This document is a combined synopsis/solicitation from the United States Coast Guard for a low cost maritime domain awareness pilot study. The Coast Guard seeks to examine the feasibility, costs, and benefits of improving maritime surveillance in the remote Pacific Ocean using an unmanned surface system over a 30-day demonstration period. Proposals are due in phases, with details provided in attachments. The solicitation will result in a firm-fixed price contract awarded to a single contractor to transport, operate, and remove an unmanned surface vehicle system south of Oahu, Hawaii, with onboard sensors to detect maritime targets and enhance situational awareness for law enforcement activities. The contractor will also provide a control center and daily briefings, with data collected on detection performance and communicated to the Coast Guard and Global Fishing Watch for verification.
Attachment II
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Q&A Additional.docx | DOCX document | |
| Amendment 00001.pdf | ||
| Attachment III-A TRLDefinitions.docx | DOCX document | |
| QandA.docx | DOCX document | |
| 70Z02319RPE6R0100.docx | DOCX document | |
| Attachment_I_Satement_of_Work_MDA.docx | DOCX document | |
| Attachment_III_TRL_Definitions.docx | DOCX document | |
| Attachment_A_Price_Input.xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Low Cost USV System Technology Demonstration Plan
N O T I C E
This document is disseminated under the sponsorship of the Department of Homeland Security in the interest of information exchange.
For use outside the United States Government, the Government assumes no liability for its contents or use thereof.
The United States Government does not endorse products or manufacturers. Trade or manufacturers’ names appear herein solely because they are considered essential to the objective of this plan.
Surface Branch United States Coast Guard
Research & Development Center
1 Chelsea Street
New London, CT 06320
(This page intentionally left blank.)
EXECUTIVE SUMMARY
In 2018 Congress tasked the United States Coast Guard (USCG) to examine the feasibility, costs, and benefits of improving Maritime Domain Awareness in the remote Pacific Ocean using a low cost unmanned surface system. The USCG faces challenges with respect to conducting maritime surveillance in the Pacific Ocean necessary to support its statutory missions related to marine safety, security, and protection. One of the three tenets of the Coast Guard’s Western Hemisphere Strategy is the defensive posture of this strategy to sustain effective offshore awareness capability. This is the comprehensive ability to detect threats and safeguard our homeland, prevent illegal fishing, and stop intrusion into protected marine sanctuaries. One of the Fourteenth Coast Guard District’s (D14) primary Maritime Domain Awareness (MDA) concerns is identifying where Illegal, Unreported, and/or Unregulated (IUU) fishing activity is most prevalent. Their current focus is on transshipments of fish at sea.
The demonstration will be comprised of Three major phases:
· Phase I – System Characterization
· Phase II – Operational Performance
· Phase III – Unmanned Surface Vehicle (USV) System Removal and Out-brief The goals of the demonstration include:
· Determine the operational utility of a USV System for USCG maritime missions in remote areas.
· Quantify the impact of utilizing the USV System.
· Demonstrate USV System operational capabilities in the maritime environment.
· Inform the development of Concepts of Operation (CONOPS) for a USV System.
· Demonstrate the integration of the USV System into the maritime law enforcement force structure.
(This page intentionally left blank.)
TABLE OF CONTENTS
ivEXECUTIVE SUMMARY viiiLIST OF FIGURES viiiLIST OF TABLES ixLIST OF ACRONYMS AND ABBREVIATIONS
INTRODUCTION
11.1 Demonstration Phases
11.2 Assumptions and Limitations
DEMONSTRATION FACILITY AND EQUIPMENT
22.1 Demonstration Facility
22.1.1 Location – South of Oahu, Hawaii
22.1.2 Demonstration Facility Requirements:
22.1.3 Logistics
32.1.4 Target Vessels
32.1.5 Instrumentation Plan
32.2 Communications Plan
32.3 Support Equipment
32.4 Payload
32.5 Daily Briefs
DEMONSTRATION DESIGN
33.1 Scope
33.2 Schedule
DEMONSTRATION METHODS AND PROCEDURES
44.1 Roles and Responsibilities
54.2 Operational Procedures
54.3 Safety Briefings
54.4 Data Collection
54.4.1 Data Sheets
54.4.2 Media Events
DEMONSTRATION EVENTS
65.1 Pre-Demonstration Preparations
65.1.1 USV Preparation and Functional Inspection
65.1.2 Demonstration Readiness Review
65.1.3 USV Transport
65.2 Phase I – On-Site System Design, Construction, and Operation Overview
75.2.2 Support Requirements
85.2.3 Personnel Requirements
85.3 Phase II – Operational Performance
85.3.1 Launch and Recovery
85.3.2 Sensor/Payload Calibration
85.3.3 Target Detection
95.3.4 Maritime Target Activity and Interdiction Situational Awareness
95.3.5 Missions
115.3.6 Standoff Determination from Surface Asset
125.3.7 Close out Summary Briefing
125.3.8
125.4 Phase III – USV System removal
125.4.1 Removal of USV
125.4.2 Removal of the CMS
125.4.3 Support Gear
125.4.4
135.4.5 Data Collection
DATA COLLECTION INDEX
RISK MANAGEMENT
147.1 Safety Requirements
147.2 Test Hazard Analysis
147.3 Security Requirements
147.4 Environment
147.5 USV Operations Risk
ADMINISTRATIVE CONSIDERATIONS
158.1 Personnel Contact Information
158.2 Demonstration Plan Revision History
158.3 Data Distribution List
158.4 Report Distribution List
158.5 Safety and Security
A-1APPENDIX A.
