SF30 Amendment 08.pdf
PDF 2 MB Posted
- Attached to
- HC-144B Maintenance Training Unit (MTU)
- Solicitation number
- 70Z02321RDAM00200
About this file
This is a request for proposal for a HC-144B Maintenance Training Unit. The Coast Guard seeks to convert an existing CN-235-100 aircraft hull into an integrated training unit with a combination of real, simulated, and virtual systems. Key requirements include installing real flight control components and engine/propeller systems. Offerors must develop a solution meeting enabling learning objectives for avionics and maintenance technician training, including the ability to introduce faults and complete maintenance procedures. The proposal due date is March 22, 2021, with award intended as a 4-year firm fixed-price contract including 2 years for build/delivery and 2 years of sustainment support. Pricing is listed by CLIN for the base year and two option years.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SF30 Amendment 07.pdf | ||
| Amendment 6 Questions.pdf | ||
| SF30 Amendment 06.pdf | ||
| SF30 Amendment 05.pdf | ||
| SF30 Amendment 04.pdf | ||
| SF30 Amendment 03.pdf | ||
| SF30 Amendment 02.pdf | ||
| SF30 Amendment 01.pdf | ||
| RFP 70Z02321RDAM00200.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
7. ADMINISTERED BY (If other than Item 6) CODE
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
FACILITY CODE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED (SEE ITEM 13)
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
12. ACCOUNTING AND APPROPRIATION DATA (If required) copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15C. DATE SIGNED
15A. NAME AND TITLE OF SIGNER (Type or print)
16C. DATE SIGNED
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
PAGE OF PAGES
6. ISSUED BY CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X)
CODE
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
Previous edition unusable
Solicitation 70Z02321RDAM00200 Amend 8
Questions and Answers
1. Does Coast Guard want to be able to touch real world cables for troubleshooting or do it virtually? Yes, real world cables are ideal.
2. What steps are they expecting to do for maintenance? Students will perform an operational check of the system in question with an MPC card as guidance to determine what fault is present and then proceed to troubleshoot by using schematics and a Fluke meter to look for opens, shorts, etc.
3. How much current is available for 115VAC, 400Hz power? 200 Amps
4. Is 208VAC, 3-Phase, 60 Hz power available in the sim building? Yes 208 VAC, 3 phase, 60 Hz is available with 60 amps. 28 VDC is also available with 200 Amps.
5. How much real test equipment do they want to use versus virtual test equipment? Real test equipment is preferable, however, it is probably more cost effective to use simulated test equipment as long as students are able to still turn the knobs, switches, and progress through menus seeing the desired results simulated. For avionics purposes, the USCG requires a
AN/USM 708A ramp test set, a Druck pitot/static test set and the Fuel Calibration set.
a. How does Coast Guard expect to use simulated test equipment? See above.
b. Will need photos of any test equipment we need to build. Photos and possibly technical manuals may be provided on request.
6. What equipment has to be “real” panels and boxes vs. what is desired on the virtual trainer?
All panels and boxes could be simulated as long as value as a prop can still be attained by having them look and act as the real item, i.e., switches, knobs, instruments are functional and provide the same simulated results or indications.
7. What is the environment like that the simulator will go into? The High Bay Training Area in building 21 is large enough to house a fully assembled HC-144 and serving equipment. It does not have a deluge system and therefore cannot house fueled aircraft.
8. Is that environment climate controlled? The High Bay Training Area in building 21 is not air conditioned. Cooling is provided by giant overhead fans. Temperatures in the summer with the doors closed most likely approach into the low to mid 80s. There is a radiant heating system overhead which keeps the space pleasant during the winter.
9. Could we put an air conditioning unit outside and run conduit to the simulator? Or does it need to be self-contained with a conduit drain? Yes an outside AC would work, however, the conduit would be lengthy. If self-contained, the drain would be lengthy.
10. What is the state of the deicing boots on the donor? All components were preserved via what looks like vacuum sealed foil bags inside of wooden crates. The assumption based on preservation method would be that the deice boots are in good condition if installed.
11. Will contract winner receive an actual HC-144 throttle quadrant that is specific to the Coast
Guard configuration of the CN-235? Unknown. Current throttle quadrant in the hull is not a match.
12. SOW mentions a “Functional test of the wing.” How is this test defined? This is supposed to say “Functional test of the wing flaps”. Perform adjustment/test of flaps IAW CGTO 1C-144A-
2-27-1, 27-51-00.
a. Are their unspecified systems in the wing that are desired to be tested? No
Solicitation 70Z02321RDAM00200 Amend 8
13. What type of emergency battery does the HC-144B have? The HC-144 has two Back-Up
Batteries which provide 24 VDC (5 ampere-hours) each to certain avionics systems during engine starts or when the aircraft loses power. During engine starts they prevent avionics systems from losing volatile memory due to the large current draw of the starter generators.
14. Does Coast Guard want to do the emergency battery test on a physical battery replica or will virtual work? Virtual will work.
15. How is brush block test defined, Propeller heat, generator/alternator brush blocks? Complete propeller deice checks IAW MPC 306101.0.
16. How is ‘dry testing’ defined for this simulator? No fluids at all? Yes, in reference to a dry calibration of the fuel system there would be no fluid.
17. Which pieces of equipment does the Coast Guard need to have fail? All types of failures?
Only specific failures? Most failures in the avionics/electrical class are opens and shorts in wiring. The SOW is being updated to reflect the required number of faults/system for both
AMT and AET. Instructor Training Books are also being added to the list of available references which include various possible scenarios.
18. Are aural cues required? Such as engine sounds, prop sounds and so forth. Prop and engine aural cues are not needed, however, cockpit aural cues such as tones for outer marker, middle marker, inner marker, EGPWS system alerts, and TCAS system alerts are needed.
