MARIA D SANTIAGO Digitally signed by MARIA D SANTIAGO Date: 2022.02.23 12:20:24 -08'00'
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO)
ATTACHMENT A
Federal Protective Service
Management Directorate
U.S. Department of Homeland Security
STATEMENT OF WORK
For
Install of
Video Surveillance System (VSS)
Updated February 15, 2022 Amendment No. 0003
911 Federal Building 911 NE 11th Avenue
Portland, OR 97232-4128
General Services Administration Building Number: OR0033
RFQ #70RFPW22QWA000004
AMD0003
Attachment A
STATEMENT OF WORK
TABLE OF CONTENTS
A. BACKGROUND
B. PURPOSE
B.1 PLACE OF PERFORMANCE
B.2 REQUIREMENTS
B.3 DESCRIPTION OF EXISTING SYSTEMS
B.4 DESCRIPTION OF NEW VSS (BASE REQUIREMENT)
B.5 CONTRACTOR FURNISHED EQUIPMENT
C. VSS SCOPE
C.2 INSTALLATION REQUIREMENTS
C.4 VIDEO STORAGE REQUIREMENTS
C.5 NETWORKING EQUIPMENT
C.6 UNINTERRUPTED POWER SUPPLY (UPS) REQUIREMENTS
C.7 OPERATING SYSTEMS UPDATES AND SERVICE PACKS
D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND REQUIREMENTS
D.1 NETWORK VIDEO RECORDER (NVR) SERVER
D.2 VIDEO MANAGEMENT SYSTEM – SHALL SUPPORT THESE ESSENTAIL SOFTWARE
CAPABILITIES
D.3 WORKSTATION REQUIREMENTS (IF CONTRACTOR CHOOSES NOT TO USE EXISTING
WORKSTATION)
D.4 DESCRIPTION OF CAMERAS AND SPECIFICATIONS FOR MINIMUM REQUIREMENTS
D.5 UNINTERRUPTED POWER SUPPLY (UPS)
D.6 NETWORK SWITCH REQUIREMENTS
E. ADDITIONAL PROJECT REQUIREMENTS
E.1 DESIGN STANDARDS
E.2 MATERIALS AND EQUIPMENT
E.3 ELECTRICAL AND CABLING REQUIREMENTS
E.4 FINAL INSPECTION AND ACCEPTANCE
E.5 CLEANLINESS, PROTECTION, AND PATCHING
E.6 WARRANTY AND MAINTENANCE
E.7 SAFETY AND HEALTH
RFQ #70RFPW22QWA000004
E.8 QUALITY CONTROL PLAN
E.9 TRAINING
E.10 COMPONENT/DEVICE CONFIGURATIONS
E.11 NETWORK SETTINGS
E.12 AUDIT AND ACCOUNTABILITY
E.13 IDENTIFICATION AND AUTHENTICATION / ACCESS CONTROL
E.14 DATA PROTECTION
E.15 USER ACCOUNTS
E.16 INCIDENT MANAGEMENT AND DISASTER RECOVERY
E.17 SOFTWARE MAINTENANCE
E.18 ENTERPRISE ARCHITECTURE
F. DELIVERABLES
F.1 GENERAL
F.1.9 REQUEST FOR QUOTATION (RFQ) IN ORDER FOR THE GOVERNMENT TO COMPREHENSIVELY
EVALUATE THE CONTRACTOR’S PROPOSAL, THE FOLLOWING INFORMATION SHALL BE REQUIRED.
PROPOSALS THAT DO NOT INCLUDE THE REQUIRED INFORMATION SHALL BE CONSIDERED NON-
COMPLIANT AND SHALL NOT BE FURTHER EVALUATED
F.2 PRE-INSTALLATION DELIVERABLES
F.3 POST-INSTALLATION DELIVERABLES
G. PROJECT ADMINISTRATION
G.1 WORK AUTHORIZATION
G.2 PERIOD OF PERFORMANCE
G.3 SPECIAL SCHEDULING REQUIREMENTS
G.4 CONTRACTOR ACCESS AND USE OF PREMISES
G.5 SECURITY REQUIREMENTS
G.6 CONTRACTOR SUITABILITY REQUIREMENTS
G.7 GOVERNMENT ACCEPTANCE PERIOD
H. APPLICABLE STANDARDS
H.1 GENERAL
H.2 SECTION 508 REQUIREMENTS
H.3 INSTRUCTIONS TO OFFERORS
H.4 ACCEPTANCE CRITERIA
I. ACCOUNTABLE PROPERTY
RFQ #70RFPW22QWA000004
I.1 DEFINITIONS:
I.2 DELIVERABLES:
I.3 INVOICES:
I.4 PROPERTY ACCOUNTABILITY:
I.5 PROPERTY DISPOSAL:
I.6 LOST, STOLEN, DAMAGED OR DESTROYED (LDD) PROPERTY
J. INFORMATION TECHNOLOGY SECURITY
J.1 SECURITY CERTIFICATION/ACCREDITATION
J.2 SECURITY REVIEW AND REPORTING
A. BACKGROUND
The Federal Protective Service (FPS) is the federal law enforcement agency responsible for the protection and security of federal facilities, employees, and visitors. FPS actively works to reduce security vulnerabilities of federal facilities from criminal, terrorist, accidental, and natural disaster threats to ensure properties remain safe, secure, and available to the American public and employees of the federal Government.
