PACP01 Dredge IFB Houston.pdf
PDF 1 MB Posted
- Attached to
- DREDGE BOAT BASIN USCG STATION HOUSTON, TX
- Solicitation number
- 70Z08221BPACP0100
About this file
This document is a sources sought notice for a dredging project. The U.S. Coast Guard is seeking potential contractors to dredge and dispose of sediment from three boat slips at Coast Guard Station Houston, Texas. The work includes pre- and post-dredging surveys, dredging approximately 1,500 cubic yards of sediment by mechanical means, and transporting the dredged material to a designated placement area. The performance period is 150 calendar days. The estimated value is between $250,000 and $500,000. The NAICS code is 237990 and the small business size standard is $30 million in annual gross receipts. Bid, payment, and performance bonds are required. Interested small businesses must respond by November 10 with intent to bid, small business designation evidence, relevant experience, bonding capacity, and DUNS number. The solicitation will be issued in December 2020, with bids due in January 2021 and work completion by July 2021. The Coast Guard is considering setting this acquisition aside for women-owned small businesses, HUBZone, or service-disabled veteran-owned small businesses.
View the file
Other files
Show all 34
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Appendix B –Notice For Filing Agency Protests
APPENDIX B – CHAPTER 3033
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program
It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time-consuming litigation. OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office
(GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative Dispute
Resolution (ADR) forum rather than filing a protest with the GAO or some external forum. Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or
Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the U.S. Coast Guard Ombudsman for
Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman:
solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the
Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely, protests must be filed within the period specified in FAR 33.103(e). Formal protests filed under the OPAP program should be submitted electronically to
OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting Officer or the
Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.
The Ombudsman Hotline telephone number is 202.372.3695.
mailto:OPAP@uscg.mil
PART I – THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM/INDEX
Table of Contents
PART I – THE SCHEDULE
SECTION A - SOLICITATION/CONTRACT FORM/INDEX
SECTION B - SUPPLIES OR SERVICES AND PRICES
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
SECTION D - PACKAGING AND MARKING
SECTION E - INSPECTION AND ACCEPTANCE
SECTION F - DELIVERIES OR PERFORMANCE
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION H - SPECIAL CONTRACT REQUIREMENTS
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
PART III – LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
PART IV – REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS OF OFFERORS
SECTION L - INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS
SECTION M - EVALUATION FACTORS FOR AWARD
SOLICITATION OFFER
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
70Z08221BPACP0100
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
12/08/2020
PAGE OF
PAGES
IMPORTANT – The “offer” section on the reverse must be fully completed by offeror.
The "offer" section on the reverse must be fully completed by offeror.
The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
21-20-821PACP01
6. PROJECT NUMBER.
11714704
7. ISSUED BY CODE 8. ADDRESS OFFER TO
CONTRACTING OFFICER
USCG CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FLORIDA 33177-1630
CONTRACTING OFFICER
USCG CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FLORIDA 33177-1630
9. FOR INFORMATION
CALL
A. NAME
Cheryl A. Berry, Contract Specialist
B TELEPHONE NUMBER (INCLUDE AREA CODE) (NO COLLECT CALLS)
(305) 278-6763
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS:
THIS IS A TOTAL SMALL BUSINESS SET-ASIDE
SUMMARY OF WORK: The Contractor shall furnish all labor, tools, equipment, material and supervision necessary to dredge the mooring areas and dispose of sediment at United States Coast Guard Station Houston, TX. All work shall be performed in strict accordance with the specifications (11714704), Drawings (M2351-D) and the contract.
LOCATION: U.S. Coast Guard Station Houston
9640 Clinton Dr.
Houston, TX, 77029-4324
Offerors are requested to review this IFB as soon as possible upon receipt. If an offeror has any questions regarding the solicitation which require an answer from the issuing office, these questions shall be submitted, in writing, referencing section and paragraph of solicitation to the U.S. Coast Guard, Civil Engineering Unit Miami, 15608 SW 117 Avenue, Miami, FL 33177. The deadline for submitting
Requests for Information (RFIs) is December 21, 2020; any RFI's received after this date the Government cannot guarantee an answer. A final amendment with questions and answers will be issued approximately 10 days prior to proposal due date. Email address is:
karina.gudiel@uscg.mil.
11. The contractor shall begin performance within 10 calendar days and complete it within 150 calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See Section F).
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and 0 copies to perform the work required are due at the place specified in Item 8 by 2:00 PM EST (hour) local time January 13, 2021. If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than 60 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
NSN 7540-01-155-3212 STANDARD FORM 1442 (REV. 8/2014)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
15. TELEPHONE NO. (Include area code)
DUNS: _________________________________________
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CAGE: ____________________ TIN:_______________________
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation - give number and date of each)
AMENDMENT NO.
