Amendment 1 Vendor Questions and Answers.pdf
PDF 100 KB Posted
- Attached to
- Perimeter Security Assets Federal contract opportunity
- Solicitation number
- 70US0926R70093552
About this file
This document contains Vendor Questions and Answers for a new 5-year Indefinite Delivery, Indefinite Quantity (IDIQ) multiple award contract for perimeter security assets and services. The contract will cover National Special Security Events (NSSEs) across the Continental United States, with a tentative performance period from March 1, 2025 to February 28, 2030. Key details include: events will vary in location and duration, with asset rental periods ranging from one day to several months; contractors must provide physical perimeter assets like fencing, barriers, generators, mobile command centers, and scaffolding; and pricing should be all-inclusive, covering asset costs, labor, and trucking.
The solicitation emphasizes flexibility in asset deployment, with no minimum quantity thresholds for asset categories. Contractors can demonstrate capacity through supplier agreements and inventory lists. The government will evaluate asset capacity on a per-task-order basis, with typical event notification occurring 6-9 months in advance, though some requirements may arise with as little as 24 hours' notice. Offerors are expected to describe surge labor strategies, Program Management Office structure, and resource prioritization. Pricing will be assessed for both reasonableness and competitiveness, with value-added capabilities potentially viewed favorably if baseline requirements are met.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 2.4.1 RFP 70US0926R70093552 Perimeter Assets IDIQ Final.pdf | ||
| 2.1.1 RFP 70US0926R70093552 Perimeter Assets IDIQ Final.pdf | ||
| 2.1.1 Attachment 1 - Ceiling Price Worksheet.xlsx | XLSX spreadsheet | |
| 2.1.1 Attachment 2 - Past Performance Questionnaire.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Vendor Question and Answers:
1. Is the solicitation a new requirement set by the government or is this a contract currently being performed that the government is renewing. If this is a renewal, do you have the contract number associated with the old contract?
New Requirement: New 5-year Indefinite Delivery, Indefinite Quantity (IDIQ) multiple award contracts are being established.
Previous Contract Numbers: 70US0920D70090002 and 70US0920D70090003
2. Could you please confirm the anticipated start date for the period of performance (POP)?
Tentative POP: March 1, 2025 – February 28, 2030
This indicates a five-year base period for the overall IDIQ contract, during which individual task orders or delivery orders will be issued, each with its own specific POP depending on the event requirements.
3. If this is for rent what is the rental duration required for the price schedule?
Events vary. Each order issued under the IDIQs will have its own Period of Performance, which will vary based on the specific event. Historically, rental of equipment and installation durations have ranged from as short as one day to several months, depending on requirements. This flexible approach allows for tailored support to each event’s needs.
4. Do the events take place in the same area? Do you have a map or total acreage of the site?
No. Since the events occur in different locations across the Continental United States and the perimeter asset locations are determined only after venues are selected, it is not possible to provide a definitive map or list of asset locations in advance. Asset deployment and mapping will need to be coordinated once venues are confirmed for each event.
5. Does the Government have minimum quantity thresholds for any perimeter-security asset categories (e.g., fencing, jersey barriers, vehicles, power/lighting) that offerors are expected to demonstrate at time of award?
No. The Government doesn’t have a minimum quantity threshold (see assets list from most recent large-scale event).
6. Will the Government consider supplier agreements, inventory lists, and documented procurement pipelines as sufficient evidence of capacity where assets are not owned outright at time of proposal submission?
Yes. The Government would consider suppliers agreements, inventory lists, and documented pipelines as sufficient evidence of capacity where assets are not owned outright at time of proposal submission.
7. When evaluating asset capacity, will the Government assess offerors’ ability to support multiple simultaneous NSSEs, or evaluate capacity on a per-task-order basis?
No. The Government will evaluate assets capacity per task order basis
8. Does the Government place greater value on assets pre-positioned regionally, or is national sourcing with rapid delivery considered equivalent if timelines are met?
Yes. National sourcing with rapid delivery is considered equivalent as long as the timelines are met.
9. Does the Government anticipate scenarios requiring rapid surge staffing beyond baseline planning assumptions, and should offerors explicitly address surge labor strategies in Volume I?
