70RFPW26QW9000011 - SF1449 w Attachments.pdf
PDF 4 MB Posted
- Solicitation number
- 70RFPW26QW9000011
About this file
This is a Request for Quote (RFQ) for commercial products and services issued by the U.S. Department of Homeland Security, Federal Protective Service (DHS/FPS), for installation of a Video Surveillance System (VSS) at Sirena Plaza located at 108 Hernan Cortez Avenue, Hagåtña, Guam (facility code GU7069). The solicitation number is 70RFPW26QW9000011, with an offer due date of July 27, 2026 at 0900 PT. This is a Women-Owned Small Business (WOSB) set-aside at 100%, with a North American Industry Classification Standard (NAICS) code of 561621 and a size standard of $25 million. The requisition number is 192126R09EQPP0053.
The single line item requires installation of a new Video Surveillance System for the Sirena Plaza facility (Product/Service Code N063: Installation of Equipment—Alarm, Signal, and Security Detection Systems), with a unit of measure designated as "LO" (Lump Sum). The contractor shall provide all labor, material, management, expertise, transportation, supervision, training, licenses, and permits in accordance with the Statement of Work. Project completion is required within 90 business days after receipt of the Notice to Proceed. The period of performance for installation runs from May 1, 2026 to September 30, 2026, with a separate service period from September 1, 2026 to February 28, 2027. The Government retains the right to inspect equipment and refuse acceptance if damaged or non-functional, with all costs for a finished working product borne by the contractor. The contracting officer is Kelly Minturn, and the point of contact is Rachel Kalac at (253) 876-6838. Attachments include the Statement of Work, drawings/floor plans, contract clauses, wage determination WD-2015-5393, past performance forms, and solicitation provisions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 70RFPW26QW9000011 - AM4.pdf | ||
| 70RFPW26QW9000011 - AM3.pdf | ||
| 70RFPW26QW9000011 - AM2.pdf | ||
| 70RFPW26QW9000011 - AM1.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
WOMEN-OWNED SMALL
BUSINESS (WOSB)
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES
1. REQUISITION NUMBER PAGE 1 OF
2. CONTRACT NUMBER 3.AWARD/EFFECTIVE
DATE
4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE
DATE
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME b. TELEPHONE NUMBER (No collect calls)
8. OFFER DUE DATE/
LOCAL TIME
9. ISSUED BY
13b. RATING
14. METHOD OF SOLICITATION
CODE
15. DELIVER TO 16. ADMINISTERED BY CODE
18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/
OFFEROR
CODE
FACILITY
CODE
CODE
TELEPHONE NUMBER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN
OFFER
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK
BELOW IS CHECKED
REQUEST
FOR QUOTE
(RFQ)
INVITATION
FOR BID
(IFB)
REQUEST
FOR
PROPOSAL
(RFP)
SEE ADDENDUM
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
(Use Reverse and/or Attach Additional Sheets as Necessary)
25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 29. AWARD OF CONTRACT: REFERENCE
. YOUR OFFER ON SOLICITATION
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
30a. SIGNATURE OF OFFEROR/CONTRACTOR
30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED
31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 11/2021)
Prescribed by GSA - FAR (48 CFR) 53.212
10. THIS ACQUISITION IS UNRESTRICTED OR
NORTH AMERICAN
INDUSTRY CLASSIFICATION
STANDARD (NAICS):
SIZE STANDARD:
13a. THIS CONTRACT IS A
RATED ORDER UNDER
THE DEFENSE PRIORITIES
AND ALLOCATIONS
SYSTEM - DPAS (15 CFR 700)
SET ASIDE: % FOR:
11. DELIVERY FOR FREE ON
BOARD (FOB) DESTINATION
UNLESS BLOCK IS MARKED
SEE SCHEDULE
12. DISCOUNT TERMS
ARE ARE NOT ATTACHED
ARE ARE NOT ATTACHED
27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4.
FAR 52.212-3 AND 52.212-5 ARE ATTACHED.
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
8(A)
ECONOMICALLY
DISADVANTAGED
WOMEN-OWNED SMALL
BUSINESS (EDWOSB)
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
(SDVOSB)
HUBZONE SMALL
BUSINESS
SMALL BUSINESS
NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH
AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND
ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS
SPECIFIED
DATED.
OFFER
ADDENDA
ADDENDA
70RFPW26QW9000011
SIRENA PLAZA
108 HERNAN CORTEZ
AGANA GU
DHS/FPS/West CCG/Region 9 U.S. Dept. of Homeland Security Ofc of Procurement Operations - FPS 1102 15th Street SW, Suite 105 Attn: Rachel Kalac Auburn WA 98001
FPS WEST CCG (70RFPW)
U.S. Dept. of Homeland Security Office of Procurement Operations Federal Protective Service Acq. Division 1102 15th Street SW, Suite 105 Auburn WA 98001
07/27/2026 0900 PT
192126R09EQPP0053
Rachel Kalac
(253) 876-6838
70RFPW 100.00
OPO/FPS/WEST CCG/R9
Kelly Minturn
561621
$25
GU7069
Requisition # 192126R09EQPP0053
COR: Phil Coughlin, Philip.J.Coughlin@fps.dhs.gov, 415-500-1995
CO: Kelly Minturn, Kelly.Minturn@fps.dhs.gov, Continued...
STOCK RECORD (S/R)
STANDARD FORM 1449 (REV. 11/2021) BACK
19.
ITEM NO.
20.
SCHEDULE OF SUPPLIES/SERVICES
21.
QUANTITY
22.
UNIT
23.
UNIT PRICE
24.
AMOUNT
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE RECEIVED (MM/DD/YYYY) 42d. TOTAL CONTAINERS
40. PAID BY
32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
32g. EMAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED
CORRECT FOR
PARTIAL FINAL
37. CHECK NUMBER
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER
36. PAYMENT
COMPLETE PARTIAL FINAL
ACCEPTED,
253-346-0187
CS: Rachel Kalac, Rachel.D.Kalac@fps.dhs.gov, 253-346-0252
Budget POC: Tonia Patterson, Tonia.A.Patterson@fps.dhs.gov, 415-816-4365
Video Surveillance System (VSS) Installation at the Sirena Plaza in Hagåtña, Guam for Federal
Protective Service – Region 9
1. The contractor shall provide all labor, material, management, expertise, transportation, supervision, training, license and permits to provide the services in accordance with the Statement of Work (SOW) for
Video Surveillance System Installation at the
Sirena Plaza located at 108 Hernan Cortez Ave, Hagåtña, Guam (GU7069).