INSTRUMENTATION PLAN
B-1APPENDIX B.
DAILY DATA RECORD
C-1APPENDIX C.
COMMUNICATIONS PLAN
LIST OF FIGURES
2Figure 1. Proposed Operational Area for the USV System demonstration.
10Figure 2. Example ladder search pattern.
11Figure 3. Example spiral search pattern.
LIST OF TABLES
4Table 1. Technology Demonstration sequence (durations estimated/average).
8Table 2. Phase I demonstration team personnel.
12Table 3. Phase II demonstration team personnel.
12Table 4. Phase III demonstration team personnel.
13Table 5. Data Collection Index
LIST OF ACRONYMS AND ABBREVIATIONS
| AIS |
| Automatic Identification System |
| BLOS |
| Beyond-line-of-sight |
| C4ISR |
| Command, Control, Communications, Computers, Intelligence, Surveillance, and Reconnaissance |
| CG-2 |
| Assistant Commandant for Intelligence |
| CMS |
| Control and Monitoring Station |
| CONOPS |
| Concepts of Operation |
| COP |
| Common Operational Picture |
| D14 |
| Fourteenth Coast Guard District |
| D17 |
| Seventeenth Coast Guard District |
| DF |
| Direction finding |
| DRR |
| Demonstration Readiness Review |
| EO |
| Electro-optical |
| GFW |
| Global Fishing Watch |
| GPS |
| Global Positioning System |
| HAZMAT |
| Hazardous materials |
| IR |
| Infrared |
| ISR |
| Intelligence, Surveillance, and Reconnaissance |
| IUU |
| Illegal, Unreported, and/or Unregulated |
| LRIT |
| Long Range Identification and Tracking |
| MDA |
| Maritime Domain Awareness |
| NATO |
| North Atlantic Treaty Organization |
| OPAREA |
| Operational Area |
| OPCEN |
| Operations Center |
| PACAREA |
| Pacific Area |
| RDC |
| Research and Development Center |
| RF |
| Radio frequency |
| SDCIP |
| Surveillance, detection, classification, identification, and prosecution |
| SIGINT |
| Signals Intelligence |
| SWaP |
| Space, weight, and power |
| THA |
| Test Hazard Analysis |
| TOI |
| Target of Interest |
| USCG |
| United States Coast Guard |
| USV |
| Unmanned Surface Vehicle |
| VIP |
| Very Important Person |
| VMS |
| Vessel Monitoring System |
(This page intentionally left blank.)
1 INTRODUCTION
In 2018 Congress tasked the United States Coast Guard (USCG) to examine the feasibility, costs, and benefits of improving Maritime Domain Awareness (MDA) in the remote Pacific Ocean using a low cost unmanned surface system. The USCG faces challenges with respect to conducting maritime surveillance in the Pacific Ocean necessary to support its statutory missions related to marine safety, security, and protection. One of the three tenets of the USCG’s Western Hemisphere Strategy is the defensive posture of this strategy to sustain effective offshore awareness capability. This is the comprehensive ability to detect threats and safeguard our homeland, prevent illegal fishing, and stop intrusion into protected marine sanctuaries. One of the Fourteenth Coast Guard District’s (D14) primary MDA concerns is identifying where Illegal, Unreported, and/or Unregulated (IUU) fishing activity is most prevalent. Their current focus is on transshipments of fish at sea.