Yes. The Government anticipates scenarios that may require rapid surge staffing beyond baseline planning assumptions. Offerors should explicitly address their surge labor strategies in Volume I to demonstrate their ability to respond effectively to such requirements.
10. To what extent will the Government consider existing local labor and vendor relationships as a discriminator under the Management Approach factor?
None. The Government is not involved in subcontracting activities.
11. Should offerors explicitly describe their approach to managing concurrent NSSE task orders, including PMO structure and resource prioritization?
Yes. While each contract is competed and awarded per event, offerors should explicitly describe their approach to managing concurrent NSSE task orders. This should include details on their proposed Program Management Office (PMO) structure and resource prioritization strategies to ensure effective support for multiple, simultaneous events.
12. Does the Government have typical or expected timelines for suitability determinations for contractor personnel supporting NSSEs?
No. Contractors should submit required documentation as early as possible and work closely with the Government security office to monitor the status of their suitability determination.
13. Will the Government consider prior USSS suitability determinations as reducing execution risk when evaluating workforce readiness?
Contractors should submit required documentation as early as possible and work closely with the sponsoring agency’s security office to monitor the status of their suitability determination.
14. When talking about size, scale, and determining relevancy, is this assessed at the task order level or the total contract value/size level?
Size, scale, and determining relevancy will be assessed at the task order level.
15. Will large-scale federal events (e.g., DoD, international summits, national ceremonies) be considered highly relevant if they exceed NSSE requirements in complexity?
The highest relevancy for this requirement is to support NSSEs.
16. How will the Government assess past performance where the offeror performed as a subcontractor but executed a majority of the operational scope?
When the Government assesses past performance where the offeror performed as a subcontractor but executed a majority of the operational scope, it typically considers the relevance and significance of the work performed, regardless of the contractual role. The Government will evaluate the offeror’s specific responsibilities, accomplishments, and outcomes as demonstrated in the past performance references. The assessment focuses on the offeror’s direct contribution to the project, including quality, timeliness, and effectiveness of the work performed.
Offerors should clearly document and describe their role, the scope of work executed, and the results achieved in their past performance submissions. The Government may request additional details or references to verify the offeror’s operational impact and ensure an accurate evaluation.
Ultimately, the Government’s goal is to assess the offeror’s capabilities and reliability based on the substantive work performed, not solely on whether the work was performed as a prime contractor or subcontractor.
17. Will the Government evaluate ceiling prices for reasonableness only, or also assess competitiveness relative to historical NSSE pricing?
The Government will evaluate ceiling prices for both reasonableness and competitiveness.
Reasonableness ensures that the proposed prices are fair and reflect the work’s value, while competitiveness involves comparing proposed prices to other offers and market rates.
18. Will reliance on Government-Furnished Property be viewed as:
i. A neutral factor, or
ii. A potential execution risk if central to the offeror’s solution?
No. The use of Government-Furnished Property is not an evaluation factor
19. Can the Government clarify whether GFP availability is guaranteed across all NSSEs, or varies by event and location?
No. GFP availability is not guaranteed across all NSSEs
20. Does the Government anticipate issuing multiple task orders per year, and should offerors assume overlapping planning and execution periods?
Yes. The Government anticipates issuing multiple task order per year, offeror should assume overlapping planning and execution periods.
21. Should offerors expect NSSE task orders to be concentrated in major metropolitan areas, or distributed across diverse and remote locations?
Yes. NSSE typically take place in major metropolitan cities, however offeror should be prepared to provide assets and services throughout the Continental United States.
22. Does the Government anticipate any requirement for contractor-provided security personnel, such as guards, access control monitors, or perimeter observation staff, in support of NSSE operations?
No. This requirement is for physical perimeter assets and services (see assets requirements list)
23. If security personnel are required, would those services be limited to:
i. Asset monitoring and protection, or
ii. Active security or law-enforcement-adjacent roles?
N/A
24. If contractor-provided security personnel are not required, can the Government confirm that perimeter assets will be operated and monitored exclusively by USSS or other Government-provided security forces?
