Attachment_2,_Updated_Specification,_Rev_4.pdf
PDF 2 MB Posted
- Attached to
- Drydock Repair for Coast Guard Cutter KUKUI
- Solicitation number
- 70Z085-18-Q-P4544400
About this file
Attachment 2, Updated Specification, Revision 4
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_02-KUKUI_DD.doc | DOC document | |
| Amendment_01-KUKUI_DD.doc | DOC document | |
| Q&A_6.docx | DOCX document | |
| Q&A_3.docx | DOCX document | |
| Q&A_2.docx | DOCX document | |
| Q&A_5.docx | DOCX document | |
| Q&A_7.docx | DOCX document | |
| Q&A_4.docx | DOCX document | |
| Q&A_1.docx | DOCX document | |
| KUKUI_RFQ,_May_3,_2018.zip | ZIP file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC KUKUI (WLB 203)
SPECIFICATION FOR DRYDOCK REPAIRS
FY2018
Developed By: Bronson L Suyat
(Rev-4, 15 May 2018)
USCGC KUKUI (WLB-225A) DOCKSIDE AVAILABILITY FY2018
ii (Rev-4)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property .............................................................................. viii Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Hydraulically Operated Cargo Hatch, Inspect and Service WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean WORK ITEM 4: Vent Ducts (Galley and Pantry Room All), Commercial Cleaning WORK ITEM 5: Hull Fittings (Weight Handling Rigging Hardware), Inspect and Test WORK ITEM 6: Crossdeck Winches, Inspect and Service WORK ITEM 7: Hydraulic Inhaul Winch, Inspect And Service WORK ITEM 8: Commissary Hoist, Inspect and Service WORK ITEM 9: Buoy Deck Auxiliary Cleat & Snubbing Winch Install WORK ITEM 10: Temporary Services, Provide - Cutter
WORK ITEM 11: DELETE
WORK ITEM 12: DELETE
WORK ITEM 13: Watertight Doors (External), Renew WORK ITEM 14: Deck Covering, Carpeting, Renew WORK ITEM 15: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 16: Weather Tight Doors, Renew WORK ITEM 17: Walk-In Freezer, Repair WORK ITEM 18: Griddles & Ranges, Renew WORK ITEM 19: EDG Room (01-78-3-E) Deck, Preserve WORK ITEM 20: Pilot House Forward Grab Rail & Foot Rail, Renew WORK ITEM 21: Auxiliary Sea Water (ASW) Temperature Control Valve, Renew WORK ITEM 22: Fire Pump, Renew WORK ITEM 23: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 24: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 25: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 26: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 27: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 28: Non-Machinery Space Decks, Preserve (Various Compartments) WORK ITEM 29: Deck Covering (Interior Wet/Dry), Renew WORK ITEM 30: Drydock WORK ITEM 31: Sea Valves and Waster Pieces, Overhaul or Renew WORK ITEM 32: Decks – Exterior (Buoy or Construction Deck), Preserve 100% WORK ITEM 33: Hull Plating Renew WORK ITEM 34: Hydraulic Oil Storage Tank, Blast to Bare Metal iii (Rev-4)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
12APR18 01 10 Table 3
12APR18 01 14 Table 1
12APR18 01 17 Paragraph 1.2
12APR18 01 17 Delete GFP
12APR18 01 10 Table 1
12APR18 01 11 Paragraph 3.2
18APR18 02 30 Add Work Item
18APR18 02 31 Add Work Item
18APR18 02 32 Add Work Item
18APR18 02 33 Add Work Item
18APR18 02 34 Add Work Item
09MAY18 03 11 DELETE
09MAY18 03 12 DELETE
15MAY18 04 17 UPDATE
15MAY18 04 31 Update table 1.1.1
15MAY18 04 34 Update NOTES
15MAY18 04 19 Update 1.1
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-4)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
Coast Guard Drawing 225-WLB 601-001, Rev AA, General Arrangements-Inboard & Outboard Profiles
Coast Guard Drawing 225 WLB 573-001, Rev P, Buoy Handling System Arrangement
Coast Guard Drawing 225 WLB 167-001, Rev T, Structural Closures
Coast Guard Drawing 225 WLB 256-001, Rev P, Seawater Cooling System Diagram
Coast Guard Drawing 225 WLB 259-001, Rev D, Combustion Intake & Exhaust Diagram
Coast Guard Drawing 225 WLB 259-005, Rev D, Combustion Intake & Exhaust A&D Hull Block 940
Coast Guard Drawing 225 WLB 259-006, Rev E, Combustion Intake & Exhaust A&D Hull Blocks 970 &
Coast Guard Drawing 225 WLB 512-001, Rev G, HVAC Diagrammatic