The following Statement of Work (SOW) and guidelines have been developed by the Department of Homeland Security (DHS), Management Directorate, Federal Protective Service (FPS) to mitigate threats and vulnerabilities pertaining to federal buildings and Government leased spaces. The SOW and regulations were developed with the notion that the security posture of each federally owned building or Government leased space is unique.
The 911 Federal Building is currently undergoing a seismic upgrade project (current estimated substantial completion date is July 2023) which includes the installation of concrete shear walls and other structural upgrades throughout the facility, including areas near the existing VSS headend location as well as a few camera locations. The VSS Contractor shall not work in these areas at the same time as the General Services Administration’s (GSA) seismic contractor unless approved by the FPS Project Manager (FPS PM). After award, the Contractor must attend an in-person pre-installation meeting with the FPS PM. The Contractor may be required to attend other meetings (in-person and/or teleconference) during the install with the FPS PM. In general, for bidding purposes, the wiring raceways to and from equipment and cameras should not be affected by the seismic project. However, pathways through or around the shear walls or other seismic structural elements must be coordinated with the FPS PM. To permit some flexibility with possible equipment movement(s), the FPS PM may ask for some service loops at equipment locations. If the VSS Contractor determines there is a need for a pathway through a shear wall or other structural element, they must request and coordinate that through the FPS PM. The Contractor shall remove all existing coax to the cameras that are being replaced. The Contractor is responsible for determining the best pathway and installing appropriate cabling to all equipment. The Contractor must limit network runs to 85% of cable manufacture recommended maximum distance specs. All network wiring must be clearly identified, certified and tested for
RFQ #70RFPW22QWA000004
bandwidth and distance. Tester shall be a Fluke DTX-1800 or equivalent with ability to save results; those results shall be printed and provided to the FPS PM.
B. PURPOSE
B.1 Place of Performance
B.1.1 The place of performance is at the 911 Federal Building at 911 NE 11th Avenue
Portland, OR 97232.
B.2 Requirements
This SOW consists of a base requirement and two optional items. Both the base and optional items shall be included in the contractor’s proposal. The Base and the two Optional Requirements shall be separate contract line items (CLINS) in the proposal submitted by the contractor. The Government reserves the right to award one of the optional items, both of the optional items, or to make no award of the optional items if determined that it is not in the Government’s best interest. The Government will evaluate the total price for the basic requirement together with any optional quantity items at the time of award. (FAR 52.217-4).
B.3 Description of Existing Systems
B.3.1 The Video Survellance System (VSS) existing system at the 911 Federal Building consists of a Server, Workstation with VideoXpert Professional, two 26 port Power over Ethernet (PoE) switches, two 16 channel encoders, uninterruptible power supply (UPS), and 24u rack with fan. There are a total of 27 cameras on the system but they will not all be replaced. Of the 27 cameras on the system seven of them are Pelco IP cameras (won’t be replaced), four belong to another agency within the complex (won’t be replaced), and 16 of them are Pelco analog cameras (will be replaced). Note: For the cameras that are not being replaced, the Contractor shall connect them to the new system. These cameras are not dipicted on the drawing (Attachment 1 First Floor and Basement drawings) showing replaced and new camera locations.
B.4 Description of New VSS (Base Requirement)
B.4.1 This SOW states the requirements for the purchase, installation and programming for a new Network Video Recorder (NVR) Server, workstation, switches, 23 new internet protocol (IP) cameras, and three monitors. Workstation with VideoXpert Professional was on the old system. The new contractor provided system shall have a NVR/server with Video Management System (VMS). The Contractor is providing 23 new cameras.
(see Section B.4.12). The Contractor is to also connect the seven IP cameras on the current system (see Section B.4.13) and the four cameras that belong to another agency (see Section B.4.14). In addition to the cameras, this SOW includes the requirements for the following: camera mounts where needed, camera licenses and all appurtenances necessary to connect the new cameras to the new NVR for a fully
RFQ #70RFPW22QWA000004
functional IP VSS. The VSS shall monitor vehicle traffic, personnel entry, emergency exits, and the exterior perimeter of the facility.
