This document is a Performance Work Statement (PWS) for the dockside repair availability of the USCGC MUNRO (WMSL 755) in Fiscal Year 2024. The work will be performed at USCG Base Alameda, CA and is 100% set-aside for small business contractors.
The key details are:
- The work items include renewing the slip-resistant deck covering, providing tenting, cleaning and inspecting potable water tanks, preserving potable water tanks, cleaning and inspecting various other tanks and system components, and providing temporary services.
- The contractor must provide qualified technical representatives for nondestructive testing, coatings inspection, and other specialized work.
- Detailed requirements are provided for surface preparation, coating application, environmental protection, safety, and quality control.
- The contractor must submit critical inspection reports, work plans, and other documentation for government review and approval.
- The government will provide some equipment and materials as listed in the consolidated government-furnished property lists.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC MUNRO (WMSL 755)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2024
Developed By: David A Robbins
(Rev-1, 16 January 2024)
USCGC MUNRO (WMSL-418) DOCKSIDE AVAILABILITY FY2024
TABLE OF CONTENTS
Revisions Record .......................................................................................................................................... iii
Consolidated List of References ................................................................................................................... iv
Consolidated List of Government-furnished Property .................................................................................. ix
Consolidated List of Critical Inspection Items ............................................................................................ xiii
Principal Characteristics ............................................................................................................................. xiv
General Requirements
WORK ITEM 1: Deck Covering (Slip-Resistant), Renew
WORK ITEM 2: Tenting (Star Deck), Provide
WORK ITEM 3: Tanks (Potable Water), Clean and Inspect
WORK ITEM 4: Tanks (Potable Water), Preserve (100%)
WORK ITEM 5: Tank (Potable Water Hydro Pneumatic), Clean and Inspect
WORK ITEM 6: Tank (High Purity Water), Clean and Inspect
WORK ITEM 7: Tank (GT Water Wash), Clean and Inspect
WORK ITEM 8: Grey Water Lift Stations, Clean and Inspect
WORK ITEM 9: Tanks (MP Fuel Service), Clean and Inspect
WORK ITEM 10: Tanks (MP Fuel Storage and Overflow), Clean and Inspect
WORK ITEM 11: Tanks (JP-5) 5-76-0-J, Clean and Inspect (NSC3&F)
WORK ITEM 12: Circuit Breakers (Draw Out), Inspect and Test
WORK ITEM 13: Folding Boom Crane Flexible Hoses, Renew
WORK ITEM 14: Reverse Osmosis Flexible Hoses, Renew
WORK ITEM 15: Anchor Windlass Level 2, Inspect and Repair
WORK ITEM 16: Forward and Aft Capstans, Level 2 Overhaul
WORK ITEM 17: Helo Hangar Door Curtain Assembly, Renew
WORK ITEM 18: Temporary Services, Provide
WORK ITEM 19: Deck Covering (Electrical Matting), Renew
WORK ITEM 20: Surfaces, Preserve
WORK ITEM 21: Gas Turbine Uptake Spaces, Preserve (Full)
WORK ITEM 22: Deck Covering (Carpet), Renew
WORK ITEM 23: Fire Prevention, Provide
WORK ITEM 24: Gas Turbine Exhaust Tie Rod Supports, Renew ii (Rev-1)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE
