This is a Statement of Work (SOW) for the installation of snow guards at the United States Coast Guard Sector Field Office in Grand Haven, Michigan. The project scope requires contractors to install rail-type, flat-mounted snow guards along the Northeast section of the roof to prevent snow and ice accumulation from falling onto condensing units. The snow guards must match the dimensions, appearance, and placement of existing snow guards already installed on the Northwest side of the roof. Materials must include ASTM B209 aluminum brackets and baseplate with clear anodized finish, and ASTM B221 aluminum bars with round profile, also clear anodized. Snow guards must withstand temperature changes from ambient to 120°F and material surface temperatures to 180°F, resist gravity loads, and prevent fastener disengagement. The contractor must provide a certified statement from the manufacturer confirming that the existing roof warranty remains unaffected by the work.
All work must be completed within 45 calendar days from the contract award date and performed during normal business hours (Monday-Friday, 0800-1700 EST) at 650 S Harbor Drive, Grand Haven, MI 49417. The contractor must employ personnel experienced in installing snow guards on TPO roofing systems and provide all materials, tools, labor, and equipment necessary for completion. The Government will furnish 110/120V power and water access as needed. The Contracting Officer's Representative will review completed work for acceptance, with notifications provided via email. Site visits are highly encouraged prior to proposal submission. The point of contact is LT Lisa Pietruszka at (616) 850-2502 or Lisa.M.Pietruszka@uscg.mil. The procurement is estimated below $25,000 and falls under NAICS code 238160 (Roofing Contractors) with a small business size standard of $19.0 million.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
Install Snow Guard at SFO Grand Haven, MI
1.0 GENERAL
The United States Coast Guard (USCG) Sector Field Office (SFO) in Grand Haven, MI is seeking to negotiate a contract for the installation of snow guards on the unit’s Northeast portion of the roof. Contractors are required to review the full Statement of Work (SOW) and are highly encouraged to visit the site to assess current conditions prior to submitting a proposal. Following the contract award, a pre-construction conference will be held at Coast Guard Sector Field Office Grand Haven.
1.1 BACKGROUND
Harsh winter conditions have caused snow to build up and fall from the roof causing an increased risk of damage to the condensing units located outside the Northeast section of the building. After a recent snowstorm, the unit noticed ice and snow once accumulated on the roof has fallen off onto the condensing units and almost severely damaging them. The unit desires to install snow guards on this portion of the roof to reduce snow falling from roof and damaging the condensing units.
1.2 SCOPE
· Install rail-type, flat mounted snow guards along the Northeast sections of the SFO Grand Haven roof. Match and mirror dimensions, appearance, product data, and placement of existing snow guards already placed on Northwest side of roof to the desired side of roof, as shown in drawing set provided.
· Snow guards shall withstand exposure to weather and resist thermally induced movement without failure, rattling, or fastener disengagement due to defective manufacture, fabrication, installation, or other defects in construction.
a. Temperature Change: 120 deg F, ambient; 180 deg F, material surfaces.
· Snow guards shall withstand the effects of gravity loads, and following loads and stresses within limits and under conditions indicated.
· Rail-Type, Flat-Mounted Snow Guards:
a. Description: Units fabricated from metal baseplate anchored to fixed bracket and equipped with one bar(s), rail(s), or pipe(s).
b. Brackets and Baseplate: ASTM B209 aluminum; clear anodized.
c. Bars: ASTM B221 aluminum; clear anodized.
i. Profile: Round.
· Provide certified statement from manufacturer that existing roof warranty has not been affected by work performed under this Scope.
1.3 OBJECTIVE
The objective is to install snow guards on the Northeast section of the roof to reduce snow and ice fall from damaging condensing units of SFO Grand Haven.
1.4 APPLICABLE DOCUMENTS
Enclosures include labeled photos illustrating existing conditions and the proposed repair areas. Additional photos available upon request from the point of contact.
2.0 SPECIFIC REQUIREMENTS/TASKS
All tasks must comply with the Scope outlined in Section 1.2.
3.0 CONTRACTOR PERSONNEL
Contractor shall employ personnel experienced in installing snow guards for a TPO roofing system. All work must be performed by skilled tradespersons qualified for their respective tasks.
4.0 PERIOD OF PERFORMANCE
All work must be completed within 45 calendar days from the date of contract award.
4.1 PLACE OF PERFORMANCE
United States Coast Guard Sector Field Office (SFO) Grand Haven, 650 S Harbor Dr, Grand Haven, MI 49417.
4.2 HOURS OF OPERATION
Work shall be performed during normal business hours: Monday through Friday, 0800 to 1700 EST, excluding Federal holidays, unless otherwise authorized by the COR.
5.0 GOVERNMENT FURNISHED RESOURCES
The Government will furnish 110/120V power for tools and provide water access as needed to support project activities.
6.0 CONTRACTOR FURNISHED PROPERTY
Contractor shall supply all materials, tools, labor, and equipment necessary to complete the tasks outlined in the
SOW.
7.0 GOVERNMENT ACCEPTANCE PERIOD
The COR will review the completed work to determine acceptance. The contractor will be notified by email regarding acceptance or required corrections.
8.0 ENCLOSURES
- Site photographs and drawing set for installation plan - Additional documentation available upon request from:
Point of Contact: LT Lisa Pietruszka Email: Lisa.M.Pietruszka@uscg.mil Phone: (616) 850-2502
Enclosure 1: Northeast section of SFO Grand Haven roof experiencing snow/ice fallout.
Enclosure 2: Drawing set of SFO Grand Haven with existing snow guards installed (in purple and blue). Scope is to match what has been installed and mirror it to the other side, which is indicated by the red outlined shapes.