Q&A_2.docx
DOCX document 22 KB Posted
- Attached to
- Drydock Repair for Coast Guard Cutter KUKUI
- Solicitation number
- 70Z085-18-Q-P4544400
About this file
Question & Answer 2
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_02-KUKUI_DD.doc | DOC document | |
| Amendment_01-KUKUI_DD.doc | DOC document | |
| Attachment_2,_Updated_Specification,_Rev_4.pdf | ||
| Q&A_6.docx | DOCX document | |
| Q&A_3.docx | DOCX document | |
| Q&A_5.docx | DOCX document | |
| Q&A_7.docx | DOCX document | |
| Q&A_4.docx | DOCX document | |
| Q&A_1.docx | DOCX document | |
| KUKUI_RFQ,_May_3,_2018.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A 2, Offeror’s questions will be answered by an Amendment.
1. Offeror’s questions concerning this solicitation shall be submitted in writing, and must be submitted on the attached “Request for Clarification” form. One question should be submitted per form. Each form should indicate the name of the offeror’s firm.
2. Questions may be submitted via email to Andrew.G.Jacobs@uscg.mil.
REQUEST FOR CLARIFICATION
Submit requests not later than May 18, 2018
Offeror’s Name:
Date:
Question No.
FY18 Dry docking for USCGC KUKUI
| RFQ Number: |
| 70Z085-18-Q-P4544400 |
SOLICITATION SECTION:
PARA NO.
| DEFINITE/OPTIONAL ITEM NO. |
| Work Item 31 |
| PARA NO. |
| 1.1.1 & 1.1.2 |
TITLE:
Sea valves and Waster Pieces, Overhaul or Renew
QUESTION:
Neither table 1.1.a Valves Designated for overhaul, or table 1.1.2 Valves designated for renewal have any valves listed for overhaul or renewal listed in the tables. The tables are blank. Please designate valves for repair and renewal.
RESPONSE:
VALVE TO BE OVERHAULED
TYPE: Gate Valve SIZE (inches): 4 in DESCRIPTION: P-100/P-250 suction valve FRAME NO. VALVE NO.: Frame 21, valve 3-21-1 PRESSUER (PSIG): Sea pressure