ATTACHMENT-1_SCHEDULE_FOR_CGC_TERRAPIN_DD.xlsx
XLSX spreadsheet 19 KB Posted
- Attached to
- USCGC TERRAPIN DRYDOCK Federal contract opportunity
- Solicitation number
- 70Z080-20-Q-P4500400
About this file
Attachment-1 Schedule of Services
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| CLARIFICATION_CGC_TERRAPIN_DD_FY20_nmb.pdf | ||
| SF30_AMEND_A00001_CGC_TERRAPIN_70Z080-20-Q-P4500400.pdf | ||
| ATTACHMENT-4_Notice_for_Filing_Agency_Protest.pdf | ||
| ATTACHMENT-2_SPECIFICATION_TERRAPIN_R0_dtd_042519_jeb.pdf | ||
| ATTACHMENT-5_Past_Performance_Questionnaire.pdf | ||
| SOLC_COMBINED_SYNOPSIS_USCGC_TERRAPIN_DRYDOCK_FY20.pdf | ||
| ATTACHMENT-3_Technical_Evaluation_Factors_TERRAPIN_FY20_DD2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT-1
| ATTACHMENT-1 SCHEDULE FOR 70Z080-20-Q-P4500400: |
| USCGC TERRAPIN (WPB-87) DRYDOCK AVAILABILITY FY2020 |
| AFC | ITEM | DESCRIPTION | UNIT PRICE | UNIT | QTY | EXTENDED PRICE |
| 45 | D-001 | Structural Analysis, 3D Laser Scan, Perform | JOB | 1 | ||
| 45 | O-002 | Ultrasonic Thickness Measurements, Perform | JOB | 1 | ||
| 45 | D-003 | U/W Body, Preserve (100%) | JOB | 1 | ||
| 30 | D-004 | Hull Plating Freeboard, Preserve “100%” | JOB | 1 | ||
| 45 | D-005 | Tank, Dirty Oil, Clean and Inspect | JOB | 1 | ||
| 45 | D-006 | Tank, Oily Water, Clean and Inspect | JOB | 1 | ||
| 45 | D-007 | Tanks (Mp Fuel Service), Clean And Inspect | JOB | 1 | ||
| 30 | D-008 | Decks, Exterior (Main Deck), Preserve | JOB | 1 | ||
| 45 | O-009 | Capastic Fairing, Depth Sounder, Renew | JOB | 1 | ||
| 45 | O-010 | Main Engine/Reduction Gear, Realign | JOB | 1 | ||
| 45 | D-011 | Intermediate Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | ||
| 45 | D-012 | Aft Water-Lubricated Propulsion Shaft Bearings, Renew | JOB | 1 | ||
| 45 | O-013 | Intermediate Bearing Carriers, Renew | JOB | 1 | ||
| 45 | O-014 | Aft Bearing Carriers, Renew | JOB | 1 | ||
| 45 | D-015 | Stern Tube Interior Surfaces, Preserve 100% | JOB | 1 | ||
| 45 | D-016 | Propellers, Renew | JOB | 1 | ||
| 45 | D-017 | Speed Log, Skin Valve, Renew | JOB | 1 | ||
| 45 | D-018 | Sea Water System, Perform Maintenance | JOB | 1 | ||
| 45 | D-019 | Stern Launch Door, Remove, Inspect and Reinstall | JOB | 1 | ||
| 45 | D-020 | Cathodic Protection/Zinc Anodes, Renew | JOB | 1 | ||
| 45 | D-021 | Drydock | JOB | 1 | ||
| 45 | D-022 | Temporary Services, Provide - Cutter | JOB | 1 | ||
| 45 | D-023 | Sea Trial Performance, Support, Provide | JOB | 1 | ||
| 45 | D-024 | Fathometer Transducer, Renew | JOB | 1 | ||
| 45 | D-025 | Oily Water Separator, Remove | JOB | 1 | ||
| 45 | D-026 | Propulsion Shaft and Shaft Seals, Replace | JOB | 1 | ||
| 45 | D-027 | Rudder Assemblies, Renew | JOB | 1 | ||
| 45 | D-028 | Main Mast, Modify | JOB | 1 | ||
| 45 | D-029 | Interior Deck Covering System, Renew | JOB | 1 | ||
| 45 | D-030 | Multi-Cable Transit Assembly, Renew | JOB | 1 | ||
| 45 | D-031 | Critical Coated Surface(s), Preserve | JOB | 1 | ||
| 45 | D-032 | Windows, Pilothouse, Renew | JOB | 1 | ||
| 45 | D-033 | Stanchion(s), Repair | JOB | 1 | ||
| 45 | D-034 | Pilothouse Deck, Inspect and Preserve | JOB | 1 | ||
| O-00A | Composite Labor Rate | Hour | 350 | $0.00 | ||
| D-00B | GFP Report | NSP | EA | NSP | ||
| O-00Z | Laydays | Day | 5 | $0.00 | ||
| Total Price of Definite Items | $0.00 | |||||
| Total Price of Option Items | $0.00 | |||||
| Total Price of Definite and Optional Items | $0.00 |
File details come from the government source that posted it.