B.4.2 The existing workstation will no longer be used. The new Contractor provided workstation shall be located where the existing workstation is located inside the rack in the electrical closet. Contractor shall supply all cabling/hardware/peripherals to operate the system at the PSO desk located on the other side of the electrical closet wall.
B.4.3 In order to alleviate future maintenance/warranty issues the new Contractor provided
NVR/Server, workstation and cameras shall all be from the same manufacture.
B.4.4 All licenses, firmware and software fees shall be non-recurring. In addition to adding the new cameras to the new system, the contractor shall connect all cameras that are not being replaced and those that belong to another agency that only can be viewed to the new system. If additional licenses, software, firmware are required to make them viewable, controllable and recorded the Contractor shall purchase and install them.
B.4.5 When installing the new cameras, the Contractor shall mount all cameras using the manufacturer’s hardware so that the camera is in a horizonal plane. When mounting on a wall the Contractor shall use the manufacturer’s wall mount. When mounting on the ceiling the Contractor shall use the manufacturer’s pendant or ceiling mount. If the Contractor has any questions/concerns on how a particular camera should be mounted, the Contractor shall work with the FPS Project Manager (PM).
B.4.6 The contractor shall remove and haul away all old wiring. The old NVR/Server, workstation, switches, cameras and mounts shall be boxed up and turned over to the FPS Project Manager. All disposed equipment shall be disposed of in a proper, acceptable manner in accordance with all federal, state and local laws and regulations from the job site. The contractor shall include this cost in their proposal.
B.4.7 Unless otherwise noted the new cameras shall be mounted in a manner using the existing holes. If the existing holes are not used it shall be the contractor’s responsibility to patch the holes.
B.4.8 The Contractor shall remove all existing coax to the cameras that are being replaced. It is the Contractor’s responsibility to determine the best cabling route to and from all VSS equipment. The Contractor must limit network runs to 85% of cable manufacture recommended maximum distance specs. If the Contractor determines core drilling is required at any location, the Contractor shall get approval from the FPS Project Manager prior to doing any core drilling.
B.4.9 The contractor shall ensure the 911 UPS can handle the additional load and maintain the four hour minimum requirement run time to support the additional equipment. The contractor shall provide the necessary upgrades to maintain the four (4) hour runtime. The Contractor shall include load calculations for each UPS
RFQ #70RFPW22QWA000004
and drawings showing what is powered by the UPS with their proposal.
B.4.10 All equipment that is proposed by the Contractor shall be in compliance with section 889 of the 2019 John S. McCain NDAA. All existing equipment meets this requirement.
B.4.11 No patch panels shall be used. All cameras must have a dedicated wire run and terminate to switch. Contractor to program switch(es) to monitor cameras connection, if connection drops, switch automatically power cycles the camera.
B.4.12 The Contractor may choose to reuse the equipment listed below. It is the Contractor’s responsibility to determine if the existing equipment listed below is compatible with the new Contractor proposed equipment. If the Contractor decides to use any of the existing equipment listed below, the Contractor shall submit all the information outlined in F.1.9 (Request for Quotation). If the Contractor decides not to use any of the equipment listed below and chooses to use their own, the Contractor shall meet the requirements outlined in Section D of the SOW (System/Equipment Salient Characteristics and Requirements).
Existing Equipment Part # Location
Encoder #1 NET5516 Main Entry/Electrical Room Rack
Encoder #2 NET5516 Main Entry/Electrical Room Rack
UPS System SMX3000LV Main Entry/Electrical Room Rack
UPS System SMX120BP Main Entry/Electrical Room Rack
UPS System SMX120BP Main Entry/Electrical Room Rack
UPS System SMX120BP Main Entry/Electrical Room Rack
B.4.13 Cameras to be installed are as follows:
1. Replace the existing analog exterior Holiday Street Rooftop pan-tilt-zoom
(PTZ) with a new exterior IP PTZ camera. See Section D.4.1 for camera specifications. See Attachment 3 Camera #1 photos.
2. Add a new fixed exterior IP camera next to the Holiday Street camera to view towards the NW corner of the facility. See Section D.4.2 for camera specifications.
3. Replace the existing interior analog fixed camera near the coffee shop with a new IP 20 MP multi-sensor camera. The contractor to determine best location
RFQ #70RFPW22QWA000004
to view the corridor, offices and childcare entry. See Section D.4.3 for camera specifications.