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE
20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
BLOCK 27
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C.3304 (a) ( )
26. ADMINISTERED BY CODE 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER
USCG CIVIL ENGINEERING UNIT MIAMI
15608 SW 117TH AVENUE
MIAMI, FLORIDA 33177-1630
COMMERCIAL INVOICES
U. S. COAST GUARD FINANCE CENTER
1430A KRISTINA WAY
CHESAPEAKE, VA 23326-0324
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _____ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
ODALYS MCGEE, USCG CONTRACTING OFFICER
30b. SIGNATURE
30c. DATE
31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 8/2014) BACK
CEU MIAMI – IFB_Construction 3 (FAC 2021-02/11-23-2020)
SECTION B - SUPPLIES OR SERVICES AND PRICES
**ALL ITEMS ARE TO BE PRICED SEPARATELY**
GENERAL SCOPE OF WORK
The Contractor shall furnish all labor, equipment, materials, tools, and supervision necessary to dredge and dispose of materials from the boat basin at U.S. Coast Guard Station Houston. All work shall be performed in strict accordance with the Contract Specifications (11714704), Contract Drawings (M2351-D) and the Contract.
ITEM 1A: Pre and Post-dredge hydrographic survey of three boat slips:
ONE LUMP SUM $_______________________
ITEM 1B: Mobilization/Demobilization of all necessary Equipment (including the dredge), Barge, Personnel, Progress
Schedule, Construction Submittals and Environmental Controls. Include all other direct costs not associated with the dredging operation.
ONE LUMP SUM $_______________________
UNIT PRICE ITEMS: THE CONTRACTING OFFICER RESERVES THE RIGHT TO ACCEPT OR REJECT ANY
INDIVIDUAL UNIT PRICE BID ITEM. IF ACCEPTED, THE QUANTITY LISTED BELOW WILL BE FUNDED AT
THE TIME OF BASE BID AWARD. PAYMENT OF THE UNIT PRICE ITEM(S) WILL BE MADE ON THE
ACTUAL QUANTITY PROVIDED AND AS VERIFIED BY THE CONTRACTING OFFICER’S REPRESENTATIVE
ITEM 1C: Remove an estimated quantity of 1,500 cubic yards of dredge material (actual quantities shall be determined based on survey results). The removal and transport of dredged material shall be paid for at the established unit price per cubic yard (CY), including treatment necessary in order to comply with disposal site material requirements as the dredge material cannot contain free liquids. Dredge the boat basin by mechanical means to a design depth of (-) 7.13’ MLLW
+ (-) 1.0’ over-dredge to a depth of -8.13’ MLLW. Payment shall not be made for dredging deeper than the allowable over-depth, dredging outside of authorized areas, or dredging of material disposed of in unauthorized manner. Transport the dredge sediment to the designated location in the Contract documents at the Rosa Allen Placement Area (PA23-A).
EST. QUANTITY: 1,500 CY x UNIT PRICE: $_______________________ = TOTAL:
TOTAL LUMP SUM BID PRICE: $ ________________________________
(SUM OF ITEMS 1A, 1B, AND 1C)
CEU MIAMI – IFB_Construction 4 (FAC 2021-02/11-23-2020)
SPECIAL INSURANCE REQUIREMENTS REQUIRED FOR THIS CONTRACT
Per SPEC Section 1. General, Paragraph 1.2.4 Item 1D
The Contractor shall ensure compliance and abide by the requirements stipulated in Appendix K
“Dredged Material Placement Agreement.” The Contractor shall obtain insurance coverage as indicated below and as stated in Appendix K. Coverage should be written on an occurrence basis by companies authorized to do business in the State of Texas and rated “A-, VII” or better by A.M. Best Company and/or be placed with a financially sound insurance carrier acceptable to Port Authority Risk
Management. Requests to self-insure specific lines of coverage are subject to approval of the Port
Authority
Type Amount
i. Workers’ Compensation Statutory
Employers’ Liability $1Million/$1 Million/$1 Million
Longshore & Harbor Workers’ Compensation Statutory
(if exposure exists)
1. All employees, leased or co-employees, independent contractors, and employees of subcontractors and vendors, performing work for the Company, or entering upon the Port Authority’s premises, must be covered by Workers’
Compensation.
2. If Company is a sole proprietorship without employees and which will not be using any subcontractor(s) in the performance of the Contract Work, it may request a waiver of required workers’ compensation insurance: The Company, as sole proprietor, agrees to indemnify and hold harmless Port Authority.
ii.
