A00002 - Revised - Attachment 3 - Statement of Work - 70Z03826QJ0000087.pdf
PDF 360 KB Posted
- Attached to
- Pilot Corner Cir BR
- Solicitation number
- 70Z03826QJ0000087
About this file
This is a Statement of Work (SOW) for the United States Coast Guard (USCG) Aviation Logistics Center (ALC) for the manufacture of aircraft parts supporting Programmed Depot Maintenance (PDM) efforts. The requirement is for the production of 10 units of Pilot Corner Circuit Breaker parts (Part Number 1016M60T100-10, NSN 1560-01-HS1-9498). Contractors who have not previously passed Form, Fit, and Function (FFF) testing must submit one first article within 60 calendar days of order receipt for testing on Government aircraft, with Contracting Officer approval/disapproval notification required within 90 calendar days. All manufacturing must comply with specified ALC drawings (1016M60T100 through 1016M60T330 and related drawings 985-9, 985-591-28-5, PL985-591-28-5, and WL985-591-28-5) and include documentation certifying conformance before payment. Contractors must provide all necessary materials, labor, tooling, and facilities for manufacturing, which may include deburring, marking, testing, and applying finishes as outlined in applicable drawings.
Quality requirements mandate ISO 9001-2000 certification or equivalent, with contractors responsible for all inspections, tests, and calibrations to verify conformance to Government specifications. Access to technical drawings requires registration in the Defense Logistics Agency's Joint Certification Program (JCP) and completion of a Non-Disclosure Agreement (DHS Form 11000-6) submitted to Cindy.K.Harmes@uscg.mil; documents will be released only to U.S. businesses, with foreign entity access requiring valid Technical Assistance Agreements and DSP-5 authorizations. The Government will furnish 13 Bus Bar Conductors per kit (NSN 6150-01-258-2389, Part Number 70550-01018-116). Delivery requirements include the first article due within 60 calendar days after receipt of order (ARO), nine production units due within 30 calendar days upon favorable FFF test results, and ten additional units due within 60 calendar days ARO for contractors with prior FFF approval. All parts must include Certificates of Conformance (IAW FAR 52.246-15) packaged with each unit, and contractors must provide their standard warranty terms with proposals.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
A00002 - REVISED – ATTACHMENT 3 – STATEMENT OF WORK
70Z03826QJ0000087
1.0 Scope
1.1 This requirement is for the manufacture of the aircraft parts listed in the Attachment 1 –“Schedule with First Article - 70Z03826QJ0000087” for any offeror who has not successfully passed a Form, Fit, and Function (FFF) test, or Attachment 2 – “Schedule - 70Z03826QJ0000087” for any offeror that has successfully passed a FFF test by the United States Coast Guard (USCG) Aviation Logistics Center (ALC), the contractor need not submit a first article.
1.2 The objective for the Contractor is to provide the Aviation Logistics Center (ALC) with the item below to support our Programmed Depot Maintenance (PDM) efforts.
Nomenclature Quantity National Stock Number Part Number Pilot Corner Cir BR 10 1560-01-HS1-9498 1016M60T100-10
2.0 Major Tasks
2.1 Work under this Purchase Order shall be performed at the Contractor’s facility or USCG approved facility. The Contractor shall provide all necessary materials, labor, tooling, and facilities to manufacture the parts listed in the Schedule. The Contractor shall manufacture the parts in accordance with (IAW) the ALC Drawing Numbers specified in Section 3.1. Attachment 1 – “Schedule with First Article – 70Z03826QJ0000087”, Contract Line-Item Number (CLIN) 1 are subject to first article testing IAW Federal Acquisition Regulation (FAR) 52.209-4 (Deviation 25-27). All services shall be accomplished as directed by the Government. Requests for clarification shall be directed to the Contracting Officer.
2.2 First Article
Any Contractor that has not previously passed FFF testing shall provide a quantity of one (1) each of line items 1, Attachment 1 – “Schedule with First Article – 70Z03826QJ0000087”, within sixty (60) days of receipt of the resulting purchase order. The First Article will be tested on Government aircraft at ALC within sixty (60) days of receipt. Upon successful completion form, fit, and function testing on the aircraft by the Government, USCG Engineering will approve the unit for the production phase. The Contracting Officer (KO) will notify the Contractor in writing of conditional approval, approval, or disapproval of the first article within ninety (90) calendar days after receipt of the first article. This approval process is only required for first article units. Any production unit sent to the USCG without approval will be returned at the offeror’s expense
2.3 Manufacture
The items are to be manufactured as given in the ALC drawing specified in 3.0. Documentation certifying that these items are in compliance with the ALC drawing must be provided with each item. Payments will not be made until these certifications are received. The prices in Attachment 1 – “Schedule with First Article – 70Z03826QJ0000087” or Attachment 2 – “Schedule – 70Z03826QJ0000087” for the manufacture of this item shall include all requirements outlined in the relevant ALC drawing in 3.0. These requirements may include but are not limited to: deburring, marking, testing, and applying finishes.