19. How is hydrostatic test on the oxygen system done – actual removal of the oxygen bottle or will virtual removal suffice… or both? Hydrostatic test is not required. Not taught. No need for oxygen bottles.
20. What tests does the Coast Guard run on the HC-144B’s engines? Engine run ups are not required for training purposes in 144 C-school classes.
21. Are functional tests allowed to be done on virtual instruments? Yes
22. Are virtual antennas allowed as replacements for real ones or do they want physical antennas replacements? Virtual antennas are acceptable.
23. If no one is being allowed to be on top of the fuselage, then will only the lower antennas be acceptable for R and R. Removal and replacement of antennas is not physically done in the course. It is enough to troubleshoot to the component or wire.
24. Does the Coast Guard want the windshield wipers to operate for wiper functionality test? No.
25. Should anti-icing equipment actually heat up during functionality test? No for safety reasons, however, it would be nice to have a local visual indicator at the component.
26. Where are removable access panels located in the floor? Preferably all floor panels should be removable for access.
27. What tail number should be used for the simulator? 2395
28. Which LRU should the students be able to conduct Remove and Replace procedures on?
R&R requirements are in section C.3.3 of the SOW and was updated after receiving these questions for better clarity.
Is this to be a physical task? Yes If so, is a dry system desired to prevent spilling? (A COTS HPU will be installed to run the desired hydraulics systems if so) Yes a dry system is preferable.
Is there a list of LRU’s that are desired to be R&R? In progress.
29. In the location where this simulator will be installed, is there enough room for a full wing? Full tail? Yes, the high bay training area was designed and built to hold a fully assembled HC-144.
STATEMENT OF WORK (SOW)
FOR
THE PRODUCTION AND DELIVERY
OF
HC-144B MAINTENANCE TRAINING UNIT
Prepared by
U.S. Coast Guard Acquisition Directorate
Office of Aviation Acquisition
(CG-9312)
November 12, 2020 (Modified May 19, 2021)
Version 1.1
C.1. GENERAL
C.1.1. Scope
The U. S. Coast Guard (USCG) Medium Range Surveillance (MRS) Aviation Acquisition
Program (CG-9312) is in need of an HC-144B Maintenance Training Unit (MTU). The MTU will support the operational fleet by providing the skills, knowledge and practical experience required to maintain and troubleshoot the Avionics, Electrical, Airframe and Engine/Powerplant systems and associated equipment installed on the HC-144B aircraft. The MTU will provide
Avionics Electrical Technician (AET) and Aviation Maintenance Technician (AMT) Class “A” and Class “C” School students the ability to receive initial and advanced, hands-on, maintenance training instruction in a realistic setting that is reflective of USCG technical manuals allowing students to learn basic and sophisticated techniques of aircraft troubleshooting and repair. The
MTU device shall be capable of meeting the Enabling Learning Objectives (ELO), critical tasks, and USCG identified faults associated with the AET and AMT “A” and “C” School training requirements. The Contractor shall convert an existing CN-235-100 hull into an integrated HC-
144B MTU with a combination of hands-on, real aircraft hardware and components as well as virtual/simulated components. All virtual/simulated systems shall accurately reflect the real/actual system, and the systems need to respond correctly to inputs from switches, circuit breakers, power levers, condition levers and fire handles.
C.1.2. Background
The USCG needs a HC-144B MTU at the Aviation Technical Training Center (ATTC) in
Elizabeth City, North Carolina, to provide training for HC-144B AMT and AET “A” and “C”
School students. In 2013, the MRS Program Office purchased an Airbus CN-235-100 aircraft hull to be outfitted as an HC-144 maintenance and avionics training aid.
USCG Class “A” school is initial, basic, entry-level aviation training and “C” School is advanced aircraft systems training for field personnel. AET and AMT Class “C” School provides advanced training for individuals that have been assigned to operational units for at least 6 months. AETs and AMTs typically perform the following tasks:
• AETs inspect, service, maintain, troubleshoot, and repair avionics systems that perform communications, navigation, collision avoidance, target acquisition, and automatic flight-control functions. In addition, AETs inspect, service, maintain, troubleshoot and replace aircraft batteries, AC and DC power generation, conversion and distribution systems, as well as the electrical control and indication functions of all airframe systems, including hydraulics, flight control, landing gear, fuel, environmental control, power plant, drive train, anti-ice, and fire detection.
• AMTs inspect, service, maintain, troubleshoot and repair aircraft engines, auxiliary power units, propellers, rotor systems, power train systems, and associated airframe and systems-specific electrical components. AMTs service, maintain and repair aircraft fuselages; wings; rotor blades; fixed and movable flight control surfaces; aircraft bleed air, hydraulic and fuel systems.
The USCG has a CN-235-100 aircraft hull and major components at ATTC. The landing gear and center wing boxes are installed on the hull however, flight control components like wings, horizontal and vertical stabilizers, ailerons, elevators, flaps, and rudder are not installed but are located at ATTC. Additional items onsite include:
Cockpit flight controls - yokes, throttle quadrants, and rudder pedals
Hydraulic system components - reservoir, pumps, valves, lines, accumulators etc.
1 engine, 1 propeller, and all accessory and auxiliary components required for mounting the engine to the airframe.
Clarification Statement – the USCG does NOT need a MTU that is completely wired with fully functional systems; the MTU only requires certain structural ‘designated areas’ to be visually and physically accurate to the real/actual components, parts and systems. The areas that are not specifically identified as a ‘designated area’ (C.3.1.6) are not required to meet traditional design/wiring and system functionality requirements of the HC-144B aircraft. An ideal solution would provide tactile components including but not limited to throttles, flaps, yokes, rudder, elevator, ailerons, and trim controls that are integrated into the Fault Isolation System (FIS) and interact with simulated or virtual replicas of cockpit, avionics, and other components/systems.