Commercial General Liability (CGL) $1 Million per occurrence
$2 Million Aggregate
1. Shall include Premises Operations, Independent Contractors, Products and Completed Operations, Personal Injury, Bodily Injury, Broad Form Contractual Liability and Property Damage, Explosion, Collapse, and Underground Hazards covering the indemnification provisions of our contract.
2. Must contain a “severability of interests” provision, and cover cross-suits between insureds.
iii. Business Automobile Liability $1 Million per accident (Any auto)
iv. Environmental Impairment Liability $5 Million per occurrence
1. All environmental policies will include tail coverage for three years after expiration of the license period.
v. Umbrella Liability $5 Million per occurrence
NOTE: All policies, except for workers’ compensation and Environmental Impairment Liability, shall designate the following as an “Additional Insured” either by an “Automatic Additional Insured” or a specific endorsement:
“Port Authority, its Commissioners, officers, employees, agents, and legal representatives.”
CEU MIAMI – IFB_Construction 5 (FAC 2021-02/11-23-2020)
SECTION C - DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
C.1 SPECIFICATIONS AND DRAWINGS:
(a) SEE SECTION J - “LIST OF ATTACHMENTS”
(b) DRAWINGS MEASUREMENTS SHOULD BE FIELD VERIFIED BY THE SUCCESSFUL CONTRACTOR
PRIOR TO ORDERING MATERIAL
(c) Failure to read the specifications in their entirety will not relieve the offerors from responsibility for properly estimating the difficulty or cost of successfully performing the work. Failure to do so will be at offeror’s risk.
(d) Each offeror shall furnish the information required by the solicitation. Any offer that does not conform to the requirements of this solicitation in every respect will be rejected as non-responsive. Deviations from, or exceptions to, the specifications or delivery schedule are causes for rejection. Offers for supplies or services other than those specified will not be considered unless authorized by this solicitation.
SECTION D - PACKAGING AND MARKING
THIS SECTION IS NOT APPLICABLE
CEU MIAMI – IFB_Construction 6 (FAC 2021-02/11-23-2020)
SECTION E - INSPECTION AND ACCEPTANCE
E.1 52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
(a) Definition. “Work” includes, but is not limited to, materials, workmanship, and manufacture and fabrication of components.
(b) The Contractor shall maintain an adequate inspection system and perform such inspections as will ensure that the work performed under the contract conforms to contract requirements. The Contractor shall maintain complete inspection records and make them available to the Government. All work shall be conducted under the general direction of the
Contracting Officer and is subject to Government inspection and test at all places and at all reasonable times before acceptance to ensure strict compliance with the terms of the contract.
(c) Government inspections and tests are for the sole benefit of the Government and do not –
(1) Relieve the Contractor of responsibility for providing adequate quality control measures;
(2) Relieve the Contractor of responsibility for damage to or loss of the material before acceptance;
(3) Constitute or imply acceptance; or
(4) Affect the continuing rights of the Government after acceptance of the completed work under paragraph (i) below.
(d) The presence or absence of a Government inspector does not relieve the Contractor from any contract requirement, nor is the inspector authorized to change any term or condition of the specification without the Contracting Officer’s written authorization.
(e) The Contractor shall promptly furnish, at no increase in contract price, all facilities, labor, and material reasonably needed for performing such safe and convenient inspections and tests as may be required by the Contracting Officer. The
Government may charge to the Contractor any additional cost of inspection or test when work is not ready at the time specified by the Contractor for inspection or test, or when prior rejection makes re-inspection or retest necessary. The
Government shall perform all inspections and tests in a manner that will not unnecessarily delay the work. Special, full size, and performance tests shall be performed as described in the contract.
(f) The Contractor shall, without charge, replace or correct work found by the Government not to conform to contract requirements, unless in the public interest the Government consents to accept the work with an appropriate adjustment in contract price. The Contractor shall promptly segregate and remove rejected material from the premises.
(g) If the Contractor does not promptly replace or correct rejected work, the Government may (1) by contract or otherwise, replace or correct the work and charge the cost to the Contractor or (2) terminate for default the Contractor’s right to proceed.
(h) If, before acceptance of the entire work, the Government decides to examine already completed work by removing it or tearing it out, the Contractor, on request, shall promptly furnish all necessary facilities, labor, and material. If the work is found to be defective or non-conforming in any material respect due to the fault of the Contractor or its subcontractors, the Contractor shall defray the expenses of the examination and of satisfactory reconstruction. However, if the work is found to meet contract requirements, the Contracting Officer shall make an equitable adjustment for the additional services involved in the examination and reconstruction, including, if completion of the work was thereby delayed, an extension of time.