Coast Guard Drawing 225 WLB 512-007, Rev E, HVAC A&D, Fr 66-92, Innerbttm & 1st Platform
Coast Guard Drawing 225 WLB 528-002, Rev E, Weather Deck Drains Diagram
Coast Guard Drawing 225 WLB 549-001, Rev H, Onboard Lubrication Requirements
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
Coast Guard Drawing 225 WLB 573-002, Rev D, Weight Handling System Arrangement
Coast Guard Drawing 225 WLB 573-011, Rev -, ATON Tie Downs
Coast Guard Drawing 225 WLB 601-002 Rev R, Booklet of General Drawings
Coast Guard Drawing 225 WLB 672-001, Rev F, Storerooms, Cargo Stowage and Ship Store
Arrangement and Details
Coast Guard Drawing 225 WLB 801-001, Rev C, Lines and Offsets
Coast Guard Drawing 225 WLB 801-003, Rev A, Curves of Form and Cross Curves of Stability
Coast Guard Drawing 225 WLB 801-006, Rev E, Docking Drawing
Coast Guard Drawing 225 WLB 801-020, Rev A, Tank Capacity Curves (WLB 203, 204, and 205)
Coast Guard Drawing 225B WLB 256-001, Rev M, Seawater Cooling System Diagram
Coast Guard Drawing 225B-WLB 521-1, Rev K, Firemain System Diagram
Coast Guard Drawing 225B-WLB-573-001, Rev P, Buoy Handling System
Coast Guard Drawing 225-WLB 111-01, Rev D, Shell Expansion
Coast Guard Drawing 225-WLB 167-001, Rev T, Structural Closures
Coast Guard Drawing 225-WLB 167-1, Rev T, Structural Closures
Coast Guard Drawing 225-WLB 180-05, Rev J, Foundations Hull Block 940 v (Rev-4)
Coast Guard Drawing 225-WLB 201-01, Rev F, Machinery Spaces Arrangement
Coast Guard Drawing 225-WLB 202-001, Rev H, MPCMS Cabling Diagram
Coast Guard Drawing 225-WLB 256-001, Rev U, Seawater System Cooling Diagram
Coast Guard Drawing 225-WLB 256-017, Rev -, MMA Seawater System Cooling Diagram
Coast Guard Drawing 225-WLB 320-004, Rev M, Power System Deck Plan – MMR & AMR – Hull
Block 940
Coast Guard Drawing 225-WLB 437-010, Rev H, Misc Cont & Ind Sys Block, Wrg Dk Plan & Elem
Wrg Diag
Coast Guard Drawing 225-WLB 551-002, Rev K, Control Air System Diagram
Coast Guard Drawing 225-WLB 631-002, Rev B, Painting Schedule, Hulls 202 - 205
Coast Guard Drawing 225-WLB 631-001, Rev G, Painting Schedule
Coast Guard Drawing 225-WLB 631-002, Rev K, Painting Schedule
Coast Guard Drawing 225-WLB 634-001, Rev F, Deck Covering Schedule
Coast Guard Drawing 225-WLB-573-001, Rev P, Buoy Handling System
Coast Guard Drawing 225-WLB-612-001-Rev H, Lifelines, Stanchions & Hand Rails
Coast Guard Drawing 225-WLB-651-001, Rev. H, Galley & Pantry Arrgt & Details
Coast Guard Drawing 225-WLB-651-208, Rev -, Cabinet with Breadproofer, Freezer, Shelving
Coast Guard Drawing 225-WLB-801-17-Rev C, Scantlings, Superstructure
Coast Guard Drawing FL 7101-573, Rev L, Buoy Chain Winch Assy Model CW1
Coast Guard Drawing FL-1602-89, Rev -, Fleet 26” x 66’ Weathertight Door
Coast Guard Drawing FL-1702-11, Rev -, Inspection of Sheaves
NAVSEA Drawing 2803-980209, Plates, Label
NAVSEA Drawing 805-14000050
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 3498, Section A, Jul 2015, Buoy Chain Winch
Coast Guard Technical Publication (TP) 3558, Apr 2008, Manufacturer’s Instruction Book-SWBS
Group(s) 573, Section B, Cross Deck Winch – Model BMD-471
Coast Guard Technical Publication (TP) 3562, Sep 2013, SWBS 589, Section B, Dumbwaiter, Model –F-
WK-806
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Coast Guard Technical Publication (TP) 3796, Section A, Aug 2006, Galley Hood – Model NBDL-60
(13’-4”)
Coast Guard Technical Publication (TP) 5458, SWBS 573, Oct 2012, Winch, Radial – Model 50.2PT
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3020 (SFLC Std Spec 3020), 2014, Overhaul AC
Electrical Motors
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2014, Shipboard
Electrical Cable Test vi (Rev-4)
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2014, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary
Machine Systems Installation Details
Surface Forces Logistics Center Standard Specification 5100 (SFLC Std Spec 5100), 2014, Clean
Shipboard Ventilation Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Preserve Ship
Structures