4. Replace the existing interior analog fixed camera viewing the 1st floor elevators with a new IP 20MP multi-sensor camera. The contractor to determine best location to view lobby corridor in both directions and the 1st floor elevators. See Section D.4.3 for camera specifications.
5. Replace the existing interior fixed analog camera that views the area by the basement conference room C with a new fixed IP camera. Contractor to determine appropriate lens to view this area. See Section D.4.2 for camera
6. Replace the existing interior fixed analog camera that views the basement elevators with a new IP 20 MP multi-sensor camera. The contractor to determine best location to view the elevators and hallways in both directions.
See Section D.4.3 for camera specifications.
7. Replace the existing interior analog PTZ camera that views the west auditorium with a new IP PTZ camera. See Section D.4.1 for camera
8. Replace the existing fixed analog camera that views the NE emergency stairwell with a new IP fixed camera. See Section D.4.2 for camera
9. Replace the existing exterior fixed analog camera that views the NE auditorium exit ramp with a new IP fixed camera. See Section D.4.2 for
10. Replace the existing interior fixed analog camera that views the GSA basement parking area with a new IP 20 MP multi-sensor camera. The contractor to determine best location to view the parking and loading dock area. See Section D.4.3 for camera specifications.
11. Replace the existing interior fixed analog camera that views the daycare entry with a new IP fixed camera. See Section D.4.2 for camera specifications.
12. Replace the existing exterior NE 11th Avenue Roof PTZ analog camera with a new IP PTZ camera. See Section D.4.1 for camera specifications. See Attachment 2 Camera #12 photos.
13. Replace the existing interior fixed analog camera that views the basement loading dock freight elevators with a new IP fixed camera. See Section D.2.3 for camera specifications.
14. Replace the existing interior fixed analog camera that views the basement restroom hallway with a new IP fixed camera. See Section D.4.2 for camera
15. Replace the existing interior fixed analog camera that views the basement loading dock with a new interior IP fixed camera. See Section D.4.2 for
16. Replace the existing exterior fixed PTZ camera at the childcare playground gate with a new exterior IP PTZ camera. See Section D.4.1 for camera
17. Replace the existing exterior fixed analog camera at the childcare playground entry with a new exterior IP fixed camera. See Section D.4.2 for camera
18. Replace the existing exterior PTZ analog camera in the center of the childcare playground with a new exterior IP PTZ camera. See Section D.4.1 for camera
19. Replace the exterior analog camera at the SE Gate in the childcare playground with a new exterior IP PTZ camera. See Section D.4.1 for camera
20. Install a new interior 20 MP IP multi-sensor camera to view inside the childcare lobby entry area. See Section D.4.3 for camera specifications.
21. Install a new interior 20 MP IP multi-sensor camera to view inside the childcare vestibule area that leads into the building main lobby. See Section D.4.3 for camera specifications.
22. Install a new interior 20 MP IP multi sensor camera to view the hallway in both directions, entrance into the childcare infant and wobbler rooms. The contractor to determine best location to view these areas. See Section D.4.3 for
23. Install a new interior IP fixed camera inside the childcare kitchen area to view the building’s NW emergency exit. See Section D.4.2 for camera
B.4.14 The following facility IP cameras are not being replaced and shall be connected to the new Contractor provided system. The Contractor shall ensure they function properly and record on the new system.
Location How installed Camera Model Switch/ Port Cable
Indoor Lobby
PTZ
In Ceiling P1220-FWH0 SW1-3 Cat 5e direct run
Main entry Doors (above Guard desk)
Surface ME329-1IS SW1-4 Cat 5e direct run
Main Hallway/Credit Union Entry
Surface ME329-1IS SW1-5 Cat 5e direct run
S Auditorium Emergency Exit
Surface MM12018-1S SW1-6 Cat 5e direct run
N Auditorium Emergency Exit
Surface MM12018-1S SW1-7 Cat 5e direct run
Coffee Shop/Lobby
Surface MM12018-1S SW1-8 Cat 5e direct run
Outside Front Entrance PTZ
Pendant D6230L SW1-9 Camera run on Vigitron IP over coax modules
B.4.15 The four Sony BPA analog PTZ cameras on the facility system are not to be replaced. The Contractor shall ensure they are viewable and record on the new Contractor provided system. They model number for each camera is unknown.
B.4.16 Contractor shall remove all existing coax cable to the cameras that are being replaced. The contractor is responsible for determining and installing appropriate cabling to each camera. All cameras must have a dedicated wire run and terminate to switch. The Contractor must limit network runs to 85% of cable manufacture recommended maximum distance specs. All network wiring must be clearly identified, certified and tested for bandwidth and distance. Tester shall be a Fluke DTX-1800 or equivalent with ability to save results, those results shall be printed and provided to the FPS Project Manager.
