Questions and Answers.pdf
PDF 68 KB Posted
- Solicitation number
- 70Z03625Q0069-0002
About this file
This document is a Questions and Answers document for the USCG Air Station Savannah Emergency Generator Replacement project, Solicitation #70Z03625Q0069-0002, published on September 8, 2025. The Q&A addresses four key technical clarifications for potential contractors, including confirmation that only a day tank inside the Generator Building will be removed and replaced, site voltage is 220 volts, the required diesel generator day tank size is 25-30 gallons, and transfer switch specifications are a 200-amp and a 70-amp switch, contrary to previous solicitation language. The document provides critical technical details to help bidders accurately understand the project scope and equipment requirements for the emergency generator replacement at the U.S. Coast Guard Air Station in Savannah.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF-30.pdf | ||
| INVOICE INSTRUCTIONS AND CLAUSES.pdf | ||
| DAVIS BACON ACT WAGE DETERMINATION GA20250317.pdf | ||
| Construction Clauses and Provisions.pdf | ||
| SF-1442.pdf | ||
| STATEMENT OF WORK.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCG Air Station Savannah Emergency Generator Replacement Solicitation #70Z03625Q0069-0002
Questions and Answers
Published: September 8, 2025
Question 1: Since we will need to remove the side lattice wall in order to take the tank out, should we reinstall the lattice wall afterward, or is the plan to repurpose that space and have us remove and dispose of it?
Answer The 950 gallon tank does not need to be removed. There is a day tank inside the Generator Building and that is what is being removed and replaced.
Question 2: What is the site voltage for this project?
Answer: It is 220 volts.
Question 3: What is the required fuel tank size for the diesel generator?
Answer: The Statement of Work says a 25-to-30 gallon day tank is the required size.
Question 4: Can you clarify what is meant by “two 200-amp transfer switches with 42 circuit load center”? Does this refer to a residential-style ATS?
Answer: The Statement of Work has the transfer switches as a 200 and a 70 amp, not two 200 amp switches. There is no 42 circuit load center as that was in the previously Statement of Work on the original solicitation that was previously cancelled.