LEGARE (WMEC 270B) DD FQ3 CNJ 20ED2_BLANK.xls
XLS spreadsheet 33 KB Posted
- Attached to
- FY20 DRYDOCK REPAIR for USCGC LEGARE
- Solicitation number
- 70Z080-20-Q-P4522900
About this file
This combined synopsis and solicitation requests quotations for drydock repairs of the USCGC Legare. The Coast Guard seeks a contractor to perform various repair and maintenance work on the cutter at the contractor's drydock facility between March and May 2020. Services include ship repair, preservation, inspection and testing of hull structures, propulsion systems, sea valves and other areas. Quotations are due by December 6, 2019 with award of a firm fixed price contract to follow. The solicitation is designated as unrestricted full and open competition under FAR Parts 12 and 13.5 for commercial items with a NAICS code of 336611 and small business size standard of 1,250 employees.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOS&S
| PRICING SCHEDULE FOR: | |||||
| USCGC LEGARE (WMEC-270B) DRYDOCK AVAILABILITY FY2020 | |||||
| ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| D-001 | Hull Plating (U/W Body), Ultrasonic Testing | JOB | 1 | ||
| D-002 | U/W Body, Preserve (100%) | JOB | 1 | ||
| D-003 | Propulsion Shaft Fairwaters and Rope Guards, Inspect | JOB | 1 | ||
| D-004 | Appendages (U/W), Leak Test | JOB | 1 | ||
| D-005 | Appendages (U/W) – Internal, Preserve | JOB | 1 | ||
| D-006 | Voids (Non-Accessible), Leak Test | JOB | 1 | ||
| D-007 | Voids (Non-Accessible), Internal Surfaces, Preserve | JOB | 1 | ||
| D-008 | Propulsion Shafting, Strain Gage Alignment, Inspect | JOB | 1 | ||
| D-009 | Propulsion Shafting; Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-010 | Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or Renew | JOB | 1 | ||
| D-011 | Propulsion Shaft Bearings (External), Renew | JOB | 1 | ||
| D-012 | Controllable Pitch Propeller (CPP) System, Inspect and Service | JOB | 1 | ||
| D-013 | Sea Valves and Waster Pieces, Overhaul Or Renew | JOB | 1 | ||
| D-014 | Sea Strainers - Duplex (All Sizes), Overhaul | JOB | 1 | ||
| D-015 | Sea Strainers - Simplex (All Sizes), Clean and Inspect | JOB | 1 | ||
| D-016 | Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or Renew | JOB | 1 | ||
| D-017 | Superstructure, Preserve “Partial” | JOB | 1 | ||
| D-018 | Cathodic Protection / Zinc Anodes, Renew | JOB | 1 | ||
| D-019 | Drydock | JOB | 1 | ||
| D-020 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| D-021 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| D-022 | Doppler Speed Log, Replace | JOB | 1 | ||
| D-023 | Wardroom Overhead, Renew | JOB | 1 | ||
| D-024 | Hangar Superstructure, Renew | JOB | 1 | ||
| D-025 | Weather Deck Drains, Renew | JOB | 1 | ||
| D-026 | Watertight Scuttle (Internal, DC Deck and Below), Renew | JOB | 1 | ||
| D-027 | Weather Tight Doors, Renew | JOB | 1 | ||
| D-028 | Watertight Hatches (External Above DC Deck), Renew | JOB | 1 | ||
| D-029 | Fuel Oil Piping, Renew | JOB | 1 | ||
| D-030 | MDE Jacket Water Piping, Renew | JOB | 1 | ||
| D-031 | Life Raft Release Levers, Renew | JOB | 1 | ||
| D-032 | Diesel Oil Storage Tank TLI Cabling, Renew | JOB | 1 | ||
| D-033 | Hull Plating, Renew | JOB | 1 | ||
| D-034 | Bilges, Preserve | JOB | 1 | ||
| D-035 | Helo Hangar Door, Renew | JOB | 1 | ||
| D-036 | Tanks (Potable Water), Preserve “100%” | JOB | 1 | ||
| D-037 | Hull Plating Freeboard, Preserve – Partial | JOB | 1 | ||
| D-038 | Propulsion Stern Tube Bearings, Renew | JOB | 1 | ||
| D-039 | Controllable Pitch Propeller Hubs, Remove, Inspect and Reinstall | JOB | 1 | ||
| D-040 | Propulsion Intermediate Shaft(s); Remove, Inspect, and Reinstall | JOB | 1 | ||
| D-041 | Controllable Pitch Propellers, Clean and Inspect | JOB | 1 | ||
| D-042 | Fathometer Transducer, General Maintenance | JOB | 1 | ||
| D-043 | Rudder Assemblies; Remove, Inspect And Reinstall | JOB | 1 | ||
| D-044 | Tanks (Ballast), Preserve Partial | JOB | 1 | ||
| O-045 | Propulsion Shaft Coating, Renew | EA | 2 | ||
| O-046 | Propeller Shaft Sleeve(s), Renew | EA | 2 | ||
| O-047 | Stern Tube Interior Surfaces, Preserve 100% | EA | 2 | ||
| O-00A | Composite Labor Rate | Hour | 2870 | ||
| D-00B | GFP Report | NSP | EA | NSP | |
| D-00C | Travel and Perdiem | $0.00 | JOB | $0.00 | |
| O-00Z | Laydays | Day | 5 | ||
| Total Price of Definite Items | |||||
| Total Price of Option Items | |||||
| Total Price of Definite and Optional Items |
&C(10/7/2019) Draft-2 - Page &P of &N
File details come from the government source that posted it. Updated .