REV#
WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iii (Rev-1) iv (Rev-1)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 418A WMSL-512-003, Rev C, HVAC Modifications for Dry Provisions Stowage
Mods
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-100-006, Rev A, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 418A-WMSL-180-003, Rev -, SS-1-69-2 Fan Fdn Modifications
Coast Guard Drawing 418A-WMSL-528-001, Rev A, Plumbing and Interior Deck Drain Diagram
Coast Guard Drawing 418A-WMSL-530-001, Rev C, Potable Water System Diagram
Coast Guard Drawing 418A-WMSL-593-006, Rev -, Reroute Sewage Piping iwo Dry Provisions Rm
Coast Guard Drawing 418A-WMSL-672-002, Rev C, Dry Provisions Storeroom Modifications
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 750 WMSL-556-009, Rev -, Anchor Windlass Hydraulic System Description
(ASC556005-02)
Coast Guard Drawing 750 WMSL-581-001, Rev D, Anchor Handling (ASC581001)
Coast Guard Drawing 750 WMSL-581-002, Rev B, Anchor Pocket (ASC581002)
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(ASC3085012)
Coast Guard Drawing 750-WMSL-100-051, Rev K, Unit 4310 Structure 01 Level to 02 Level - Fr 44 to
Fr 52 (ASC100431)
Coast Guard Drawing 750-WMSL-100-052, Rev K, Unit 4320 Structure 02 Lvl and Above - Fr 48 to Fr
53 (ASC100432)
Coast Guard Drawing 750-WMSL-100-053, Rev K, Unit 4420 Structure - 01 Level and Abv - Fr 52 to Fr
67 (ASC100442)
Coast Guard Drawing 750-WMSL-100-054, Rev H, Stack - Fr 48 to Fr 57 (ASC100443)
Coast Guard Drawing 750-WMSL-259-001, Rev H, PRPLN Gas Turbine Air Intake/Exhaust Diagram
(ASC259001)
Coast Guard Drawing 750-WMSL-259-009, Rev A, Turbine Combustion Intake Arrgt & Supports, Details and L/M abv 01 Lvl (ASC259007)
Coast Guard Drawing 750-WMSL-259-010, Rev B, Turbine Combustion Exhaust Arrgt & Supports Dets
& L/M above 01 Lvl (ASC259008)
Coast Guard Drawing 750-WMSL-100-21, Rev F, Unit 2100 Struct – Inner Bottom – Fr 35 to Fr 44
(ASC100210)
Coast Guard Drawing 750-WMSL-100-21, Rev F, Unit 2100 Structure – Inner Bottom – Fr 35 to Fr 44
(ASC100210)
Coast Guard Drawing 750-WMSL-100-22, Rev L, Unit 2110 Structure Inner Bottom to 1st Pltf Fr 35 –
44 (ASC100210)
Coast Guard Drawing 750-WMSL-100-26, Rev H, Unit 2200 Structure – Inner Bottom – Fr 44 to Fr 52
(ASC100220)
Coast Guard Drawing 750-WMSL-556-080, Rev -, Three Folding Boom Crane Hydraulic Diagram
(ASC556011)
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(AS3085012)
Coast Guard Drawing 750-WMSL-085-041, Rev -, Tank Capacity Curves (WMSL-755 Only)
(ASC085013F)
Coast Guard Drawing 750-WMSL-100-025, Rev K, Unit 2140 Structure - Main Dk to 01 Lvl - Fr 35 to Fr
44 (ASC100214)
Coast Guard Drawing 750-WMSL-100-033, Rev H, Unit 2320 - 1st Platform to 2nd Deck - Fr 52 to Fr 64
(ASC100232)
Coast Guard Drawing 750-WMSL-100-034, Rev J, Unit 2330 Structure - 2nd Deck to Main Deck - Fr 52 to Fr 64 (ASC100233)
Coast Guard Drawing 750-WMSL-100-040, Rev M, Unit 3210 Structure - Inner Bot to 1st Platform - Fr
76 to Fr 88 (ASC100321)
Coast Guard Drawing 750-WMSL-100-048, Rev J, Unit 4210 Structure - 01 Lvl to 02 Lvl - Fr 33 to Fr 44
(ASC100421)
Coast Guard Drawing 750-WMSL-100-049, Rev L, Unit 4220 Structure - 02 Lvl and Above - Fr 33 to Fr
44 (ASC100422)
Coast Guard Drawing 750-WMSL-100-084, Rev -, Topside Configuration for NSC 6 & Follow