2. The Government has the right to inspect the equipment and refuse acceptance of the equipment if it is damaged or does not function properly. All costs required to provide a finished working product shall be borne by the contractor.
3. Project Completion: No later than 90 business days after receipt of the Notice to
Proceed.
Continued...
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGES
NAME OF OFFEROR OR CONTRACTOR
SUPPLIES/SERVICES
(B)
UNIT
(D)
UNIT PRICE
(E)
AMOUNT
(F)
OPTIONAL FORM 336 (4-86)
Sponsored by GSA FAR (48 CFR) 53.110
ITEM NO.
(A)
QUANTITY
(C)
NSN 7540-01-152-8067
70RFPW26QW9000011
4. DHS/FPS is not responsible for any job-related injuries that occur while working on federal government property.
****OFFERORS ARE ENCOURAGED TO REVIEW THE RFQ
PACKAGE IN ITS ENTIRETY. ANY SUBMISSION WHICH
DOES NOT MEET THE REQUIREMENTS OF THIS RFQ WILL
BE REMOVED FROM AWARD CONSIDERATION.****
Period of Performance: 09/01/2026 to
02/28/2027
0001 1 LOInstallation of a new Video Surveillance System
(VSS)
Sirena Plaza (GU7069), Hagatna, Guam
Product/Service Code: N063
Product/Service Description: INSTALLATION OF
EQUIPMENT- ALARM, SIGNAL, AND SECURITY
DETECTION
SYSTEMS
Period of Performance: 05/01/2026 to
09/30/2026
PLEASE NOTE: All attachments are available via the paperclip icon to the right of this document. In some cases, you may need to download the document to view attachments.
ATTACHMENTS:
A – Statement of Work (SOW)
B – Drawings/Floor Plans
C – Contract Clauses
D – Wage Determination WD-2015-5393
E – Past Performance Project Form
F – Past Performance Questionnaire
G – Instructions to Offerors/Solicitation
Provisions
| Solicitation/Contract/Order for commercial products and commercial services |
| Requisition number |
| Contract number |
| Award/Effective date |
| Order number |
| Solicitation number |
| Solicitation issue date |
| For solicitation information call: |
| Name |
| Telephone number |
| Offer due date/local time |
| Issued by |
| Code |
| This acquisition is |
| NAICS |
| Size standard |
| Delivery for free on board (FOB) destination unless block is marked |
| Discount terms |
| This contract is a rated order under the defense priorities and allocations system - DPAS |
| Rating |
| Method of solicitation |
| Deliver to |
| Code |
| Administered by |
| Code |
| Contractor/Offeror |
| Code |
| Facility code |
| Telephone number |
| Check if remittance is different and put such address in offer |
| Payment will be made by |
| Code |
| Submit invoices to address shown in block 18a unless block below is checked |
| Accounting and appropriation data |
| Total award amount |
| Solicitation incorporates by reference |
| Addenda |
| Contract/purchase order incorporates by reference |
| Addenda |
| Contractor is required to sign this doc. and return: |
| Award of contract: reference |
| Signature of offeror/contractor |
| Name and title of signer |
| Signer date signed |
| Signature of contracting officer |
| Name of contracting officer |
| Contracting officer date signed |
| Authorized for local reproduction. Previous edition is not usable |
| Standard Form 1449 (Rev. 11/2021) |
| Quantity in column 21 has been |
| Signature of authorized government representative |
| Date |
| Printed name and title of authorized government representative |
| Mailing address authorized government representative |
| Telephone number of authorized government representative |
| Email number of authorized government representative |
| Ship number |
| Voucher number |
| Amount verified correct for |
| Payment |
| Check number |
| Stock record (S/R) |
| S/R account number |
| S/R voucher number |
| Paid by |
| I certify this account is correct and proper for payment |
| Signature and title of certifying officer |
| Date |
| Received by |
| Received at |
| Date received |
| Total containers |
| Standard Form 1449 (rev. 11/2021) Back |
Federal Protective Service
U.S. Department of Homeland Security
STATEMENT OF WORK
for
New Installation of
Video Surveillance System (VSS)