RDC is collaborating with Global Fishing Watch (GFW) to utilize their data analysis and advanced mapping capabilities to assist in developing a suspicious ship activity-monitoring program with machine learning and artificial intelligence. For the demonstration to be successful, data such as ship detection will be shared with GFW. They will assist in verifying ship detections and potentially assist in determining behavior of detected ships.
The goals of the demonstration include:
· Determine the operational utility of an Unmanned Surface Vehicle (USV) System for USCG maritime missions in remote areas.
· Quantify the impact of utilizing the USV System.
· Demonstrate USV System operational capabilities in the maritime environment.
· Inform the development of Concepts of Operation (CONOPS) for a USV System.
· Demonstrate the integration of the USV System into the maritime law enforcement force structure.
1.1 Demonstration Phases
The demonstration will be comprised of three major phases:
· Phase I – USV System Characterization
· Phase II – USV System Operational Performance
· Phase III – USV System Removal and Out-brief
1.2 Assumptions and Limitations
· The demonstration will focus on commercially available, low cost USV systems that have a minimal logistical footprint.
· For the demonstration, the USV will be in the operational area for 30 days. Set up and removal time is in addition to the 30 days.
· The demonstration will utilize contractor owned and operated systems.
2 DEMONSTRATION FACILITY AND EQUIPMENT
2.1 Demonstration Facility
2.1.1 Location – South of Oahu, Hawaii
The intent of operating just south of Oahu is to minimize the logistical impact on demonstration personnel. Should a recovery of the USV be required, it will be a reasonable trip. If the demonstration requires a staged passing ship, again, the distance is reasonable (see Figure 1). This is a suggested operational area and can be changed if necessary. However, the intent is to demonstrate the USV system in the Pacific Ocean, remotely and beyond line of sight to show the communications aspect of the USV system.
Figure 1. Proposed Operational Area for the USV System demonstration.
2.1.2 Demonstration Facility Requirements:
The contractor shall describe the plans for the Demonstration Control/Monitoring Center (DCMC) and any shore side facilities required.
2.1.3 Logistics
Facility logistics include:
· Communications links
· Power
· Fueling (if applicable)
· Targets
· Data collection
· Security
· Very Important Person (VIP) Events including Media and daily briefs
· USV(s) monitoring system
· Maritime Detachment “Deployed Configuration”
· Contractor provided afloat assets (Contractor shall provide specifications of afloat asset to support USV system and vignettes in accordance with SOW)
2.1.4 Target Vessels
The contractor shall describe target vessels to include the one contractor provided boats and expected targets of opportunity in the operations area.
2.1.5 Instrumentation Plan
The contractor shall document their instrumentation plan in APPENDIX A.
2.2 Communications Plan
The contractor shall document their communications plan in APPENDIX C.
The plan will describe the data links and communications system segment which provides the beyond-line-of-sight (BLOS) communication path between the USV(s) and the control/monitoring center along with communications to the remote locations and other platforms.
2.3 Support Equipment
The contractor shall describe all support equipment required. This could include but is not limited to spare parts, tools, office equipment, support boats, communications equipment, USV tracking equipment, launch and recovery equipment, and conference rooms for briefs and discussions.
2.4 Payload
The contractor shall describe the design and operations of the payload on the USV. This is to include power production, power consumption, onboard processing to minimize communications costs of the alert signals, and the integrity of the USV during the demonstration.
2.5 Daily Briefs
The contractor shall provide a daily briefs format that describes what will be included in the brief.
3 DEMONSTRATION DESIGN
3.1 Scope
The scope of the demonstration includes the preparation, inspection, transport, at sea demonstration, operation, and removal of a USV System for the purpose of generating data that examines the operational utility of a USV System for conducting Intelligence, Surveillance, and Reconnaissance (ISR) missions in remote ocean environments.
3.2 Schedule
The schedule presented in Table 1 is a draft for a proposed sequence of events that the demonstration will follow. The contractor shall modify Table 1 to suit their proposed technology while maintaining a 30 day demonstration. Weather events and other external factors may require that the schedule be altered over the course of the demonstration. The demonstration will be a 24/7 operational event but the alert system on the USV can be used to ease the manning needs during the night and weekends, allowing a longer time between the alert and the next step in the process. Each event in the table are estimates/averages and presented for information only. The USV System Tech Demo is expected to take place in July and August 2020. Current plans for the at sea 30 days is from 15 July to 13 August 2020.
