70Z08525RLREP0022 Attachment 1 Pricing Sheet A0001.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- 70Z08525RLREP0022
About this file
This document is a detailed Pricing Sheet for the dock side repair of the USCGC Munro by the US Coast Guard, scheduled for Fiscal Quarter 2 of Fiscal Year 2026. The pricing sheet covers multiple task order line items (CLINs) for ship maintenance activities, including deck covering renewal, tenting, tank cleaning and inspection, fire detection system testing, refrigeration system grooming, valve renewal, and permanent berthing modification. The repair work will be performed at Coast Guard Island in Alameda, CA, from February 24, 2026 to May 10, 2026.
The pricing document includes two primary pricing components: a task order pricing sheet with a placeholder for additional work to be ordered (with a composite labor rate to be defined by the contractor) and a detailed breakdown of 16 specific maintenance jobs, each priced at $0.00 in the current document. The sheet provides instructions for contractors to fill in their composite labor rates, materials markup, and provide pricing that includes materials, labor, equipment, overhead, and profit. The solicitation is issued by the Department of Homeland Security's US Coast Guard and appears to be seeking detailed pricing information for comprehensive ship maintenance services.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Sheet
| ATTACHMENT 1: Pricing Sheet | |||||
| USCGC MUNRO DOCKSIDE FQ2 FY26 | |||||
| 70Z08525RLREP0022 | |||||
| Contract Line Item (CLIN) | Title | Unit Price | Unit | Quantity | Total CLIN Price |
| 1 | TAB 1: Task Order Pricing Sheet | $ - 0 | Lump Sum | 1 | $0.00 |
| 2 | Additional Work To Be Ordered- Insert your Composite Labor Rate Unit Price: $______; Quantity: 3,313; Unit of Issue: Hour; Insert your Extended Price: [3,313 X hourly rate quoted] $____________. |
Insert your all inclusive mark-up/loading rate for materials and subcontractors: ____%. Unit Price: $100,000.00; Quantity: 1; Unit of Issue: Percent; Insert your Extended Price: [$100,000.00 X ( 1 + percentage quoted)] : $__________.
The above rate and percentage will be incorporated into the contract and used on change requests (CRs). Work is ordered against this CLIN on authorized CRs by the Contracting Officer.
Total Pricing Sheet Estimated Price $0.00
Tab1 Task Order 1
| Tab 1Task Order 1 | |||||||
| USCGC MUNRO DOCKSIDE FQ2 FY26 | |||||||
| 70Z08525RLREP0022 | |||||||
| Contract Line Item (CLIN) | Funding Code | Title | Unit Price | Unit | Quantity | Total CLIN Price | |
| 1 | 45 | Deck Covering (Slip-Resistant) Flight Deck, Renew | Job | 1 | $0.00 | ||
| 2 | 45 | Tenting (Flight Deck), Provide | Job | 1 | $0.00 | ||
| 3 | 45 | Talon Grid (Type 18-08), Inspect and Test | Job | 1 | $0.00 | ||
| 4 | 45 | Tanks (Ballast), Clean and Inspect | Job | 1 | $0.00 | ||
| 5 | 45 | Tanks (MP Fuel Storage and Overflow), Clean and Inspect | Job | 1 | $0.00 | ||
| 6 | 45 | Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect | Job | 1 | $0.00 | ||
| 7 | 45 | Fire Detection System, Inspect and Test | Job | 1 | $0.00 | ||
| 8 | 45 | Refrigeration Plant, System Groom | Job | 1 | $0.00 | ||
| 9 | 45 | Deck Covering (Carpet), Renew | Job | 1 | $0.00 | ||
| 10 | 45 | Deck Covering (Polymeric), Repair and Seal | Job | 1 | $0.00 | ||
| 11 | 45 | Decks, Preserve (Full) | Job | 1 | $0.00 | ||
| 12 | 45 | Valves, Renew | Job | 1 | $0.00 | ||
| 13 | 45 | Dual Point Davit, Modify | Job | 1 | $0.00 | ||
| 14 | 45 | HVAC and Chilled Water System, Modify | DELETED | ||||
| 15 | 45 | Permanent Berthing, Modify (Phase 2) | Job | 1 | $0.00 | ||
| 16 | 45 | Fire Prevention, Provide | Job | 1 | $0.00 | ||
| Total Task Order 1 Estimated Price | $0.00 |
Tab2 Task Order 1 Break Down
| Tab2 Task Order 1 Break Down |
| USCGC MUNRO DOCKSIDE FQ2 FY26 |
| 70Z08525RLREP0022 |
| Instructions: |
| Provide pricing including materials, labor, equiptment, and overhead & profit. |
Tab3 Comp Labor Rate Break Down
| Tab 3Composite Labor Rate Break Down |
| USCGC MUNRO DOCKSIDE FQ2 FY26 |
| 70Z08525RLREP0022 |
| Instructions: |
| Provide average of the direct labor rates used, G&A and Profit. |