LEGARE (WMEC 270B) DD FQ3 CNJ 20ED2_BLANK.xls

XLS spreadsheet 33 KB Posted

Attached to
FY20 DRYDOCK REPAIR for USCGC LEGARE
Solicitation number
70Z080-20-Q-P4522900
Issued by

About this file

This combined synopsis and solicitation requests quotations for drydock repairs of the USCGC Legare. The Coast Guard seeks a contractor to perform various repair and maintenance work on the cutter at the contractor's drydock facility between March and May 2020. Services include ship repair, preservation, inspection and testing of hull structures, propulsion systems, sea valves and other areas. Quotations are due by December 6, 2019 with award of a firm fixed price contract to follow. The solicitation is designated as unrestricted full and open competition under FAR Parts 12 and 13.5 for commercial items with a NAICS code of 336611 and small business size standard of 1,250 employees.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC LEGARE (WMEC-270B) DRYDOCK AVAILABILITY FY2020
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Hull Plating (U/W Body), Ultrasonic TestingJOB1
D-002U/W Body, Preserve (100%)JOB1
D-003Propulsion Shaft Fairwaters and Rope Guards, InspectJOB1
D-004Appendages (U/W), Leak TestJOB1
D-005Appendages (U/W) – Internal, PreserveJOB1
D-006Voids (Non-Accessible), Leak TestJOB1
D-007Voids (Non-Accessible), Internal Surfaces, PreserveJOB1
D-008Propulsion Shafting, Strain Gage Alignment, InspectJOB1
D-009Propulsion Shafting; Remove, Inspect, and ReinstallJOB1
D-010Propulsion Shaft Seal (Mechanical And Inflatable) Assemblies, Inspect And Repair Or RenewJOB1
D-011Propulsion Shaft Bearings (External), RenewJOB1
D-012Controllable Pitch Propeller (CPP) System, Inspect and ServiceJOB1
D-013Sea Valves and Waster Pieces, Overhaul Or RenewJOB1
D-014Sea Strainers - Duplex (All Sizes), OverhaulJOB1
D-015Sea Strainers - Simplex (All Sizes), Clean and InspectJOB1
D-016Fin Stabilizers (Bearings, Packing, Stock/Blade), Repair or RenewJOB1
D-017Superstructure, Preserve “Partial”JOB1
D-018Cathodic Protection / Zinc Anodes, RenewJOB1
D-019DrydockJOB1
D-020Temporary Services, Provide - CutterJOB1
D-021Sea Trial Performance, Support, ProvideJOB1
D-022Doppler Speed Log, ReplaceJOB1
D-023Wardroom Overhead, RenewJOB1
D-024Hangar Superstructure, RenewJOB1
D-025Weather Deck Drains, RenewJOB1
D-026Watertight Scuttle (Internal, DC Deck and Below), RenewJOB1
D-027Weather Tight Doors, RenewJOB1
D-028Watertight Hatches (External Above DC Deck), RenewJOB1
D-029Fuel Oil Piping, RenewJOB1
D-030MDE Jacket Water Piping, RenewJOB1
D-031Life Raft Release Levers, RenewJOB1
D-032Diesel Oil Storage Tank TLI Cabling, RenewJOB1
D-033Hull Plating, RenewJOB1
D-034Bilges, PreserveJOB1
D-035Helo Hangar Door, RenewJOB1
D-036Tanks (Potable Water), Preserve “100%”JOB1
D-037Hull Plating Freeboard, Preserve – PartialJOB1
D-038Propulsion Stern Tube Bearings, RenewJOB1
D-039Controllable Pitch Propeller Hubs, Remove, Inspect and ReinstallJOB1
D-040Propulsion Intermediate Shaft(s); Remove, Inspect, and ReinstallJOB1
D-041Controllable Pitch Propellers, Clean and InspectJOB1
D-042Fathometer Transducer, General MaintenanceJOB1
D-043Rudder Assemblies; Remove, Inspect And ReinstallJOB1
D-044Tanks (Ballast), Preserve PartialJOB1
O-045Propulsion Shaft Coating, RenewEA2
O-046Propeller Shaft Sleeve(s), RenewEA2
O-047Stern Tube Interior Surfaces, Preserve 100%EA2
O-00AComposite Labor RateHour2870
D-00BGFP ReportNSPEANSP
D-00CTravel and Perdiem$0.00JOB$0.00
O-00ZLaydaysDay5
Total Price of Definite Items
Total Price of Option Items
Total Price of Definite and Optional Items

&C(10/7/2019) Draft-2 - Page &P of &N

File details come from the government source that posted it. Updated .