B.4.17 All POE midspan extenders must meet IEEE 802.3af PoE (15W) and IEEE 802.3at at PoE Plus (2-event signature) (25-30W) IEEE 802.3bt PoE (to 90W+, non-LLDP) standard.
B.4.18 All midspan extenders must be powered by the system UPS.
B.4.19 Any wire/cabling not in the ceiling must be in conduit/j-hooks. It’s the contractor’s reponsiblity to determine amount needed, to purchase it, and to install it.
B.4.20 Contractor shall replace the existing two 24 port switches (Vigitron Vi30126) for the new and existing cameras. The Contractor shall determine how many new switches are needed. The PoE budget for the existing and new cameras and PoE powered devices connected to these switches shall not exceed 70% of the PoE budget of each switch. Contractor shall provide load calculations for each switch with their proposal to ensure each switch doesn’t exceed 70% of the PoE budget.
The Contractor shall also provide a drawing showing what cameras and PoE
RFQ #70RFPW22QWA000004
powered devices are connected to each switch.
B.4.21 The Contractor is responsible for determining all required cabling necessary for the switches. No patch panels are authorized. All cameras must have a dedicated wire run and terminate to switch.
B.4.22 Contractor to program switch(es) to monitor cameras connection, if connection drops, switch automatically power cycles the camera.
B.4.23 The Contractor is responsible for determining best location for the new switches to be installed. For all switches not installed in the existing cabinets the contractor shall purchase and install a cabinet that is large enough to hold the switch and UPS inside the new contractor provided cabinet. The contractor shall provide two keys for the lockable cabinet to the FPS PM. Switches are to be connected to new contractor provided UPS. All IP cameras shall be powered via PoE switch with at least four (4) hours runtime UPS.
B.4.24 The Contractor is responsible for ensuring the existing BPA analog cameras that are connected to the encoders are transferred to the new system can be viewed and recorded. If the existing encoders are used it’s the Contractor’s resonsibility to ensure they are compatible with the new contractor purchased and installed system. If additional encoders are needed contractor shall include them in their proposal.
B.4.25 The Contractor is responsible for ensuring the existing facility IP cameras that are not being replaced are compatible with the new contractor purchased and installed system.
The existing cameras shall be viewable, controllable and recorded. If additional licenses, software, firmware are required to make them viewable, controllable and recorded the Contractor shall purchase and install them.
B.4.26 Optional Items: All optional equipment must be a separate line item in the proposal.
Option 1: Purchase and install two IP cameras (one PTZ and one fixed) on the NE corner of the facility. Note: There is an existing camera at this location. The contractor shall use the same penetration for the camera that is in place. All three cameras shall be on the same corner mount. The new PTZ camera and the camera belonging to the other agency must be able to see both sides of the facility. The third camera (new fixed) on the mount is to view the set back area around the exit from the facility.
Installation includes all wiring and components/conduit necessary for fully functional cameras. Contractor to provide necessary modifications to accommodate the mounting of these cameras. Contractor must size and conduit accordingly. See Section D.4.1 for PTZ camera specifications and Section D.4.2 for Fixed camera specifications. See Attachment 4 Option 1 camera photos.
Option 2: Purchase and install an exterior IP PTZ camera on the NW corner. Note:
There is an existing camera at this location. It is not to be removed; it belongs to
RFQ #70RFPW22QWA000004
another agency. The contractor shall use the same penetration for the camera that is in place. Both cameras shall be on the same corner mount. The new PTZ camera and the camera belonging to the other agency must be able to see both sides of the facility.
Installation includes all wiring and components/conduit necessary for fully functional cameras. Contractor to provide necessary modifications to accommodate the mounting of these cameras. Contractor must size and conduit accordingly. See Section D.4.2 for camera specifications. See Attachment 3 Option 2 camera photos.
B.5 Contractor Furnished Equipment
BASE ITEMS QUANTITY UNIT
Network Video Recorder (NVR) Server 192TB 1 EA WorkStation 1 EA Fixed IP Cameras 10 EA 20 MP Multi-sensor IP Cameras 7 EA PTZ IP Cameras 6 EA Master Network Time Protocal GPS Time Server PoE 1 EA Additional Conduit Contractor to Determine FT Camera Licenses Contractor to Determine EA Uninterrupted Power Supply/ Contractor to determine Contractor to Determine/Provide Calculations EA Network Switch Contractor to Determine/Provide Calculations EA Monitors 24 inch 4K 3 EA PoE Network Extender Contractor to Determine EA
OPTIONAL ITEMS QUANTITY UNIT
Optional Item #1 PTZ Camera and Fixed Camera 1 PTZ/1 Fixed EA Optional Item #2 PTZ Camera 1 EA
C. VSS SCOPE
C.1 General
C.1.1 As part of the pre-bid process, FPS may have a site visit and all interested Contractors are invited to attend. The purpose of the site visit is for Contractors to survey the site and review the requirements of this SOW. A site visit will be scheduled by the Contracting Officer’s Representative (COR)/FPS PM. All questions relevant to this SOW shall be submitted in writing to the Contracting Officer. The Contractor shall not make or assume any changes to this SOW without written approval from the Contracting Officer.