Coast Guard Drawing 750-WMSL-100-36, Rev N, Unit 3110 Structure 1st Platform and Below Frs 65-77
(ASC100311)
Coast Guard Drawing 750-WMSL-100-37, Rev H, Unit 3120 Structure - 1st Platf to 2nd Dk - Fr 64 to Fr
76 (ASC100312)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL-169-001, Rev E, Helo Hangar Door Installation (ASC169001)
Coast Guard Drawing 750-WMSL-243-002, Rev D, Misc Pressure Vessels Design Details and L/M
(ASC243003)
Coast Guard Drawing 750-WMSL-303-002, Rev D, Coordination of Protective Devices (ASC303004)
Coast Guard Drawing 750-WMSL-320-004, Rev D, Power Sys Dk Plan - 1st Platf & Below, Fwd of Fr
36 & Aft of Fr 70 Cable Routing (ASC320003)
Coast Guard Drawing 750-WMSL-320-010, Rev G, Power Sys Deck Plan – Second Dk, Aft of Fr 52
(ASC3200016)
v (Rev-1) vi (Rev-1)
Coast Guard Drawing 750-WMSL-320-012, Rev G, Power Sys Deck Plan – Main Deck Fwd of Fr 52
(ASC320007)
Coast Guard Drawing 750-WMSL-320-016, Rev F, Power Sys Deck Plan – 01 Level (ASC320009)
Coast Guard Drawing 750-WMSL-320-038, Rev B, Electrical One Line Diagram (ASC320001)
Coast Guard Drawing 750-WMSL-500-002, Rev E, Resilient Hanger Details & Installation (ASC500002)
Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and
L/M (ASC501004)
Coast Guard Drawing 750-WMSL-520-503, Rev C, Seawater Cooling Mods IWO New Aft Folding
Cranes
Coast Guard Drawing 750-WMSL-528-015, Rev E, Plumbing & Interior Deck Drains and Vent System
Unit 2110 (ASC528211-PD)
Coast Guard Drawing 750-WMSL-528-502, Rev -, Forward Gray Water Tank Transfer to Aft Tank
Coast Guard Drawing 750-WMSL-528-503, Rev A, Aft Gray Water Tank Strainer Install
Coast Guard Drawing 750-WMSL-528-504, Rev -, FWD Gray Water Tank Strainer Install
Coast Guard Drawing 750-WMSL-530-019, Rev E, Potable Water Unit 3120 (ASC 530312-PW)
Coast Guard Drawing 750-WMSL-556-503, Rev G, Hydraulic Piping Mods IWO Aft Folding Crane
Install
Coast Guard Drawing 750-WMSL-582-001, Rev D, Anchoring, Mooring, and Towing Arrangement
(ASC582001)
Coast Guard Drawing 750-WMSL-582-002, Rev H, Mooring and Towing Arrangement (ASC582002)
(Unsigned)
Coast Guard Drawing 750-WMSL-600-030, Rev J, Fab & Instl of Hull Outfit Design, Unit 3140
(ASC600314)
Coast Guard Drawing 750-WMSL-635-002, Rev K, Insulation Arr & Details Thermal, Acoustic, & Fire
(ASC635002)
Coast Guard Drawing 750-WMSL-635-502, Rev -, Insulation Arr & Details Thermal, Acoustic, & Fire
(WMSL 754 & Follow)
Coast Guard Drawing 750-WMSL-640-502, Rev -, Furniture Schedule (WMSL 754 & Follow)
NAVSEA Drawing 803-1385828, Rev P, Nozzles AFFF and Washdown Systems
NAVSEA Drawing 803-5184182, Rev B, Insulation, Passive Fire Protection- Installation Details
NAVSEA Drawing 804-5773931, Rev A, Acoustic & Thermal Insulation for Compartments Installation
Details
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jan 2014, Coatings and Colors Manual
Coast Guard Technical Publication (TP) 7082, SWBS 533, 2020, Potable & Chilled Water Tanks
Coast Guard Technical Publication (TP) 7165, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 1
Coast Guard Technical Publication (TP) 7166, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 2
Coast Guard Technical Publication (TP) 7167, 7-Feb 2019, Ship Service Switchboards 1S, 2S, 3S and
1SP Shore Power Volume 3 vii (Rev-0)
Coast Guard Technical Publication (TP) 7181, Jan 2022, SWBS 169, Helo-Hangar Doors Operation &
Maintenance Manual