Surface Forces Logistics Center Standard Specification 6341 (SFLC Std Spec 6341), 2014, Install Interior
Deck Covering Systems
Surface Forces Logistics Center Standard Specification 8634 (SFLC Std Spec 8634), 2014, Drydocking
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2014, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2014, Temporary
Hull Accesses
OTHER REFERENCES
AAA/CAA - http://newsroom.aaa.com/diamond-ratings/diamond-rating-definitions
American Society of Mechanical Engineers (ASME) B16.34, 2004, Valves-Flanged, Threaded, and
Welding End
ASTM International (ASTM) D5363, 2008, Standard Specification for Anaerobic Single Component
Adhesives (AN)
ASTM International (ASTM) F992, 2006, Standard Specification for Valve Label Plates
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and Health Standards for Shipyard Employment
Commercial Item Description (CID) A-A-59316, 2003, Abrasive Materials for Blasting
Federal Specification (Fed Spec) DDD-C-95, Mar 1972, Carpets and Rugs, Wool, Nylon, Acrylic, Modacrylic
FORBES (formerly MOBIL) Travel Guide - http://www.forbestravelguide.com
Harken Installation and Maintenance Manual for Radial Winch 50.2PT, MRW-01
Hotel-Motel National Master List, http://www.usfa.fema.gov/applications/hotel/
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-61, 2003 Edition, Pressure Testing Of Steel Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-67, 2002 Edition, Butterfly Valves
Manufacturers Standardization Society of the Valve and Fittings Industry (MSS) SP-72, 1999 Edition, Ball Valves with Flanged or Butt-Welding Ends for General Service
Manufacturers' Standardization Society of the Valve and Fittings Industry (MSS) SP-80, 2008 Edition, Bronze Gate, Globe, Angle and Check Valves
MIL-A-22262, Mar 1996; Abrasive Blasting Media Ship Hull Blast Cleaning
MIL-PRF-24176, Oct 2004, Cement, Epoxy, Metal Repair And Hull Smoothing (Metric)
MIL-S-45180, 1998; Sealing Compound, Gasket, Hydrocarbon Fluid and Water Resistant
Naval Sea Systems Command (NAVSEA) Underwater Ship Husbandry Manuals (UWSH) S0600-AA-
PRO-160, Jan 2006, Chapter 16, Cofferdams
Public Law 101-391, 1990, Hotel and Motel Fire Safety Act vii (Rev-4)
Society of Automotive Engineers (SAE) Aerospace Material Specification (AMS) C6183, 2013, Cork and
Rubber Composition Sheet; For Aromatic Fuel and Oil Resistant Gaskets
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2012, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10/NACE No.2, 2007, Near-White Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6/NACE No. 3, 2007, Commercial Blast Cleaning
TP 3574 Manufacturer’s Instruction Book – SWBS Group(s) 633-638 30 JAN 2018 viii (Rev-4)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM
DESCRIPTION
NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 N Cargo Hatch Gasket Walz & Krenzer P/N D-
WK-837-1-4 or equivalent
2 $200.00
6 N Hand Pump SS NSN: 4320-01-517-1444 1 ea 1,499.66
6 N Pressure Gauge -
Model BMD-471
NSN: 6685-01-437-2519 4 ea 43.79
6 N Wire rope Assembly NSN: 4010-01-643-2077 4 ea 900.00
6 N Hydraulic brake repair kit - Model
BMD-471
NSN: 3950-01-526-9090 4 ea. 913.00
6 N Counter balance valve - Model BMD-
NSN: 4810-01-353-0586 4 ea. 150.00
6 N **Shuttle valve -
Model BMD-471
NSN: 4820-01-317-2748 4 ea. 35.00
6 N Needle valve - Model
BMD-471
NSN: 4820-01-329-0051 4 ea. 82.00
6 N Hydraulic motor seal kit - Model BMD-
NSN: 5330-01-475-4566 8 ea. 84.00
6 N Clutch shoe - Model
BMD-471
NSN: 4910-01-475-4125 4 ea. 56.90
6 N Drum bushing -
Model BMD-471
NSN: 3950-01-631-0884 8 ea. 272.00
6 N Shaft bushing -
Model BMD-471
NSN: 3950-01-631-0771 4 ea. 298.00
6 N ** Gear boxSeal kit(for Winch
Gearbox Assemblies)
- Model BMD-471
NIIN: XFC343225 PN:
YMD-8194-R
4 ea. 70.00
6 N Control Station
Repair Parts. Kit
NSN: 6110-01-644-9898 4 ea. 438.00
6 N Flag Block Bearing
Kit
NSN: 3940-01-526-5592 2 ea. 180.00
6 N Valve, Safety Relief NSN: 4820-01-324-4269
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 69.19
6 N Plug, Pipe NSN: 4730-01-426-7736
(Included as a Component of
Manifold Replacement Parts
4 ea. 17.15 ix (Rev-4)