July 3, 2025
Sirena Plaza VSS Project
Sirena Plaza
108 Hernan Cortez Ave.
Hagatna, GU 96910 GU7069
STATEMENT OF WORK
TABLE OF CONTENTS
| A. | BACKGROUND | 3 |
| B. | PURPOSE | 3 |
| B.1 | Description of Existing System | 3 |
| B.2 | Description of New System | 3 |
| C. | SCOPE | 4 |
| C.1 | General | 4 |
| C.2 | Installation Requirements | 5 |
| C.3 | Video Storage Requirements and MS Windows Configuration | 7 |
| C.4 | Control Room Monitors | 8 |
| C.5 | Networking Equipment | 8 |
| C.6 | Operating Systems Updates, Service Packs, and Firmware | 9 |
| C.7 | Wireless Point-to-Point (Remove this section if not applicable.) | 10 |
| C.8 | Attachments | 10 |
| D. | SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS & REQUIREMENTS | 11 |
| D.1 | Network Video Management System | 11 |
| D.2 | Minimum Server and Workstation Requirements | 13 |
| D.3 | Workstation Minimum Requirements | 14 |
| D.4 | IP Network Video Camera Minimum Requirements | 14 |
| D.5 | Network Managed Switch | 15 |
| D.6 | Additional System Component, Software, Location Specifications | 15 |
| E. | ADDITIONAL PROJECT REQUIREMENTS | 15 |
| E.1 | Design Standards | 15 |
| E.2 | Materials and Equipment | 16 |
| E.3 | Electrical and Cabling Requirements | 17 |
| E.4 | Final Inspection and Acceptance | 19 |
| E.5 | Cleanliness, Protection, and Patching | 19 |
| E.6 | Warranty and Maintenance | 21 |
| E.7 | Safety and Health | 27 |
| E.8 | Quality Control Plan | 27 |
| E.9 | Training | 28 |
| E.10 | Configuration Management | 29 |
| E.11 | Component/Device Configurations | 29 |
| E.12 | Network Settings | 30 |
| E.13 | Wireless Network Security | 31 |
| E.14 | Audit and Accountability | 31 |
| E.15 | Identification and Authentication/Access Control | 31 |
| E.16 | Data Protection | 32 |
| E.17 | User Accounts | 32 |
| E.18 | Incident Management and Disaster Recovery | 33 |
| E.19 | Software Maintenance | 33 |
| E.20 | Enterprise Architecture | 33 |
| F. | DELIVERABLES | 37 |
| F.1 | General | 37 |
| F.2 | Request for Quotation (RFQ) | 38 |
| F.3 | Pre-Installation Deliverables | 39 |
| F.4 | Post-Installation Deliverables | 39 |
| G. | PROJECT ADMINISTRATION | 40 |
| G.1 | Work Authorization | 40 |
| G.2 | Period of Performance | 41 |
| G.3 | Place(s) of Performance | 41 |
| G.4 | Contacts | 41 |
| G.5 | Special Scheduling Requirements | 41 |
| G.6 | Contractor Access and Use of Premises | 41 |
| G.7 | Security Requirements | 42 |
| G.8 | Contractor Suitability Requirements | 43 |
| G.9 | Contractor Employee Access Requirements | 44 |
| G.10 | Government Acceptance Period | 51 |
| H. | APPLICABLE STANDARDS | 52 |
| H.1 | General | 52 |
| H.2 | Accessibility Requirements (Section 508) | 53 |
| H.3 | Historic Preservation Requirements | 53 |
| I | ACCOUNTABLE PROPERTY | 54 |
| I.1 | Definitions | 54 |
| I.2 | Deliverables | 55 |
| I.3 | Property Accountability | 55 |
| I.4 | Physical Inventory | 56 |
| I.5 | Property Disposal | 56 |
| I.6 | Lost, Stolen, Damaged or Destroyed (LDD) Property | 56 |
| J. | INFORMATION TECHNOLOGY SECURITY | 57 |
| J.1 | Security Certification/Accreditation | 57 |
| J.2 | Security Review and Reporting | 57 |
| J.3 | Continuous Monitoring | 58 |
FOR OFFICIAL USE ONLY (FOUO)
For Official Use Only (FOUO)
FPS VSS SOW Template 7/20/2024
For Official Use Only (FOUO)
1. BACKGROUND
A.1 The Federal Protective Service (FPS) is the federal law enforcement agency responsible for the protection and security of federal facilities, employees, and visitors. FPS actively works to reduce security vulnerabilities of federal facilities from criminal, terrorist, accidental, and natural disaster threats to ensure properties remain safe, secure, and available to the American public and employees of the Federal Government.
A.2 The following Statement of Work (SOW) and guidelines have been developed by the Department of Homeland Security (DHS), Federal Protective Service (FPS) to mitigate threats and vulnerabilities pertaining to federal buildings and Government leased spaces. The SOW and regulations were developed with the notion that the security posture of each federally owned building or Government leased space is unique.
PURPOSE
B.1 Description of Existing System
The existing Video Surveillance System (VSS) is antiquated technology and has expired its lifecycle. The existing components include an DVR, client workstation, Control room video wall monitors, five (5) PTZ analog cameras, twenty-one (21) fixed analog cameras and one (1) matrix switcher.
B.2 Description of New System
B.2.1 This SOW is for the purchase and installation of a new standalone, Network Video Management System (NVMS), fixed/panoramic/PTZ IP cameras, client workstations, control center flat panel monitors, and all additional equipment and appurtenances necessary for a fully functional IP VSS located at the Sirena Plaza 108 Hernan Cortez Ave. Hagåtña, GU 96910. The VSS will have a workstation, monitor and console desk at the lobby screening station.
B.2.2 The VSS shall monitor vehicle traffic, personnel entry, emergency exits, the exterior perimeter of the facility, and other critical asset areas. The VSS shall retain video for a minimum of 30 days plus 25% additional storage space for future expansion. Storage shall be calculated at full camera resolution, full frame rate, and low compression.
B.2.3 All systems shall be stand-alone and separated from all other computer networks and do not require internet access.
C. SCOPE
C.1 General
C.1.1 All questions relevant to this SOW shall be submitted in writing to the CO. The Contractor shall not make or assume any changes to this SOW without written approval from the FPS CO.
C.1.2 The Contractor shall be responsible for the removal, inventory, packaging for storage and return of all removed equipment to the FPS Contracting Officer Representative/Technical Point of Contact (COR/TPOC). All currently installed wire, cable, and fiber, which are not designated for reuse, shall be completely removed by the Contractor, and properly disposed of.
C.1.3 The existing video system shall remain fully functional and operational to the greatest extent possible during the installation of the new surveillance system. The Contractor shall cut over from the existing system to the new system in stages to minimize the number and duration of outages. The Contractor shall submit a system cutover plan in accordance with Section F Deliverables. The FPS COR/TPOC shall review and approve the cutover plan in writing.
C.1.4 The Contractor shall provide, install, and configure the system as described and/or shown herein. The new system shall include all equipment, cabling, connectors, adapters, terminators, and appurtenances to interconnect all equipment installed in accordance with the requirements of this SOW.
C.1.5 The Contractor shall follow all applicable codes in Section H while carrying out the work outlined in this SOW.
C.1.6 The Contractor shall furnish all tools and equipment necessary to complete all work outlined in this SOW. The Contractor is NOT authorized to use Government-owned property, tools or equipment to complete work in accordance with this SOW, unless otherwise specified.