Coast Guard Technical Publication (TP) 7183B 21 Feb-19, Anchor Windlass - Model 2344A000
Coast Guard Technical Publication (TP) 9557, SWBS 582, Jun 2021, Forward & Aft Capstan – Model
4A0100
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0450 (SFLC Std Spec 0450), 2022, Electrical
Power for Contractor Tools and Equipment
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 0850 (SFLC Std Spec 0850), 2022, General
Requirements for Drawing Preparation
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Inspect, Repair, And Test Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire
Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirement for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2022, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2022, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary
Hull Accesses
USCG, HWSL Guidance/Fall Protection Plan, Working Aloft Aboard Cutter
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities
American National Standards Institute/NSF International (ANSI/NSF) 61, 2008, Drinking Water System
Components - Health Effects
American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2020, Personnel Qualification and Certification in Nondestructive Testing
American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2020, 2020, ASNT Standard for Qualification and Certification of Nondestructive Testing Personnel
American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of
Welds
American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds
American Welding Society (AWS) D1.1/D1.1M, 2020, Structural Welding Code – Steel viii (Rev-1)
American Welding Society (AWS) D3.5, 2000, Guide for Steel Hull Welding
ASTM International (ASTM) D1330, 2022, Standard Specification for Rubber Sheet Gaskets
ASTM International (ASTM) G46, 2018, Standard Guide for Examination and Evaluation of Pitting
Corrosion
Code of Federal Regulations (CFR) Title 29, Part 1910, 2017, Occupational Safety and Health Standards
Code of Federal Regulations (CFR) Title 29, Part 1915, 2013, Occupational Safety and Health Standards for Shipyard Employment
Code of Federal Regulations (CFR) Title 40, 2013, Protection of the Environment
EASA Standard AR 100-2015, Recommended Practice For The Repair Of Rotating Electrical Apparatus.
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated
MIL-DTL-15562, May 1996, Matting or Sheet, Floor Covering Insulating for High Voltage requirements
MIL-DTL-32585A, 2021, Insulation, Thermal and Acoustic, Fibrous Glass
MIL-PRF-24176C, 2020, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24667C w/Int. Amendment 1, 2018, Coating System, Non-Skid, for Roll, Spray, or Self-
Adhering Application
MIL-PRF-24667D, 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering Application
MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure
Naval Sea Systems Command (NAVSEA) 0640-LP-119-0175, 2019, NAVSEA OP 4 Rev 12, Ammunition and Explosives Safety Afloat
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
NFPA 70E: 2015 Edition Standard for Electrical Safety in the Work Place
Schneider Electric Maintenance and Field Testing Guide for Masterpact NT and NW Circuit Breaker
Instruction Bulletin No.06131b1202 Oct 2014
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C-6183B, 2019, Cork and Rubber Composition Sheet; for Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.1 (SSPC-SP 1), 2016, Solvent Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Bare Metal Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast
Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-4/NACE WJ-4, 2017, Waterjet Cleaning of Metals – Light Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE), Joint Surface Preparation
Standard SSPC-SP 10/NACE No. 2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP
10/NACE No.2, 2007, Near-White Blast Cleaning ix Rev-2
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
5 N Bladder, Water NSN: 4510-01-601-2564 PN:
660603996
1 ea. 2,506.00
13 N HOSE ASSEMBLY (S.S)
1.00 ID X 81 IN. LG
SWIVEL “1” TO
PRESSURE
MANIFOLD "P-A-IN"
PN: YMD12291 3 ea. 959.00
13 N HOSE ASSEMBLY (S.S)
1.00 ID X 82 IN. LG
SWIVEL “2” TO
PRESSURE FILTER
MANIFOLD "P-B-IN"
PN: YMD12291 2 ea. 961.00
13 N HOSE ASSEMBLY (S.S)
1.00 ID X 111 IN. LG
SWIVEL “3” TO
CONTROL VALVE
"T1/T2"
PN: YMD12291 2 ea. 1049.00
13 N HOSE ASSEMBLY (S.S)
0.50 ID X 124 IN. LG
SWIVEL “4” TO
DRAIN RESERVOIR
"DR-OUT"
PN: YMD12290 3 ea. 441.00
13 N HOSE ASSEMBLY (S.S)
0.50 ID X 136 IN. LG
SWIVEL “5” TO
DRAIN RESERVOIR
VENT
PN: YMD12290 3 ea. 449.00
13 N HOSE ASSEMBLY (S.S)
0.38 ID X 83 IN. LG
SWIVEL “6” TO
PRESSURE FILTER
MANIFOLD "PP-IN"
PN: YMD12289 3 ea. 316.00
13 N HOSE ASSEMBLY (S.S)
0.375 ID X 112 IN. LG
PRESSURE FILTER
MANIFOLD "PP-Out"
TO CONTROL
VALVE "X"
PN: YMD8960 3 ea. 242.00
13 N HOSE ASSEMBLY (S.S)
1.0 ID X 109 IN. LG
PRESSURE FILTER
MANIFOLD "P-B-
OUT" TO CONTROL
VALVE "P2"
PN: YMD8964 2 ea. 728.00
13 N HOSE ASSEMBLY (S.S)
1.0 ID X 109 IN. LG
PRESSURE FILTER
MANIFOLD "P-A-
Out" TO CONTROL
VALVE "P1"
PN: YMD8964 3 ea. 728.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 62 IN. LG
CONTROL VALVE
"LUFF A" TO LUFF
CYLINDER "E"
PN: YMD8963 3 ea. 419.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 80 IN. LG
CONTROL VALVE
"LUFF B" TO LUFF
CYLINDER "R"
PN: YMD8963 3 ea. 445.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 46 IN. LG
CONTROL VALVE
"SWING A" TO
SWING C.B. VALVE
"VB"
PN: YMD8963 2 ea. 395.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 46 IN. LG
CONTROL VALVE
"SWING B" TO
SWING C.B. VALVE
"VA"
PN: YMD8963 2 ea. 395.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 127 IN. LG
CONTROL VALVE
"WINCH A" TO
WINCH PIPE RUN
PN: YMD8963 2 ea. 507.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 127 IN. LG
CONTROL VALVE
"WINCH B" TO
WINCH PIPE RUN
PN: YMD8963 2 ea. 507.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 87 IN. LG
WINCH PIPE RUN
TO WINCH BRAKE
VALVE "A"
PN: YMD8963 2 ea. 454.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 87 IN. LG
WINCH PIPE RUN
TO WINCH BRAKE
VALVE "B"
PN: YMD8963 2 ea. 454.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 147 IN. LG
CONTROL VALVE
"JIB A" TO JIB
PN: YMD8963 3 ea. 534.00 x Rev-1 xi Rev-1
CYLINDER "E"
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 155 IN. LG
CONTROL VALVE
"JIB B" TO JIB
CYLINDER "R"
PN: YMD8963 2 ea. 544.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 127 IN. LG
CONTROL VALVE
"TELE. A" TO PIPE
RUN
PN: YMD8963 3 ea. 507.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 127 IN. LG
CONTROL VALVE
"TELE. B" TO PIPE
RUN
PN: YMD8963 3 ea. 507.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 87 IN. LG
PIPE RUN TO TELE.
CYLINDER "E"
PN: YMD8963 2 ea. 454.00
13 N HOSE ASSEMBLY (S.S)
0.75 ID X 87 IN. LG
PIPE RUN TO TELE.
