This is an Amendment of Solicitation/Modification of Contract (Standard Form 30) issued by the Department of Defense, specifically the Naval Supply Systems Command (NAVSUP) at Naval Station Norfolk, Virginia. The amendment is numbered 70Z08026QPBPL00470003, effective August 21, 2026, and modifies solicitation 70Z08026QPBPL0047 dated August 12, 2026.
The amendment serves solely to provide responses to vendor questions regarding the relocation of a P-100 pump in relation to the existing fire main system. The single question-and-answer set addresses whether the contractor is required to furnish and install new suction and discharge piping from the relocated P-100 pump to the existing fire main system, including specifications for piping arrangement, materials, fittings, valve modifications, and check valve considerations. The contracting officer's answer clarifies that there is no piping to move or connect to, thereby eliminating contractor responsibility for this work scope. All other terms and conditions of the original solicitation remain unchanged and in full force and effect. Offerors must acknowledge receipt of this amendment prior to the bid opening date and time specified in the solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70Z08026QPBPL00470004.pdf | ||
| 70Z08026QPBPL00470002_US signed.pdf | ||
| 70Z08026QPBPL00470001.pdf | ||
| 70Z08026QPBPL0047_SOL.pdf | ||
| Attachment 3- SOW Addendum.pdf | ||
| Attachment 2- Specification.pdf | ||
| Attachment 1- Schedule of Services USCGC ROBERT WARD.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
70Z08026QPBPL00470003
Summary of Changes
QUESTIONS & ANSWERS
Questions:
• Is the KTR required to furnish and install new suction and discharge piping from the relocated
P-100 pump to the existing fire main system?
• If so, please provide the applicable piping arrangement/diagram, pipe size, material, fittings, valves, and tie-in locations.
• Is Coast Guard Drawing 154 WPC 521-301-Fire Main System and Magazine Sprinkler
Diagram intended to define this piping work?
• Should existing piping be reused where practical, or should all piping necessary for the relocated pump be considered new Contractor-Furnished material?
• Also, the existing fire main arrangement appears to include check valves that may restrict or prevent flow from the proposed new P-100 location. Please clarify whether any check valves, valves, or associated fire main piping are required to be relocated, reversed, renewed, or otherwise modified to accommodate the new pump location and maintain proper system flow.
Answer:
There isn't any piping to move or connect to.
| Text52: |
| Text54: 1 |
| TOTAL_NO_OF_PAGES: 2 |
| CUST_PROJ_CODE: |
| DOCUMENT_NUMBER: 70Z08026QPBPL00470003 |
| EFFECTIVE_DATE: 2026-08-21T15:22:23.000-04:00 |
| REF_PR_NUM_T: 52000PR260024757 |
| SOL_DOCUMENT_NUMBER: 70Z08026QPBPL0047 |
| SOL_OPEN_BID_DATE: 2026-08-12T12:13:45.000-04:00 |
| NO_OF_COPIES: 1 |
| Check Box91: Yes |
| Check Box92: Off |
| MANUAL_EXTEND_FLAG: N |
| Check Box95: Yes |
| Check Box96: Off |
| Check Box97: Off |
| Check Box98: Off |
| Check Box99: Off |
| Check Box100: Off |
| Check Box101: Off |
| Text1: AMENDMENT CONTROL NUMBER : |
| HDR_DOCUMENT_NUMBER: 70Z08026QPBPL0047 |
| Text134: SUMMARY OF CHANGES : |
| AMENDMENT_DESCRIPTION: AMEND-The purpose of this amendment is to provide responses to vendor questions. All other terms and conditions remain the same. |
| Text2: Same As Issuing Office |
| AMD_ISSUING_OFFICE_LADDR: 70Z080 CPD 1 - Norfolk, VA |
Commander, USCG-SFLC-CPD 1, 300 East Main Street, Suite 550 Norfolk, VA, 23510, US
AMD_ISSUING_OFFICE_LOCCODE: 70Z080
File details come from the government source that posted it. Updated .