(Remainder of this Page Intentionally Left Blank)
3.0 USCG Documents
3.1 Applicable Documents
Drawings for 1016M60T100-10 Pilot Corner Cir BR which includes the manufacturing and installation of the wiring harness are listed below:
1016M60T100 1016M60T300 1016M60T303 1016M60T304 1016M60T305 1016M60T306 1016M60T307 1016M60T308 1016M60T310 1016M60T320 1016M60T330 985-9 985-591-28-5
PL985-591-28-5
WL985-591-28-5
3.2 Access to Documents
Drawings are available from the USCG. Before obtaining copies of these documents, Contractors shall be registered in the Defense Logistics Agency's (DLA) Joint Certification Program (JCP). More information on this certification can be found at http://www.dlis.dla.mil/jcp/Default.aspx. After ensuring registration, the Contractor shall complete Attachment 4 – DHS Form 11000-6, Non-Disclosure Agreement, specifically the section regarding “Other Sensitive but Unclassified (SBU)” information. A written request for access to the drawings should be submitted to Cindy.K.Harmes@uscg.mil along with proof of JCP registration and the completed DHS-11000-6.
3.3 The USCG will only release these documents to United States (U.S.) businesses that have followed the above procedures. The documents will not be released to any foreign entity. If the U.S.
business plans to release these documents to any foreign entity, they must first provide the USCG with a copy of a valid Technical Assistance Agreement (TAA) and DSP-5 authorizing release to that entity.
4.0 Quality
4.1 Quality Control
The Contractor is required to be certified and maintain a quality system that complies with the requirements of ISO 9001-2000 Quality Management Systems – Requirements or equivalent. The Contractor is responsible for performing or assuring all inspections, tests and calibration necessary to substantiate that the goods or services furnished conform to Government’s requirements. The Contractor shall take prompt action to correct conditions that have or could result in goods or services that do not conform to contractual requirements. Records of conformance shall be maintained on file at the Contractor’s facility and made available or provided for review by the Government upon request. The Government reserves the right to conduct surveillance at Contractor’s facility to verify the existence, adequacy and effectiveness of the quality system. Upon request of the Government, the Contractor(s) shall forward a copy of their current certification and Quality Assurance Manual for review.
5.0 Government Furnished Property
The Government will furnish the following resources to the contractor in support of this purchase order:
NSN: 6150-01-258-2389/Part Number: 70550-01018-116, Nomenclature: Bus Bar, Conductor (13 each per kit), Pilot Corner Circuit Breaker NSN: 1560-01-HS1-9498; Part Number 1016M60T100-10
6.0 Warranty
The Contractor’s standard warranty for manufactured parts shall be provided with the quotation and shall be incorporated into the purchase order.
7.0 Records and Reports
7.1 All manufactured parts under the provisions of this Purchase Order must be suitable for installation on USCG aircraft. The Contractor shall furnish a Certificate of Conformance (COC) IAW FAR 52.246-15 for all components. These forms shall be packaged with each part.
8.0 Delivery Requirements
8.1 Government Requested Delivery for Priced CLINs
The following table shows the requested delivery for each priced CLIN listed in the schedule. Early deliveries, when appropriate, are desired and acceptable.
(Remainder of this Page Intentionally Left Blank)
CLINs Item Description Quantity Due No Later Than:
1 Attachment 1 – “Schedule with First
Article – 70Z03826QJ0000087” 1 Sixty (60) calendar days after receipt of order (ARO).
2 Attachment 1 – “Schedule with First
Article – 70Z03826QJ0000087” Production Buys
9 Thirty (30) calendar days upon a favorable Form, Fit, and Function test of CLIN 1.
1 Attachment 2 – “Schedule –
70Z03826QJ0000087”
10 Sixty (60) calendar days ARO.
File details come from the government source that posted it. Updated .