CYLINDER "R"
PN: YMD8963 2 ea. 454.00
13 N HOSE ASSEMBLY (S.S)
0.375 ID X 87 IN. LG
WINCH ELR VALVE
"ELR" TO PIPE RUN
PN: YMD8960 2 ea. 227.00
13 N HOSE ASSEMBLY (S.S)
0.375 ID X 144 IN. LG
PIPE RUN TO ELR
MANIFOLD "ELR-1"
PN: YMD8960 2 ea. 260.00
13 N HOSE ASSEMBLY (S.S)
0.375 ID X 82 IN. LG
CONTROL VALVE
"D" TO PIPE RUN
PN: YMD8960 3 ea. 225.00
N
HOSE ASSEMBLY
(S.S.) 1.00 ID X 102 IN.
LG
SWIVEL "3" TO PIPE
RUN
PN: YMD12291
1 ea.
1032.00
HOSE ASSEMBLY (S.S)
0.75 ID X 147 IN. LG
CONTROL VALVE
"JIB B" TO JIB
CYLINDER "R"
PN: YMD8963
494.00
0.75 ID X 124 IN. LG
CONTROL VALVE
"WINCH A" TO
WINCH C.B. VALVE
"VB"
503.00
0.75 ID X 124 IN. LG
CONTROL VALVE
"WINCH B" TO
WINCH C.B. VALVE
"VA"
503.00
0.75 ID X 42 IN. LG
CONTROL VALVE
"SWING A" TO
SWING C.B. VALVE
"VB"
389.00
0.75 ID X 42 IN. LG
CONTROL VALVE
"SWING B" TO
SWING C.B. VALVE
"VA"
389.00
0.75 ID X 92 IN. LG
PIPE RUN TO TELE.
CYLINDER "E"
461.00
0.75 ID X 92 IN. LG
PIPE RUN TO TELE.
CYLINDER "R"
461.00
0.75 ID X 118 IN. LG
CONTROL VALVE
"WINCH CT A" TO
CT WINCH "P"
PN: YMD8964
495.00
1.0 ID X 65 IN. LG
CONTROL VALVE
"T1" TO PIPE RUN
PN: YMD8964
645.00
17 Y Hanger Door Curtain
Assembly Port
NSN: 2040-01-620-3728 PN:
HH3060K-PORT
1 56,000
17 Y Hangar Door Curtain
Assembly Starboard
NSN: 2040-01-620-3730 PN:
HH3060K-STBD
1 56,000
17 N Door Curtain Bottom
Bar Assembly
NSN: 2040-01-675-5682 PN:
HH3070
2 12,500
17 N Port Door Spring
Barrel Assembly
PN: HH3045 1 12,185
17 N Starboard Door Spring
Barrel Assembly
PN: HH3040 1 12,185
*Government-loaned property, which must be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xii Rev-1 xiii Rev-1
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Deck Covering (Slip-Resistant), Renew
2 Tenting, Provide
3 Tanks (Potable Water), Clean and Inspect
11 Tanks (JP-5) 5-76-0-J, Clean and Inspect (NSC3&F)
12 Circuit Breakers (Draw Out), Inspect and Test
14 Reverse Osmosis Flexible Hoses, Renew
15 Anchor Windlass Level 2, Inspect and Repair
20 Surfaces, Preserve xiv Rev-1
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
00000_0623_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
None
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2020, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
1 Rev-1
2 Rev-1
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s proposal when work be conducted in a Contractor–owned facility. Include any
MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.2 Fire watch requirements. The Contractor must refer to 3.3.1.3 (Fire watch requirements) of SFLC Std Spec
0000, in accomplishing the following task:
• Provide fire watch personnel and fire extinguishers for the duration of the availability period, during and beyond noted Coast Guard fire watch support.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Coatings approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written COR authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The activity Generator Status for the Coast Guard Facility is 7690390037. The
EPA ID for the Coast Guard Facility is CA7690390037.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
• National Pollutant Discharge Elimination System (NPDES) Storm Water (SW) Permit: Unit has an
NPDES SW permit which requires unit-specific procedures be followed for the storage and inspection of equipment and materials which may contribute contaminants to storm water discharges.