Kit (PN: YMD-8192-R))
6 N Valve, Globe NSN: 4820-01-329-0051
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 37.14
6 N O-Ring NSN: 5331- 00-165-1941
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 0.34
6 N Valve, Shuttle NSN: 4820-01-317-2748
(Included as a Component of
Manifold Replacement Parts
Kit (PN: YMD-8192-R))
4 ea. 18.51
6 N Flag Block Bearing
Cup, Sheave
NSN: 3110-01-644-9670 2 ea. 231.00
6 N Flag Block Bearing
Cone, Sheave
NSN: 3110-01-013-4036 2 ea. 182.00
6 N Seal NSN: 5330-01-287-2826 2 ea. 104.00
6 N Valve, Globe NSN: 4820-01-329-0051 4 ea. 38.11
7 N Roller bearing Unit NSN: 3130-01-504-4363 2 ea. 4,012.00
7 N Grease seal NSN: 5330-01-462-5544 4 ea. 79.25
7 N Level wind pivot bushing
NSN: 3120-01-621-2293 1 ea. 1,139.00
7 N Level wind thrust bearing
NSN: 3120-01-621-2300 2 ea. 483.30
7 N Rexroth DCV NSN: 4810-01-507-0037 1 ea. 208.29
7 N Rexroth Sandwich
Flow Control
NSN: 4810-01-505-9289 1 ea. 250.00
7 N Sun Sandwich Relief
Valves
NSN: 4820-01-439-2451 2 ea. 900.00
7 N Rexroth Tandem
Center Proportional
Directional Valve
NSN: 4810-01-506-3841 1 ea. 300.00
7 Y Level Wind
Hydraulic Cylinder
NSN: 3040-01-441-3721 1 ea. 7,423.00
7 N 3:1 Pilot Ratio, Vented
Counterbalance
Valve Assembly
NSN: 4820-01-563-5841 1 ea 98.70
7 N Fully Adjustable
Needle Valve
NSN: 4820-01-416-0579 1 ea 48.75
7 N Wire Rope Assembly NSN: 4010-01-646-6972 1 ea. 500.00
7 Y **Hydraulic Motor NSN: 4320-01-445-2248 1 ea 23,998
7 N **Pump, Hydraulic
Ram, Hand Driven
NSN: 4320-01-286-4065 1 ea. 419.77
7 N **Cylinder Pin NSN: 5315-01-515-9847 1 ea 500.00
7 N **Cylinder Pin NSN: 5315-01-515-9912 1 ea 520.00
9 N Winch, Radial NSN: 3950-01-623-8912
PN: 50.2 PTA
6 ea. $2,181.60
9 N Cleat, 15 in.; Steel NSN: 2040-01-614-2587 8 ea. $135 x (Rev-4)
PN: 7254
13 N 26” x 66” Quick-
Acting Watertight
Door, Steel, 10-Dog, 3-Hinged, LH Swing, 9” Dia Fixed Light
NAVSEA Drawing 805-
14000050
1 ea.
13 N 36” x 66” Quick-
Acting Watertight
Door, Steel, 10-Dog, 3-Hinged, LH Swing
9” Dia Fixed Light
Railway Specialties PN: B-
930812
. 1 ea, 16 N 26” x 66” Starboard
Westhertight Door, Steel, RH Swing
FL-1602-89 1 ea. $5,775
16 N 26” x 66” Port
Weathertight Door, Steel, LH Swing
FL-1602-89 1 ea. $6,000
18 N Lang HD Range
GALLEY RANGE
NSN: 7310-01-411-5699
P/N: R36C-ATC-480M
01 $8,599.00
18 N Lang HD Range
GALLEY GRIDDLE
NSN: 7310-01-290-5148
P/N: R36C-ATD-480M
01 $8,599.00
19 N Electrical Matting NSN: 7220-01-024-9040 1 ea.
21 N Leslie Valve Model
RVB(M)-55-HOD
NSN: 4820-01-522-0016 1 ea. 11,829.11
22 N FIRE PUMP 16-
40121-XA11XX-
NSN: 4820-01-413-9056 16-
40121-XA11XX-6931
1 ea. 78,350.00
30 Y *Transducer Cover
Plate
N/A 4 ea. 50.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-4)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
1 Hydraulically Operated Cargo Hatch, Inspect and Service
6 Crossdeck Winches, Inspect and Service
7 Hydraulic Inhaul Winch, Inspect And Service
8 Commissary Hoist, Inspect and Service
29 Deck Covering (Interior Wet/Dry), Renew xii (Rev-4)
PRINCIPAL CHARACTERISTICS
225' WLB (A-CLASS)
PHYSICAL
Length overall 225' 0"
Length between perpendiculars 206' 0"
Maximum beam 46'
Designed draft 13' 0"
Full load displacement 1929.74 Long Tons SW
Light ship displacement 1544.38 Long Tons SW
Minimum operating displacement 1906.70 Long Tons SW
Mast height (above 12' waterline) 67' 5"
Anchor Two 4000 lb standard Navy stockless anchors, 8 shots each, port and starboard, 1-
3/8 die lock chain
HULL
Bilge keels (port & starboard) Frames 42-79
Frame spacing
FR 0 to 12 21"
FR 12 to 30 22"
FR 30 to 102 24"
MACHINERY
Main propulsion Diesel Reduction
Diesel engines Two Caterpillar 3608, TA, 3100 BHP each @ 900 RPM
Number of propellers 1
Number of blades 4
Diameter 10'
Pitch Controllable
RPM 254
Ship's service diesel generators Two Caterpillar 3508 TA, 450 KW
Emergency diesel generator One Caterpillar 3406 DITA, 280 KW
Shore tie Two 450 VAC, 400 Amp, 3-wire
Shaft bearing, forward Cooper Bearing 01-BCP-1400-EX-TL
Shaft bearing, aft Water Lubricated Cutless Bearing
TANK CAPACITIES
Diesel oil 76,498 gal.