C.1.7 In the event any operational system or utility (e.g., fire, IDS, HVAC) is required to be disabled or turned off, a forty-eight (48) hour notice shall be required and approved by the GSA Building Manager, FPS Inspector, and/or FPS COR/TPOC prior to deactivation.
a) The Contractor, prior to departing for the day, shall ensure all system(s) previously disabled or turned off are functioning properly. A basic functional test shall be required to determine proper functionality of the system(s) and should be reported to the FPS COR/TPOC.
b) In the event a system is non-functional once enabled or turned on, it shall be the responsibility of the Contractor, at no additional cost to the Government, to restore the system(s) prior to departure from the site.
c) If the Contractor fails to restore all system(s) before departing, they shall be liable for all costs incurred by the Government to restore system(s) functionality.
C.1.8 All personnel engaged in installation activities pursuant to this SOW shall be licensed by the state, local authority, and/or the city local authority in the required trades or professions that require licensing by such jurisdictions. The type and level of license shall be consistent with requirements of the jurisdictions and work to be performed by this SOW.
C.1.8.1 The contractor shall provide and submit with their proposal documentation from the manufacturer that they are trained, certified, and authorized to install, integrate, test, and commission the system.
C.1.9 It shall be the sole responsibility of the contractor to employ personnel licensed and qualified to carry out all tasks outlined in this SOW. At no time during the installation shall the contractor require Government personnel to complete tasks required to be completed by the contractor as covered by this SOW.
C.1.10 The Contractor shall be solely responsible for ensuring their employees and subcontractors abide by all requirements of the contract. At all times while work is being performed in accordance with this contract, the Contractor shall have a supervisory representative available to answer questions, resolve issues, supervise company employee(s), and subcontractor(s).
C.1.11 The Contractor shall provide a daily access schedule to coordinate installation activities. The schedule shall be submitted with their proposal documentation.
C.1.12 The Contractor shall maintain a separate set of drawings, schematics, and wiring diagrams of the VSS to be used for creating as-built drawings. This set shall be accurately kept up to date by the Contractor, noting all changes and additions to the VSS and shall be available for the final inspection walkthrough.
C.1.13 The Contractor may be required to attend installation construction meetings.
C.1.14 For buildings 45 years of age or older: All repairs, installations and removals are required to follow the Secretary of the Interior’s Standards for Rehabilitation (SOI): https://www.nps.gov/crps/tps/rehab-guidelines/stand.htm.
C.1.15 The Contractor must be ISO 9001-2015 Certified and provide their ISO certification with their proposal documentation.
C.2 Installation Requirements
C.2.1 The Contractor shall install all system components and appurtenances in accordance with manufacturer’s instructions following all applicable local, state, and federal codes and policies. All appurtenances, such as, but not limited to connectors, terminators, and mounting hardware shall be supplied by the Contractor, as well as all adjustments, alignments, programming, and configuration required for a complete and optimal VSS operating system.
C.2.2 The Contractor shall provide and install a complete statically assigned IP-based VSS to include, but not limited to, Network Video Management System (NVMS) capable of viewing, recording, playback, and exporting of video, cameras, servers, RAID 6 video storage, workstations, and network routers/switches. Provide and install camera mounts and other appurtenances, premise wiring, and system hardware as required for a complete and fully operational system as specified in this SOW. The installed system shall easily be expandable for future growth.
C.2.3 The Contractor, for all equipment/device(s) requiring licensing, shall purchase/install license(s) as required by the manufacturer. Documentation of all software and hardware licenses shall be provided to FPS as part of the final system documentation.
C.2.4 Roof work, to include, but not limited to conduit installation and penetrations must be performed in such a manner as to not void any roof warranty and must be completed in accordance with roof manufacture’s recommendations. Any work to be performed on the roof must be approved by the GSA Building Manager.
C.2.5 The Contractor shall be responsible to provide the necessary equipment and tools to access all equipment which is not accessible by ladder. The contractor is accountable for all tools and equipment used during the course of installation; potentially dangerous items must remain under the physical control of the installer at all times. All tools and equipment to include electronic equipment and computers are subject to inspection by FPS.
C.2.6 All measurements and equipment locations are approximate and shall be verified by the Contractor for accuracy and installation feasibility. The Government shall not be held responsible for any error or variation in any measurements or other data listed, nor shall the Contractor, because of an error or variation in any measurement listed, be relieved of the responsibility to carry out the requirements in accordance with the true intent and meaning of the specifications without additional cost to the Government.
C.2.7 All ceiling tiles removed to accommodate installation shall be returned at the end of the workday. Any ceiling tiles damaged from the contractor shall be replaced with like type.
C.2.8 The Contractor shall remove and haul debris off the site property daily and disposed of in accordance with all federal, state, local laws, and regulations. Debris created from this project shall NOT be placed and/or disposed of in Government dumpsters on Government property.
C.2.9 The Contractor shall install and configure cameras in accordance with manufacturer’s recommendations and industry best practices for optimal live view and recording.
C.2.10 The Contractor shall verify all camera installation locations and views with the FPS COR/TPOC prior to installation.
C.2.11 The Contractor, when removing the existing cameras, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed and/or patched accordingly to protect against weather exposure. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure throughout the installation period.
C.2.12 Installers shall be trained, certified, and authorized by the Manufacturer to install, integrate, test, and commission the system. The contractor shall provide and submit with their proposal documentation from the manufacture that they are trained, certified, and authorized to install, integrate, test, and commission the system. If documentation is not available, the contractor can substitute by providing with their proposal confirmation on manufacturer letterhead, they are trained, certified, and authorized to install, integrate, test, and commission the system within two years of the submittal date.
C.2.13 At least one factory certified trained technician on the NVMS being installed by the contractor must be onsite at all times during the installation. Factory certification must be within the last two years (date of proposal).
C.3 Video Storage Requirements and MS Windows Configuration
C.3.1 The Contractor shall calculate appropriate storage for all cameras recording at full frame rate at the device (Camera, not total system), maximum resolution, and minimum compression. Storage capacity shall be capable of storing video for a minimum of thirty (30) days. The Contractor shall calculate and provide video storage requirements with the Quotation. The Contractor shall include enough storage for an additional 25% storage for future expansion maintaining the thirty (30) day minimum requirement. In addition to 6 additional camera licenses. The contractor will not have access to video data and will not be responsible for the collection, use, maintenance or storage of video data.
