QuestionsAnswers_70Z03325Q201900001_Annual Fire Protection System Inspection.pdf

PDF 37 KB Posted

Attached to
Annual Fire Protection System Inspection
Solicitation number
70Z03325Q201900001
Issued by

About this file

This document is a Questions & Answers file for Solicitation 70Z03325Q201900001 for an Annual Fire Protection System Inspection at USCG Air Station Port Angeles, Washington. The Q&A provides technical details about the facility's fire protection systems, including that both electric and diesel fire pumps have 2000 GPM ratings at 80 psi, and the site contains two Clean Agent systems: (1) Fike FM 200 @ 561 lb 8oz and (2) Fike FE 227 @ 833 lb. The responses also confirm that monthly churn testing and monthly inspections are completed by on-site personnel, supplementing the annual inspection requirement.

The associated federal contract opportunity is a small business set-aside solicitation for professional fire protection system inspection services, classified under NAICS code 541990. The contract will be a firm fixed price purchase order, with quotes due on 06/11/25 at 3pm PST. Quotes must be submitted on SF 1449 with a cost breakdown to Patrick.R.Gittings@uscg.mil. The government intends to award to the lowest-priced, technically acceptable quote, with contractors required to be registered in the System Award Management (SAM) prior to award.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions & Answers for:

70Z03325Q201900001

Annual Fire Protection System Inspection

06JUN2025

Q: What are the GPM ratings for the diesel and electric fire pumps?

A: Both the electric and diesel fire pumps GPM ratings are 2000 at 80 psi.

Q: Are Clean Agent and/or Halon systems present onsite? If so, could you please provide:

The make and model of the systems?

The quantity and size of each tank?

A: (1) Fike FM 200 @ 561 lb 8oz

(2) Fike FE 227 @ 833 lb

Q: Are any of the following required beyond the stated annual testing:

NFPA Weekly Churn Test for the Diesel Fire Pump NFPA Monthly Churn Test for the Electric Fire Pump NFPA Quarterly Inspections for the Fire Sprinkler System

A: Monthly Churn testing and monthly inspections are completed by on-sire personnel.

File details come from the government source that posted it. Updated .