(i) Unless otherwise specified in the contract, the Government shall accept, as promptly as practicable after completion and inspection, all work required by the contract or that portion of the work the Contracting Officer determines can be accepted separately. Acceptance shall be final and conclusive except for latent defects, fraud, gross mistakes amounting to fraud, or the Government’s rights under any warranty or guarantee.
(End of clause)
E.2 CONTRACTOR INSPECTION SYSTEM
(a) Provide all necessary equipment, instruments, qualified personnel, facilities, and test fluids and gases, and perform all inspections, sampling, testing, and certifications specified in the individual Sections of the Specifications; fill out Daily
Construction Report forms as documentation and submit the forms to the Government inspector by 10:00 a.m. on the first
CEU MIAMI – IFB_Construction 7 (FAC 2021-02/11-23-2020) working day following the day the work was performed. Sample forms are provided in Section J of this contract. Daily
Construction Report forms will be furnished to the Contractor.
SECTION F - DELIVERIES OR PERFORMANCE
F.1 THE FOLLOWING FEDERAL ACQUISITION REGULATION CLAUSES ARE INCORPORATED BY
REFERENCE:
52.211-18 VARIATION IN ESTIMATED QUANTITY (APR 1984)
52.242-14 SUSPENSION OF WORK (APR 1984)
F.2 IN ADDITION TO THE ABOVE CLAUSES INCORPORATED BY REFERENCE, THE FOLLOWING CLAUSES
ARE APPLICABLE TO THE SOLICITATION AND RESULTING CONTRACT:
52.211-10 COMMENCEMENT, PROSECUTION AND COMPLETION OF WORK (APR 1984)
ALTERNATE I (APR 1984)
The Contractor shall be required to (a) commence work under this contract within ten (10) calendar days after the date the Contractor receives the NOTICE TO PROCEED, (b) prosecute the work diligently, and (c) complete the entire work ready for use not later than 150 calendar days after receipt of the notice to proceed. The time stated for completion shall include final cleanup of the premises.
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
(a) The Contractor shall, within five days after the work commences on the contract or another period of time determined by the Contracting Officer, prepare and submit to the Contracting Officer for approval three copies of a practicable schedule showing the order in which the Contractor proposes to perform the work, and the dates on which the
Contractor contemplates starting and completing the several salient features of the work (including acquiring materials, plant, and equipment). The schedule shall be in the form of a progress chart of suitable scale to indicate appropriately the percentage of work schedules for completion by any given date during the period. If the Contractor fails to submit a schedule within the time prescribed, the Contracting Officer may withhold approval of progress payments until the
Contractor submits the required schedule.
(b) The Contractor shall enter the actual progress on the chart as directed by the Contracting Officer, and upon doing so shall immediately deliver three copies of the annotated schedule to the Contracting Officer. If, in the opinion of the
Contracting Officer, the Contractor falls behind the approved schedule, the Contractor shall take steps necessary to improve its progress, including those that may be required by the Contracting Officer, without additional cost to the
Government. In this circumstance the Contracting Officer may require the Contractor to increase the number of shifts overtime operations days of work and/or the amount of construction plant and to submit for approval any supplementary schedule or schedules in chart form as the Contracting Officer deems necessary to demonstrate how the approved rate of progress will be regained.
(c) Failure of the Contractor to comply with the requirements of the Contracting Officer under this clause shall be grounds for a determination by the Contracting Officer that the Contractor is not prosecuting the work with sufficient diligence to ensure completion within the time specified in the contract. Upon making this determination, the Contracting
Officer may terminate the Contractor’s right to proceed with the work, or any separable part of it, in accordance with the default terms of this contract.
CEU MIAMI – IFB_Construction 8 (FAC 2021-02/11-23-2020)
F.3 CONTRACTOR’S SCHEDULE
A preliminary copy of the Contractor’s proposed schedule shall be prepared and submitted to the Contracting
Officer prior to the preconstruction conference. Any questions or problems that might cause a delay in approval of the schedule can be addressed during this conference.
SECTION G - CONTRACT ADMINISTRATION DATA
G.1 SUBMITTALS/SHOP DRAWINGS:
Contractor shall provide a schedule of required submittals indicating the order in which the Contractor proposes to provide the required submittals and the dates on which the Contractor plans to provide said submittals. This schedule shall be provided prior to the preconstruction conference for review and discussion during the conference. Reviewed submittals by the Government will indicate approval or disapproval of the submittals/shop drawings and if not approved as submitted shall indicate reasons thereof. Any work done prior to such approval shall be at the Contractor’s risk.