• Air Emission Permit: Unit has an Air Emission Permit which requires unit-specific procedures be
3 Rev-1
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 are considered the same as those for welding HY-130.
followed for the emissions of VOCs and hazardous air pollutants.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by qualified laboratories; and where required by law, the laboratories must be certified.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The Contractor must submit copies of all regulatory notifications to the COR and the local Facility Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System (NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal, and ensure that waste removals are conducted during normal business hours (0800-1600) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 COR approval is needed for the Contractor or Subcontractor to sign a Hazardous Waste Manifest using the Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the
Coast Guard facility.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications
4 Rev-1 will appear here.
3.7.1 None.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 Rev-1
6 Rev-1
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: / ; Return to service or removal from environment controls: /
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 Rev-1
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME
HULL #
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
8 Rev-1
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 Rev-1
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
10 Rev-1
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 Rev-1
(Use one sheet for each sequence)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
VESSEL NAME
HULL #
WORK ITEM
COATING MFG
PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 Rev-1
4.2 Tank and Void Assessment form.
13 Rev-1
14 Rev-1
S23_NNN_613NN_ANS_0923_755
WORK ITEM 1: Deck Covering (Slip-Resistant), Renew
1.1 Intent. This work item describes the requirements for the Contractor to renew deck covering with slip-resistant deck covering system (MIL-PRF-24667 Type V Comp. G/D/L Non-skid) for areas as listed in
Table 1.
TABLE 1 SLIP-RESISTANT DECK COVERING
LOCATION
COMPO
AREA
(SQFT)*
SYSTEM/APPENDIX
(SFLC STD 6310)
TOPCOAT COLOR
PRESERVE
LEVEL
Pilot House
(Top of)
Decks, Platforms
803 Weather Decks (Weather
Deck Non-Skid, MIL-
SPEC Coating for Steel)
Dark Gray 36076
Match existing adjacent surfaces
Renew MIL-PRF-24667D
Type V Comp. G/D/L
Non-skid
MK46 Equipment
Room
(Top of)
Decks, Platforms
44 Weather Decks (Weather
Deck Non-Skid, MIL-
SPEC Coating for Steel)
Dark Gray 36076
Match existing adjacent surfaces
Renew MIL-PRF-24667D
Type V Comp. G/D/L
Non-skid
*Approximated
1.2 Government-furnished property.
None.
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-100-006, Rev A, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 &
Follow (AS3085012)
Coast Guard Drawing 750-WMSL-100-049, Rev L, Unit 4220 Structure - 02 Lvl and Above - Fr
33 to Fr 44 (ASC100422)
Coast Guard Drawing 750-WMSL-100-084, Rev -, Topside Configuration for NSC 6 & Follow
NAVSEA Drawing 803-1385828, Rev P, Nozzles AFFF and Washdown Systems
15 Rev-1
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (Series), Coatings and Color
Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
American Society for Nondestructive Testing (ASNT), Recommended Practice No. SNT-TC-1A, 2020, Personnel Qualification and Certification in Nondestructive Testing
American Society for Nondestructive Testing (ASNT), Standard No. ANSI/ASNT CP-189-2020, 2020, ASNT Standard for Qualification and Certification of Nondestructive Testing
Personnel
ASTM Internationals (ASTM) G46, 2018, Standard Guide for Examination and Evaluation of
Pitting Corrosion
MIL-PRF-24176C, 2020, Cement, Epoxy, Metal Repair and Hull Smoothing
MIL-PRF-24667D, 2021, Coating System, Non-Skid, for Roll, Spray, or Self-Adhering
Application
MIL-STD-1689A, 1990, Fabrication, Welding, and Inspection of Ships Structure
Naval Sea Systems Command (NAVSEA) 0640-LP-119-0175, 2019, NAVSEA OP 4 Rev 12, Ammunition and Explosives Safety Afloat
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP
11), 2020, Bare Metal Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface
Preparation Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet
Abrasive Blast Cleaning
3.1 General.
3.1.1 CIR. The Contractor must submit a CIR for the inspections listed in the following paragraph(s) :
• 3.3 Operational test – initial
• 3.4 Inspection
3.1.2 Tech Rep. The Contractor must provide the services of Tech Reps and personnel as follows :
• NDE Tech Rep : NDE Operator/Level 1
• Preservation Tech Rep : CIP Level 3 – Peer Review with Marine Specialty
3.1.2.1 NDE Tech Rep. The Contractor must provide the services of a qualified and certified NDE
Operator/Level 1 as follows:
16 Rev-1
• Perform NDE Operations.