All property, including Government Furnished Property (GFP), becomes the responsibility of the contractor once accepted. Operation and monitoring of perimeter assets will be governed by contract requirements, and contractors are responsible for the assets in their possession, regardless of whether contractor-provided security personnel are required.
25. Does the Government anticipate that requirements for contractor-provided personnel (beyond installation/removal labor) could vary by task order, event type, or venue?
Yes. Personnel requirements beyond installation and removal labor may vary by task order, event type, or venue. The contractor is responsible for determining and providing appropriate personnel to meet the specific requirements of each task order.
26. Does the Government anticipate any requirement for contractors to supply electronic security or surveillance equipment, such as:
Cameras (fixed, mobile, or temporary) Antennas or communications relay devices Monitors, command displays, or control stations Temporary sensor or detection systems?
No. The Government doesn’t anticipate any requirement for contractors to supply electronic security or surveillance equipment.
27. If electronic security or surveillance equipment is not currently required, can the Government confirm that the scope of this IDIQ is limited to physical perimeter assets and related logistical services?
Yes. The scope of this IDIQ is for physical perimeter assets and consultative services.
28. Would the Government be open to offering electronic security or surveillance capabilities at the task-order level if such capabilities enhance perimeter awareness, coordination, or risk reduction?
No. The scope of this IDIQ is for physical perimeter assets and consultative services.
29. If electronic security equipment is contemplated in future task orders, should offerors assume:
i. Stand-alone systems, or
ii. Integration with existing USSS command, communications, or monitoring infrastructure?
The scope of this IDIQ is limited to physical perimeter assets and consultative services. Electronic security equipment integration is not contemplated under this contract.
30. Who is expected to monitor and control perimeter assets during events:
i. USSS personnel only, or
ii. A combination of Government and contractor support?
All property is the responsibility of the contractor to include GFP once accepted by the vendor.
31. Are contractors expected to support or provision any temporary operations centers, staging areas, or monitoring spaces related to perimeter asset deployment?
Yes. It is the responsibility of the contractor to obtain and monitor staging areas or spaces related to perimeter assets deployment.
32. Will the Government consider value-added capabilities—such as enhanced situational awareness, asset tracking, or temporary surveillance—when evaluating technical approaches, provided all baseline requirements are met?
Yes. The Government may consider value-added capabilities—such as enhanced situational awareness, asset tracking, or temporary surveillance—when evaluating technical approaches, provided all baseline requirements are met. These capabilities can strengthen a proposal by demonstrating innovation, increased operational effectiveness, or risk mitigation beyond the minimum requirements.
However, the extent to which value-added features are considered depends on the specific evaluation criteria outlined in the solicitation. Offerors should ensure that any proposed enhancements are clearly described, justified, and do not detract from meeting the mandatory requirements. The Government will primarily evaluate proposals based on compliance with baseline requirements, but value-added capabilities may be viewed favorably if they offer measurable benefits.
33. If additional electronic or monitoring capabilities are proposed as optional or value-added, will they be evaluated as:
i. Neutral enhancements, or
ii. Potential discriminators under the Technical Approach factor?
No. This is not a requirement for this IDIQ
34. Can the Government clarify whether the term “perimeter assets” is intended to encompass:
i. Physical barriers and infrastructure only, or
ii. A broader set of physical and electronic measures supporting access control and perimeter awareness?
The contractor is responsible for the perimeter assets to complete the build-out (reference SOW).
This contract does not have a requirement for electronic measures supporting access and control.
35. In the spreadsheet titled “2.1.1 Attachment 1 - Ceiling Price Worksheet,” Tab “Ceiling Pricing Worksheet Asset,” please define the meaning of the column heading (column E) “Evaluation Weightings.”
Column D (Evaluation Weightings) is for the minimum amounts that we will evaluate pricing to.
36. Attachment 1 – What is the difference between the Small Portable Office Trailer and Mobile Command Center?
Small office trailer: 8x20 Mobile Command Center: 12x44
Please price without any accessories.
37. Attachment 1 – There are currently 25 categories for labor in the “Ceiling Pricing Worksheet Labor” tab can more be added if needed?
Yes. We do not dictate a limit. Add as many as you feel are necessary.
38. Attachment 1 – There are no specific labor categories to price for fairness in pricing could the government list the labor categories that are needed.