Students must have the ability to safely navigate throughout the physical aircraft as well as the virtual environment, including walking around the aircraft to locate specific panels and components (either real, simulated, or virtual) and to perform required maintenance steps.
Students will open actual panels, disconnect real and/or simulated, and/or virtual cables, observe component operation (either real, simulated, or virtual) in both normal and faulted conditions, and perform troubleshooting and removal/replacement actions. Virtual and/or simulated test equipment required to perform maintenance actions must be available for student operation with test equipment measurements accurately reflecting the state of the simulated aircraft system.
C.1.3. Terms and Assumptions
The following assumptions apply to this SOW:
The term “real” describes actual, physically existing hardware components and parts.
The term “simulated” describes components and parts that are not real and are replicas of the actual physical components. Simulated components will be the same size and shape of the real component and part and will be within 10% of actual component weight for
Remove & Install (R&I) fidelity.
The term “virtual” describes systems with components and parts that do not physically exist but are made by software to appear like the physical components and parts.
The MTU will be ready for training within 24 months from contract award.
Warranty period will be a minimum of 12 months commencing upon signing of the DD-
250.
ATTC will provide USCG personnel to oversee hull modifications, assembly (at contractor facilities if applicable) and delivery.
If hull modifications and assembly are completed at the contractor’s facility, the contractor shall provide office space for the USCG personnel to work when visiting the facility.
The HC-144B’s mission/sensor system (Minotaur) functionality will have simulated
RADAR (APS 143) and Forward Looking Infrared (FLIR) inputs.
The terms “operational” and “functional” in relation to the word “test” carry the same meaning in this document and are interchangeable with each other. Both terms are used to remain consistent with and provide clear traceability to USCG engineering and maintenance documentation.
The term “operational check” refers to an "in-motion" or "power on" test for determining that an item of equipment will operate at a specified performance level.
The term “visual check” refers to checking an item of equipment for cleanliness, need for lubrication, or painting and deterioration of parts or materials.
The term “maintenance inspection” includes daily/preflight, segment, safety, service, special, and numbered inspections. These inspections vary in scope and frequency of performance according to types of aircraft.
For computers/software - the contractor shall harden the computers to the Risk
Management Framework (RMF).
The USCG will provide all applicable documents in Table 1: HC-144B MTU References.
Tasks and procedures described in this SOW will be in accordance with (IAW) the applicable referenced USCG Aircraft Computerized Maintenance System (ACMS) MPC.
With the exception of the systems listed in the Installation Requirements section of this
SOW (C.3.1.2), the USCG does not require a certain percentage of the MTU systems to be real.
C.2. APPLICABLE DOCUMENTS
C.2.1. The Contractor shall safeguard Government Furnished Information (GFI) in accordance with distribution statement and notices provided on the references.
The documents listed in Table 1: HC-144B MTU References form a part of this SOW.
Table 1: HC-144B MTU References
Publication Name
Coast Guard Technical Order (CGTO) 1C- 144A-2-(ATA Chapter)
a. 21-00-00 Air Conditioning
b. 26-00 Fire Protection
c. 27-00 Flight Controls
d. 28-00 Fuel
e. 29-00 Hydraulic Power
f. 30-00 Ice and Rain Protection
g. 32-00 Landing Gear
h. 22-1 Autoflight
i. 23-1 Communications
j. 24-1 Electrical Power
k. 31-1 Indicating/Recording
l. 33-1 Lights
m. 34-1 Navigation
n. 43-1 Communication: Staff
o. 71-1 Powerplant
p. 73-1 Engine and Fuel Control
q. 77-1 Engine Indicating
r. 80-1 Engine Starting
s. 93-1 Surveillance
C-144A Aircraft Maintenance Manual (AMM)
CGTO 1C-144A-10 Aircraft Powerplant Build-up Manual
CGTO 1C-144A-4 (ATA Chapter) Illustrated Parts Catalogue (IPC)
CGTO 1C-144A-11-(Series) Component Maintenance Manuals Index
(CMMI)
CGTO 1C-144A-11-611303 Variable Pitch Aircraft Propeller Component Maintenance Manual
P5209 Propeller System Maintenance Manual
CGTO 1C-144A-TPUG Technical Publications User's Guide (TPUG)
CGTO 1C-144A-20 Zoning and Access Panel (APM)
GE Pub SEI-576 CT7B Powerplant Maintenance Manual
GE Pub SEI-723 CT7B Illustrated Parts Manual
GE Pub GEK9250 Commercial Engine Standard Practices Manual
CGTO 1C-144A-2-9 Technical Manual C-144 Aircraft Wiring Diagrams Manual (WDM)
CGTO 1C-144A-2-9-1 Technical Manual C-144 Aircraft - Aircraft Wiring List CG01 VERSI
CGTO 1C-144A-4TP-14 Technical Order Page Supplement C-144A Aircraft Illustrated Parts Catalog
CGTO 1C-144A-1 Flight Manual U.S. Coast Guard Series HC- 144A Aircraft
Publication Name
Electrical Sections:
01-14 Avionics Sections:
02-26
AET HC-144 C School Instructor Guides
Chapters on: Flight Controls, Fire Detection, Pneumatics, Ice and Rain Protection, Landing Gear, Hydraulics, Fuel System, Powerplant, and Propellers.
AMT HC-144 C School Instructor Guides
C.3. REQUIREMENTS
C.3.1. General Requirements
The contractor SHALL:
C.3.1.1. Convert the existing CN-235-100 hull into an integrated HC-144B MTU with hands-on, real aircraft hardware and components as well as simulated and virtual systems and components. All virtual/simulated systems shall accurately reflect the real or actual system and all systems and components need to communicate with each other during MPC procedural steps and respond correctly to inputs from real, simulated and/or virtual switches, circuit breakers, power levers, condition levers and fire handles. The HC-144B MTU shall meet USCG Safety and Environmental Health standards.