C.3.2 Microsoft Windows and the NVMS software shall be configured to use MS Active Directory for authentication. If the NVMS software is not capable of authenticating to the Active Directory, then separate NVMS accounts will be configured in accordance with account management plan.
C.3.3 The Contractor shall not apply power to the NVMS until, at a minimum; the following checks have been completed.
a) All equipment has been installed and connected in accordance with manufacturer’s instructions.
b) All installed and/or reused wiring has been tested accordingly (e.g., shorts, opens, continuity).
c) Power supplies have been verified to operate at the correct voltage, phase, and frequency. Satisfaction of the above requirements shall not relieve the Contractor of responsibility for incorrect installation, defective equipment, or collateral damage as a result of Contractor work/equipment.
C.3.4 The Contractor shall ensure all system devices are configured appropriately for time synchronization. The local time zone where the system physically resides will be utilized. All devices shall be configured for time synchronization with a GPS-enabled network time source. The GPS time source will not have any connectivity capability beyond received functionality.
C.3.5 The Contractor shall demonstrate to the FPS COR/TPOC that the completed NVMS installation complies with the contract requirements. Using an approved test procedure, all physical and functional requirements of the project shall be demonstrated and shown. The test procedure shall include techniques and requirements for validating all significant system functions. The Contractor shall provide all test equipment and personnel required for final testing.
C.3.6 The Contractor shall remove as much as possible the existing console and relocate any IDS and ACS Components to the new console.
C.4 Control Room Monitors
C.4.1 The new monitors to be provided and installed are two (2) forty-three (43”) monitors and three (3) twenty-seven-inch (27”) monitors shall be installed in the FPS Security Control Room. The two (2) 43” monitors shall be video wall mounted. The three (3) 27” monitors shall be a vesa desk mounted and shall be located in the FPS Security Control room. One (1) 27” desk mounted monitor will be located in the lobby screening.
C.4.2 At a minimum, the 43” Monitors shall possess the following salient characteristics.
a) Color
b) 3840 x 2160 resolution, 16- or 32-bit pixel color resolution
c) Flat Panel
d) Wall mountable.
e) Must meet applicable and appropriate Electronic Product Environmental Assessment Tool (EPEAT) and ENERGY Star standards.
C.4.3 At a minimum, the 27” Monitors shall possess the following salient characteristics.
a) Color
b) 3840 x 2160 resolution, 16- or 32-bit pixel color resolution
c) Flat Panel
d) Mountable to articulating desk mount to hold two (2) 24” monitors.
e) Must meet applicable and appropriate Electronic Product Environmental Assessment Tool (EPEAT) and ENERGY Star standards.
C.5 Networking Equipment
C.5.1 As required per this SOW, the contractor shall purchase, install, and configure all equipment, components, and necessary appurtenances for a complete and appropriately configured Ethernet network connecting all devices of the NVMS.
C.5.2 The Contractor shall configure installed switches for Trunk line communication between the switches. Line encryption shall be enabled between all network devices to the maximum intent possible. If copper network cabling is utilized between network devices, it shall be metallically shielded twisted pair.
C.5.3 The Contractor shall configure installed switches with Virtual Local Area Network (VLAN) and appropriate VLAN Routing. VLAN’s to be configured are:
Siren Plaza VLAN
C.5.4 All equipment shall be rack mountable, if possible. All equipment that is not rack mountable shall be installed on the wall. An appropriately sized piece of ¾” plywood shall be mounted on the wall, painted with fire retardant paint, and all equipment mounted on the plywood. Final mounting location shall be approved by the FPS COR/TPOC.
C.5.5 The Contractor shall install a rack mounted 19” combination display, keyboard, and mouse (KVM) at a usable height, in FPS control room connected to the new NVMS Server for system configuration and administration.
C.5.6 The Contractor shall install a new VSS client workstation in room FPS Control Room. The location of workstation shall be coordinated with the FPS COR/TPOC before installation.
C.5.7 The Contractor shall enable software-based, packet filtering firewalls on the VSS network. Firewalls will be enabled to permit only authorized network devices and protocols. A list of ports and protocols shall be provided as part of the system documentation for each unique device model and software suite. The VSS shall be functionality tested to ensure enabled firewall rules and port restrictions do not interfere with the overall functionality of the systems.
C.5.8 The Contractor shall ensure that all installed network devices that are Wi-Fi capable are disabled.
C.5.9 The Contractor shall install hardware-based, packet-filtering firewalls in accordance with the Network Settings specifications noted in Section E.12.
C.6 Operating Systems Updates, Service Packs, and Firmware
C.6.1 Operating systems and software applications shall be capable of being updated/patched after delivery. The Contractor shall ensure that all installed server(s) and client workstation(s) Operating System Software (OS), at the time of installation, are current with all security updates/patches, service packs, revisions, and shall be provided through the warranty period. The NVMS and all other installed software shall be the current version with all applicable updates and installed in accordance with manufacturers recommendations.
C.6.2 The Contractor shall remove and/or disable all software components (bloatware) that are not required for the operation and maintenance of the camera system; and shall provide documentation on what is removed and/or disabled. The software to be removed and/or disabled shall include, but is not limited to games, device drivers for network devices not delivered, messaging services (e.g., MSN, AOL, and IM), servers or clients for unused Internet services, unused networking and communications protocols, unused document processing utilities (Microsoft Word, Excel, PowerPoint, Adobe Acrobat, OpenOffice, etc.).
C.6.3 The Contractor shall provide notification of patches affecting security within the warranty period and follow on option periods as identified in the patch management process.
The Contractor shall, for software products procured under this Contract, provide all OEM software updates and patches to correct defects. Software updates and patches shall be either: made available to the government, or installed until End of Support (EoS) is reached; unless formally waived (in writing) by the DHS Contracting Officer.
a) Pre-Contract Award. The Contractor shall provide details on their patch management and update process. Responsibility for installation and update of patches shall be identified in your Submittal.
b) Post-Contract Award. The Contractor shall provide notification of known vulnerabilities affecting Contractor-supplied or required OS, application, and third-party software within 30 days after public disclosure.
