Solicitation No. 70Z08519RP45828 Request for Proposal Dry-dock & Repairs of CGC HAMILTON (WMSL 753)
ATTACHMENT 2 – SCHEDULE OF SUPPLIES/SERVICES - PRICES
B.1 – Definite & Optional Items CLIN 0001 – DEFINITE ITEMS - These are the items that, if there is an award at all, will be awarded. The proposal shall be evaluated to include the proposed price for each definite item.
| Work Item No. |
| Description |
| QTY/UN |
| Unit Price |
| Amount |
| D-01 |
| Hull Plate (Freeboard) Ultrasonic Test |
| 1 JB |
| $ |
| $ |
| D-02 |
| Hull Plate (U/W body), Ultrasonic Test |
| 1 JB |
| $ |
| $ |
| D-05 |
| Voids (Non-Accessible) Preserve |
| 1 JB |
| $ |
| $ |
| D-07 |
| Hull, 3D Laser Scan |
| 1 JB |
| $ |
| $ |
| D-08 |
| Chain Lockers and Sump, Clean & inspect |
| 1 JB |
| $ |
| $ |
| D-09 |
| Tanks (Aft Oily Water & VCHT), Clean & Inspect |
| 1 JB |
| $ |
| $ |
| D-10 |
| Tanks (Fuel Oil Storage & Main Engine Leak), Clean and Inspect |
| 1 JB |
| $ |
| $ |
| D-11 |
| Voids (Non-Accessible), Leak Test |
| 1 JB |
| $ |
| $ |
| D-15 |
| Propulsion Shaft GRP Coating, Inspect & Repair (Shaft in Place) |
| 1 JB |
| $ |
| $ |
| D-17 |
| Propulsion Shaft Seals (Mechanical), Inspect and Clean |
| 1 JB |
| $ |
| $ |
| D-19 |
| Propulsion Shaft Alignment & Bearings (external) Clearances, Check |
| 1 JB |
| $ |
| $ |
| D-20 |
| Controllable Pitch Propeller System, Perform General Maintenance |
| 1 JB |
| $ |
| $ |
| D-21 |
| Controllable Pitch Propeller Hub Assembly, General Maintenance |
| 1 JB |
| $ |
| $ |
| D-22 |
| Doppler Speed Log, General Maintenance |
| 1 JB |
| $ |
| $ |
| D-23 |
| Doppler Speed Log Valve, Overhaul |
| 1 JB |
| $ |
| $ |
| D-24 |
| Sea Valves and Waster Pieces, Overhaul or Renew |
| 1 JB |
| $ |
| $ |
| D-25 |
| Seawater Strainers (All Sizes), Overhaul and inspect |
| 1 JB |
| $ |
| $ |
| D-26 |
| Steering Gear (General), Overhaul |
| 1 JB |
| $ |
| $ |
| D-27 |
| Rudder Stock Bearings, Check Clearances |
| 1 JB |
| $ |
| $ |
| D-28 |
| Rudder, Inspect and Repair |
| 1 JB |
| $ |
| $ |
| D-29 |
| Rudder Stock Seals, clean and Inspect |
| 1 JB |
| $ |
| $ |
| D-30 |
| Bow Thruster Unit (General), Overhaul |
| 1 JB |
| $ |
| $ |
| D-31 |
| Anchor Chains and Ground Tackles, Inspect and Preserve |
| 1 JB |
| $ |
| $ |
| D-32 |
| Transom Door, Inspect and Test |
| 1 JB |
| $ |
| $ |
| D-34 |