Table 1. Technology Demonstration sequence (durations estimated/average).
| Week |
| Activity |
| Days |
| At sea Hours |
Weeks 1-2 Demonstration Preparation
| Demonstration Readiness Review |
| 0.5 |
| 0.0 |
| Expeditionary Transport |
| 4.0 |
| 0.0 |
| Field Assembly, Set-up, Calibration |
| 7.0 |
| 0.0 |
| USV Instrumentation |
| 0.5 |
| 0.0 |
| Week 3 |
| Phase I |
System Instruction
| On site and ready in Oahu |
| 0.5 |
| 0.0 |
| System Design, Construction, and Operation Overview |
| 0.5 |
| 0.0 |
| Ground Support Equipment Demonstration |
| 0.5 |
| 0.0 |
| Maintenance Evolutions |
| 1.0 |
| 0.0 |
| Deployment |
| 0.5 |
| 0.0 |
| Fully operational and operating |
| 5.0 |
| 120 |
| USCG/GFW alert verification as needed |
| 5.0 |
Week 4
Phase II
Detection Performance
| Operating |
| 7.0 |
| 168 |
| Design Reference Missions |
| 2.0 |
| 0.0 |
| Test detection and communications |
| 2.0 |
| ? |
| USCG/GFW alert verification as needed |
| 7.0 |
| 0.0 |
| Week 5 |
| Phase II |
Detection Performance
| Operating |
| 7.0 |
| 168 |
| Target Detection and alert communications |
| 7.0 |
| ? |
| Maritime Target Activity |
| 1.0 |
| ? |
| USCG/GFW alert verification as needed |
| 7.0 |
| 0.0 |
| Week 6 |
| Phase II |
Detection performance
| Operating |
| 7.0 |
| 168 |
| Target detection and alert communications |
| 7.0 |
| 0.0 |
| USCG/GFW alert verification as needed |
| 7.0 |
| 0.0 |
| Week 7 |
| Phase III |
Completion, USV System Removal, and Summary Briefing
| Operating |
| 4.0 |
| 96 |
| Target detection and alert communications |
| 4.0 |
| 0.0 |
| USCG/GFW alert verification as needed |
| 4.0 |
| 0.0 |
| Complete 30 day deployment |
| 0.0 |
| 0.0 |
| USV System removal |
| 3.0 |
| ? |
| Conduct Close out Summary Briefing |
| 0.5 |
| 0.0 |
4 DEMONSTRATION METHODS AND PROCEDURES
4.1 Roles and Responsibilities
The contractor shall be responsible for the USV System and its operation in its entirety. The contractor will be responsible for directing the contractor provided boat according to the daily plan.
The USCG Project Manager will be responsible to be liaison between the contractor, the USCG customer, and GFW.
USCG operators and GFW will be responsible for verifying the USV System alerts.
4.2 Operational Procedures
The contractor is responsible for operational procedures.
4.3 Safety Briefings
The contractor is primarily responsible for safety and the safety elements of the daily morning briefings.
4.4 Data Collection
4.4.1 Data Sheets
Data will be collected during all aspects of the demonstration. For each event, the following data will be recorded (see APPENDIX B for sample data sheets):
· Date
· Time
· Environmental Conditions
· Location
· Alert
· Alert Verification Data/documentation for all support evolutions includes:
· Photographic and/or video documentation
· Written description of any support required Additional Data/documentation for all evolutions includes:
· Personnel requirements (number and qualifications)
· Equipment requirements
· Mishaps, warning lights, communications failures, faults, etc.
· Pre-, through-, and post-deployment and maintenance - photographic and descriptive summary documentation
· Photographic and/or video capture of screen (if applicable) Additional specific data requirements are included in the discussion of each day’s operations during the daily brief.
4.4.2 Media Events
The contractor shall describe a media strategy for responding to any media inquiries or events with the USCG’s authorization and preparations for up to three presentations for the media.
5 DEMONSTRATION EVENTS
5.1 Pre-Demonstration Preparations
5.1.1 USV Preparation and Functional Inspection
The contractor shall document a plan or action and milestones for the USV Preparation and Functional Inspection.
5.1.2 Demonstration Readiness Review
The contractor shall describe their high level plan for conducting the DRR.
