TE 1b_QASP_2020.pdf

PDF 36 KB Posted

Attached to
Buoy Overhaul and Maintenance for Coast Guard District 13
Solicitation number
70Z08424RWOPL0003
Issued by

About this file

This document is a Quality Assurance Surveillance Plan (QASP) that describes the methods the Government will use to monitor the Contractor's performance on a contract for buoy overhaul and maintenance services for U.S. Coast Guard District 13.

The QASP outlines the Government's responsibility for quality assurance, the surveillance methods to be used (including periodic inspections and surveillance), and the deduction methods that may be applied for substandard performance, such as presentation of a Contract Discrepancy Report, payment deductions per the Performance Requirements Summary (PRS), or deductions per applicable FAR clauses. The document includes a checklist for evaluating specific work items such as buoy overhaul, color change, additional upgrade items, and transportation. The overarching federal contract opportunity is for Buoy Overhaul and Maintenance for Coast Guard District 13, with a Solicitation Number of 70Z08424RWOPL0003.

View the file

Other files

File Type Posted
Attachment 4. - Past Performance Questionnaie (revised).docx DOCX document
TE-4_Estimated Color Schemes (revised).pdf PDF
Amendment 00001.pdf PDF
Drawings.pdf PDF
Solicitation 70Z08424RWOPL0003.pdf PDF
Attachment 2. Schedule of Services.xls XLS spreadsheet
TE-5 FOAM BUOY REPAIR.pdf PDF
TE-3 REQUIRED DELIVERY DAYS.pdf PDF
TE 1a_PRS_2020.pdf PDF
Attachment 4. - Past Performance Questionaire.docx DOCX document
Attachment 5 - Reserved for SCA Wage Determination.pdf PDF
TE-4 _Estimated Color Schemes.pdf PDF
Attachment 3. Spec 507-B.pdf PDF
Attachment 1 - PWS.pdf PDF
TE-2_GFP.pdf PDF
TE-6_Forms.pdf PDF
Attachment 6 -Drawings.pdf PDF
Solicitation 70Z08424RWOPL0003.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUALITY ASSURANCE SURVEILLANCE PLAN

1. Purpose: This Quality Assurance Surveillance Plan (QASP) describes methods that the Government will use to monitor whether the Contractor’s performance of the contract work is acceptable. The QASP is the Government's written plan for administering the Contract and monitoring major aspects of the Contractor's performance. The QASP is not part of the Contract. It is provided to the Contractor solely for informational purposes and is subject to change by the Government at any time during the contract performance period.

Therefore, the Government reserves the right to perform more or less surveillance than is provided in this

QASP.

2. Introduction: The QASP establishes a method to evaluate the services the Contractor is required to furnish. It is designed to provide an effective method of monitoring Contractor performance for each listed objective on the Performance Requirements Summary (PRS) in the contract. The Government is concerned with the quality of the services provided, and not with the method that the Contractor uses to provide these services. If performance of any required service is unsatisfactory as a result of the Contractor's actions or omissions, then the Government may reduce the contract payments to reflect the decreased value of the services received in accordance with the PRS and/or applicable FAR clauses.

3. Responsibility for Quality Control: The Contractor, not the Government, is responsible for quality control and management actions to meet the terms of the Contract. The Government performs quality assurance to monitor whether Contract standards are achieved.

4. Surveillance Methods: The Government will evaluate the Contractor's performance under this contract.

Government surveillance may include, but is not limited to, the following methods:

a. Periodic COR inspections; and/or

b. Periodic surveillance.

5. Deduction Methods: The Government will record all instances of substandard performance, whether through inspections, direct observation, customer complaint, or any other mechanism. The Government's preferred course of action will be discussions with the Contractor to make the Contractor aware of the problem, and to effectively prevent any recurrence of substandard performance. However, the Government may also take the following actions in addition to, or instead of, discussions with the Contractor:

a. Presentation of a Contract Discrepancy Report requiring a written explanation for substandard performance;

b. Payment deductions in accordance with the PRS; and/or

c. Payment deductions in accordance with the applicable FAR clause(s).

6. Checklist: The USCG will use the following checklist during periodic surveillance.

a. Work Item 1: Overhaul

b. Work Item 2: Color Change

c. Work Item 3: Additional Upgrade Items

d. Work Item 4: Transportation

Work Item 1: Standard Overhaul

Buoy Serial number ______________________

ITEM PWS SECTION REQUIREMENT

SATISFACTORY/

UNSATISFACTORY

(S/U)

1. Steel Buoys C-5.5.3.1 Overhaul for Steel Buoys as per PWS

2. Foam Buoys

C-5.5.3.2

Overhaul for Foam Buoy as per PWS

COR or QAE comments:

Signature: ________________________________________________ Date:______________________

Contractor Comments:

Work Item 2: Color Change

UNSATISFACTORY

(S/U)

1. Color Change C-5.6.1 Hull Preparation and Paining to both Lighted and Unlighted Buoys as per PWS

Work Item 3: Additional Upgrade Items

Only evaluate item/items as per associated task order.

UNSATISFACTORY

(S/U)

1. Replace 1 SQFT Buoy Body Plating C-5.7.1 Repair body plating as per PWS

2. Inspect and Repair Battery Pockets

C-5.7.2

Battery pockets shall be inspected and repaired as per PWS

3. Permanently Close battery Pockets

C-5.7.3 Close battery Pockets as per PWS.

4. Install Tower C-5.7.4 Install new tower as per PWS.

5. 7X20LI Conversion to

7X20LIR

C-5.7.5

Convert to add Radar Reflective tower as per PWS.

6. Install Lifting Eye/Mooring Eye on

Buoy

C-5.7.6

Install Lifting Eye/Mooring Eye buoy as per PWS.

7. Install Mooring Arm C-5.7.7 Install Mooring Arm as per PWS.

8. Install Counterweight Tubes

C-5.7.8 Install Counterweight Tubes as per PWS.

9. Serial Number Modification

C-5.7.9 Modify Serial number as per PWS.

10. Outfit Sound Signal C-5.7.10 Outfit sound signal as per PWS.

Work Item 4: Transportation

UNSATISFACTORY

(S/U)

1. Transportation C-5.3.3 Buoys transported as per PWS. Buoy was delivered as per PWS and/or Task Order.

2. DD-1149

C-5.9.4

Properly documented DD-1149

File details come from the government source that posted it. Updated .