Fresh water capacity 8056 gal.
Hydraulic oil capacity 2785 gal.
Lube oil storage 764 gal.
Grey water tank 2700 gal.
Sewage holding tank 1700 gal.
1 (Rev-4)
00000_0917_FLT
REC_00000_FLT_Commercial Project @ Contractor’ Facility (1212)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed at a commercial contractor’s facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General. The Contractor shall conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability.
NOTE
The requirements of paragraph 3.1 (General) applies to all work under the scope of this contract, whether explicitly stated in work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
2 (Rev-4)
3.2 Contractor-provided fire watch personnel. The Contractor shall provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor shall accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. Ensure that all colors and color coat/paint schemes are in accordance with COMDTINST M10360.3, Chapter 6 (Cutter and Boat Colors Exterior and Interior).
NOTE
Unless a waiver has been granted (in writing) by the KO, deviations from authorized coatings (listed in Appendix C of SFLC Std Spec 6310) and colors and color schemes
(provided in Chapter 6 of COMDTINST M10360.3) are strictly prohibited.
3.4 Welding and brazing requirements. The Contractor shall perform all welding and allied processes, and NDI in accordance with SFLC Std Spec 0740.
3.5 Environmental protection requirements. The Contractor shall adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 Contractor operated (non USCG) facilities. The Contractor shall provide and maintain environmental protection as defined in SFLC Std Spec 0000 Appendix A, Requirements for Environmental Protection at
Contractor Operated (Non USCG) Facilities, as applicable, during the performance of this availability. Contractor shall plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor shall comply with applicable Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item shall not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.2 Test and procedures. The Contractor shall be required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work shall be done by qualified laboratories; and where required by law, the laboratories shall be certified.
3.5.3 Regulatory notifications. The Contractor shall be responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor shall submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications shall be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor shall appoint in writing an Environmental Manager for the project, and shall be responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager shall ensure compliance with Hazardous Waste
Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the
Contractors’ Environmental Management Plan; ensure that all environmental permits are obtained, maintained, 3 (Rev-4) and closed out; ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas;
ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the
Environmental Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor shall comply with SFLC Std Spec 0000 Appendix A, Requirements For
Environmental Protection At Contractor Operated (Non USCG) Facilities for HW disposal.
3.6 Local Policy. None.
3.7 SFLC standard specification approved changes. The Contractor shall be aware that the following are approved changes to published SFLC 2014 Edition Standard Specifications and supersede published content:
3.7.1 SFLC Standard Specification 6310, Requirements for Preservation of Ship Structures.
3.7.1.1 SFLC Std Spec 6310, page C-2, Section C1.5.1. Change from "lead-containing paint as 0.06%" to "lead-containing paint as 0.009%".
3.7.1.2 SFLC Std Spec 6310, page 4, Section 2 References, Group- Other References. Add “The Society for
Protective Coatings (SSPC) Paint Application Guide No. 11, 2008, Protecting Edges, Crevices, and Irregular Steel
Surfaces by Stripe Coating”
3.7.1.3 SFLC Std Spec 6310, page Appendix C-6, add "Hempel Hempadur Multi-Strength GF 35870" with FED-
STD-595 color "Black/Red" under ANTI-ABRASION COATING, ICE BREAKING CAPABLE VESSELS, <235’.
3.7.1.4 Standard Spec 6310, page Appendix A-7, Under "UNDERWATER (U/W) BODY/BOOT-TOP", Add line
Column 1: Option for U/W Body and Boot-Top, Steel Hulls, <154', in Salt Water. Column 2: Blank. Column 3:
SSPC-SP 10/NACE NO. 2 using grit conforming to MIL-A-22262 / (1.5-3.5) - or - SSPC-SP WJ-2(M)/NACE
WJ-2(M). Columns 4 and 5: Same as "U/W Body and Boot-Top, Aluminum Hull, High Speed (>30 knots)".
3.7.1.5 SFLC Std Spec 6310, page Appendix C-8, Under "Epoxy/Primer/Mid-Coat", add line Column 2:
International Intergard 264. Column 3: Various. Under "Polysiloxane", add line Column 2: International Interfine
979. Column 3: Various.
3.7.2 SFLC Standard Specification 0000 General Requirements.
3.7.2.1 SFLC Std Spec 0000, paragraph 1.3 ‘Acronyms and term definitions’, page 5, “PCL (Paint Containing
Lead)” definition replaced by, “Any paint or coating containing lead in excess of 0.009 percent by weight (1.0 mg/cm2 or 90 ppm). Lead Based Paint (LBP) is an interchangeable term with PCL.”
