Attachment 1 - Section B Schedule of Prices KATHERINE WALKER DD FY20 Rev1.xls
XLS spreadsheet 54 KB Posted
- Solicitation number
- 70Z085-20-Q-P4561800
About this file
This document contains a solicitation for commercial services and a schedule of supplies and services for the USCGC KATHERINE WALKER (WLM 552) Drydock Repair Availability. The solicitation requests quotes to perform various dry dock repairs to the 175-foot buoy tender from 21 July 2020 through 29 September 2020 at the contractor's facilities. Services include ship repair and associated support work as outlined in the attached specification. Quotes are due by the date specified in the solicitation. The solicitation will result in a firm fixed price contract awarded under FAR Part 12 to a small business. Required documentation includes a schedule of supplies and services with pricing, past performance documentation, certifications, insurance documentation, and representations and certifications. The place of performance is the contractor's facilities, and the cutter's homeport is in Bayonne, New Jersey.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC KATHERINE WALKER (WLM-175) DRYDOCK AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (Side Scan), Ultrasonic Testing | JOB | 1 | $0.00 | |
| D-002 | U/W Body, Preserve (100%) | JOB | 1 | $0.00 | |
| O-003 | Hull and Structural Plating (General) -10.2-Pound Steel, Renew | sq ft | 1 | $0.00 | |
| O-004 | Hull and Structural Plating (General) - 12.75-Pound Steel Plate, Renew | sq ft | 1 | $0.00 | |
| O-005 | Hull and Structural Plating (General) - 15.3-Pound Steel Plate, Renew | sq ft | 1 | $0.00 | |
| O-006 | Hull And Structural Plating (General) - 20.4-Pound Steel Plate, Renew | sq ft | 1 | $0.00 | |
| O-007 | Hull and Structural Plating (General) - 7.5-Pound (3/16") Steel Plate, Renew | sq ft | 1 | $0.00 | |
| O-008 | Hull and Structural Plating (General) - 7.65- Pound Steel Plate, Renew | sq ft | 1 | $0.00 | |
| O-009 | Hull And Structural Plating (General) - Cracked Steel Welds, Repairs | linear ft | 1 | $0.00 | |
| D-010 | Appendages (U/W), Leak Test | JOB | 1 | $0.00 | |
| O-011 | Appendages (U/W) - Internal, Preserve | JOB | 1 | $0.00 | |
| D-012 | Tanks (Mp Fuel Stowage And Overflow), Clean And Inspect | JOB | 1 | $0.00 | |
| O-013 | Voids (Non-Accessible), Leak Test | JOB | 1 | $0.00 | |
| D-014 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | $0.00 | |
| D-015 | Tanks (MP Fuel Service), Clean and Inspect | JOB | 1 | $0.00 | |
| D-016 | Tanks (Dirty Oil and Waste), Clean and Inspect | JOB | 1 | $0.00 | |
| D-017 | Z-Drive Input Drive Shaft, Thrust Bearing Renewal | JOB | 1 | $0.00 | |
| D-018 | Sw Heat Exchangers; Clean, Inspect And Hydro | JOB | 1 | $0.00 | |
| D-019 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | $0.00 | |
| O-020 | Sea Bay, Preserve - Partial | JOB | 1 | $0.00 | |
| D-021 | Sea Bay, Clean and Inspect | JOB | 1 | $0.00 | |
| O-022 | Sea Bay, Preserve 100% | JOB | 1 | $0.00 | |
| D-023 | Thruster Unit (General), Overhaul | JOB | 1 | $0.00 | |
| D-024 | Anchor Windlass, Inspect And Service | JOB | 1 | $0.00 | |
| D-025 | Anchor Chain(s) and Ground Tackle, Inspect and Repair | JOB | 1 | $0.00 | |
| D-026 | Anchor(s), Preserve | JOB | 1 | $0.00 | |
| D-027 | Hawse Pipes, Preserve | JOB | 1 | $0.00 | |
| D-028 | Chain Locker, Preserve 100% | JOB | 1 | $0.00 | |
| O-029 | Tanks (Dirty Oil and Waste), Preserve “100%” | JOB | 1 | $0.00 | |
| O-030 | Tanks (Dirty Oil and Waste), Preserve “Partial” | JOB | 1 | $0.00 | |
| D-031 | Decks – Exterior (Buoy or Construction Deck), Preserve 100% | JOB | 1 | $0.00 | |
| D-032 | Hull Plating Freeboard (Buoy Port Areas), Preserve | JOB | 1 | $0.00 | |