5.1.3 USV Transport
The contractor shall describe how they will transport the USV system and supporting equipment.
Data/documentation to be collected:
· Transport configuration and assembly photographs
· Assembly data: data/documentation for all support evolutions
· Any calibrations required
· Any issues with the shipment
5.2 Phase I – On-Site System Design, Construction, and Operation Overview The contractor shall modify the following example sections to be consistent with their USV system.
5.2.1.1 USV System Design, Construction, and Operation Overview The overview may include a verbal briefing/walkthrough of the USV System furnished for demonstration. The briefing could cover system familiarization topics such as design concept, construction, component functions, operation, maintenance, and any other topics applicable to the ownership, operation, and deployment of the system.
Data may include:
· Storage requirements
· Fuel availability/commonality (if applicable)
· Climate restrictions
· Temperature
· Rain
· Sea State
· Communications
· Software (detection sensors, communications, training, etc.)
· Detect and avoid solutions
· Modularity
· Instrumentation and data collection capabilities
5.2.1.2 Mission Configuration
The contractor shall propose a format and content for the Mission Configuration Data Sheet.
5.2.1.3 Support Equipment Demonstration
The contractor shall list/document the support equipment needing a briefing/walkthrough.
Data to be collected:
· Support equipment/tooling
· Photographic documentation and list
5.2.1.4 Maintenance Evolutions
The contractor shall list/document all the maintenance activities to be demonstrated:
Data to be collected:
· Photographs/video of the processes
· Maintenance documentation/cards (if available)
· For each evolution:
· Data/documentation for all support evolutions
· Consumables
· Hazardous materials (HAZMAT)
5.2.1.5 Pre-deployment/Operations/Post-deployment Inspections The contractor shall list/document the procedures to execute pre-deployment, operations, and post-deployment activities for the entirety of the USV, CMS, and associated equipment.
Data to be collected:
· Pre-deployment check list.
· Operations check list.
· Post-deployment check list.
· For each evolution: data/documentation for all shore-side evolutions.
5.2.2 Support Requirements
5.2.2.1 Contractor Support.
The contractor shall identify all support that may be required to operate the USV system that only the contractor should do.
5.2.3 Personnel Requirements
Table 2 provides an example list of demonstration team personnel and roles for Phase I. (Contractor shall update Table 2 with contractor personnel and roles) Table 2. Phase I demonstration team personnel.
| Name |
| Organization |
| Role |
| Phone |
| TBD |
| Contractor |
| Demonstration Director |
| TBD |
| TBD |
| Contractor |
| System Characterization Control |
| TBD |
| TBD |
| RDC |
| Observer and USCG Liaison |
| TBD |
| TBD |
| PACAREA |
| Observer |
| TBD |
| TBD |
| D-14 |
| Observer |
| TBD |
| TBD |
| D-17 |
| Observer |
| TBD |
| TBD |
| USCG HQ CG-2 |
| Observer |
| TBD |
| TBD |
| GFW |
| Observer |
| TBD |
5.3 Phase II – Operational Performance
5.3.1 Launch and Recovery
The contractor shall describe the launch and recovery events.
Data to be collected:
· Data/documentation for all control/monitoring station/shipboard evolutions
· Photos/video of the Launch
· Special equipment requirements
· Photos/video of the Recovery
· Special equipment requirements
5.3.2 Sensor/Payload Calibration
The contractor shall list/document the sensors to be calibrated.
Data to be collected (as applicable):
· Procedures
5.3.3 Target Detection
The contractor shall describe a target detection regime.
Data to be collected for each evolution:
· General.
· Data/documentation for all evolutions
· Profiles and search patterns used
· Characterization of the surveille and detect process
· Range from USV to target at events
· Imagery
· Locations and types of targets identified
· Datalink usage
· Ability to maintain awareness of previous targets
· Detection
· Target location
· Method used
· Classification. (If applicable)
· Time
· Target type (description, course, and speed)
· Process (including sensor used)
· Identification. (If applicable)
· Imagery
· Any unique identifiers or behaviors
· Direction/location finding results
· Frequency
· Content (if available)
5.3.4 Maritime Target Activity and Interdiction Situational Awareness
The contractor shall describe demonstration events that allow USV(s) and sensor/payload to detect moving maritime targets to enhance situational awareness for law enforcement activities.
Data to be collected:
· Data/documentation for all evolutions.