Approval by the Contracting Officer shall not relieve the Contractor from responsibility for any errors or omissions in such drawings, nor from the responsibility for complying with the requirements of this contract.
G.2 PRECONSTRUCTION CONFERENCE:
As soon as practicable after the award of contract, a mutually agreeable time and date for a preconstruction conference between the representatives of the Government and the Contractor will be established. This conference will be held either by telephone or, if convenient, at the site or this office to discuss the terms and conditions of the contract. Below are some of the items to be discussed:
(a) Detailed procedures for the administration of the project,
(b) Identify the authorized representatives of the Government and the Contractor’s Superintendent(s),
(c) Contractor’s field office address and telephone number,
(d) Contractor’s draft Construction Progress Schedule (Section F (F.4))
The Notice to Proceed date will be established during this meeting.
(e) Procedures for processing periodic pay estimates (Section G (G.3-6))
(f) Review of Submittal Schedule giving proposed dates Contractor will submit all required contract submittals
(Section G (G.1))
(g) Requirements and procedures for preparing work schedules and reporting programs,(Section E (E.2))
(h) Procedures for equal opportunity compliance,
(i) Information on delivery of Government-furnished property (If Applicable).
G.3 DESIGNATED BILLING OFFICE
(a) Submit original invoice to the following designated billing office via one of the following modes, listed in descending order of preference:
(1) FINCEN Website invoice receipt form:
http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
(2) Mailed to: Commercial Invoices
U.S. Coast Guard Finance Center
1430A Kristina Way
Chesapeake, VA 23326 http://www.fincen.uscg.mil/centralinv/central_inv_contr.cfm
CEU MIAMI – IFB_Construction 9 (FAC 2021-02/11-23-2020)
(b) Submit a copy of the invoice with any required supporting documentation to the Contracting Office:
CONTRACTING OFFICER
U. S. COAST GUARD
CIVIL ENGINEERING UNIT MIAMI
15608 S. W. 117TH AVENUE
MIAMI, FLORIDA 33177-1630
(c) To facilitate processing, all proper invoices and any supporting information submitted electronically using the
FINCEN web based invoice submission capability must be submitted as a single Adobe (.pdf) formatted file, or as otherwise specified in the contract.
(d) Web based submission by the contractor and receipt confirmation does not reflect Government review or acceptance of the invoice.
(e) Payment inquiries and status may be obtained - at the following website: -https://www.fincen.uscg.mil/secure/payment.htm.
G.4 INVOICE
(a) To be accomplished on the form provided by the Coast Guard. See Section J for copy of said form.
(b) In addition to the items required for a proper invoice under FAR 52.232-5 and 52.232-27, the invoice must also include the following information:
1. Invoice Routing Code: CEU-MIAMI
2. Name of the Contract Specialist
3. Indication that the contractor represents a small business for accelerated payment purposes.
(c) To facilitate the approval and processing of an invoice, contractor shall furnish an advance copy of the invoice to the Contracting Officer’s Technical Representative for review of the invoice amount and estimates of work accomplished prior to submission to the billing office.
G.5 GOVERNMENT REPRESENTATIVES
The Government may, upon contract award or thereafter, name representatives with titles such as Project Engineer, Contracting Officer’s Technical Representative(s), Inspector(s), and so on. Such individuals will be named in writing by the Contracting Officer, with individual responsibilities set forth at that time.
In any event, no such named individual has the authority to issue any direction under this contract either technical or otherwise, which constitutes a change to the terms, conditions, and price or delivery schedule of the contract. Only the
Contracting Officer is authorized to alter the contract in any manner.
http://www.fincen.uscg.mil/electron.htm http://www.fincen.uscg.mil/electron.htm
CEU MIAMI – IFB_Construction 10 (FAC 2021-02/11-23-2020)
SECTION H - SPECIAL CONTRACT REQUIREMENTS
H.1. JOB SUPERINTENDENT
Special attention is called to the requirement for superintendence by the Contractor, FAR Clause 52.236-6. The contractor shall provide a job superintendent on the site at all times during contract performance that is able to read, write, understand, and speak English.
