This is a Questions and Answers document for federal contract opportunity 70Z03826QK0000014 related to a test stand procurement by the U.S. Coast Guard (USCG).
The document addresses six key inquiries from potential bidders regarding technical documentation, automation requirements, and testing procedures for a replacement Automated Engine Component Test Stand (AECTS). Regarding required technical documents, the USCG clarified that CGTO (Component General Technical Order), DMWR (Depot Maintenance Work Requirements), and CMM (Component Maintenance Manual) documents will not be provided by the Government; instead, vendors certified through the Defense Logistics Agency's Joint Certification Program (JCP) must obtain access independently. Vendors seeking DLA JCP certification should initiate the DS-2345 process, though the bidding phase is not considered part of the contract period of performance. The USCG requires a fully automated test stand with manual operation capability to support generators for the H-65, MH-60T, HC-144, HC-27, C-130H, and C-130J aircraft. Existing equipment drawings and technical data are proprietary to Testek (the incumbent contractor), and the USCG cannot provide this information; however, existing dimensions are referenced in SOW Section 5.2. Regarding testing and acceptance, Government test procedures cannot be shared without prior authorization but closely mirror industry standards for each specified hardware component. Pass/fail criteria and acceptance procedures similarly cannot be disclosed prior to authorization.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 9 – Questions and Answers – 70Z03826QK0000014
7. The SOW states the test stand should be capable of supporting generators for the H- 65, MH-60T, HC-144, HC-27, C-130H and C-130J. Paragraph 3.0 (Governing Documents) also lists several CGTO, DMWR, and CMMs as the “contractor shall adhere to”. These are necessary documents to provide an accurate proposal. Will the Government make these documents available for interested bidders on this project?
No, these documents will be available through the Defense Logistics Agency’s (DLA) Joint Certification Program (JCP).
CGTO – If a vendor is certified in DLA JCP, then DLA has verified that they have access to the manuals for maintenance, repair, or overhauls of the components.
DMWR – The USCG cannot provide this as it is controlled by the U.S. Army.
CMM – This is proprietary to the OEM, the USCG cannot provide.
8. In SOW Paragraph 3.1 states “contractor must have access to technical documents throughout the period of performance of this contract. “Is the bidding phase considered part of the “period of performance of this contract”? If so, who should I send our DS-2345 to, to begin the process to obtain the documents?
No, the period of performance is to be determined upon contract award.
CGTO - If a vendor is certified in the Defense Logistics Agency’s (DLA) Joint Certification Program (JCP), then DLA has verified that they have access to the manuals for maintenance, repair, or overhauls of the components.
DMWR – The U.S Army, The USCG does not have contact information.
CMM – OEM, The USCG does not have contact information.
9. I don’t see reference to automation in the SOW. Does the Government wish to have an automated test stand delivered or will a fully manual test stand meet all expectations?
The USCG requests a fully automated test stand with the capability of manual operation.
10. Existing Equipment Drawings: Are drawings, schematics, interface documents, or other technical information available for the existing AECTS/test stand, including electrical and mechanical interfaces, dimensions, utility connections, and anchoring details?
The existing equipment drawings and technical data are proprietary to Testek and the USCG does not have the authority to give out this information.
The existing dimensions are listed in SOW Section 5.2.
Attachment 9 – Questions and Answers – 70Z03826QK0000014
11. Testing Procedures: Are Government test procedures or protocols available that define the required factory runoƯ, installation/commissioning, and/or acceptance testing for the replacement system?
Test procedures cannot be shared without prior authorization; Government test procedures closely mirror the industry standard for each piece of hardware listed in the SOW.
12. Pass/Fail Criteria: What specific acceptance criteria will the Government use to determine whether the equipment has successfully completed testing and commissioning? If documented pass/fail criteria, test sheets, or acceptance procedures exist, could those please be provided?
This cannot be provided; test procedures cannot be shared without prior authorization; Government test procedures closely mirror the industry standard for each piece of hardware listed in the SOW.