C.3.1.2. Install the following systems/components (Government Furnished Equipment)1:
Flight control components - wings, horizontal and vertical tails/stabilizers, ailerons, elevators, rudder, flaps, aileron/rudder/elevator trim tabs, servos and actuators.
Cockpit flight controls - yokes, throttle quadrants, and rudder pedals.
Hydraulic system components - reservoir, pumps, valves, lines, accumulators etc.
1 engine, 1 propeller, and all accessory and auxiliary components required for mounting the engine to the airframe
C.3.1.3. Assemble and configure the hull/components at either the contractor’s site or at
ATTC. If assembled at the contractor’s site, the contractor shall coordinate pick-up, shipment and delivery of parts, components, and aircraft hull to the contractor’s facilities If assembly and configuration would be more cost effective /or more efficient to complete at ATTC by a contractor team, then the contractor shall provide a reflective cost estimate.
C.3.1.4. Inspect GFE after unpacking material at the Contractor’s facilities and provide a condition assessment report to the USCG for review (if assembly is completed at the
Contractor’s facility).
C.3.1.5. Coordinate disassembly, shipment and delivery of parts and components back to
ATTC, and reassembly of MTU (if the MTU is assembled at the Contractor’s site).
C.3.1.6. Develop a MTU device that meets the ELO, critical tasks, and USCG identified faults associated with the AET and AMT “A” and “C” School training requirements.
C.3.1.7. Build and install floor panels that can support 350 lb per sq ft. or greater. Panels shall fasten to the deck support structure and allow access to each void individually.
1 Full list of GFE is provided in Attachment 1 – HC-144B MTU GFE Inventory
C.3.1.8. Build the systems and components in the “Designated Area” locations (fuselage sections 18, 21-24, 25-36, 41, and 52) so they visually and physically replicate the actual system
(operational functionality is not required).
C.3.1.9. Provide and install compatible, basic cockpit seats. These seats shall replicate the pilot fitment and position adjustments of the aircraft (lap belts and harnesses not required).
C.3.1.10. Design and develop a Commercial-Off-the-Shelf (COTS) hardware and software open architecture integrated solution for the MTU that meets both the AMT and AET ELO. The
MTU will be an unclassified training system. All software and hardware components shall meet
USCG Information Security requirements in accordance with COMDTINST 5500.13 series.
C.3.1.11. Provide a MTU with cockpit components, indications, interface controls and layouts on the flight deck that represent the HC-144B aircraft used in the USCG. The device shall exhibit the same functional and performance characteristics as the actual aircraft systems.
C.3.1.12. Develop the MTU cockpit baseline design and software code using the HC-
144B1U Reconfigurable Flight Training Device (RFTD) common load software. The baseline software shall be modified to replicate the HC-144B aircraft cockpit design and interact with hardware components and the FIS.
C.3.1.13. Develop a MTU that has a combination of real hardware (provided as GFE) and high fidelity virtual interactive systems and components. The AMT ELO are typically met by hands-on interactions with the real, physical components and parts. The AET ELO can be met by a combination of real, simulated and virtual systems and components. All simulated components shall be within 10% of actual component weight for Remove & Install (R&I) fidelity.
C.3.1.14. Design a MTU device with an integrated FIS capable of a variety of aircraft system faults, to include shorts, cross shorts and avionics software and data bus failures. The induction shall be instantaneous and shall manifest precisely as it would in an operational HC-
144B aircraft. The FIS shall allow the student’s to be capable of completeing a minimum of 18
19 AMT and 71 92 AET fault isolation procedures (FIP) associated with the scenarios in the HC-
144 C School Instructor Training Books listed in Table 1 of this SOW.and will allow all
Terminal Performance Objectives to be met. The FIS shall allow for additional faults to be added for a maximum of 200 faults.
C.3.1.15. Provide full Government Purpose Rights for independent operations, maintenance and modification of the MTU.
C.3.1.16.C.3.1.15. Provide full Government Purpose Rights for independent operations, maintenance and modification of the MTU.
C.3.1.17.C.3.1.16. Provide sustainment support for up to 24 months post MTU delivery
(design dependent). Sustainment support shall include the following items:
Non-recurring Engineering efforts
Technical integration support
Hardware and structural corrective maintenance
Windows 10 compliance and integration
Design, update or modify software code
Fault system components and hardware sparing
Software maintenance, configuration management and documentation support
Software troubleshooting
C.3.1.18.C.3.1.17. Generate drawings for any new configurations.
C.3.1.19.C.3.1.18. Conduct design reviews and include prototyping, integration, inspection and testing activities into their Integrated Master Schedule (IMS).
C.3.1.20.C.3.1.19. Strip, prime and paint the aircraft for corrosion protection (IAW HC-144
Paint Drawing 1100-11-1).
C.3.1.21.C.3.1.20. Provide a MTU capable of completing at least 76 required maintenance operational check (MOC) procedures as defined by the USCG.
C.3.1.22.C.3.1.21. Provide a solution compatible to ATTC hangar power sources (2428V
DC, 115V 3-phase AC/400-Hz).
C.3.1.23.C.3.1.22. The Virtual Interactive Environment (VIE) shall provide a combination of
2D and 3D representations of components, parts and systems. The VIE shall be integrated with the FIS and real and/or simulated components. The student shall be able to conduct AET and
AMT MOC procedures in the VIE.
C.3.1.24.C.3.1.23. Conduct Hardware Software Integration (HSI) system testing to ensure the device and systems are ready for the testing.
C.3.1.25.C.3.1.24. Develop an Acceptance Test Procedures (ATP) document for use during testing and inspection activities. The ATP shall be USCG-approved prior to use.
C.3.1.26.C.3.1.25. Perform configuration management in accordance with best commercial practices. The contractor shall place all GFI/GFE under configuration management upon receipt and shall provide the Government access to documentation and configuration items under configuration control.
