This is a Statement of Work (SOW) for technical services to support the USCGC MAPLE (WLB 205), a 225-foot Coast Guard cutter undergoing drydock repairs at Coast Guard Yard, Baltimore, Maryland. The contract, identified as PR 52000PR260003249, requires the contractor to provide all labor, materials, equipment, and tools necessary to calibrate the vessel's thruster system following a motor replacement. The primary objective is to bring both the bow and stern thrusters to full operational capability.
The contractor must perform DECS 250 commissioning tasks including inspections, evaluations, tests, and tuning to determine optimal Voltage Regulator and DSD-412 Drive settings. Specific requirements include troubleshooting the DECS 250 in accordance with OEM and USCG standards, making parameter changes to enable 100% drive speed operation, verifying and documenting voltage regulator settings, fine-tuning system parameters dockside and underway, conducting full thruster tests per compliant documents, ensuring compliance with TCTO 225-WLB-TH2030.0, providing hard and digital copies of finalized voltage regulator setpoints, troubleshooting thruster breaker tripping and power fluctuations, diagnosing DSD-412 drive issues, and installing and programming the AEM-2020. The contractor must perform a system operational test witnessed by the Engineer Officer and provide a trip report documenting all findings within 48 hours of returning to the home office. The period of performance shall not exceed seven calendar days from the award date. Work shall generally occur between 0730 and 1600 EST, Monday through Friday, though weekend and holiday work may be required. The contractor must hold daily progress meetings with the Engineer Officer and provide all written reports in electronic format compatible with DHS workstations using Windows and Microsoft Office applications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08526Q3249_NOI.pdf | ||
| 70Z08526Q3249_WD.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LAST UPDATED: 02/01/2026 PAGE 1/3
STATEMENT OF WORK (SOW)
FOR
USCGC MAPLE Thruster System Field Support (Programming and Service)
PR 52000PR260003249
CGC MAPLE is currently undergoing drydock repairs at CG Yard and requires technical services to bring their thrusters to full operating condition and has an immediate need for technical support for tasks outlined in this Statement of Work (SOW).
1.0 GENERAL
1.1 BACKGROUND
The 225’ WLB asset, USCGC MAPLE (WLB 205), is undergoing a thruster motor replacement and requires technical support to calibrate the thruster system to full operational capability.
1.2 SCOPE
The scope of this contract is defined by the efforts and tools required to support USCGC MAPLE (WLB 205). The Contractor shall provide all labor, materials, and tools necessary calibrate the thruster system.
1.3 OBJECTIVE
The goal is to successfully calibrate the MAPLE’s thruster system and to bring the bow and stern thruster to full operational capability.
1.4 APPLICABLE DOCUMENTS
1.4.1 Compliance Documents
The following documents provide specifications, standards, or guidelines that must be complied with in order to meet the requirements of this contract:
Technical Publication Hull, Mechanical, & Electrical 3556
BOW AND STERN THRUSTERS
2.0 SPECIFIC REQUIREMENTS/TASKS
Unless otherwise stated, this contract applies to on-site support for USCGC MAPLE (WLB 205) at the Coast Guard Yard, Baltimore, MD, 21226.
2.1 DECS 250 Commissioning
The Contractor shall perform any inspections, evaluations, tests, and/or tuning, as deemed necessary, to determine the most effective Voltage Regulator and DSD-412 Drive settings for proper thruster operation.
2.1.1 Contractor shall utilize their own laptop with required up-to-date software and communications cable.
2.1.2 The Contractor shall troubleshoot the DECS 250 IAW OEM and USCG requirements.
2.1.3 The Contractor shall make parameter changes within DECS-250 Automatic Voltage Regulator to allow Thruster System to operate to 100% drive speed reliably.
LAST UPDATED: 02/01/2026 PAGE 2/3
2.1.4 The Contractor shall verify and document proper settings in the DECS- 250 voltage regulator.
2.1.5 The contractor shall tune the DECS-250, to include; fine tuning of all system parameters both dockside and underway.
2.1.6 Conduct full thruster test IAW compliant documents.
2.1.7 The contractor shall ensure that he DECS-250 meets the requirements set forth in TCTO 225-WLB-TH2030.0
2.1.8 Contractor Shall provide hard and digital copy of finalized voltage regulator setpoints.
2.1.9 Contractor shall troubleshoot and repair thruster breaker tripping open
2.1.10 Contractor shall troubleshoot and repair thruster power fluctuations.
2.1.11 Contractor Shall troubleshoot and diagnose any issues with the DSD-412
Drives.
2.1.12 Contractor shall install and program/calibrate the AEM-2020.
2.2 Test Thoroughly and Document
The Contractor shall ensure the system is fully functional by preforming a system operational test to be witnessed by Engineer Officer (EO) or the EO’s designated representative.
2.2.1 The Contractor shall provide a trip report documenting all findings no later than 48 hours after returning to the home office.
3.0 CONTRACTOR PERSONNEL
3.1 The Contractor shall provide qualified personnel to perform all requirements specified in this SOW.
4.0 OTHER APPLICABLE CONDITIONS
4.1 PERIOD OF PERFORMANCE
The period of performance for this contract shall not exceed 07 calendar days from the date of award.
4.2 PLACE OF PERFORMANCE
The primary place of performance will be at the Coast Guard Yard, Baltimore, MD 21226 at cutters designated drydock space unless an alternate location is approved by the Coast Guard.
4.3 HOURS OF OPERATION
Contractor employees shall generally perform all work between the hours of 0730 and 1600 EST, Monday through Friday (except Federal holidays). However, there may be occasions when Contractor employees shall be required to work other than normal business hours, including weekends and holidays, to fulfill requirements under this SOW. Precise times may be negotiated with the cutter Engineer Officer (EO) as scheduling is subject to ship’s operations.
4.4 Daily Progress Reports
The Contractor shall hold a daily progress meeting with the Engineer Officer and/or Commanding Officer upon arrival at the asset each morning of the visit. This report shall include
LAST UPDATED: 02/01/2026 PAGE 3/3
a summary of all Contractor work performed, an assessment of technical progress, schedule status, and discuss any hazardous work conditions or necessary precautions the crew need to be made aware of prior to commencing work.
4.5 General Report Requirements
The Contractor shall provide all written reports in electronic format with read/write capability using applications that are compatible with DHS workstations (Windows and Microsoft Office Applications).
5.0 GOVERNMENT FURNISHED RESOURCES
NA
POC: CWO Erik Bratland (Port Engineer) Ph: 617-939-1053 POC: Bryan G. Wright (APM) Ph: 757-329-9508
6.0 CONTRACTOR FURNISHED PROPERTY
The Contractor shall furnish all materials, equipment, and services necessary to fulfill the requirements of this contract, except for the Government Furnished Resources specified in Section 5.0.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The EO will inspect deliverables prior to acceptance and provide the contractor with an e-mail that provides documented reasons for non-acceptance. If the deliverable is acceptable, the EO will send an e-mail to the Contractor notifying it that the deliverable has been accepted.
8.0 DELIVERABLES
The Contractor shall provide a trip report IAW 2.2 of this SOW.