H.2 MODIFICATION PROPOSALS - PRICE BREAKDOWN
The contractor, in connection with any proposal made for a contract modification, shall furnish a price breakdown, itemized as required by the Contracting Officer. Unless otherwise directed, the breakdown shall be in sufficient detail to permit an analysis of all material, labor, equipment, subcontract, and overhead costs, as well as profit, and shall cover all work changed. Any amount claimed for subcontracts shall be supported by a similar price breakdown. In addition, if the proposal includes a time extension, a justification therefore shall also be furnished. The proposal, together with the price breakdown and time extension justification, shall be furnished by the date specified by the Contracting Officer. Once a contract modification has been authorized, the contractor shall submit an updated progress schedule that includes all changes implemented by the modification.
H.3 SANITATION
Adequate sanitary conveniences of an approved type for the use of persons employed on the work, and properly secluded from public observation, shall be constructed and maintained by the Contractor in such a manner and at such points as shall be required or approved by the Contracting Officer. These conveniences shall be maintained at all times without nuisance and their use shall be strictly enforced. Upon completion of the work they shall be removed from the premises, leaving the premises clean and free from nuisance.
H.4 WORK OUTSIDE REGULAR WORK HOURS
If the contractor desires to perform work under this contract outside regular work hours or on Saturdays, Sundays or holidays, a written request shall be made, to the Contracting Officer no less than 10 calendar days prior to the planned start of such work. Regular work hours are, for the purpose of this clause, those hours the activity or Command, where the work is to be performed, normally works on a day-by-day basis. Application by the Contractor does not imply consent by the Government. Each application will be considered, and a decision made, on the potential benefit of permitting such work. Approval of a Contractor’s application under this clause will be, unless otherwise agreed in writing, at no additional cost to the Government.
H.5 STATEMENT AND ACKNOWLEDGMENT FORM (SF 1413)
Special attention is called to the requirement for insertion of and compliance with various labor clauses called out in FAR
Clause 52.222-11 in any subcontracts regardless of tier. Within 14 days after contract award of the prime contract, an executed SF-1413 is required for each subcontract. This also applies to any subsequently awarded subcontract.
H.6 REQUIRED BONDING –
PERFORMANCE BOND (Standard Form 25) will be required as follows: 100% of total amount of contract;
PAYMENT BOND (Standard Form 25a) will be required as follows: 100% of total amount of contract;
Performance and payment bonds placed with a surety or sureties acceptable to the Government and in the amounts indicated shall be submitted within ten (10) calendar days after receipt of award and shall be maintained for the entire contract.
CEU MIAMI – IFB_Construction 11 (FAC 2021-02/11-23-2020)
H.7 REQUIRED INSURANCE
(a) The contractor shall procure and maintain insurance during the entire period of performance under this contract, in accordance with Federal Acquisition Regulation Clause 52.228-5, INSURANCE - WORK ON A GOVERNMENT
INSTALLATION (JAN 1997) (See Section I). FAR 28.307-2 states the following minimum amounts of liability:
MINIMUM COVERAGE REQUIRED—Please refer to page 4 of this solicitation for special insurance required by this contract.
(b) As evidence that the specified insurance has been obtained, the contractor shall furnish the contracting officer with a certificate of insurance. Such certificate shall be furnished prior to commencement of work and shall provide for thirty
(30) calendar days written notice to the Contracting Officer.
CEU MIAMI – IFB_Construction 12 (FAC 2021-02/11-23-2020)
PART II – CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
I.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if it was given in full text. Upon request, the Contracting Officer will make full text available. Also, the full text of a clause may be assessed electronically at this/these address(es): http://www.arnet.gov/far/
I.2 FEDERAL ACQUISITION REGULATION (48 CFR CHAPTER 1) CLAUSES
52.202-1 DEFINITIONS (JUN 2020)
52.203-3 GRATUITIES (APR 1984)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (JUN 2020)
52.203-7 ANTI-KICKBACK PROCEDURES (JUN 2020)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(JUN 2020)
52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS & REQUIREMENTS TO
INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (JUN 2020)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER
(MAY 2011)
52.204-7 SYSTEMS FOR AWARD MANAGEMENT (OCT 2018)
52.204-9 PERSONNEL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUN 2020)
52.204-13 SYSTEMS FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (OCT 2016)
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (AUG 2020)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT. (AUG 2020)
52.209-6 PROTECTING THE GOVERNMENT’S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(JUN 2020)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY
MATTERS (OCT 2018)