C.6.4 The Contractor shall ensure that all VSS components have the latest manufacturer approved firmware version installed. Firmware version is to be documented on the device inventory.
C.6.5 All equipment must be National Defense Authorization Act (NDAA) and Trade Agreement Act (TAA) compliant. See Section E.2.6.
C.7 Wireless Network Not Applicable
C.8 Attachments
C.8.1 VSS Locations: See floor plans (Attachment B - Drawings). The contractor and FPS shall verify all camera installation locations to provide the optimal view prior to any installation.
1. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS & REQUIREMENTS
D.1 Network Video Management System
D.1.1 The NVMS shall support these essential software capabilities:
a) Live video monitoring
b) Recording of video
c) Playback of video from local or remote location(s)
d) Integral alarm/event management
e) Video export
D.1.2 The NVMS shall store/archive video using one of the following techniques:
a) Internal Disk Storage
b) Direct Attached Storage
c) Storage Area Network
D.1.3 The NVMS shall include image storage with configurable resolutions and frame rates.
D.1.4 The NVMS shall be compatible with, but not limited to: H.264, MPEG4, and MJPEG video compression formats.
D.1.5 The NVMS shall be capable of system fail-over and redundancy options, per the design of the system, execution, and technical requirements.
D.1.6 NVMS System Architecture Minimum Requirements equal or better than Avigilon:
a) HDMS Smart Codec Technology: Automatically adjust compression levels for regions in a scene, to optimize bandwidth while and maintaining image quality.
b) Appearance Search Technology/Capability: Allow the user to search recorded video to find instances of a person or vehicle across all sites using cameras with Avigilon (or similar) self-learning analytics. Allow the user to search for a person by physical description, including clothing color, hair color, gender, and age group. Capability to search for a vehicle by physical description, including color and category – car, truck, bus, bicycle, and motorcycle.
c) Facial Recognition Technology Artificial Intelligence – Capable of facial recognition algorithms to notify operators when a person of interest returns to a facility. Allows the user to add a person to a face watch list by uploading a photo or from recorded video. Allows a creation watch list alarm or monitor the Focus of Attention interface to detect matches.
d) Intelligent Search: Allows the user search recorded video for motion, the presence of classified objects (people or vehicles), background changes in the scene (thumbnail search), and for events.
e) Video Archive: Capable of retaining and managing large amounts of video for on-demand retrieval and review. Allow extension of storage beyond NVRs through the use of Avigilon Video Archive (or similar).
f) Provide detailed Management, Monitoring, and Reporting of System Status and Security Detailed logs of storage, network, and overall system status.
g) Unusual Activity Detection (UAD) technology: Capable of object-level detection of atypical activity. AI based technology capable of object-aware enabling operators to know when a person or vehicle is in an unusual location in the scene or moving at an unusual speed.
h) Unusual Motion Detection (UMD) technology: Allows fast video search and capable of narrowing motion events video.
i) Compliance with FIPS 140-2 Certified Encryption enable FIPS 140-2 certified cryptography on VSM software and on supported cameras. Allow required camera cryptography licenses to be centrally managed in VMS. Within VMS, capability to turn on licensed FIPS cryptography on cameras. VMS is to be able to inventory number of FIPS camera licenses being used and determine required number of licenses within a facility.
j) The NVMS shall operate on a TCP/IP managed digital network.
k) The system software shall operate in a Client/Server configuration across a Local Area Network (LAN) or Wide Area Network (WAN).
l) Streams live and recorded video up to 60 frames per second.
m) Support prioritizing streaming at 30 frames per second on 4K (8MP) cameras.
n) Streams live and recorded video from cameras up to a resolution of 7K (30 MP) — 6720 x 4488.
o) Decompresses H.264 and/or H.265 video through the client graphics card to help leverage the client’s total processing power.
p) Scalable to support up to 100 servers and/or 10,000 cameras per site.
q) All recorded video and audio are digitally signed using 256-bit encryption so video can be authenticated for evidentiary purposes.
r) Secure video and audio data by securely transmitting all command-and-control data via TCP/IP using cryptographic keys based on SSL to prevent eavesdropping or tampering.
s) External system alarms can be pre-selected and configured to be monitored and trigger event driven video operations.
t) Video and audio recording is to be defined by a recording schedule assigned to each video source.
u) Allow recording schedules to be based on event types that trigger video recording over a time period each day per week.
v) Video recording is to be cable of being activated manually by user triggered recording.
w) Alarms and rules be triggered by self-learning video analytics-based events.
x) Each recorded event is to include a pre-event and post-event recording option to provide context for a given situation.
y) Reference frame recording when no events are detected.
z) Motion detection is to be provided for each individual video source with adjustable sensitivity, threshold, and detection zones.
aa) Include primary and secondary video streams from each H.264 and/or H.265 video source to be recorded and maintained for a set amount of time before the primary stream is discarded as a means of increasing record time.
ab) Allow maximum recorded video retention time to be set for each video source.
ac) Video Analytics Activity overlay: display a color-coded bounding box around moving objects categorized as humans or vehicles.
ad) Configure the ability to display analytics activity for individual cameras or for the system.
ae) The ability to stream video and audio is limited only by the system hardware capabilities.
af) The application window display can be shared with other users for collaborative investigations while viewing both live and recorded video.
ag) Live and recorded video and audio can be streamed simultaneously on the same monitor.
ah) Use High-Definition Stream Management (HDSM) software technology to efficiently compress and preserve image quality while intelligently managing HD image transmission throughout the system.
ai) Operating System shall be certified to work by the Video Management Software’s manufacturer and be one of the following: Windows Server 2010 or newer.
aj) Windows 10 or newer.
ak) Support recording and management of video and audio sources using industry standard drivers. These drivers shall include: ONVIF Profile S, T and G Publicly Published API.
al) Support the following video analytic event types when captured by supported cameras: Objects in area, object loitering’ objects crossing defined line, object appears or enters area, object not present in area, objects enter area, objects leave area, object stops in area, anticipated direction of travel is violated, scene dramatically changes in an unexpected fashion.
am) Support the ability to export media and provide the following options.
