DREDGE BOAT BASIN USCG STATION HOUSTON, TX
Solicitation number
70Z08221BPACP0100
Issued by

About this file

This document contains a pre-solicitation notice and sources sought announcement for solicitation number 70Z08221BPACP0100 from the United States Coast Guard. The solicitation is for dredging services at the boat basin at Coast Guard Station Houston, Texas. Services required include dredging approximately 1,500 cubic yards of sediment from three boat slips using mechanical means, conducting pre-dredge and post-dredge surveys, and transporting dredged materials to a designated placement area. The performance period is 150 calendar days. The estimated value is between $250,000 and $500,000. Bid, payment and performance bonds are required. Tentative solicitation issue date is December 2020, bid opening is January 2021, and contract completion is July 2021. The solicitation will be set aside for small businesses, with preference given to HUBZone, service-disabled veteran-owned, or women-owned small businesses. Responses were due by November 10, 2020 for the sources sought notice.

View the file

Other files

File Type Posted
Abstract of Offer.pdf PDF
Appendix A - Dept. of Army Permit SWG-2020-00071 & 2004-00909.pdf PDF
Appendix L - Pipeline Route Property Limits.pdf PDF
Section B Pricing REVISED.pdf PDF
Specifications.pdf PDF
Drawings.pdf PDF
Appendix B - NWP 35.pdf PDF
Appendix C - NWP 16.pdf PDF
Appendix D - DA Disposal Site Real Estate Permit.pdf PDF
Appendix K - Dredge Material Placement Agreemnt.pdf PDF
Appendix M - Temporary Access Agreement.pdf PDF
Appendix E -Disposal Area Coordinates.pdf PDF
Appendix G - Hydrographic Survey.pdf PDF
A003.pdf PDF
Appendix I - Sediment Sampling and Analysis Report.pdf PDF
Appendix F - TCEQ Conc. Letter (SWG-2004-00909).pdf PDF
Appendix J - Migratory Bird BMPs.pdf PDF
Appendix H - Hydrographic Survey Cross Sections.pdf PDF
A002.pdf PDF
A001 PACP01.pdf PDF
Appendix A - Dept. of Army Permit SWG-2020-00071 and 2004-00909.pdf PDF
3C--Specs PACP01 Houston Dredge.pdf PDF
PACP01 Dredge IFB Houston.pdf PDF
Appendix B - NWP 35.pdf PDF
Appendix C - NWP 16.pdf PDF
Appendix J - Migratory Bird BMPs.pdf PDF
Appendix H - Hydrographic Survey Cross Sections.pdf PDF
Appendix E -Disposal Area Coordinates.pdf PDF
Appendix I - Sediment Sampling and Analysis Report.pdf PDF
Appendix F - TCEQ Conc. Letter SWG-2004-00909.pdf PDF
Appendix K - Dredge Matl Plcmnt Agreemnt.pdf PDF
Appendix G - Hydrographic Survey.pdf PDF
3C--Drawings-Plans M2351-D PACP01 Houston Dredge.pdf PDF
Appendix D - DA Disposal Site Real Estate Permit.pdf PDF
Show all 34

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE

PAGE OF PAGES

1 2

2. AMENDMENT/MODIFICATION NO.

6/10/2021 4. REQUISITION/PURCHASE REQ. NO.

21-21-821PACP01

5. PROJECT NO. (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

CONTRACTING OFFICER

USCG, CIVIL ENGINEERING UNIT MIAMI

15608 SW 117TH AVENUE

MIAMI, FL 33177-1630

8. NAME AND ADDRESS OF CONTRACTOR (NO., STREET, COUNTY, STATE AND ZIP CODE)

PROSPECTIVE CONTRACTORS

9A. AMENDMENT OF SOLICITATION NO.

70Z08221BPACP0100

9B. DATED (SEE ITEM 11)

12/8/2020

10A. MODIFICATION OF CONTRACT/ORDER NO.