C.3.1.27.C.3.1.26. Prepare problem/change reports to describe each problem detected in hardware, software and documentation that have been placed under internal configuration control. The contractor shall implement a corrective action process to ensure that all detected problems are reported, corrective action is initiated, resolution is achieved, status is tracked and reported and records of the problems are maintained for the life of the contract.
C.3.2. MTU Required Systems
The MTU SHALL provide the student with the ability to inspect and troubleshoot the following systems:
a. Air Conditioning
b. Pressurization
c. Rain and Ice Protection
d. Powerplant
e. Fire Protection System
f. Hydraulic Electrical SubsSystem
g. Fuel System
h. Electrical System (includes AC and DC subsystems)
i. Flight Control System
j. Landing Gear System
k. Navigation System
l. Communication System
m. Data Transfer and Storage System
n. Flight Director/Flight Management System and autoflight
o. RADAR (APS 143) and Forward Looking Infrared (FLIR) inputs Collins TWR 850
Weather Radar
p. Indicating
q. Propellers
r. Lighting
C.3.3. MTU Remove and Replace (R&R) Tasks
The students SHALL be able to perform the following maintenance tasks:
C.3.3.1. Remove and install and rig flight control surfaces (flaps, cables, rudder, ailerons, and elevator).
C.3.3.2. Remove and install engine from wing
C.3.3.3. Remove and install landing gear (main and nose) and landing gear actuatorsRemove and install propeller blades
C.3.3.3. Re
C.3.3.4. Remove and install electric motor-driven hydraulic pump
C.3.3.5. Remove and install hydraulic system reservoirs
C.3.3.6. Remove and install navigation and communications radios receivers and antennae
C.3.4. AMT and AET Maintenance Procedures Requirements
The students SHALL be able to perform the following procedures IAW references in Table 1
(primary source is CGTO 1C-144A-11-(Series). The students SHALL be able to see corresponding cockpit indications (where applicable) associated with the below procedures:
C.3.4.1. Test procedure for HF10 l bleed air low pressure switch
C.3.4.2. Pressurization System operational test
C.3.4.3. Operational test of the Crossover Valve
C.3.4.4. Functional test of Bleed Air Low Pressure Switch
C.3.4.5. Operational test of the Recirculation Fans
C.3.4.6. Operational test of Avionics Bay Fan
C.3.4.7. Operational test of the Mission Console Vent System
C.3.4.8.C.3.4.5. Functional test of Pressurization Control System
C.3.4.9.C.3.4.6. Temperature Control System operational test IAW MPC 216100.0
C.3.4.10.C.3.4.7. Operational test of Pneumatic De-icing System
C.3.4.11.C.3.4.8. Operational test of Heater Blanket SHALL be IAW MPC 301102
C.3.4.12.C.3.4.9. Functional test of the Regulator Valve
C.3.4.13. Water Separator inspection/check
C.3.4.14.C.3.4.10. Operational test of Engine Air Inlet Anti-Icing System IAW MPC 302101
C.3.4.15.C.3.4.11. Operational test of the heater elements of the Angle-Of-Attack (AOA)
Sensor IAW MPC 303000
C.3.4.16.C.3.4.12. Operational test of the system (Windshield heater, reg, probe)
C.3.4.17.C.3.4.13. Operational test of the Windshield Washing System
C.3.4.18.C.3.4.14. Functional test of Propeller De-icing System IAW MPC 306101 and have all Prop De-ice cockpit indications.
C.3.4.19.C.3.4.15. Operational test of Ice Detection System SHALL be IAW 1C-144-2-30, chapter 30-80-00-501 and SHALL have all cockpit indications.
C.3.4.20.C.3.4.16. Visual inspection of the Fire Sensing Elements.
C.3.4.21.C.3.4.17. Operational test of Warning Circuit (smoke detection) - must be able to complete an electrical circuit operational check IAW MPC 261205
C.3.4.22. Extinguishing Cylinder inspection/check
C.3.4.23.C.3.4.18. Operational test of Electrical Circuits - electrical panel SHALL be functional
C.3.4.24. Check of the hand fire extinguisher
C.3.4.25. Hydrostatic test
C.3.4.26. Operational test of the Manual Control Mode
C.3.4.27.C.3.4.19. Functional test of the Hydraulic Indication System IAW MPC 293005.0
C.3.4.28.C.3.4.20. Functional test of Gust Lock System
C.3.4.29.C.3.4.21. Operational check of the Aileron Trim System SHALL be IAW MPC
271300.0
C.3.4.30.C.3.4.22. Functional test of the Rudder Trim System SHALL be IAW MPC
272200.0
C.3.4.31.C.3.4.23. Operational check of the Elevator Trim System SHALL be IAW MPC
273300.0
C.3.4.32.C.3.4.24. Functional test of Flaps Brake Assembly
C.3.4.33.C.3.4.25. Operational test of Flaps Torque Limiters
C.3.4.34.C.3.4.26. Functional test of Wing Flaps
C.3.4.35. Operational test of the Emergency Extension System
C.3.4.36. Over-center System inspection
C.3.4.37.C.3.4.27. Insp/check and test of Temperature Sensor
C.3.4.38.C.3.4.28. Operation check of retraction inhibition system
C.3.4.39.C.3.4.29. Operational test of the Brake Temperature Indicating System
C.3.4.40.C.3.4.30. Operational test of the gravity transfer valve.
C.3.4.41. Operational test of the Magnetic Fuel Level Indicator
C.3.4.42.C.3.4.31. Functional test of the Fuel Quantity Indicating System. System SHALL be capable of dry calibration procedure IAW MPC 280001.0 with test set PSD90-1C
C.3.4.43.C.3.4.32. Functional test of the Pressure Relief Valve
C.3.4.44.C.3.4.33. Functional test of the Engine Shut-off Valve – See item 22 of this section as the engine shutoff valve is controlled by T-handles.