an) Export recorded video in the following formats: Native (AVE), JPEG, PNG, TIFF, AVI, Print. Export recorded audio in the following formats: WAV, Native (AVE), AVI. Export a still frame of video as displayed in the video preview area: Native (AVE), JPEG, PNG, TIFF.
ao) Native (AVE) format exports shall:
ap) Digitally sign recorded video and audio using 256-bit encryption so video can be authenticated for evidentiary purposes.
aq) Be able to export video from one or multiple camera streams simultaneously.
ar) Support exporting multiple video segments from different spans of time.
as) Support reviewing of exported or backed-up video and audio in a dedicated player.
at) Support playback of exported clips in synchronized sequential time.
au) Support playback of multiple clips in continuous, sequential order.
av) Support exporting of video in lower frame-rates than originally recorded.
aw) Support exporting of a designated area from the camera’s recorded field of view.
ax) Support re-export into Native or other supported formats.
ay) Provide a record of the video source properties, including but not limited to: Camera model, Firmware version, Location, MAC address, Serial number, Resolution.
D.1.7 All components/equipment/device(s) requiring licensing. The license(s) shall be purchased/installed as required by the manufacturer’s instructions.
D.2 Minimum Server and Workstation Requirements
D.2.1 Network Video Management Server Minimum Requirements
CPU
Intel® Xeon® E (1.9GHz)
OS
Windows Server 2022 Windows 11 Windows 10 (64-bit) 21H2 LTSC Value or later
RAM
16 GB DDR4
OS Hard Drive
SSD RAID Mirrored
Network Interface
4X1GB
Display Adaptor
DVI, HMDI
Storage Configuration
RAID 6
Power Supply
Dual redundant hot swappable
Drives
Hot Swappable
Warranty
5-year Warranty
Multimedia Storage Requirements
General
· Multimedia storage shall be dedicated for archiving.
· Archiving shall be physically separated from OS/DB drives.
· OS/DB and Archive drive may be housed in the same chassis.
· Archive drives RAID 6 configuration
Total Storage Capacity
· Shall be calculated by the Contractor based on the requirements of the SOW. All calculations shall be provided with quotation.
D.3 Workstation Minimum Requirements
D.3.1
CPU
Intel Core i7 or newer
OS
Windows 11 Windows 10 (64-bit) 21H2 LTSC Value or later
RAM
16 GB DDR3
OS Hard Drive
SSD RAID Mirrored
Network Interface
1GB
Display Adaptor
VGA, DVI, HDMI dual monitor support
D.4 IP Network Video Camera Minimum Requirements
D.4.1 At a minimum, equal or better than Avigilon Exterior PTZ 8MP IP Camera: The FPS Local POC shall determine the field-of-view (FoV) for each camera with the Contractor, at the time of installation.
a) ONVIF Compliant Profile S, Profile T and Profile G
b) Operate in a temperature range of -40 deg C to +60 deg C (-40 deg F to +140 deg F)
c) Operate in a humidity range of 0-95% RH (non-condensing)
d) High Definition Stream Management
e) Multi-stream H.264, Multi-stream H.265, Motion JPEG.
f) Video Resolution: 8 MP
g) IPv4/IPv6, HTTP, HTTPS, SOAP,DNS,NTP, RTSP, RTCP, RTP, TCP,UDP, IGMP, ICMP, DHCP, Zeroconf, ARP,HSTS
h) Environmental rating IP66 and IP67
i) Impact rating IK10
j) Video Pattern Detection and Teach by Example Technology
k) Password protection, HTTPS encryption, digest authentication, WS authentication, user access log, 802.1x port based authentication, FIPS 140-2 L1 (with optional camera license), FIPS 140-2 L3 (with optional accessory)
l) 5-year warranty
D.4.2 At a minimum, equal or better than Avigilon 180/270/360-degree Exterior/Interior IP Panoramic Camera: verify the panoramic camera is compatible with the video management system software to ensure full functionality of the camera.
a) 180/270/360 degree panoramic
b) Wide Dynamic Range Panoramic
c) 3 or 4 sensors (cameras) within the housing
d) Lens: 2.8mm f1.2-103° , 4mm f1.6-72°, Remote Focus; 4mm f1.8-101°, 5.2mm f1.8-70° Remote Focus
e) Image Compression: H.264 HDSM Smartcodec or H.265 HDSM SmartCodec or Motion JPEG
f) Outdoor Rated IP66 and IK-10 Impact-Resistant Housing
g) Self learning video analytics on all sensors
h) Content adaptive IR technology up to 30m (100ft)
i) 3D Noise Reduction Filter
j) 8 MP per sensor resolution
D.4.3 At a minimum, equal or better than Avigilon Interior Fixed 5 MP IP Cameras: The FPS Local POC shall determine the field-of-view (FoV) for each camera with the Contractor, at the time of installation.
a. ONVIF Compliant 1.02, 2.00, Profile S, Profile T and Profile G
b. Operate in a temperature range of -40 deg C to +60 deg C (-40 deg F to +140 deg F
c. Operate in a humidity range of 0-95% RH (non-condensing)
d. High Definitntion Sream Management
e. Multi-stream H.264, Multi-stream H.265, Motion JPEG; HDSM
f. Advance Video Pattern and Teach by Example Technology
g. IPv4/IPv6, HTTP,HTTPS, SOAP,DNS,NTP, RTSP, RTCP, RTP, TCP,UDP, IGMP, ICMP,DHCP, Zeroconf,ARP,HSTS
h. Environmental rating IP66, IP67, IK10
i. PoE IEEE 802.3af, Class 3, 24V AC
j. Video Pattern Detection and Teach by Example Technology
k. Password protection,HTTPS encryption, digest authentication, WS authentication, user access log, 802.1x port based authentication, FIPS 140-2 L1 (with optional camera license), FIPS 140-2 L3 (with optional accessory)
l. 5 year warranty
D.5 Network Managed Switch
a) Physical Aspects
(1) 24 auto-sensing RJ45 10/100/1000 ports; Layer 3 managed
(2) 4 SFP ports 100/1000
(3) Serial DB9 RS-232 console port
(4) Rack Mountable
b) Power over Ethernet (PoE)
(1) 24 PoE+ ports
(2) IEEE 802.3 up to 30 Watts/port, or 802.3bt for 60 Watts/port
c) Network components shall be capable of disabling maintenance ports during normal system operation and enabling them only during approved maintenance activities.