| Vacuum Collection Holding tanks, Preserve, 100% |
| 1 JB |
| $ |
| $ |
| D-35 |
| Cathodic Protection (Zincs), Renew |
| 1 JB |
| $ |
| $ |
| D-37 |
| Impressed Cathodic Protection System, Inspect and Maintain |
| 1 JB |
| $ |
| $ |
| D-40 |
| Dry-dock Temporary Services, Provide (vessel in drydock) |
| 1 JB |
| $ |
| $ |
| D-41 |
| Sea Trial Performance, Support, Provide |
| 1 JB |
| $ |
| $ |
| D-42 |
| Drydocking Accomplish |
| 1 JB |
| $ |
| $ |
| D-43 |
| Mast Preserve |
| 1 JB |
| $ |
| $ |
| D-44 |
| Surfaces, Preserve |
| 1 JB |
| $ |
| $ |
| D-46 |
| U/W Body, Preserve (Partial-Condition B) |
| 1 JB |
| $ |
| $ |
| D-47 |
| Freeboard, Preserve (Full) |
| 1 JB |
| $ |
| $ |
| D-48 |
| Deck Covering (Slip Resistant) Mast, Renew & Repair |
| 1 JB |
| $ |
| $ |
| D-49 |
| Auxiliary Seawater Piping, Modify |
| 1 JB |
| $ |
| $ |
| D-50 |
| Main Diesel engine Sea Chest Suction Pipe, Modify |
| 1 JB |
| $ |
| $ |
| D-51 |
| Stern Ramp Rails, Modify |
| 1 JB |
| $ |
| $ |
D-52
Balanced Doors, Replace
| D-53 |
| Ship Service Diesel Generator (No. 3) Exhaust Piping, Modify |
| 1 JB |
| $ |
| $ |
| D-54 |
| Propulsion Shaft Fairwaters and Rope Guards, Inspect |
| 1 JB |
| $ |
| $ |
| D-55 |
| Fathometer Transducer (Shallow Water), Renew |
| 1 JB |
| $ |
| $ |
| D-57 |
| Deck Covering (Slip Resistant), Renew |
| 1 JB |
| $ |
| $ |
| D-58 |
| Galley Grease Fire Extinguishing System, Inspect and Test |
| 1 JB |
| $ |
| D-59 |
| Gas Turbine Module Fixed CO2 Fire Extinguishing System, Inspect & Test |
| 1 JB |
| $ |
| $ |
| D-60 |
| Heptafluoropropane (HFP) Fire Extinguishing System, Inspect & Test |
| 1 JB |
| $ |
| $ |
| D-61 |
| Water Mist Fire Extinguishing System, Inspect & Test |
| 1 JB |
| $ |
| $ |
| TOTAL AMOUNT OF DEFINITE ITEMS |
| $ |
CLIN 0002 – OPTIONAL ITEMS - Optional items may be awarded if inspection reports reveal the necessity for activation, or if funds are made available, at the price proposed in the Contractor’s proposal and without any other consideration whatsoever. However, after midnight on 19 August 2019, the Contractor shall have the right to refuse to accept the award of such Optional Items.
| Work Item No. |
| Description |
| QTY/UN |
| Unit Price |
| Amount |
| O-03 |
| CHAIN LOCKERS & SUMP, PRESERVE (NOTE: 1 |
Activation per location shown on Table 1 of the Specification.)