5.3.5 Missions
In addition to the mission listed in this section, the contractor shall propose and describe specific missions to execute during the 30 demonstration that demonstrate the capability of the USV.
5.3.5.1 Loiter
The USV Can demonstrate the ability to loiter in a given location. The loiter will last for 24 hours and the USV will be tracked to show the actual drift during the loiter. This will be repeated in different environmental conditions. The actual loiter pattern will be recorded and be part of the submitted data.
Data collected during the loiter:
· GPS track
· Environmental conditions around the USV(s)
· Any alerts
5.3.5.2 Ladder Search Pattern – Maximize Efficiency
The USV will execute multiple ladder search patterns (Figure 2) with the goal of maximum efficiency.
Figure 2. Example ladder search pattern.
Data to be collected:
· GPS recorded continuously and reported twice daily
· Environmental conditions around the USV(s)
· Any alerts
5.3.5.3 Spiral Search Pattern – Maximize Efficiency
The USV will execute multiple spiral search patterns (Figure 3) with the goal of maximum efficiency.
Figure 3. Example spiral search pattern.
Data to be collected:
· GPS recorded continuously and reported twice daily
· Environmental conditions around the USV(s)
· Any alerts
5.3.6 Standoff Determination from Surface Asset
The USV will determine/demonstrate the maximum standoff distances associated with sustaining communications to the launching surface asset. This is to explore the possibilities of operating the USV from a ship to determine the viability of increasing the patrol area using the autonomous system. As this tasking aims to generate data on USV performance, while working in concert with a ship it will be required that the sensor and/or payload be operating during this activity.
Data to be collected:
· GPS track
· Environmental conditions around the USV(s)
· Any alerts
· Communications connectivity
5.3.7 Close out Summary Briefing
The contractor shall describe the contents of the Close out Summary Briefing.
5.3.8 Personnel Requirements
Table 3 provides a list of demonstration team personnel and roles for Phase II. (Contractor shall update Table 3)
Table 3. Phase II demonstration team personnel.
| Name |
| Organization |
| Role |
| Phone |
| TBD |
| Contractor |
| Demonstration Director |
| TBD |
| TBD |
| Contractor |
| System Operational Control |
| TBD |
| TBD |
| RDC |
| Observer and USCG Liaison |
| TBD |
| TBD |
| PACAREA |
| Observer |
| TBD |
| TBD |
| D-14 |
| Observer |
| TBD |
| TBD |
| D-17 |
| Observer |
| TBD |
| TBD |
| USCG HQ CG-2 |
| Observer |
| TBD |
| TBD |
| GFW |
| Observer |
| TBD |
5.4 Phase III – USV System removal
5.4.1 Removal of USV
The USV shall be retrieved or programmed to return to the contractor’s site.
5.4.2 Removal of the CMS
All equipment and office gear shall be removed from the CMS in accordance with the contractor’s agreement.
5.4.3 Support Gear
All support gear will be removed and returned to the contractor’s site.
5.4.4 Personnel Requirements
Table 4 provides a list of demonstration team personnel and roles for Phase III.
Table 4. Phase III demonstration team personnel.
| Name |
| Organization |
| Role |
| Phone |
| TBD |
| Contractor |
| USV System Removal |
| TBD |
| TBD |
| RDC |
| Oversite |
| TBD |
5.4.5 Data Collection
Record any issues or maintenance required upon removal of the USV System.