3.1.2.1.1 Qualifications/certifications. NDE Operator/Level 1 certified and qualified in accordance with
ASNT No. SNT-TC-1A. Submit the Tech Rep’s qualifications/certifications to the COR at the Arrival
Conference.
3.1.2.1.2 Dates of services. Include the dates of services in which Tech Reps must be on site as per their subcontract documentation.
3.1.2.2 Preservation Tech Rep. The Contractor must provide the services of a Certified Coating Inspector having successfully completed the NACE International Coatings Inspector Program (CIP), Level 3 – Peer
Review with Marine Specialty to:
• Serve as an Independent Coating Tech Rep.
• Accomplish applicable requirements in SFLC Std Spec 0000, Paragraph 3.2.4.2.2 (Coating
Tech Rep).
• Oversee the Preservation Plan requirements in SFLC Std Spec 6310, Paragraph 3.2
(Preservation Plan).
• Review and sign daily reports summarizing work. See forms QA-1 thru QA-5 provided in the
General Requirements.
• Submit reports to the COR within 24 hours of each inspection.
3.1.2.2.1 Qualifications/certifications. Submit the Coating Tech Rep’s qualifications/certifications in accordance with SFLC Std Spec 0000, 3.2.4.2.2.3 and 3.2.4.2.4, include name, certificate number and documented completion of NACE Marine Coating Technology Course and Exam.
3.1.2.2.2 Submit the name and the certification of the Tech Rep to the COR at the Arrival Conference.
Include the dates of services the Qualified Tech Reps will be on site as per their subcontract documentation.
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.3.1 Specific protections. Specific areas/equipment/components to be protected include, but are not limited to:
• Weapons, controls, and components (e.g. guns, ESM systems, and controls)
• Machinery, equipment, and components
• Ventilation systems, and components (e.g. ventilation inlets/outlets, and trunks)
• Ordinance marks
• Ammo racks and foundations
• Ready service lockers
• Flag storage boxes.
• Wash down counter measure fittings
• Drains, covers, and plugs
3.1.3.2 Inspection of integrity. Inspect the integrity of the protective covering at the beginning of each shift where surface preparation and/or painting will be accomplished. Ensure that equipment and
17 Rev-1 machinery have not been infiltrated by contamination. Clean any contamination and repair any defects in the protective covering prior to continuing work.
3.1.3.3 Watertight closures. Close all weather tight closures in the vicinity of the work area or install double curtain baffles at the entrance of each access door where airborne contamination could occur during surface preparation and painting. Double curtain baffles are necessary at all closures that will be in use during the preservation process. Install a dirt collection mat on the deck directly inside each closure.
3.1.3.4 Deck drains. Plug or cover all deck drains, weather deck supply and discharge to prevent entry of blast grit or debris.
3.1.3.5 Wash down counter measure (CMWD). Cover CMWD nozzles (i.e. NAVSEA Dwg 803-
1385828) to prevent entry of blast grit or debris using the following:
• Fender Washer (i.e. Carbon Steel, SAE J403H (1008-1020), UNS G10080-G10200, Zinc
Plated)
• Machine Screw (Stainless, Type 18-8, must comply with ANSI-B18.6.3 Slotted, Trusshead.
Full form threads are to extend to within 0.050 inch of the head bearing surface).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, Paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following :
• Small boats
• Weapons, controls, and components (e.g. guns, ESM systems, and controls)
• Machinery, equipment, and components
• Ventilation systems, and components (e.g. ventilation inlets/outlets, and trunks)
• Ordinance marks
• Ammo racks and foundations
• Ready service lockers
• Flag storage boxes
• Wash down counter measure fittings
• Drains, covers, and plugs
• Closures (e.g.