C.1.2 The Contractor shall be responsible for the removal, inventory, packaging for storage and return of all removed equipment to the FPS PM..
C.1.3 The existing system shall remain fully functional and operational to the extent possible during the installation of the new surveillance system. The contractor shall cut over from the existing system to the new system in stages to minimize the number and
RFQ #70RFPW22QWA000004
duration of outages. The Contractor shall submit a system cutover plan in accordance with Section F Deliverables. The cutover plan shall be reviewed and approved in writing by the FPS PM.
C.1.4 The Contractor shall provide and install and configure the system as described and/or shown herein. The system shall include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The Contractor shall also supply any required licenses and all miscellaneous materials necessary to interconnect all equipment installed in accordance with this SOW.
C.1.5 The Contractor shall be required to be familiar with all applicable codes while carrying out the work outlined in this SOW. The Contractor shall complete the work pursuant to this SOW following all applicable codes and standards including, but not limited to:
Occupational Safety and Health Administration (OSHA), Underwriters Laboratories (UL), National Fire Protection Association (NFPA), National Electrical Code (NEC), and any additional federal, state and local codes and policies.
C.1.6 The Contractor shall furnish all tools and equipment necessary to complete all work outlined in this SOW. By no means shall the Contractor be authorized the use of Government owned property, tools or equipment, to complete work in accordance with this SOW, unless otherwise specified.
C.1.7 In the event, the Contracor determines any operational system or utility (e.g. fire, IDS, HVAC) is required to be disabled or turned off, forty-eight (48) hour notice shall be required and approved by the GSA Building Manager, FPS Inspector, and/or FPS PM prior to deactivation.
a) The Contractor, prior to departing for the day, shall ensure all system(s) previously disabled or turned off are functioning properly. A basic functional test shall be required to determine proper functionality of the system(s) and should be reported to the FPS PM.
b) In the event a system is non-functional once enabled or turned on, it shall be the responsibility of the Contractor, at no additional cost to the Government, to restore the system(s) prior to departure from the site.
c) If the Contractor fails to restore all system(s) before departing, they shall be liable for all costs incurred by the Government to restore system(s) functionality.
C.1.8 The Contractor shall be solely responsible for ensuring their employees and subcontractors abide by all requirements of the contract. At all times while work is being performed in accordance with this contract, the Contractor shall have a supervisory representative available to answer questions, resolve issues, supervise company employee(s), and subcontractor(s).
C.1.9 For scheduling purposes, the Contractor shall request in writing access needs into tenant space (including childcare) and sensitive areas 48 hours in advance to the FPS PM. The FPS PM will coordinate installation activities in those area.
C.1.10 The Contractor shall maintain a separate set of drawings, schematics, and wiring diagrams of the VSS to be used for creating as-built drawings. This set shall be accurately kept up to date by the Contractor, noting all changes and additions to the VSS and shall be available for the final inspection walkthrough.
C.1.11 After contract award, the Contractor shall attend an in-person pre-installation meeting with the FPS PM. The Contractor may be required to attend other meetings (in-person and/or teleconference) during the install with the FPS PM as communicated by the
FPS PM.
C.1.12 There may or may not be onsite parking. The contractor should plan on unloading materials and finding parking offsite if necessary.
C.2 Installation Requirements
C.2.1 Installers shall be trained, certified, and authorized by the Manufacturer to install, integrate, test, and commission the system. The contractor shall provide and submit with their proposal documentation from the manufacture that they are trained, certified, and authorized to install, integrate, test, and commission the system.
C.2.2 The Contractor shall install all system components and appurtenances in accordance with manufacturer’s instructions following all applicable local, state and federal codes and policies. All appurtenances, such as, but not limited to connectors, terminators, and mounting hardware shall be supplied by the Contractor, as well as, all adjustments, alignments, programming, and configuration required for a complete and operational VSS operating system.
C.2.3 The Contractor shall provide and install cameras, and any other equipment necessary for fully functional VSS. Provide and install camera mounts, other appurtenances, and system hardware as required for a complete and fully operational system as specified in this SOW. The installed system shall easily be expandable for future growth.
