CRAC (COMPUTER ROOM AIR CONDITIONING) UNIT REMOVAL AND INSTALLATION FOR USCG D17 JUNEAU ALASKA
Solicitation number
70Z04519-Q-JCD00500
Issued by

About this file

Questions/Responses

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

D17 CRAC UNIT REPLACEMENT

QUESTIONS: RESPONSES

1. Clarification on the existing system:

SOW Section 1.0: CRAC Units 1 and 2 serving the District spaces are designed to run simultaneously. CRAC Units 5 and 6 serving the Sector spaces are designed to run in a lead/lag operation. New units shall be programmed to match the existing operational run design.

2. Clarification on the control panel:

SOW Section 2.0E: The existing control panel is in room 672 and controls CRAC Units for the District spaces, Sector spaces, and the Server Room in room 638. The existing controls for the CRAC units in the Server Room shall remain in place, and the CRAC units in the Server Room shall remain in continuous operation. New digital controls for the CRAC Units 1 and 2 serving the District spaces shall be located in room 611 at a location acceptable to the Coast Guard. New digital controls for CRAC Units 5 and 6 serving the Sector spaces shall be located in room 672 in the vicinity of the existing controls at a location acceptable to the Coast Guard.

3. CRAC Units located in Room 638 are NOT included in this solicitation.