52.214-26 AUDIT AND RECORDS - SEALED BIDDING (JUN 2020)
52.214-27 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA—
MODIFICATIONS—SEALED BIDDING (JUN 2020)
52.214-28 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA - MODIFICATIONS - SEALED
BIDDING (JUN 2020)
52.214-29 ORDER OF PRECEDENCE – SEALED BIDDING (JAN 1986)
52.219-6 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2020)
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
52.219-13 NOTICE OF SET-ASIDE OF ORDERS (MAR 2020)
52.219-14 LIMITATIONS ON SUBCONTRACTING (MAR 2020)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020)
http://www.arnet.gov/far/
CEU MIAMI – IFB_Construction 13 (FAC 2021-02/11-23-2020)
52.222-3 CONVICT LABOR (JUNE 2003)
52.222-4 CONTRACT WORK HOURS AND SAFETY STANDARDS ACT-OVERTIME
COMPENSATION (MAR 2018)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
52.222-7 WITHHOLDING OF FUNDS (MAY 2014)
52.222-8 PAYROLLS AND BASIC RECORDS (AUG 2018)
52.222-9 APPRENTICES AND TRAINEES (JUL 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222-12 CONTRACT TERMINATION-DEBARMENT (MAY 2014)
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND RELATED
REGULATIONS (MAY 2014)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION
(APR 2015)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020)
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUN 2020)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUN 2020)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS
ACT (DEC 2010)
52.222-50 COMBATING TRAFFICKING IN PERSONS (OCT 2020)
52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (NOV 2020)
52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND
CONSTRUCTION CONTRACTS (SEP 2013)
52.223-3 HAZARDOUS MATERIAL IDENTIFICATION & MATERIAL SAFETY DATA (JAN 1997)
ALT I (JAN 1997)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
52.223-12 MAINTENANCE, SERVICE, REPAIR, OR DISPOSAL OF REFRIGERATION EQUIPMENT
AND AIR CONDITIONERS (JUN 2016)
52.223-15 ENERGY EFFICIENCY IN ENERGY CONSUMING PRODUCTS (MAY 2020)
52.223-17 AFFIRMATIVE PROCUREMENT OF EPA-DESIGNATED ITEMS IN SERVICE AND
CONSTRUCTION CONTRACTS (AUG 2018)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (JUN 2020)
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227-1 AUTHORIZATION AND CONSENT (JUN 2020)
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT INFRINGEMENT
(JUN 2020)
52.227-4 PATENT INDEMNITY - CONSTRUCTION CONTRACTS (DEC 2007)
52.227-17 RIGHTS IN DATA - SPECIAL WORKS (DEC 2007)
52.228-1 BID GUARANTEE (SEP 1996)
(c) The amount of the bid guarantee shall be twenty percent (20%) of the bid price.
52.228-2 ADDITIONAL BOND SECURITY (OCT 1997)
52.228-5 INSURANCE -WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-11 PLEDGES OF ASSETS (AUG 2018)
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
52.228-14 IRREVOCABLE LETTER OF CREDIT (NOV 2014)
CEU MIAMI – IFB_Construction 14 (FAC 2021-02/11-23-2020)
52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (JUN 2020)
52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232-5 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232-17 INTEREST (MAY 2014)
52.232-18 AVAILABILITY OF FUNDS (APR 1984)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (JAN 2017)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER – SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
52.232-40 PROVIDING ACCELERATED PAYMENT TO SMALL BUSINESS SUBCONTRACTORS
(DEC 2013)
52.233-1 DISPUTES (MAY 2014)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236-2 DIFFERING SITE CONDITIONS (APR 1984)
52.236-3 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236-5 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-6 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-7 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-8 OTHER CONTRACTS (APR 1984)
52.236-9 PROTECTION OF EXISTING VEGETATION STRUCTURE, EQUIPMENT, UTILITIES
AND IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREA (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION, ALT I (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-17 LAYOUT OF WORK (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.236-27 SITE VISIT (CONSTRUCTION), ALTERNATE I (FEB 1995)
52.242-13 BANKRUPTCY (JUL 1995)
52.242-14 SUSPENSION OF WORK (APR 1984)
52.243-4 CHANGES (JUN 2007)
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (NOV 2020)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994) ALT I (APR 1984)
52.248-3 VALUE ENGINEERING - CONSTRUCTION (OCT 2020)
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED PRICE)
(APR 2012) – ALT I (SEP 1996)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
I.3 DEPARTMENT OF HOMELAND SECURITY REGULATION (HSAR) (48 CFR CHAPTER 30) CLAUSES
3052.205-70 ADVERTISEMENTS, PUBLICIZING AWARDS, AND RELEASES (SEP 2012)
3052.211-70 INDEX FOR SPECIFICATIONS (DEC 2003)
3052.222-70 STRIKES OR PICKETING AFFECTING TIMELY COMPLETION OF THE CONTRACT
WORK (DEC 2003)
3052-222-71 STRIKES OR PICKETING AFFECTING ACCESS TO A DHS FACILITY (DEC 2003)
3052.222-90 LOCAL HIRE (USCG) (JUN 2006)
CEU MIAMI – IFB_Construction 15 (FAC 2021-02/11-23-2020)
3052.223-70 REMOVAL OR DISPOSAL OF HAZARDOUS SUBSTANCES - APPLICABLE LICENSES
AND PERMITS (JUNE 2006) If the Contractor does not currently possess these documents, it shall obtain all requisite licenses and permits within 30 days after date of award.