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE REFERENCED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET

FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (SPECIFY TYPE OF MODIFICATION AND AUTHORITY)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (ORGANIZED BY UCF SECTION HEADINGS, INCLUDING SOLICITATION/CONTRACT SUBJECT MATTER WHERE FEASIBLE.)

SOLICITATION NUMBER: 70Z08221BPACP0100 – DREDGE MOORINGS AT UNITED STATES COAST GUARD STATION

HOUSTON, TX IS AMENDED AS FOLLOWS:

A. THIS AMENDMENT PROVIDES ANSWERS FROM CONTRACTOR’S REQUEST FOR INFORMATION ON ATTACHED PAGE.

B. BID OPENING DATE OF JUNE 14, 2021 IS EXTENDED TO JUNE 16, 2021 AT 2:00 P.M. LOCAL TIME MIAMI, FL.

C. PLEASE RETURN A SIGNED COPY OF THIS AMENDMENT WITH YOUR BID.

D. ALL OTHER TERMS AND CONDTIONS REMAIN UNCHANGED.

15A. NAME AND TITLE OF SIGNER (Type or Print)

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

ADA HOGGARD, CONTRACT SPECIALIST, USCG

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED

16B UNITED STATES OF AMERICA

BY

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070 STANDARD FORM 30 (Rev. 10-83) PREVIOUS EDITION UNUSABLE Prescribed by GSA

FAR (48 CFR) 53.24

GOVERNMENT RESPONSE TO REQUEST FOR INFORMATION (RFI)

1) Does the disposal area currently have a usable water control outlet structure?

The outfall structures are in proper working condition, the contractor will have to monitor the outfall in accordance with contract documents. There is no requirement to construct berms or containment areas.

2) Does the 1,500 CY estimate include the 1’ of overdredge?

Yes, the estimated quantity of 1,500 CY includes 1’ overdredge.

3) Can we work 12 hours per day, seven days per week?

Yes; however, specific schedule/hours shall be coordinated through the Contracting Officer’s Representative

(COR).

4) Page 32 of the solicitation specifies that the estimated cost is between $500,000 and $1,000,000 while on beta.sam.gov it specifies $250,000 - $500,000. Could this be clarified?

The estimated cost is between $500,000 and $1,000,000.

5) Is the contractor to include any disposal fees from the Port of Houston in its pricing or will the US Coast Guard pay for this directly?

No, the Contractor will not include disposal fees to the Port of Houston Authority in their pricing. The U.S.

Coast Guard has coordinated this with the Port of Houston Authority.

6) Section 1B Item 1C states that the dredge material cannot contain free liquids. How is this possible if we are to pump the material from Sims Bayou to the DMPA as shown and specified in the various exhibits?

There is no mentioning about free liquids in the revised contract specifications dated March 2021.

7) What is meant by “pump-out feature” in Section 1B Item 1C?

If desired by the contractor, as part of their means and methods, the material could be excavated mechanically, loading material into a barge, to then use a hydraulic pipeline to transport the sediment from the barge to the placement area. The contractor’s means and methods are determined by the contractor; however the discharge of the dredge sediment shall be via hydraulic pipeline as dump trucks are not allowed on the levees as stated in Specification Section 35 20 23, paragraph 3.3.

8) When was the bathymetric done as shown in the plans?

The hydrographic survey included in Appendix G was conducted in July 2018.

9) The sediment sampling analysis shows that the sediment contains dioxins and organochlorine pesticide constituents above their respective USCG screening limits. The placement area agreement specifically states that the material deposited there cannot be hazardous. Can the owner clarify that it classifies the material as non-hazardous?

The sediment sampling analysis has been reviewed by the U.S. Army Corps of Engineers and has agreed that the chemical analyses do not indicate a concern with the placement of the sediments and the dredge material is accepted for placement in the designated Federal upland placement area.

10) Could the owner provide the contact information for someone at TPC so to coordinate a site visit?

Mr. Michael Bankston, Plant Manager, Michael.Bankston@tpcgrp.com

11) Also, are we expected to dredge underneath the boathouse and boat lifts?

Yes.

END OF QUESTIONS/ANSWERS