C.3.4.45.C.3.4.34. Operational test of the minimum level float switch
C.3.4.46.C.3.4.35. Check of the PGB Chip Detector.
C.3.4.47.C.3.4.36. Operational check of the Actuating System Linkage Assembly.
C.3.4.48.C.3.4.37. Operational check of the Np Over-Speed Protection
C.3.4.49.C.3.4.38. Propeller Over-Speed System test SHALL indicate similar engine parameters.
C.3.4.50.C.3.4.39. Functional test of Feather Aux Pumps, KC4 l and KC42, and timers KC15 and KC16
C.3.4.51.C.3.4.40. Operational check of the flight idle switch
C.3.4.52.C.3.4.41. Operational check of the Transformer/Rectifier (T/R) SHALL be IAW
MPC 242202.0
C.3.4.53. Operational test of the Batteries Temperature Indicating Circuit SHALL be IAW
MPC 243002.0
C.3.4.54. Functional test of the Emergency Batteries SHALL be IAW MPC 243005.0
C.3.4.55.C.3.4.42. AC Generation - Constant Frequency operational test and functional test
SHALL be IAW MPC 242100.0 and 242102.0
C.3.4.56.C.3.4.43. Emergency Trim Control Unit Test SHALL be IAW MPC 270005.0
C.3.4.57.C.3.4.44. Brush Block test - panel shall indicate functionally in fast and slow modes
C.3.4.58.C.3.4.45. Operational check of the Data Processing Management (DPM) System and the Information Management System SHALL be capable of performing operational test of
CDU IAW MPC 462402.0, IPC IAW MPC 462001.0 and MFD IAW MPC 463520.0
C.3.4.59.C.3.4.46. Operational test of the Integrated Active Engine Display (IEDS) unit and weight on wheels (WOW) Switch by accessing the maintenance displays IAW MPC 774010.0
C.3.4.60.C.3.4.47. Pitot and Static System test SHALL be IAW MPC 341100.0 using Air
Data Test Set
C.3.4.61.C.3.4.48. Operational check of Air Data System Reversion Switch
C.3.4.62.C.3.4.49. Stall Warning System test SHALL be IAW maintenance manual 1C-144-
2-V4
C.3.4.63.C.3.4.50. Attitude and Heading Reference System (AHRS) test - system SHALL be capable of performing power up BIT test IAW MPC 342610.0
C.3.4.64.C.3.4.51. Ground Proximity Warning System (GPWS) test SHALL be IAW MPC
344910.0
C.3.4.65.C.3.4.52. Weather/Search Radar System test SHALL be IAW MPC 344710.0
C.3.4.66.C.3.4.53. Radio Altimeter System (RADALT) test SHALL be IAW MPC 341510.0
- Cockpit PFD and IMFDs display associated RADALT readings and RADALT off Flag
C.3.4.67.C.3.4.54. Operational test of the TACAN SHALL be IAW MPC 345110.3 - Cockpit
PFD and IMFDs display associated Nav source, bearing and distance information.
C.3.4.68.C.3.4.55. Traffic and Collision Avoidance System (TCAS) Test SHALL be IAW
MPC 344330.0. Cockpit PFD and IMFDs display TCAS associated traffic advisories and aural warnings heard on flight deck
C.3.4.69.C.3.4.56. Air Traffic Control (ATC) Transponder System test SHALL be IAW maintenance manual 1C-144A-2-V2
C.3.4.70.C.3.4.57. Operational test of the ADF System SHALL be IAW MPC 345210.2 with cockpit PFDs display, Nav source and bearing information and morse code station ID audio.
C.3.4.71.C.3.4.58. Direction Finding (DF-430) System test SHALL be IAW MPC 345650.0 with PFD and IMFDs display bearing information.
C.3.4.72.C.3.4.59. VOR/ILS/MB System test SHALL be IAW MPC 345023.0 with PFDs and IMFDs display all associated test indications to include Marker Beacon audio
C.3.4.73.C.3.4.60. Operational test of the Distance Measuring Equipment (DME) SHALL be
IAW MPC 345510.0 and PFDs display distance information
C.3.4.74.C.3.4.61. Operational test of the Audio Integrating System (AIS) SHALL be IAW
MPC 235211.0
C.3.4.75.C.3.4.62. Operational test of the Passenger Address System SHALL be IAW MPC
234000.0
C.3.4.76.C.3.4.63. Operational test of the Cockpit Voice Recorder (CVR) IAW MPC
237111.0.
C.3.4.77.C.3.4.64. Adjustment/operational test of the VHF/UHF System SHALL be IAW
MPC 233220.0
C.3.4.78.C.3.4.65. Operational test of Engine Starting (Cranking) System IAW MPC
801020.0 System SHALL indicate as normal start, failed start (no ignition, no fuel, and no oil pressure)
C.4. PLANNING AND MANAGEMENT
C.4.1. The Contractor shall develop and deliver a baseline IMS at the Kick-off Meeting and will update it throughout the performance of the contract. The IMS will be approved by the
Government.
C.4.2. The Contractor shall provide progress, status and management reports every month to the Contracting Officer’s Representative (COR), Project Manager and the Contracting
Officer via electronic mail (email).
C.4.3. The Contractor shall identify by name to the COR a single point of contract and only one alternate of like qualifications and experience who have full authority to act for the
Contractor on all manners relating to work performed under this contract.