| O-03(a) |
| Chain Locker & Sump, Preserve |
| 1 JB |
| $ |
| $ |
| O-03(b) |
| Chain Locker & Sump, Preserve |
| 1 JB |
| $ |
| $ |
| O-03(c) |
| Chain Locker & Sump, Preserve |
| 1 JB |
| $ |
| $ |
| O-04 |
| SHAFTING SYSTEM (INTERNAL SURFACES), PRESERVE (NOTE: 1 activation per location shown on Table 1 of the specification.) |
| O-04(a) |
| Shafting System (Internal Surfaces), Preserve |
| 1 JB |
| $ |
| $ |
| O-04(b) |
| Shafting System (Internal Surfaces), Preserve |
| 1 JB |
| $ |
| $ |
| O-04(c) |
| Shafting System (Internal Surfaces), Preserve |
| 1 JB |
| $ |
| $ |
| O-04(d) |
| Shafting System (Internal Surfaces), Preserve |
| 1 JB |
| $ |
| $ |
| O-06 |
| GENERAL WELDING PROVIDE |
| O-06(a) |
| General Welding Provide |
| 1 JB |
| $ |
| $ |
| O-06(b) |
| General Welding Provide |
| 1 JB |
| $ |
| $ |
| O-06(c) |
| General Welding Provide |
| 1 JB |
| $ |
| $ |
| O-06(d) |
| General Welding Provide |
| 1 JB |
| $ |
| $ |
| O-06(e) |
| General Welding, Provide |
| 1 JB |
| $ |
| $ |
| O-12 |
| PROPULSION SHAFT BEARING (STRUT AND STERN TUBE) STAVE RENEWAL (NOTE: 1 per each strut bearing & 1 per stern tube bearing) |
| O-12(a) |
| Propulsion Shaft Bearing (Strut and Stern Tube) Stave Renewal |
| 1 JB |
| $ |
| $ |
| O-12(b) |
| Propulsion Shaft Bearing (Strut and Stern Tube) Stave Renewal |
| 1 JB |
| $ |
| $ |
| O-12(c) |
| Propulsion Shaft Bearing (Strut and Stern Tube) Stave Renewal |
| 1 JB |
| $ |
| $ |
| O-12(d) |
| Propulsion Shaft Bearing (Strut and Stern Tube) Stave Renewal |
| 1 JB |
| $ |
| $ |
O-13
| PROPELLER SHAFT SLEEVE, SKIM CUT |
| 1 JB |
| $ |
| $ |
| O-13(a) |
| Propeller Shaft Sleeve, Skim Cut |
| 1JB |
| $ |
| $ |
| O-13(b) |
| Propeller Shaft Sleeve, Skim Cut |
| 1 JB |
| $ |
| $ |
| O-14 |
| PROPULSION SHAFT BEARING STAVES, RENEW (NOTE: 1 per each strut bearing and 1 per each stern tube bearing.) |
| O-14(a) |
| Propulsion Shaft Bearing Staves Renew |
| 1 JB |
| $ |
| $ |
| O-14(b) |
| Propulsion Shaft Bearing Staves Renew |
| 1 JB |
| $ |
| $ |
| O-14(c) |
| Propulsion Shaft Bearing Staves Renew |
| 1 JB |
| $ |
| $ |
| O-14(d) |
| Propulsion Shaft Bearing Staves Renew |
| 1 JB |
| $ |
| $ |
| O-16 |
| STERN TUBE SHAFT SLEEVE SKIM CUT (NOTE: 1 per stern tube shaft sleeve.) |
| O-16(a) |
| Stern Tube Shaft Sleeve Skim Cut |
| 1 JB |
| $ |
| $ |
| O-16(b) |
| Stern Tube Shaft Sleeve Skim Cut |
| 1 JB |
| $ |
| $ |
| O-18 |
| PROPULSION SHAFTING, REMOVE, INSPECT, AND REINSTALL (NOTE: 1 each shaft) |
| O-18(a) |
| Propulsion Shafting, Remove, Inspect & Reinstall |
| 1 JB |
| $ |
| $ |
| O-18(b) |
| Propulsion Shafting, Remove, Inspect & Reinstall |
| 1 JB |
| $ |
| $ |
| O-33 |
| TANK (AFT OILY WATER), PRESERVE |
| 1 JB |
| $ |
| $ |
| O-36 |
| IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM DIELECTIC SHIELD, RENEW (NOTE: This item may be activated a maximum of 6) |
| O-36(a) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-36(b) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-36(c) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-36(d) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-36(e) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-36(f) |
| Impressed Current Cathodic Protection System Dielectic Shield Renew |