3052.223-90 ACCIDENT AND FIRE REPORTING (DEC 2003)
3052.228-70 INSURANCE (DEC 2003)
3052.228-90 NOTIFICATION OF MILLER ACT PAYMENT BOND PROTECTION (USCG)
(DEC 2003)
3052.242-72 CONTRACTING OFFICER’S TECHNICAL REPRESENTATIVE (DEC 2003)
I.4 IN ADDITION TO THE ABOVE CLAUSES INCORPORATED BY REFERENCE, THE FOLLOWING
CLAUSES ARE APPLICABLE TO THE SOLICITATION AND RESULTING CONTRACT:
52.204-1 APPROVAL OF CONTRACT (DEC 1989)
This contract is subject to the written approval of Senior Field Contracting Officer, Civil
Engineering Unit Miami and shall not be binding until so approved.
(End of Clause)
52.222-30 – CONSTRUCTION WAGE RATE REQUIREMENTS – PRICE ADJUSTMENT
(NONE OR SEPARATELY SPECIFIED METHOD) (AUG 2018)
(a) The wage determination issued under the Construction Wage Rate Requirements statute by the
Administrator, Wage and Hour Division, Employment Standards Administration, U.S. Department of Labor, that is effective for an option to extend the term of the contract, will apply to that option period.
(b) The Contracting Officer will make no adjustment in contract price, other than provided for elsewhere in this contract, to cover any increases or decreases in wages and benefits as a result of--
(1) Incorporation of the Department of Labor’s wage determination applicable at the exercise of the option to extend the term of the contract.
(2) Incorporation of a wage determination otherwise applied to the contract by operation of law; or
(3) An increase in wages and benefits resulting from any other requirement applicable to workers subject to the
Construction Wage Rate Requirements statute.
52.225-9 - BUY AMERICAN ACT—CONSTRUCTION MATERIALS (MAY 2014)
(a) Definitions. As used in this clause—
“Commercially available off-the-shelf (COTS) item”—
(1) Means any item of supply (including construction material) that is—
(i) A commercial item (as defined in paragraph (1) of the definition at FAR 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in section 3 of the Shipping Act of 1984 ( 46 U.S.C. App.
1702), such as agricultural products and petroleum products.
“Component” means an article, material, or supply incorporated directly into a construction material.
“Construction material” means an article, material, or supply brought to the construction site by the
Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies. However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction
CEU MIAMI – IFB_Construction 16 (FAC 2021-02/11-23-2020) material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
“Cost of components” means—
(3) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(4) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
“Domestic construction material” means—
(1) An unmanufactured construction material mined or produced in the United States;
(2) A construction material manufactured in the United States, if—
(i) The cost of its components mined, produced, or manufactured in the United States exceeds 50 percent of the cost of all its components. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic; or
(ii) The construction material is a COTS item.
“Foreign construction material” means a construction material other than a domestic construction material.
“United States” means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements the Buy American Act (41 U.S.C. 10a - 10d) by providing a preference for domestic construction material. In accordance with 41 U.S.C. 431, the component test of the Buy American Act is waived for construction material that is a COTS item (See FAR 12.505(a)(2)). The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial item or to the construction materials or components listed by the Government as follows: “NONE”
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that—
(i) The cost of domestic construction material would be unreasonable. The cost of a particular domestic construction material subject to the requirements of the Buy American Act is unreasonable when the cost of such material exceeds the cost of foreign material by more than 6 percent;
(ii) The application of the restriction of the Buy American Act to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American Act.
(1)(i) Any Contractor request to use foreign construction material in accordance with paragraph
(b)(3) of this clause shall include adequate information for Government evaluation of the request, including—
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
CEU MIAMI – IFB_Construction 17 (FAC 2021-02/11-23-2020)
(iv) Any Contractor request for a determination submitted after contract award shall explain why the
Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting
Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American Act applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American Act applies, use of foreign construction material is noncompliant with the Buy American Act.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison
Construction material description Unit of measure
Quantity Price (dollars) *
Item 1
For…