C.2.4 The Contractor, for all camera/equipment/device(s) requiring licensing, shall purchase/install license(s) as required by the manufacturer. All licensing fees shall be nonrecurring. This includes the cameras that are not being replaced and that are being connected to the new system.
C.2.5 The Contractor shall be responsible to provide the necessary equipment and tools to access all equipment which is not accessible by ladder. A lift may be needed to get to some of the exterior cameras. It’s the Contractor’s responsibility to determine if one is needed. The facility does not have one onsite nor does it have a place to store one. If Contractor decides to leave it onsite it shall be at the Contractor’s own risk if something happens to the lift. If the Contractor decides a lift is necessary, they are to
RFQ #70RFPW22QWA000004
include it in their proposal.
C.2.6 All measurements and equipment locations are approximate and shall be verified by the Contractor for accuracy and installation feasibility. The Government shall not be held responsible for any error or variation in any measurements or other data listed, nor shall the Contractor, because of an error or variation in any measurement listed, be relieved of the responsibility to carry out the requirements in accordance with the true intent and meaning of the specifications without additional cost to the Government.
C.2.7 All cameras that are being replaced must be removed.
C.2.8 All ceiling tiles removed to accommodate installation shall be returned at the end of the work day.
C.2.9 The Contractor shall pay for, remove and haul debris from the project site daily and dispose of in a proper, acceptable manner in accordance with all federal, state and local laws and regulations, off the job site property. The debris created from this project shall not be disposed of at the job site, in Government dumpsters, or on Government property.
C.2.10 The Contractor shall install and configure cameras in accordance with manufactures recommendations and industry best practices for optimal live view and recording.
C.2.11 The Contractor shall verify all camera views with the FPS PM prior to installation.
C.2.12 The Contractor, when removing the existing cameras, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed and/or patched accordingly to protect against weather exposure, unless otherwise designated for reuse. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure throughout the installation period.
C.3 Network Video Recorder (NVR)
C.3.1 The contractor shall purchase, install, and program a new NVR and workstation that meets the salient characteristics in section D.1 and D.3. They can be installed where the existing 911 headend equipment is located or in a new contractor provided rack.
There are approximately 24 rack units available in the existing rack.See section D.1 for minimum NVR specifications and for minimum VMS specifications.
C.3.2 The workstation and NVR shall be two separate computers.
C.3.3 Workstation shall be able to view live cameras via VMS client application should the
NVR have a failure or go offline.
RFQ #70RFPW22QWA000004
C.3.4 See section D.1 for minimum NVR specifications and for minimum VMS
C.3.5 All individual components of the system shall be 100% compatible with the existing cameras, existing components the contractor uses, and integrable with any future additions/upgrades to system. Commercially manufactured end products shall remain unaltered and not tailored to fit end use.
C.4 Video Storage Requirements
C.4.1 The Contractor shall provide and install a minimum of 192TB of storage in contractor provided NVR.
C.4.2 The Contractor shall demonstrate to the COR/FPS PM that the completed installation complies with the contract requirements. Using an approved test procedure, all physical and functional requirements of the project shall be demonstrated and shown.
The test procedure shall include techniques and requirements for validating all significant system functions. The Contractor shall provide all test equipment and personnel required for final testing.
C.5 Networking Equipment
C.5.1 As required per this SOW, the contractor shall purchase, install, and configure all equipment, components, and necessary appurtenances for a complete and appropriately configured Ethernet network connecting all devices of the NVMS.
C.5.2 The Contractor shall configure installed switches for Trunk line communication between the switches.
C.5.3 All equipment shall be rack mountable, if possible. All equipment that is not rack mountable shall be installed on the wall. An appropriately sized piece of ¾” plywood shall be mounted on the wall, painted with fire retardant paint, and all equipment mounted on the plywood. Final mounting location shall be approved by the FPS PM.
C.5.4 The Contractor shall ensure that all newly installed switches shall be secured in size appropriate, ventilated, wall mounted, lockable cabinet, and connected to contractor provided UPS.
C.5.5 All wiring shall be neat and properly labeled at the new NVR and all switches.
C.6 Uninterrupted Power Supply (UPS) Requirements
C.6.1 Backup Power Requirements –All VSS electrical and electronic equipment installed shall be powered from an Uninterruptable Power Supply (UPS) with a minimum 4-hour runtime when generator powered outlets are not available or UPS
RFQ #70RFPW22QWA000004
with 15-minute minimum runtime when connected to generator powered outlets. It is expected that all equipment necessary for continuous live viewing, recording, and archiving of video will be uninterrupted during a power outage. The Contractor shall include load calculations for each UPS with their proposal. The contractor shall also provide a drawing showing each UPS size and what each UPS is providing power to.