3.7.2.2 Change Std Spec 0000 paragraph 3.2.4.2.3(QP 1 inspector or tech rep duties) bullet, “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph
3.1.19 of SFLC Std Spec 6310 (Critical drying time requirements)).” to “Determine when applied coats have sufficiently cured for overcoating or for system service resumption (see paragraph 3.1.17 of SFLC
Std Spec 6310 (Critical drying time requirements)).”
4 (Rev-4)
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
5 (Rev-4)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK ITEM # WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfgr.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfgr.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/NACE INSPECTOR SIGNATURE CERT. # DATE / TIME
6 (Rev-4)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER COAT,
BARRIER COAT, TOP COAT,
ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFACE AMBIENT ΔT
| DP -
SURFACE |
7 (Rev-4)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Place surface profile replica tapes in the spaces provided below, to serve as permanent QA record. Maintain a separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
8 (Rev-4)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/NACE No. 2
SSPC-SP WJ-1/NACE WJ-1
SSPC-SP WJ-2/NACE WJ-2
SSPC-SP WJ-3/NACE WJ-3
SSPC-SP WJ-4/NACE WJ-4
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
Record measurements taken in the spaces provided below, to serve as permanent QA record. Maintain separate log for each location. When an area is divided into separate sections, maintain a separate log for each section.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Reading
(mils)
Mean Reading (mils) IAW ASTM DD4417).
9 (Rev-4)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
SOLUBLE SALT CONDUCTIVITY Measurements IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
10 (Rev-4)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
COATING MFG PRODUCT NAME
BATCH
INDUCTION
TIME
COATING SYSTEM SEQUENCE
(PRIMER/TOUCHUP/3RD COAT, ETC.)
Dry Film Thickness (DFT) Measurements IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR) Required, If Magnetic
Pull-Off (Type I/Banana) Gauge Is
Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
1 AVG. BMR DEVIATION
1 AVG. BMR DEVIATION
APPLICATION METHOD (AIRLESS, CONVENTIONAL SPRAY,
ROLLED)
AVERAGE DFT
11 (Rev-4)
16700_MWC_0815_IBCT
REC_16700_CrgHtchInspctSrvc_IBCT_225’ WLB (‘A’ Class: Hulls 201-205)(0815)
WORK ITEM 1: Hydraulically Operated Cargo Hatch, Inspect and Service
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to perform inspections and service for the hydraulically-operated cargo hatch.
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY
ESTIMATED
COST
($/UNIT)
N Cargo Hatch Gasket Walz & Krenzer P/N D-WK-837-1-4 or equivalent 2 $200.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 528-002, Rev E, Weather Deck Drains Diagram
Coast Guard Drawing 225 WLB 549-001, Rev F, Onboard Lubrication Requirements
Coast Guard Drawing 225 WLB 556-001, Rev K, Hydraulic System Diagram
Coast Guard Drawing 225 WLB 601-001, Rev AA; General Arrangement Inboard and
Outboard Profiles
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) 3717, Jun 2003, Hydraulic Cargo Hatch
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2014, Welding and Allied Processes
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2014, Auxiliary Machine Systems
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
12 (Rev-4)
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR. The Contractor shall submit a CIR for the inspections listed in the following paragraph(s):
3.2 (Tasks to be accomplished) – Task #1.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
Electrical and hydraulic switches.
Dogs.
Toggles.
Hydraulic cylinders.
Hydraulic lines.
Electrical cables.
Hoses.
Overhead insulation.
3.2 Tasks to be accomplished. The Contractor shall perform the following tasks:
ADDITION REQUIREMENTS
# TASK
TYPE
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
1 Operate and
Inspect
1 Cargo Hatch 3.2.1 (Operate and inspect)
1. Check for hatch proper operation of all indicators, switches, dogging un-dogging and overall operation.
2. Check entire coaming and drains for signs or debris or clogging of drains.
13 (Rev-4)
ADDITION REQUIREMENTS
# TASK
TYPE
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
3. Conduct a visual inspection of the hatch. Check all linkage.
4. Inspect both inner and outer knife edges for proper height and evenness of wear.
5. Inspect entire hatch structure, for signs of paint wear and corrosion.
6. Inspect gasket channels for corrosion. 7. Take a total of 10 UT measurements of gasket channel surfaces, in locations designated by the Coast Guard Inspector, in accordance with SFLC Std Spec 0740, Appendix C.
8. Perform NDI of all welds in accordance with SFLC Std Spec 0740, Appendix C. Submit a CFR.
9. Inspect hydraulic hose condition.
10. Check condition of dogs and wedges.
Submit A CIR.
2 Remove and reinstall
1 Cargo Hatch N/A Remove hatch, to facilitate inspections and service tasks, and reinstall hatch, upon completion of work.
