70Z08525RLREP00180002 Solicitation Amendment.pdf
PDF 130 KB Posted
- Attached to
- USCG JAMES DS FQ1 FY26
- Solicitation number
- 70Z08525RLREP0018
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a U.S. Coast Guard (USCG) project issued by USCG-SFLC-CPD 2 in Baltimore, MD. The amendment provides clarifications and responses to six specific questions related to a work item involving cuttter equipment and maintenance. Key details include: requirements for insulation renewal (75 linear feet), Government Furnished Equipment (GFE) davit provisions, heat exchanger and piping specifications, transport services for equipment, wire rope lubrication, and cooler fitting reuse conditions. The amendment aims to provide bidders with precise guidance on material procurement, equipment handling, and specific technical requirements to ensure accurate bid preparation.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
1 2
70Z08525RLREP00180002 09/04/2025
70Z08525RLREP0018
09/04/2025
70Z085
AMENDMENT CONTROL NUMBER : 70Z08525RLREP0018
SUMMARY OF CHANGES : AMEND-List questions and responses
Same As Issuing Office 70Z085 CPD 2 - Baltimore, MD Commander, USCG-SFLC-CPD 2, 2401 Hawkins Point Road Baltimore, MD, 21226, US
70Z085
70Z08525RLREP00180002
Summary of Changes
The purpose of this amendment is to do the following:
1) Provide a list of the following questions and responses:
Specification Paragraph Reference: WI: 01 Para 3.21
Question 1: Para 3.21 states to renew up to 75 linear feet of damaged insulation but then references ten linear feet later in the paragraph and in 3.21.2. May you please clarify the length of insulation to be renewed, for bidding purposes?
Response: This work item is calling out 75 feet of insulation renewal. Please bid accordingly. 10 feet is what is commonly anticipated, but it is confirmed to be 75 feet in this instance.
Specification Paragraph Reference: WI: 02 Para 3.5.1
Question 2: Para 3.5.1 - Does the GFE DPD come with all fastening hardware?
Response: The davit will not have mounting hardware with it. At least it isn't specifically called out in the overhaul spec. KTR to furnish the mounting bolts, and associated hardware
Specification Paragraph Reference: WI: 02 Para 3.6
Question 3: Para 3.6 - Does the Contractor need to procure all materials listed on sheet 1 of DWG 750- WMSL_583_518_1_D and sheet 2 of DWG 750-WMSL-520-004?
Response: Heat Exchanger are provided as GFE. Piping and hoses necessary for relocation must be provided by Contractor.
Recommend Contractor to perform ship check.
Specification Paragraph Reference: WI: 02 Para 3.1.9
Question 4: Para 3.1.9 states to provide transport services. May you please elaborate on what will be transported, the weight, and the distance to/from, for bidding purposes?
Response: The GFE will be delivered to Contractor dockside. Transport services is for the Contractor to move the GFE from dockside to aboard cutter and to remove used davit from cutter to dock.
Specification Paragraph Reference: WI: 02 Para 3.5.4
Question 5: Para 3.5.4 - Do the davit ropes need to be flushed?
Response: For bidding purposes Contractor must make a provision to include lubrication the wire ropes.
Flushing of wire ropes is not required. The flushing requirement applies to the hydraulic system not the wire ropes.
Specification Paragraph Reference: WI: 02 Para 3.6.6
Question 6: Para 3.6.6 - Can the Contractor reuse all the cooler fittings, specifically the titanium flanges?
Response: If the existing fittings are in good condition (No cracks, excessive corrosion) Contractor may reuse them.