We are not dictating specific categories. We would expect a Project Director, Sr. Project Director, Environmental Specialist, etc.
39. Attachment 1 – What is the size of the refrigerator that is required.
3.1 Cu. Ft. with freezer
40. Attachment 1 – What are the sizes of the dumpster and recycling bins that are needed and how long will they be needed?
The sizes of dumpsters and recycling bins are at the discretion of the contractor, based on site requirements and anticipated waste volume. All trash from perimeter sites must be collected daily or whenever bins are full, throughout the build-out, event, and close-out periods.
41. How is the cost of potential staging areas considered in the pricing structure?
It’s a reimbursable cost within the pricing structure.
42. SOW – Marshalling Yard - What is the size and type of space that the contractor is required to provide and how is this to be invoiced according to the current pricing structure?
The size and type of space required is at the discretion of the contractor, based on operational needs. This is considered a reimbursable cost and should be invoiced in accordance with the current pricing structure outlined in the contract.
43. The number of meetings for pre-planning, Periodic Status Meetings, and meetings required during an event are undetermined. Are these meetings to billed on and hourly rate and does this include travel time?
The Government does not assume any costs until the contract has been awarded. Once awarded, meetings for pre-planning, periodic status updates, and event-related coordination will be covered under the fixed price for Project Management as specified in the quote. These meetings, including any associated travel time, are not billed separately at an hourly rate; they are included within the overall fixed price for Project Management.
44. SOW G - Is this award going to be given to multiple contractors and then each TO be bid separately?
Yes.
45. What duration should we use for the assets? Ex. one week of fence onsite including installation and dismantle?
For planning purposes, please use the following durations for assets:
• Installation: Three (3) days
• Event Duration: One (1) week
• Dismantle: Two (2) days
Major roads should be reopened within 24 hours following the conclusion of the event, subject to coordination between the city and contractors.
46. Can you please provide more detail for the following assets:
*generators (portable, towable & large panel: please specify KW for each as there are large ranges within each category) *mobile command center: please specify size and any necessary furniture/accoutrements/functionality
*scaffolding: dimensions?
*office trailer: size and furniture/accoutrements?
Generator:
- Portable 10kW
- Towable 20kW
- Large 56kW
Scaffolding dimensions:
• Width: 1.35 meters (4.5 feet)
• Length: 2.5 meters (8 feet)
• Platform Height: Adjustable, up to 6 meters (20 feet)
• Overall Height (including guardrails): 1 meter (3.3 feet) higher than the platform height
Mobile Command Center: 12x44 (accoutrements will be ordered separately)
47. Please confirm the method of notification for events. Will the contractor be provided an event schedule for the year, quarter, or monthly to plan for perimeter security and or prepare CAD drawings? Or what will be the average lead time the contractor will be provided for event notification for mobilization?
The average lead time for event notification is typically 6 to 9 months for National Special Security Events (NSSE). However, perimeter asset requirements may arise with as little as 24 hours’ notice. Notification will be provided via mass email message. Event schedules may not be provided on a yearly, quarterly, or monthly basis.
48. The pricing worksheet does not have a field for consumables or associate material for the rented/owned equipment. Can you please confirm that misc ODCs will be priced at the task order level along with travel?
Yes. ODCs are reimbursable (see SOW).
49. Given the amount of product requested for a (1) day event use, will the Government agree for all entities bidding to a load in/build schedule of (10) days prior and load out/removal of (7) days after the (1) day use? There are assets that require a usage time for pricing from drop off to removal.
For planning purposes, please use the following durations for assets:
• Installation: Three (3) days
• Event Duration: One (1) week
• Dismantle: Two (2) days
Major roads should be reopened within 24 hours following the conclusion of the event, subject to coordination between the city and contractors.
50. Is the Government requesting an asset price only or does it need to include Labor and Trucking?
Pricing should be all-inclusive and must include asset costs, labor, and trucking.
51. Will the Government please confirm the CPW is based on an event in Washington, DC?
No. The CPW is not based solely on an event in Washington, DC. Events can occur anywhere within the Continental United States (CONUS).
File details come from the government source that posted it. Updated .