Q and A B87 Steam Boilers June 2025.pdf
PDF 49 KB Posted
- Solicitation number
- 70Z08125PELIZ0018
About this file
This document is a Questions and Answers (Q&A) file for the federal contract opportunity to replace Steam Boilers at the USCG Base in Elizabeth City, NC. The Q&A provides critical technical details about the project, including that the existing Building Automation System (BAS) is manufactured by Siemens, and the contractor will be responsible for providing electrical wiring and conduit to new boilers while reusing existing BAS sensors. The boilers should operate independently, and the USCG will handle BAS programming under an existing maintenance contract.
Key logistical details include that no performance or payment bonds are required, no forklift will be available on base for equipment loading, and contractor personnel must be vetted through USCG Security Force for base access. The procurement is 100% set-aside for small businesses with a size standard of $12.5M, using NAICS code 811310. Quotes are due by noon Eastern Time on June 30, 2025, to be submitted via email to Luis.R.Perez1@uscg.mil, with a scheduled site visit on June 24 at 1000 hours. The contract will be awarded on a Lowest Price Technically Acceptable basis as a Firm-Fixed Price contract.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-1449 Clauses and Provisions.pdf | ||
| B87 Riverside boiler replacement SOW.pdf | ||
| Wage Determinations.pdf | ||
| Riverside Steam Boiler SF1442.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
70Z08125QELIZ0018 Q&A
• Question: Will performance and payment bond and/or bid bond required for this project?
Answer: Bonds are not required for this contract
• Could you please confirm the manufacturer of the existing BAS system?
Answer: Siemens. Only BAS piping connection points are required for this project.
Reuse the existing BAS sensors. See paragraph 17, sub paragraph “B”.
Any BAS programming requirements will be handled by the USCG under an existing maintenance contract.
• Are existing BAS control drawings available for review? If so, could those be provided to help clarify tie-in requirements?
Answer: No
• Is the existing boiler system currently stand-alone, or does it already interface with the BAS?
Answer: It is interfaced.
• Is a specific point list or control sequence available for what the BAS needs to monitor and control (e.g., alarms, run status, pressure, temperature)?
Answer: N/A
• Should the contractor provide all new control wiring and conduit from the boiler to the BAS panel, or will existing infrastructure be reused?
Answer: The Contractor provide all electrical wiring and conduit to the new boilers.
The existing BAS controls should be installed in the new boilers at the appropriate location.
• Are there any specific terminal locations or I/O requirements to be met when tying into the BAS?
Answer: N/A
• Should the operational burner controls be fully integrated with the BAS for remote control, or only for monitoring/alarm points?
Answer: The Boilers should operate independently.
• Are there any specific makes or models required for pressure switches, burner controls, or make-up water valves to ensure compatibility with the BAS?
Answer: No
• Will the government or a separate BAS contractor be responsible for programming, commissioning, and integration of BAS points once the field wiring is completed?
Answer: The USCG will handle any programming of the BAS
70Z08125QELIZ0018 Q&A
• Do you have the cut sheets of the existing boilers that can be shared?
Answer: No. The existing Boiler information is included in the Statement of Work, Section 17.
• Who does the Coast Guard Base use for their BAS System?
Answer: Siemens
• Is there a forklift on the base to use for loading /offloading of equipment if needed?
Answer: No.
• Will badges be issued or will they escort for base access?
Answer: Contractor personnel will be vetted through the USCG Security Force for security access to the Base. Upon Security approval of the personnel, employees will present their Drivers Licenses to the Security Gate Guard for Base entry