| D-033 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | $0.00 | |
| D-034 | Drydock | JOB | 1 | $0.00 | |
| D-035 | Temporary Services, Provide - Cutter | JOB | 1 | $0.00 | |
| D-036 | Sea Trial Performance, Support, Provide | JOB | 1 | $0.00 | |
| D-037 | Fathometer Transducer, Renew | JOB | 1 | $0.00 | |
| D-038 | Underwater (Speed) Log Transducer(s), Service and Inspect | JOB | 1 | $0.00 | |
| D-039 | Buoy Crane, Inspect And Service | JOB | 1 | $0.00 | |
| D-040 | Thruster Quick Disconnects (QDs), Install | JOB | 1 | $0.00 | |
| D-041 | Auxiliary Sea Water System Valves, Overhaul Or Renew | JOB | 1 | $0.00 | |
| D-042 | Vent Space, Deck, Preserve | JOB | 1 | $0.00 | |
| D-043 | HVAC Heat Pump Condenser, Replace | JOB | 1 | $0.00 | |
| D-044 | Handrails, Renew | JOB | 1 | $0.00 | |
| D-045 | Both Main Diesel Engine Mounts, Renewal | JOB | 1 | $0.00 | |
| D-046 | Both Z-Drive Propulsion Trains, Alignment | JOB | 1 | $0.00 | |
| D-047 | DeScoped | JOB | 0 | $0.00 | |
| D-048 | Crane Winch DCV, Replace | JOB | 1 | $0.00 | |
| D-049 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | $0.00 | |
| D-050 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | $0.00 | |
| D-051 | Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean | JOB | 1 | $0.00 | |
| D-052 | Z-Drive Propulsion Unit, Renew (Drydock) Port & Stb | JOB | 1 | $0.00 | |
| O-00A | Composite Labor Rate | Hour | 1320 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | (Not Applicable) | $0.00 | |||
| O-00Z | Laydays | Day | 5 | $0.00 | |
| Total Price of Definite Items | $0.00 | ||||
| Total Price of Option Items | $0.00 | ||||
| Total Price of Definite and Optional Items | $0.00 |
&C(4/22/2020) Rev-3 - Page &P of &N
CostEstimateBreakdowns
| Composite Labor Rate | 55 | |||||||||||||||||||||||
| Assumed G&A Factor | 15% | |||||||||||||||||||||||
| Assumed Profit Factor | 10% | Direct Labor | Direct Material/Subs Cost | |||||||||||||||||||||
| ITEM | DESCRIPTION | UNIT PRICE | Sub-Contracted (put a "1" in the blank) | Total Labor Hours | Total Material & Subs (cost + G&A + profit) | Eng Tech | Machinest/Pipe Fitter | Electrician | Shipfitter | Welder | Firewatch | Insulator/Lagger | Painter | Gen Labor/Helper/Rigger | Supt/QA/NDT | Mat/Sub Cost 1 | Mat/Sub Cost 2 | Mat/Sub Cost 3 | Mat/Sub Cost 4 | Lab Rate | Area | WorkItemID | WIFileID | LoadData |
| 62 | Baltimore, MD | |||||||||||||||||||||||
| 52 | Biloxi, MS | |||||||||||||||||||||||
| 56 | Boston, MA | |||||||||||||||||||||||
| 50 | Charleston, SC | |||||||||||||||||||||||
| 60 | Corpus Christi, TX | |||||||||||||||||||||||
| 51 | Hampton Roads | |||||||||||||||||||||||
| 64 | Honolulu, HI | |||||||||||||||||||||||
| 55 | Houston, TX | |||||||||||||||||||||||
| 56 | Los Angeles, CA | |||||||||||||||||||||||
| 55 | Median Rate | |||||||||||||||||||||||
| 49 | Miami | |||||||||||||||||||||||
| 50 | Narragansett Bay, RI | |||||||||||||||||||||||
| 55 | New London, CN | |||||||||||||||||||||||
| 45 | New Orleans | |||||||||||||||||||||||
| 62 | NYNY | |||||||||||||||||||||||
| 49 | Panama City, FL | |||||||||||||||||||||||
| 60 | Philadelphia, PA | |||||||||||||||||||||||
| 51 | Portland, ME | |||||||||||||||||||||||
| 57 | Portland, OR | |||||||||||||||||||||||
| 55 | San Diego, CA | |||||||||||||||||||||||
| 67 | San Francisco, CA | |||||||||||||||||||||||
| 55 | Santa Barbara, CA | |||||||||||||||||||||||
| 55 | SE North Carolina | |||||||||||||||||||||||
| 65 | Seattle, WA | |||||||||||||||||||||||
| 48 | Tampa-St. Petersburg | |||||||||||||||||||||||
| 60 | Wilmington, DE |
&C(09/28/2009) Page &P of &N
CostEstimateTemplate
File details come from the government source that posted it. Updated .