| 1 JB |
| $ |
| $ |
| O-38 |
| IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM ANODES, RENEW (NOTE: 1 per compartment in Table 1 of the specification) |
| O-38(a) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1 JB |
| $ |
| $ |
| O-38(b) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1 JB |
| $ |
| $ |
| O-38(c) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1 JB |
| $ |
| $ |
| O-38(d) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1JB |
| $ |
| $ |
| O-38(e) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1 JB |
| $ |
| $ |
| O-38(f) |
| Impressed Current Cathodic Protection System Anodes, Renew |
| 1 JB |
| $ |
| $ |
| O-39 |
| IMPRESSED CURRENT CATHODIC PROTECTION SYSTEM REFERENCE CELL, RENEW (NOTE: 1 per compartment in Table 1 of the specification.) |
| O-39(a) |
| Impressed Current Cathodic Protection System Reference Cell, Renew |
| 1 JB |
| $ |
| $ |
| O-39(b) |
| Impressed Current Cathodic Protection System Reference Cell, Renew |
| 1 JB |
| $ |
| $ |
| O-39(c) |
| Impressed Current Cathodic Protection System Reference Cell, Renew |
| 1 JB |
| $ |
| $ |
| O-39(d) |
| Impressed Current Cathodic Protection System Reference Cell, Renew |
| 1 JB |
| $ |
| $ |
| O-45 |
| PLATE, RENEW (NOTE: maximum activation 64 sq ft) |
| 64 SQ FT |
| $ |
| $ |
| O-56 |
| U/W BODY HULL, PRESERVE (100%) (NOTE: 1 per location in Table 1 of the specification.) |
| O-56(a) |
| U/W Body Hull, Preserve (100%) |
| 1 JB |
| $ |
| $ |
| O-56(b) |
| U/W Body Hull, Preserve (100%) |
| 1 JB |
| $ |
| $ |
| O-56(c) |
| U/W Body Hull, Preserve (100%) |
| 1 JB |
| $ |
| $ |
| O-62 |
| TANKS (WATER MIST) PRESERVE “PARTIAL (NOTE: 1 per location in Table 1 of the specification.) |
| O-62(a) |
| Tank (Water Mist) Preserve “Partial” |
| 1 JB |
| $ |
| $ |
| O-62(b) |
| Tank (Water Mist) Preserve “Partial” |
| 1 JB |
| $ |
| $ |
| O-63 |
| TANKS (WATER MIST) PRESERVE 100% (Note; 1 per location in Table 1 of the specification.) |
| O-63(a) |
| Tanks (Water Mist) Preserve 100% |
| 1 JB |
| $ |
| $ |
| O-63(b) |
| Tanks (Water Mist) Preserve 100% |
| 1 JB |
| $ |
| $ |
| TOTAL AMOUNT OF OPTIONAL ITEMS |
| $ |
| TOTAL AMOUNT OF DEFINITE AND OPTIONAL ITEMS |
| $ |
B.2 – COMPOSITE LABOR HOUR RATE
The following labor hour rate shall be used in pricing all contract changes in accordance with the ADDENDA clause (17) entitled “COMPOSITE LABOR HOUR RATE.”
| Labor Hour Rate |
| Estimated Hours |
| Extended Amount |
Composite Labor Hour Rate- Provide the all inclusive mark-up/loading rate for materials and subcontractors: ___%. This rate will be incorporated into the contract and used on change requests.
$________/HR
9,192 hours
*NOTE: The estimated quantity and extended amount indicated above are for evaluation of offers only. The Composite Labor Hour Rate provided above will apply to all changes involving additional work under this contract regardless of the actual total hours required.
B.3 LAY DAYS
Provide a price for dry dock Lay Days in accordance with HSAR 3052.217-94 (DEC 2003). The quoted price per day will apply to all lay days. The estimated quantity of 3 days is for evaluation purposes only.
PRICE PER DAY:
X 3 DAYS
EXTENDED AMOUNT:
TOTAL EVALUATED AMOUNT $_________________