This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for Bosch Rexroth Axial Piston Steering Pumps, issued by the U.S. Coast Guard (USCG) Sea Command at the Surface Forces Logistics Center in Baltimore, MD. The amendment (A0003) addresses a question regarding pump performance testing requirements, specifically clarifying that the contractor must perform all testing using the Original Equipment Manufacturer (OEM) test procedures with the latest approved methods, equipment, and acceptance criteria. Test results must be documented in a detailed report, with one copy packed with the tested pump and another provided to the Coast Guard Quality Assurance Representative, who will be present during testing. The contract number is 70Z08526QAC015B00, and the amendment is effective on 12/01/2025.

View the file

Other files for this federal contract opportunity

Other files attached to Bosch Rexroth Axial Piston Steering Pumps, newest first.
File Type Posted
A0004_Sol ID 70Z08526QAC015B00.pdf PDF
Solicitation_70Z08526QAC015B00 rev.1.pdf PDF
A0002_Sol ID 70Z08526QAC015B00.pdf PDF
A0001_Sol ID _70Z08526QAC015B00_.pdf PDF
Attachment 1_ Specification_Bosch Rexroth Axial Piston Steering Pump_Rev.1_24NOV2025.pdf PDF
Attachment 2_Schedule of Supplies.xlsx XLSX spreadsheet
Solicitation_70Z08526QAC015B00.pdf PDF
Attachment 1_ Specification_Bosch Rexroth Axial Piston Steering Pump.pdf PDF
Attachment 3_Past Performance Information.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1. CONTRACT ID CODE PAGE OF PAGES

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1 2

2. AMENDMENT/MODIFICATION NO. 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

Amendment 0003 12/01/2025

6. ISSUED BY CODE 70Z085 7. ADMINISTERED BY (If other than Item 6) CODE 70Z085

USCG -SEA-C-SFLC

CPD 2 LRE PL

24 HAWKINS POINT ROAD, BLDG 3

BALTIMORE, MD 21226

USCG -SEA-C-SFLC

CPD 2 LRE PL

24 HAWKINS POINT ROAD, BLDG 3

BALTIMORE, MD 21226

8. NAME AND ADRESS OF CONTRACTOR (no., street, county, State and ZIP Code) 9.A AMENDMENT OF SOLICITATION NO.

70Z08526QAC015B00

X 9B. DATE (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER

NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the Offer submitted: or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE

RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT/.ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc)

SET FORTH IN ITEM 14, PURSUANT TO AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority).

Contract Clause, H.4 Option Item; FAR 17.207©

E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copy to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Bosch Rexroth Axial Piston Steering Pumps 70Z08526QAC015B00

The purpose of this amendment is to address submitted question.

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

Kiya Plummer Dantzler

15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED

BY

12/01/2025

(Signature of person authorized to sign)

(Signature of Contracting Officer)

NSN 7540-01-152-8070 30-105 STANDARD FORM 30 (REV. 10-83) PREVIOUS

EDITION UNUSABLE Prescribed by GSA, FAR (48 CFR) 53.243

Standard Form 30 Continued

CONTINUATION OF SF 30 – BLOCK 14

70Z08526QAC015B00 is hereby amended A0003 as follows:

Question 1: Pump Performance Testing Requirements:

Section 4.1.1. General states that each new fully assembled pump shall be tested. Could you please clarify whether the Government has defined testing requirements beyond this statement—such as the expected length of test, flow rate, pressure parameters, compensator set points, or any mandatory performance test points that each pump must demonstrate during acceptance?

Answer: To clarify the testing requirements for the pump units, the contractor shall perform all testing in accordance with the Original Equipment Manufacturer (OEM) test procedures. The contractor must use the latest OEM-approved methods, equipment, and acceptance criteria to verify system performance and ensure compliance with OEM standards.

Test results shall be documented in a detailed report. A copy of this test report shall be packed with the tested pump, and another copy shall be turned over to the Coast Guard Quality Assurance

Representative. Please note that the Coast Guard Quality Assurance Representative will be on-site during the testing process.

No other changes are made or implied.