6 DATA COLLECTION INDEX
Table 5. Data Collection Index
| Week |
| Activity |
| Data Collected |
| Weeks 1-2 |
| Demonstration |
Preparation
| Demonstration Readiness Review |
| Minutes |
| Expeditionary transport |
| Media |
| Field assembly, set-up, calibration |
| Media, Description |
| USV Instrumentation |
| Media, Description, |
| Week 3 |
| Phase I |
System Characterization/ Instruction
| On site and ready in Oahu |
| Media, Poster |
| System design, construction, and operation overview |
| Media |
| Ground Support Equipment demonstration |
| Media |
| Maintenance evolutions |
| Media, Description |
| Deployment |
| Media |
| Fully operational |
| Media, Daily Data Sheet |
| USCG/GFW alert verification as needed |
| Media, Daily Data Sheet |
| Week 4 |
| Phase II |
Detection Performance
| Operating |
| Media, Daily Data Sheet |
| Design Reference Missions |
| Media, GPS Tracks |
| Deploy support boats if needed |
| Media, GPS Tracks |
| Test detection and communications |
| Daily Data Sheets |
| USCG/GFW alert verification as needed |
| Daily Data Sheets |
| Week 5 |
| Phase II |
Detection Performance
| Operating |
| Media, Daily Data Sheet |
| Target detection and alert communications |
| Daily Data Sheets |
| Maritime target activity |
| Media, Daily Data Sheet |
| USCG/GFW alert verification as needed |
| Daily Data Sheets |
| Week 6 |
| Phase II |
Detection performance
| Operating |
| Media, Daily Data Sheet |
| Target detection and alert communications |
| Daily Data Sheets |
| USCG/GFW alert verification as needed |
| Daily Data Sheets |
| Week 7 |
| Phase III |
Completion, USV System Removal, and Close out Summary Briefing
| Complete 30 day deployment |
| Media, Daily Data Sheet |
| Target detection and alert communications |
| Daily Data Sheets |
| USCG/GFW alert verification as needed |
| Daily Data sheets |
| USV System removal |
| Media, Daily Data Sheets |
| Conduct Close out Summary Briefing |
| Media |
7 RISK MANAGEMENT
Risk management is the process by which:
· Hazards are identified;
· An assessment is made of the risks involved;
· Mitigating procedures are established to reduce or eliminate the risks; and
· A conscious decision is made, at the appropriate level, to accept residual risks.
As a precursor to USV testing, it is prudent to assess hazards and implement processes and procedures to manage risk. Processes and procedures inherent to testing of manned craft frequently have to be adapted to accommodate USV technologies and capabilities, and new approaches have to be developed to address considerations unique to USVs. (NATO, 2010)
The contractor shall describe any risks in their approach to meeting the requirements of the SOW and describe how they will mitigate those risks.
7.1 Safety Requirements
The contractor shall describe how they will control and monitor safety for the demonstration. An example could be a Safety Checklist which consists of a series of standard questions for all USV testing that is intended to assure that all “lessons learned”, and appropriate preparations have been incorporated into the plan. The checklist is essentially a double-check of all configuration, envelope, and procedural actions implemented to minimize risk. The checklist is designed to stimulate the thinking process of all test team members so that the risks associated with all types of test operations can be materially reduced and is based on lessons learned from past mishaps. Yes and no answers are not considered adequate, but rather pointers to the location where the question’s appropriate response is addressed are cited. If a question is not applicable to the test, the reason should be explained. (NATO, 2010)
7.2 Test Hazard Analysis
The contractor shall describe the process they will use to identify all hazards or risks associated with the proposed demonstration, then to rate those hazards in terms of both severity and probability, and then to identify means by which the hazards can be reduced. For example, a failure modes analysis provided by the designers, if available, provides an excellent basis for developing this description. Those failure modes that pose a risk of loss of the USV, injury, or property damage must be considered, and appropriate corrective action employed. Actions such as proficiency, training, and simulator runs may be used to help mitigate risks. (NATO, 2010)
7.3 Security Requirements
The contractor shall describe any security requirements that will be addressed for successful completion of the demonstration.
7.4 Environment
The contractor shall describe how the USV system will monitor and report on the environment it is operating in.
7.5 USV Operations Risk
The risk of running a low cost USV in the open ocean is low. However, such things as being runover, netted, or just taken do exist. The contractor shall describe actions to be taken should any of these situations arise.
8 ADMINISTRATIVE CONSIDERATIONS
8.1 Personnel Contact Information
To Be Added
8.2 Demonstration Plan Revision History
To Be Added
8.3 Data Distribution List
To Be Added
8.4 Report Distribution List
To Be Added
8.5 Safety and Security
The classification of this project is unclassified. The demonstration plan, USV demonstration data, and reports are unclassified. This demonstration plan has been reviewed for OPSEC requirements, and it has been determined that a definitive OPSEC annex to this demonstration plan is not required.
(This page intentionally left blank.)
APPENDIX A. INSTRUMENTATION PLAN
[This will be provided by the contractor.] (This page intentionally left blank.)
APPENDIX B. DAILY DATA RECORD
These are modifiable by agreement between the contractor and the government.
APPENDIX C. COMMUNICATIONS PLAN
[This will be provided by the contractor.]
Distribution Statement A: Approved for public release; distribution is unlimited.
Destruction Notice: For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
Mar 2019
Low Cost Unmanned Surface Vehicle (USV) System Technology Demonstration Plan
File details come from the government source that posted it. Updated .