REVISION 2 Attachment E - Contractor Quotation Checklist via AM3.docx
DOCX document 145 KB Posted
- Attached to
- Video Surveillance System Installation for Robert E. Coyle Federal Courthouse in Fresno, CA
- Solicitation number
- 70RFPW24QW9000003
About this file
This document is an Attachment E - Contractor Quotation Checklist for a Request for Quotation (RFQ) related to the installation of a video surveillance system at the Robert E. Coyle Federal Courthouse in Fresno, CA.
The checklist outlines the required components of the contractor's quotation, including providing an itemized equipment list, cut sheets for all proposed equipment, completing the pricing information on the SF 1449 form, acknowledging any amendments, providing required representations and certifications, and submitting current licenses, insurance, and ISO 9001-2015 certification. Contractors may also optionally submit past performance information. Failure to provide all the requested information may result in the quotation being rejected.
The related federal contract opportunity is for the purchase and installation of a new network video management system and video surveillance system at the Robert E. Coyle Federal Courthouse. This is a 100% small business set-aside with a firm-fixed price contract, and the period of performance for installation is within 60 business days of the notice to proceed. The solicitation number is 70RFPW24QW9000003 and the NAICS code is 561621.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| REVISION 2 Instructions to Offerors via AM3.docx | DOCX document | |
| 70RFPW24QW9000003 - AM3.pdf | ||
| REVISED Instructions to Offerors via AM2.docx | DOCX document | |
| 70RFPW24QW9000003 - AM2.pdf | ||
| REVISED Attachment A - SOW via AM2 70RFPW24QW9000003.docx | DOCX document | |
| REVISED Attachment E - Contractor Quotation Checklist via AM2.docx | DOCX document | |
| 70RFPW24QW9000003 - AM1.pdf | ||
| REVISED Attachment A1 via AM1 on 240422.pdf | ||
| V2 - Synopsis.docx | DOCX document | |
| 70RFPW24QW9000003 - Solicitation.pdf | ||
| C - Past Performance Form.pdf | ||
| E - Contractor Quotation Checklist.docx | DOCX document | |
| D - Past Performance Questionnaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT E
CONTRACTOR QUOTATION CHECKLIST – REVISED VIA AM0003
*FAILURE to provide all of the requested parts, including Part I – REDACTED, may result in rejection of the Contractor’s quotation and shall not be further evaluated.
* FAILURE to adhere to the instructions on this Attachment and in the “Instructions to Offerors” section of the Request for Quotation (RFQ) package may result in rejection of the Contractor’s quotation and shall not be further evaluated.
PART I – Compliance with Technical Specifications
The Contractor shall provide an Itemized List of all Contractor furnished equipment without pricing. Please make sure to include brand/manufacturer and model for each piece of equipment quoted.
Contractor shall provide cut sheets for all proposed equipment that shall correspond to all equipment listed on the Itemized List mentioned above – all cut sheets shall be on one (1) file. The Contractor shall not separate equipment cut sheets into individual files.
PART II – Price Submission
The offeror shall complete blocks 12, 17a, 17b and column 24 (EA price only for entire job), blocks 30a, 30b of the SF 1449. The price submission on the SF 1449 shall include a total price for all requirements to include labor, supervision, material/equipment, travel, per diem, shipping/freight, training, and warranty as specified within the Statement of Work (SOW).
In addition, an itemized price listing shall be submitted that clearly identifies each item proposed. For each item proposed, the item, model, manufacturer and cost must be specified. In addition, the itemized price listing shall clearly identify prices for labor, supervision, project management, project engineering, equipment rental, travel, per diem, warranties, shipping/freight charges and any other applicable prices; these prices shall be listed individually. Pricing associated with travel and per diem shall be in accordance with FTR travel and per diem rates.
PART III – Contract Documentation/Representations & Certifications
Amendments - If amendments have been issued, the offeror shall acknowledge each amendment by any of the three (3) methods prescribed in block 11 of the amendment form (SF30); (a) By completing blocks 8, 15a, 15b, 15c and returning one (1) copy of the amendment, (b) By acknowledging receipt of this amendment on each copy of the offer submitted, (c) By separate letter which includes a reference to the solicitation and amendment numbers.
The Contractor shall complete 52.212-3 OFFEROR REPRESENTATIONS AND CERTIFICATIONS – COMMERCIAL ITEMS, per the clause instructions. 52.212-3 has been provided within the “Instructions to Offerors” section of the Request for Quotation (RFQ) package. The only exception to the Contractor filling out the attached Reps & Certs is if the Contractor is already represented and certified via SAM.gov (System of Award Management). This is solely the responsibility of the Contractor to ensure their company is properly represented and certified.
Contractors shall provide current copies of all licenses required by state and local municipalities and a current Certificate of Insurance with quote.
Contractors shall provide a current copy of their ISO 9001-2015 Certificate. Failure to provide the required ISO 9001-2015 certification, held by the prime contractor, shall preclude the quotation from evaluation and award consideration.
PART IV – Checklist Submission
The Contractor shall sign this document, “Attachment E – Contractor Quotation Checklist” and shall submit the signed Attachment under Part IV of the Contractor’s quotation.
PART V – Past Performance (OPTIONAL)
The Contractor may submit recent and relevant past performance as outlined within the Instructions to Offerors Section 3, Paragraph 5.
There will be two (2) submissions within the one (1) email sent to rachel.d.kalac@fps.dhs.gov via the instructions listed in the “Instructions to Offerors, Part 1. SUBMISSION OF ELECTRONIC QUOTATIONS”:
One (1) submission shall contain all three (3) parts from the “Instructions to Offerors” Part 3 and listed above; 1) PART I - Compliance with Technical Specifications, 2) PART II - Price Submission, and 3) PART III - Contract Documentation/ Representations & Certifications.
One (1) submission shall contain only 1) PART I - Compliance with Technical Specifications with all company and personally identifiable information redacted.
*FAILURE to provide all of the requested parts, including Part I – redacted, may result in rejection of the Contractor’s quotation and shall not be further evaluated.
* FAILURE to adhere to the instructions on this Attachment and in the “Instructions to Offerors” section of the Request for Quotation (RFQ) package may result in rejection of the Contractor’s quotation and shall not be further evaluated.
Signed by (print name and title): Date:
Signature:
File details come from the government source that posted it. Updated .