Solicitation 70Z08524RIBCT0002 - Questions and Answers.pdf
PDF 112 KB Posted
- Attached to
- USCGC JOSHUA APPLEBY DD FY24
- Solicitation number
- 70Z08524RIBCT0002
About this file
This document provides questions and answers regarding Solicitation 70Z08524RIBCT0002 for dry dock repairs to USCGC JOSHUA APPLEBY. The Coast Guard is seeking bids to perform ultrasonic thickness measurements of 250 spots on deck plating, inspect the substrate around a scuttle, and prepare and coat any renewed steel. Bidders should price only the initial inspection, with any required scuttle renewal or steel preservation to be addressed using a Condition Found Report and Change Request if needed. A site visit to the cutter can be scheduled by contacting the listed point of contact.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Questions and Answers:
Solicitation 70Z08524RIBCT0002
USCGC JOSHUA APPLEBY (WLM 556) DRY DOCK REPAIRS
Below are all of the questions received in response to the subject solicitation by the deadline and answers provided by the government. Any vendor specific information has been removed.
Q: 3.2.1 Ultrasonic thickness measurement. Prior to priming deck surfaces, in the presence of the Coast Guard Inspector, perform a UT inspection of the affected plating in the area described above, in accordance with SFLC Std Spec 0740. Cite corroded plating where the remaining thicknesses are less than 75% of the original thickness as shown on Coast Guard Drawing 175-WLM 801-15 and submit a Condition Found Report (CFR) to the Coast Guard Inspector. Question: For bidding purposes provide quantity of UT shots.
A: Please bid for 250 UT shots, that will be our baseline. If more is needed, we can utilize CFR/CRs.
Q: 3.2 Renewal. Inspect substrate around scuttle and if it cannot be preserved the insert for the scuttle will have to be cut out and renewed. 3.3.1. Scuttle surfaces. Prepare and coat both sides of the new scuttle assembly(s) and all other disturbed surfaces to match existing adjacent surfaces as follows:… nothing follows Questions: SOW is not clear. Price should include renewal of the insert and scuttle, and preservation? Or only price for inspection and preservation of the existing assembly? And if a new scuttle assembly is required, could it be addressed with a CFR followed by a CR? Or should it be priced the renewal and if it is not required to be descoped after the inspection and CFR? Is the Government providing the new scuttle?
A: Please bid only for the initial inspection. If the steel is found to be above wastage, we will utilize a CFR/CR to renew and preserve the new insert. The scuttle itself does not have any issues and will continue to be used. Regarding paragraph 3.3.1, please assume the prep/coating is for any new steel if renewed.
Q: Is there a site visit timeframe and POC for this availability?
A: Contact the cutter rep, MK1 Siok Dallas (443) 254-5646), to schedule a visit.
File details come from the government source that posted it. Updated .