12/08/2017:

Clarification to Solicitation 70Z080-18-Q-P4503000 – Drydock Repairs to

USCGC SEA LION (WPB-87352)

1. Regarding Specification Work Item 32: Temporary Services, Provide – Cutter Paragraph C 3.3.10.1 Instructs Contractor to provide Potable Water;

unlimited gallons per day.

Question: Contractor requests that the Government provide a gallon per day amount for billing purposes?

CG Response: Potable water will only be required during short-tie period (before and after drydock).

2. Regarding Specification Work Item 32: Temporary Services, Provide – Cutter Paragraph 3.3.9 Instructs Contractor to provide Heavy Lift equipment: 3 day(s).

Question: Contractor requests a clarification of the hours duration per day, is a work shift hours per day or a 24 hours day, and also how many lifts per day?

CG Response: Below addresses Heavy Lift Equipment, an excerpt taken from the SFLC STD Spec 8635; the requirement is in intervals but will be required during a standard 8 hour work day.

SFLC Std Spec 8635 states: Heavy lift equipment. Provide heavy lift equipment services for use by the COR upon request, in minimum 15-minute increments, with at least four working hours notice, in the form of a crane or a forklift, with operator and riggers. Ensure that crane and associated weight handling gear and equipment, have a minimum two-ton lift capacity and an outreach sufficient to reach an offload point on the forecastle, fantail, or flight deck, as applicable.