C.4.4. The Contractor shall support the following reviews and meetings (Table 2):
Table 2: Review/Meeting Requirements
Event Duration Chair Frequency Location
Post Award Kick-off Meeting
1 day Government Contracting
Officer
Once; no later than 30 business days after contract award
USCG ATTC
In Progress Reviews
(IPR)
1 day Contractor 3 months following initial contract award and every 3 months thereafter
USCG ATTC
Monthly Status Meeting
1 hour Contractor Monthly; no later than 5 business days after new month begins Contractor provided teleconference phone
Event Duration Chair Frequency Location number
System Requirements Review (SRR)
1 day Contractor NLT 90 business days after GFE/GFI received by Contractor
TBD
Preliminary Design Review (PDR)
1 day Contractor Once; per the IMS
TBD
Critical Design Review
(CDR)
1 day Contractor Once; per the IMS
TBD
Government Initial Inspection
2 – 3 days Government &
Contractor At least once, as required per the
IMS
Contractor facility
Technical Readiness Review (TRR)
1 day Contractor At least once, as required per the
IMS
Contractor facility
Government Final Inspection
2-3 days Government &
Contractor At least once, as required per the
IMS
Contractor facility
Physical Configuration Audit (PCA)
1 day Government Following successful completion of the Contractor and Government Final Inspections
Contractor facility
Post Delivery Inspection (PDI)
2-3 days Government Once; per the IMS
USCG ATTC
C.4.5. The Contractor shall prepare and deliver a proposed IPR agenda and a copy of the presentation materials to the Government.
C.4.6. The Contractor shall conduct IPRs and monthly teleconference meetings that include the following information for technical discussions and exchange of information:
Technical status; logistics status
Production and delivery schedules
Schedule and program risks
Planned and executed milestones
Cost/Funding Status
Other topics of interests as agreed to by the Contractor and Government
C.4.7. The Contractor shall conduct IPRs and monthly teleconference meetings with the following individuals in attendance:
Contractor’s Project Lead
Contractor’s Technical Lead
Government COR
Government CG-9312 Representative
Government ATTC Representative
C.4.8. The Contractor shall prepare and deliver Post Award Kick-off and IPR Meetings
Minutes/Action Items.
C.4.9. The Contractor shall establish a Test and Evaluation Program. The T&E program shall be designed to verify that the trainer and integration of all systems and equipment meet the technical and functional requirements of this SOW.
C.4.10. The Contractor shall coordinate all T&E activities. Tests shall be performed IAW the contractor-prepared, Government-accepted Acceptance Test Procedures (ATP) document.
Test, examination, demonstration, inspection, and verification procedures shall be documented in the ATP.
C.4.11. The Contractor’s measuring and testing devices shall be made available for use by the Government when required to determine conformance with contract requirements.
C.4.12. Design Reviews and inspection activities. Design Reviews shall present and describe the training system design and address:
Training system hardware and software design
Reliability and Maintainability
Parts management program progress
Logistics design aspects
Test and evaluation
Project schedule and progress
Problem and risk areas including recommended solutions and/or alternatives
C.4.13. The TRR shall be conducted by the contractor, following completion of JPI, to determine trainer readiness for delivery and Final Inspection. The contractor shall provide the resources, including facilities, equipment, and personnel to support the TRR. The TRR will include a review of the T&E program, including all JPI final test results, presentation of contractor certification of test readiness, and open deficiencies remaining from JPI. The TRR will be repeated as necessary until the trainer has been determined by the Government to be acceptable for commencement of the Final Inspection.
C.4.14. The PCA shall be conducted on-site following successful completion of the
Government Final Inspection and Acceptance Testing. The contractor shall provide the personnel necessary to support the Government-conducted examinations. The PCA will consist of hardware examinations of the as-built trainer. The PCA will also consist of software examinations of the as-built version of the computer system configuration items against the software technical documentation. Deficiencies recorded by the Government shall be corrected by the Contractor prior to Government acceptance of the MTU.
C.5. DELIVERABLES
C.5.1. The Contractor shall provide the following deliverables:
Table 3: HC-144B MTU References Deliverables
Number Name Description Due Date
1 Requirements
Traceability Matrix
(RTM)
Document that captures all requirements proposed in the SOW and is used to design and test the MTU solution to ensure all requirements are met.
Draft due at the SRR with updates included in final RTM 30 days after SRR.
2 Acceptance Test
Procedures
The ATP documents test criteria, examination, demonstration, and inspection procedures to verify system requirements.
Draft due 45 days prior to start of
Final Government Inspection.
Final due 15 days after receiving
Government comments on the draft ATP.
3 Test/Inspection
Report
A Test Report document that encompasses results of the ATPs.
Due 30 days after completion of
Government acceptance testing.
The Government has 30 days for review
4 Cold Start Procedures Process and procedures for starting the operating system’s hardware and software components from powerless state and setting to normal working conditions.
Draft due 30 days prior to commencement of on-site installation.
Final due 60 days after successful completion of installation.
5 Operational and
Maintenance Manual
Describes the operation of the device, troubleshooting, simulation hardware descriptions, and hardware replacement.
Draft due 30 days prior to commencement of on-site installation.
Final due 60 days after successful completion of installation.
The Government will have 60 days for review.
6 Product
Drawing/Models and
Associated Lists
Drawing Package reflecting the product baseline consisting of hardware drawings
Available for the PCA.
Final delivered NLT 30 calendar days after MTU ready for training.
The Government will have 30 days to review.
7 Interface Control
Document (ICD)
A detailed record of all interface information (drawings, diagrams, tables, and textual information) generated for the
MTU.
Due NLT 30 days after MTU ready for training.
The Government will have 30 days to review.
8 Software Product
Specification (SPS)
A list of executable software, source code and data files for each software configuration item (including ‘as built’ design information.
NLT 30 days after formal acceptance of the MTU.
9 Instructor Utilization
Handbook
Guide for the instructor on how to use the training device, including power up, power down, recovery, start-up, shutdown and operation of the device.
Draft due 45 days prior to Final
Government Inspection.
Final NLT 30 days after installation completion.