3 Service and
Inspect
1 Hydraulic hatch lift cylinder
3.2.2 (Service and inspect)
Submit CFR
4 NDE 1 Cargo Hatch 3.2.5 (NDE) Components designated for NDE: All welds.
Submit a CFR.
5 Renew 1 Cargo hatch gasket
N/A See CG TP-3717.
Conduct gasket compression test, upon installation. Submit CFR.
6 Groom And
Lubricate
1 Cargo Hatch 3.2.6 (Groom and lubricate)
See Coast Guard Drawing 225 WLB
549-001.
7 Operational
Testing –
Post Repairs
1 Cargo Hatch N/A 1. Raise and lower, dog and un-dog, the hatch three complete cycles.
2. Verify hatch operates in accordance with parameters specified in TP-3717 with no unusual noise or binding.
Submit CFR.
8 Boundary
Testing
1 Cargo Hatch N/A Accomplish a chalk test and water hose test, in accordance with SFLC
Std Spec 0740, Appendix C.
Submit a CFR.
9 Preserve 1 Cargo Hatch
(i.e. all surfaces
3.2.4
(Preservation)
Use Coating System: “Weather
Decks (Weather Deck, Buoy Tender
14 (Rev-4)
# TASK
TYPE
QTY COMPONENT
OR
ASSEMBLY
APPENDIX
AND PARA.
FROM
5000_STD
OTHER
of the cargo hatch)
Working Deck)” in accordance with in SFLC Std Spec 6310, Appendix A
(Cutter and Boat Exterior Painting
Systems).
Submit CFR.
10 Touch-Up
Preservation
All New and disturbed surfaces
N/A Prepare and coat all new and disturbed exterior and interior surfaces to match existing adjacent surfaces, in accordance with SFLC Std Spec 6310, Appendix A (Cutter and Boat Exterior
Painting Systems) and Appendix B
(Cutter and Boat Interior Painting
Systems), respectively, and as applicable.
CAUTION
Do not paint gaskets or any moving parts, including dogs, nuts, wedges, spindles, yokes, packing, connecting rods and hinge pins.
4. HYDRAULIC FLUSH
4.1 Upon completion of all Hydraulic Work Items in specification package, filter hydraulic system using Contractor filter cart. The Contractor shall furnish a minimum 5gpm filtering cart/rig equipped with a three-micron absolute filter, a water separator, and a pressure differential gage across the filter element assembly. Connect the supply and discharge lines of the filtering cart/rig to the hydraulic system located in HPUs compartment.
NOTE
THE BEST CONNECTION POINTS WILL MINIMIZE
FILTERING TIME AND WILL MAXIMIZE THE RATE AT
WHICH PREVIOUSLY UNFILTERED FLUID PASSES THROUGH
THE RIG/CART. SELECT POINTS AT OPPOSITE ENDS OF THE
RESERVOIR IF POSSIBLE.
4.2 Continuously circulate system hydraulic fluids through the filtering cart/rig for the period of a minimum of three complete cycles and then take hydraulic oil sample. Be aware that the Coast
Guard Inspector shall be allowed to cycle the system actuators four separate times as described in the notice below during the filtering process.
15 (Rev-4)
To dislodge and suspend particulate contamination and to heat the fluid to a maximum, constant, steady state temperature, the Coast
Guard inspector will cycle all actuators associated with the hydraulic system for a minimum of 20 minutes at the start of the filtering process. The Coast Guard Inspector will repeat this process a minimum of three additional times, equally spaced through the filtering period.
4.3 The Contractor shall renew the filter element as required and whenever the pressure differential across the filter element exceeds the filter element manufacturer's specifications.
4.4 The Contractor shall furnish a portable oil sample particle counting analyzer. All oil samples shall be immediately tested with the portable analyzer onboard the Cutter. Submit CFR.
4.5 Whenever a noticeable increase in the pressure drop across the filter cart is observed, the filter should be renewed. Be aware that this may occur as frequently as 15 min intervals.
4.6 During filtering, constant monitoring of the filtering oil must be maintained in order to determine the contamination level. Filtering shall continue until the fluid entering the return filter meets the particle population ISO cleanliness code of 19/17/14, in accordance with ISO 4406. In addition, the Contractor shall visually inspect return filter for contamination and submit CFR.
4.7 The Contractor shall furnish return filters as required. The Contractor shall dispose all used filters in accordance with all rules and regulations.
4.8 Take a representative sample of oil from the hydraulic system in accordance with (SFLC Std
Spec 5000) paragraph C2.1.3. Send sample out to a laboratory for oil analysis. Analysis shall include viscosity, moisture, total acid number, particle size and population in sufficient detail to determine ISO cleanliness code of 19/17/14, in accordance with ISO 4406. Submit CFR.
This section is not applicable to this work item.
