TOTAL CONTRACT PRICE WILL BE WITHHELD

UNTIL ALL DELIVERABLES, REQUIRED BY THE CONTRACT, ARE

RECEIVED AND ACCEPTED.

FURTHER CONSIDERATIONS WITH INVOICING:

In accordance with the Prompt Payment Act, for the purposes of determining a payment due date and the date on which interest will begin to accrue if a payment is late, a proper invoice shall be deemed to have been received:

(1) On the later of:

mailto:IPPCustomerSupport@fiscal.treasury.gov mailto:FIN-SMB-Customerservice@uscg.mil https://www.uscg.mil/fincen/CustomerService/ https://www.uscg.mil/fincen/CustomerService/ mailto:Summer.Gould@uscg.mil

(i) For invoices electronically transmitted by the Contractor via web-based submission, the date a transmission is received by the designated billing office, and receipt confirmation is provided to the designated recipient; or

(ii) The seventh day after the date on which the property is actually delivered or performance of the services is actually completed; unless—

a) The agency has actually accepted the property or services before the seventh day in which case the acceptance date shall substitute for the seventh day after the delivery date; or

b) A longer acceptance period is specified in the contract, in which case the date of actual acceptance or the date on which such longer acceptance period ends shall substitute for the seventh day after the delivery date.

(2) On the date of delivery, when the contract specifies that the delivery ticket may serve as an invoice.

(3) Web based submission by the Contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.

All payments for partial performance rendered by the Government under this contract are based on the assumption that the Contractor will, in good faith, execute and honor all payment terms entered into between it, the Prime Contractor, and any subcontractor thereof in the performance of this contract. The Contractor hereby acknowledges the Government’s right to reduce or suspend progress payments based on non-payment in accordance with any payment terms of the subcontract agreement.

Any amount deemed not payable will be deducted from the Contractor’s invoice.

Deducted amounts may be resubmitted on the next invoice for reconsideration.

(24) PROGRESS PAYMENTS

A. The Contractor may invoice requesting progress payments without discount, other than any prompt payment discount offered, not more frequently than every two weeks.

B. The invoice amount should reflect the percentage and dollar amount of completion established by the cutter's appropriate weekly progress report. Payments shall be derived from the accomplished percentage of completion as determined by the Contracting Officer.

Dockside Repairs of CGC STRATTON (WMSL 752)

C. All material and work paid for by progress payments shall thereby become the sole property of the Government, but this provision shall not relieve the Contractor from the obligation to complete the requirements of the contract.

D. The contractor shall be paid the remaining amount due upon completion and acceptance of all work under this contract.

(25) ORDERING - ADDITIONAL WORK

(a) The Contractor shall not perform additional work without the…