The Government will have 90
Calendar Days for Review
10 Test Inspection
Report, , A Test Report document encompasses results of the ATPs including, at a minimum, the nature of the observations, number of observations made, and the number and type of deficiencies found
Test Report due NLT 30 days after completion of Government testing.
11 Warranty Report A report used to track items under warranty and provide information on warranty periods, delivery schedules, failure data, and repair and replacement status.
Draft due 30 days prior to
Installation.
Final due NLT 90 calendar days after successful completion of installation
12 IMS Management schedule that includes project milestones, product design, development, integration and test activities.
At Kick-off Meeting
13 Meeting Minutes Formal meeting minutes/notes submissions for the SRR, PDR, CDR, TRR and PCA.
Within 10 days of having the meeting
14 Monthly Status
Report
Contractors progress, status and management report from the 1st to end of each month
NLT the 10th of the month following the reported period.
15 Condition
Assessment Report
Assessment of GFE upon its arrival at the
Contractors facilities
NLT 30 days after GFE arrives at
Contractor’s facilities.
C.6. TRAVEL
C.6.1. The Contractor shall provide sustainment support for up to 24 months post MTU delivery. The Contractor shall travel to ATTC Elizabeth City, NC once each month for approximately 3 days to provide MTU sustainment support.
C.6.2. The Contractor shall travel to/from ATTC to conduct a pre-shipment assessment.
C.6.3. The Contractor shall travel to ATTC to pick-up GFE, GFI, and aircraft hull and return to contractor’s facility for assembly.
C.6.4. The Contractor shall travel to ATTC for delivery, on-site reassembly, and testing of final MTU.
C.7. PERIOD OF PERFORMANCE
The contract Period of Performance (PoP) is 4 years; 2 years to build and deliver the MTU and 2 years to provide sustainment support.
RFP # 70Z02321RDAM00200 Page 2
NOTICE FOR FILING AGENCY PROTESTS
United States Coast Guard Ombudsman Program It is the policy of the United States Coast Guard (USCG) to issue solicitations and make contract awards in a fair and timely manner. The Ombudsman Program for Agency Protests (OPAP) was established to investigate agency protest issues and resolve them without expensive and time- consuming litigation.
OPAP is an independent reviewing authority that is empowered to grant a prevailing protester essentially the same relief as the Government Accountability Office (GAO).
Interested parties are encouraged to seek resolution of their concerns within the USCG as an Alternative
Dispute Resolution (ADR) forum rather than filing a protest with the GAO or some external forum.
Interested parties may seek resolution of their concerns informally or opt to file a formal agency protest with the Contracting Officer or Ombudsman.
Informal Forum with the Ombudsman. Interested parties who believe a specific USCG procurement is unfair or otherwise defective should first direct their concerns to the applicable Contracting Officer. If the
Contracting Officer is unable to satisfy their concerns, interested parties are encouraged to contact the
U.S. Coast Guard Ombudsman for Agency Protests. Under this informal process the agency is not required to suspend contract award performance. Use of an informal forum does not suspend any time requirement for filing a protest with the agency or other forum. In order to ensure a timely response, interested parties should provide the following information to the Ombudsman: solicitation/contract number, contracting office, Contracting Officer, and solicitation closing date (if applicable).
Formal Agency Protest with the Ombudsman. Prior to submitting a formal agency protest, protesters must first use their best efforts to resolve their concerns with the Contracting Officer through open and frank discussions. If the protester’s concerns are unresolved, an Independent Review is available by the
Ombudsman. The protester may file a formal agency protest to either the Contracting Officer or as an alternative to that, the Ombudsman under the OPAP program.
Contract award or performance will be suspended during the protest period unless contract award or performance is justified, in writing, for urgent and compelling reasons or is determined in writing to be in the best interest of the Government. The agency’s goal is to resolve protests in less than 35 calendar days from the date of filing. Protests shall include the information set forth in FAR 33.103(d) (2). If the protester fails to submit the required information, resolution of the protest may be delayed or the protest may be dismissed. To be timely protests must be filed within the period specified in FAR 33.103(e).
Formal protests filed under the OPAP program should be submitted electronically to OPAP@uscg.mil and the Contracting Officer or by hand delivery to the Contracting Officer.
Election of Forum. After an interested party protests a Coast Guard procurement to the Contracting
Officer or the Ombudsman, and while the protest is pending, the protester agrees not to file a protest with the GAO or other external forum. If the protest is filed with an external forum, the agency protest will be dismissed.
The Ombudsman Hotline telephone number is 202-372-3695.
RFP # 70Z02321RDAM00200 Page 3
United States Coast Guard
HC-144B Maintenance Training Unit (MTU)
Request for Proposal (RFP) No. 70Z02321RDAM00200
PART 1 – THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
The Government contemplates award of a Firm Fixed-Price contract resulting from this solicitation.
BASE YEAR CLINs
CLIN Description QTY Unit Unit Price Total Price
0001 HC-144B Maintenance Training Unit 1 Lot $ $
0002 Data in support of CLIN 0001 1 Lot
Not Separately
Priced (NSP)
Not Separately
Priced (NSP)
0003 Travel (Not to Exceed) $50,000.00 $50,000.00
TOTAL BASE YEAR PRICE $
OPTION YEAR 1 CLINs
1001 Sustainment Support 12 MO $ $
1002 Travel (Not to Exceed) 1 Lot $50,000.00 $50,000.00
TOTAL OPTION PERIOD 1 PRICE $
OPTION YEAR 2 CLINs
2001 Sustainment Support 12 MO $ $
2002 Travel (Not to Exceed) 1 Lot $50,000.00 $50,000.00
TOTAL OPTION 2 PRICE $
RFP # 70Z02321RDAM00200 Page 4
SECTION C
STATEMENT OF WORK
See Section J, Attachment 1: Statement of Work.
SECTION D
PACKAGING AND MARKING
Unless otherwise specified, all items to be delivered under this contract shall be…