D.6 Additional System Component, Software, Location Specifications
D.6.1 At a minimum, the Monitor Mount for Desk Console shall have the following characteristics:
a) Holds most monitors up to 20 lbs. with VESA 75/100 pattern.
b) Capable of holding two (2) 24” monitors
c) Compatible with LD Series Desk systems
d) Vertical Range: 26.8"
e) Horizontal Range: 19.3" to 36.2"
D.6.2 At a minimum, the UPS shall possess the following salient characteristics.
a) Heavy duty surge protector
b) Rack Mountable
c) Sized to provide at least four (4) hours of back up battery power.
D.6.3 At a minimum, the Console Desk shall be equal or better than Winstead and have the following.
a) Height: 30"
b) Monitor Mountable
c) Material: Wood Top
d) Desktop finish: constructed of 1” thick 45 lb. density industrial MDF board with thermolaminate.
e) Power distribution/cable management cabinet/constructed of fully welded, 16- gauge steel and feature integral front and rear doors for convenient access.
f) Stainless steel footrest shall be constructed of 18-gauge steel.
g) Long enough to fit all existing VSS and control room equipment to include monitors.
D.6.4 At a minimum, the GPS Time Server shall have the following.
a) Protocol NTP Stratum 1 Time Server
b) Accuracy Ethernet NTP ± 1ms overall
c) GPS source ±0.1μS
d) ANTENNA
e) Connector SMA Male
f) Cable 5-meter cable, (optional 10-meter extension)
g) Antenna head GPS sensor, in externally rated magnetic housing (+ adhesive pad/window fixing)
h) Unit power 1.5W
i) POE type Class 1
j) Alternative power input 10-40V DC (max current 150mA at 12V)
k) ETHERNET
l) Connector type RJ45
m) Rate 10Base-T/100Base-TX full-duplex with auto-negotiation
n) Data security Shared Keys system (server authentication)
o) Dimensions L 87mm W 75mm H 22mm. L 3.42 inches W 2.95 in H 0.86 in.
p) Weight 123g [ 4.3oz] (with mounting brackets) 121g [4.2oz].
q) Operating temperature -15oC to 75oC [5oF to 167oF].
r) Relative humidity 95% non-condensing.
s) Compliance CE, FCC, RoHS.
D.6.5 At a minimum, the CCV Equipment Rack shall have the following characteristics.
a) Metal lockable rack
b) Glass doors with handle
c) On rolling casters
d) Equipment cooling fans
e) 72” high
1. ADDITIONAL PROJECT REQUIREMENTS
E.1 Design Standards
E.1.1 Design Limitations – During design and planning activities, the Contractor shall advise the FPS COR/TPOC of all functional incompatibility issues and/or system interoperability limitations of any equipment to be installed. This shall include, but is not limited to, limitations as a result of insufficient heating, ventilation and HVAC, power, rack, console, and space requirements.
E.1.2 Infrastructure Design – The system design shall include all conduit, junction boxes, cabling, fiber, network topology, and HVAC and power requirements for the proposed Network Video Management System (NVMS).
E.1.3 Equipment Selection – The Contractor shall use commercial off the shelf (COTS) components in system design.
E.1.4 Backup Power Requirements –All VSS electrical and electronic equipment installed shall be powered from an Uninterruptable Power Supply (UPS). It is expected that all equipment necessary for continuous live viewing, recording, and archiving VSS video will be uninterrupted during a power outage. The UPS shall be sized to provide at least four (4) hours[footnoteRef:2] battery backup in the event the primary power source is interrupted. The Contractor shall include load calculations with their bid proposal. [2: ISC RMP Criteria 70 - Provide uninterruptible emergency power to essential electronic security systems for a minimum of four hours.]
E.1.5 Wiring Schematics – The Contractor shall provide complete system design wiring schematic diagrams representing planned device terminations to and between system equipment and components.
E.1.6 Riser Diagrams – The Contractor shall supply a system riser diagram. The diagram shall indicate the location of all associated system components, to include and not limiting to proper grounding.
E.2 Materials and Equipment
E.2.1 Items of the same type shall be products of a single manufacturer. All material, software and hardware, shall be new, the most current version, and presently being produced.
E.2.2 The Contractor shall provide enclosures as necessary for equipment not mounted in racks or supplied with an appropriate housing.
a) Interior: Enclosures to house equipment in an interior environment shall meet the requirements of NEMA 250 Type 12.
b) Exterior (Exposed-to-Weather): Enclosures to house equipment in an outdoor environment shall meet the requirements of NEMA 250 Type 4X.
E.2.3 All external camera housings shall be minimum IP66/NEMA4X rated for protection against rain, dust, and snow.
E.2.4 All camera housings shall be a minimum IK-10 Impact-Resistant for vandalism.
E.2.5 Optional - ONLY if recommended by the FSC: Camera housings shall match the color and architecture of the building, equal to or greater than the existing camera housings. Coloring camera housings shall not void the camera and housing manufacturer’s warranty. Before camera housings are painted the color shall be approved in writing by the Facility Security Committee.
E.2.6 All procured and installed equipment must me the National Defense Authorization Act (NDAA) and Trade Agreement Act (TAA) for compliance. Both acts play significant roles in government procurement and defense-related matters.
1) The National Defense Authorization Act (NDAA) is a U.S. federal law that authorizes appropriations for military activities, defense construction, and other related purposes. It sets military personnel strengths and outlines defense policies.
2) The Trade Agreements Act (TAA) limits the country of origin for products sold through your Schedule contract, in general, this means the following may be sold: GSA Reference Look up Trade Agreements Act-designated countries | GSA
a) Articles that are wholly the growth, product, or manufacture of the U.S. or a designated country, or
b) Articles that are "substantially transformed" in the U.S. or a designated country into a new and different article of commerce with a name, character, or use distinct from that of the article or articles from which it was…