16 (Rev-4)
25901_0617_FLT
REC_25901_FLT_225' WLB ('A' Class: Hulls 201-205) (1113)
WORK ITEM 2: Main Diesel Engine (MDE) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the Main Diesel
Engine (MDE) exhaust piping system, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 225 WLB 259-001, Rev D, Combustion Intake & Exhaust
Diagram
Coast Guard Drawing 225 WLB 259-005, Rev D, Combustion Intake & Exhaust A&D
Hull Block 940
Coast Guard Drawing 225 WLB 259-006, Rev E, Combustion Intake & Exhaust A&D
Hull Blocks 970 & 975
COAST GUARD PUBLICATIONS
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2014, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2014, Requirements for Preservation of Ship Structures
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, 2014, Occupational Safety and
Health Standards for Shipyard Employment
3. REQUIREMENTS
3.1 General.
17 (Rev-4)
3.1.1 CIR.
None.
3.1.2 Tech Rep.
Not applicable.
3.1.3 Protective measures. The Contractor shall furnish and install all protective coverings to seal off and protect all non-affected vessel's components, equipment, and spaces near the work area against contamination during the performance of work. Upon completion of work, the Contractor shall remove all installed protective measures, inspect for the presence of contamination, and return all contaminated equipment, components, and spaces to original condition of cleanliness.
3.1.4 Interferences. The Contractor shall handle all interferences in accordance with SFLC Std
Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the following:
Access covers
Exhaust stack
MDE
Piping
Pipe insulation
Vent ducting
Wiring
Exhaust pipe expansion joints
Exhaust insulation blankets
3.1.5 Work site access. The Contractor shall gain access to both MDE exhaust stacks via existing
Access 02-79-2.
3.2 Staging or scaffolding, netting. The Contractor shall erect suitable staging or scaffolding in accordance with 29 CFR 1915, Subpart E (Scaffolds, Ladders and Other Working Surfaces) to facilitate work, as required.
3.2.1 Rig suitable safety netting, to protect workers during possible falls, and to protect the
Engine Room and machinery from falling tools.
3.3 Work plan. The Contractor shall develop and submit, to the COR, a plan for collecting and disposing of waste extracted during cleaning process. Ensure that the proposed plan shall detail how and where exhaust piping will be disconnected, how entire length of exhaust piping will be divided/sectioned for cleaning, and precautions to protect the MDE. The Contractor shall perform this work upon receiving Coast Guard approval of the plan.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
18 (Rev-4)
3.4 Operational test, initial. Prior to commencement of work, the Contractor shall witness Coast
Guard personnel perform an initial operational test of the exhaust stack system, to demonstrate existing operational condition. Submit a CFR.
3.5 Cleaning. The Contractor shall clean the interior surfaces of the exhaust piping and stack uptakes to the MDE, shown on Coast Guard Drawings 225 WLB 259-001, 225 WLM 259-005, and 225 WLB 259-006, to a condition free from soot, tar, and any other foreign matter as follows:
3.5.1 Disconnect the exhaust piping as necessary to facilitate cleaning.
3.5.2 Thoroughly sweep, mechanically clean, and vacuum the interior of each exhaust pipe system, including the mufflers, from the exhaust outlet to the topmost location outside the vessel.
Clean all adjacent stack uptake surfaces. Ensure that all tar deposits, soot deposits, and all other surface contaminants are completely removed.
3.5.3 Remove all debris from the pipe surfaces, stack deck, and Engine Room areas by vacuuming. Dispose of all cleaning materials and generated debris in accordance with all applicable Federal, state, and local regulations.
3.5.4 Reassemble exhaust piping; renew all flange connection gaskets with suitable high temperature, non-asbestos-containing gasket materials; and renew all fasteners.
3.6 Inspection and report. The Contractor shall perform a visual inspection of the following components; submit a CFR:
Exhaust stack access hatches, including all associated studs and nuts.
All cleaned exhaust stack surfaces.
All exhaust expansion joints, including associated bolts.
3.6.1 Following cleaning of the interior of each exhaust pipe system, the Contractor shall demonstrate completeness of the cleaning process to the Coast Guard Inspector, showing that the entire length of exhaust piping has been satisfactorily cleaned according to the work plan.
3.7 Touch-up preservation. The Contractor shall prepare and coat all new and disturbed surfaces to match existing adjacent surfaces in accordance with SFLC Std Spec 6310, paragraph 3.1.13
(Touch-ups and minor coating repairs.)
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.8 Operational test, post repairs. After completion of work, the Contractor shall thoroughly test, in the presence of the Coast Guard Inspector and demonstrate the exhaust stack system to be in satisfactory operating condition. Submit a CFR
19 (Rev-4)
25902_0617_FLT
REC_25902_FLT_225' WLB ('A' Class: Hulls 201-205) (0712)
WORK ITEM 3: Ship Service Diesel Generator (SSDG) Exhaust Piping, Commercial Clean
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to clean the exhaust piping system for the following diesel generators: #1 SSDG, #2 SSDG, and the EDG, including the associated stack uptakes.
1.2 Government-furnished property.
None.
2. REFERENCES
COAST GUARD DRAWINGS
Coast…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it.