C.6.2 1 ISC RMP Criteria 70 - Provide uninterruptible emergency power to essential electronic security systems for a minimum of four hours.
C.6.3 The contractor may use the existing UPS units in place. If the contractor chooses to use the existing UPS units they shall ensure the 911 Building UPS can handle the additional load and maintain requirements per B.6.1 for both the existing and the new additional equipment.
C.7 Operating Systems Updates and Service Packs
C.7.1 Operating systems and software applications shall be capable of being updated/ patched after delivery. The Contractor shall ensure that all installed server(s) and client workstation(s) Operating System Software (OS), at the time of installation, are current with all security updates/patches, service packs, revisions, and shall provide through the warranty period. The NVMS and all other installed software shall be the current version with all applicable updates and installed in accordance with manufacturers recommendations.
C.7.2 The Contractor shall remove and/or disable of all software components that are not required for the operation and maintenance of the camera system; and shall provide documentation on what is removed and/or disabled. The software to be removed and/or disabled shall include, but is not limited to: games, device drivers for network devices not delivered, messaging services (e.g., MSN, AOL IM), servers or clients for unused internet services, unused networking and communications protocols, unused document processing utilities (Microsoft Word, Excel, PowerPoint, Adobe Acrobat, OpenOffice, etc.)
C.7.3 The Contractor shall provide notification of patches affecting security within a pre-negotiated period as identified in the patch management process.
1) Pre-Contract Award – The Contractor shall provide details on their patch management and update process. Responsibility for installation and update of patches shall be identified.
2) Post-Contract Award - The Contractor shall provide notification of known vulnerabilities affecting Contractor-supplied or required OS, application, and third-party software within 30 days after public disclosure.
D. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND
REQUIREMENTS
D.1 Network Video Recorder (NVR) Server
D.1.1 Network Video Recorder (NVR)
a) Record new and existing cameras
b) Standard components that are manufactured and available for purchase as standard replacement parts as long as the product is commercially available from the manufacturer.
c) All manufactured products shall be thoroughly tested and proven in actual use
d) Minimum 3-year manufacture warranty for replacement and repair of defective equipment
e) Software updates shall be available for free of charge during product warranty period. The software installed on the IP Video Management appliance shall not be subject to any additional software maintenance agreements.
f) Supports a minimum of 256 IP cameras.
g) Supports Network Encoders
h) Must run off of Windows Server 2016 or newer
i) Must have minimum 192TB of storage and capable of upgrading.
j) Must have minimum 16 Hard Drive bays
k) Bandwidth minimum 550 Mbits/s
l) Operate on an Intel Xeon processor and minimum 16 GB of system memory
m) Rack mountable
n) Live video recording
o) Play back of Video
p) Minimum 30 Days of Storage
q) HDMI and VGA Output
r) Four USB 2.0 ports and 2 USB 3.0 ports for Back-up
s) The NVR Server shall be compatible with, but not limited to: H.264, MPEG4, and
MJPEG video compression formats
t) The NVR Server shall include image storage with configurable resolutions and frame rates
u) Automatic IP Camera Discovery
v) Minimum Raid 5 and Raid 6 HDD Redundancy
w) AVI, DAV or ASF File Format
x) All components/equipment licensing fees for the newly installed NVR Server shall be nonrecurring.
y) The NVR Server shall be capable of system fail-over and redundancy options
z) Proof of authentication to prevent video alteration
aa) Search by date, time, alarm event, or Analytic Forensic Search
bb) Multi-level password protection
cc) Capable of continuous scheduled alarm/event and motion recording. Pre- and post-alarm recording shall also be available and shall be fully programmable on a per channel basis.
dd) Built-in Transcoder shall support up to 4 UHD resolution video streams in parallel.
RFQ #70RFPW22QWA000004
ee) Search by date, time, alarm event, or Analytic Forensic Search
ff) Multi-level password protection
gg) Capable of continuous scheduled alarm/event and motion recording. Pre- and post-alarm recording shall also be available and shall be fully programmable on a per channel basis.
hh) Built-in Transcoder shall support up to 4 UHD resolution video streams in parallel.
D.2 Video Management System – shall support these essentail software capabilities.
a) New and existing cameras
b) Live video moitoring and intelligent video alarming
c) Recording of video direct to Internet Small computer Systems Interface (ISCSI) storage target
d) Playback of video from local or remote independent ISCSI storage(s) with rapid playback mode (I-frame only)
e) Integral alarm/event management with existing panels
f) Video export with extensive audit-log records and tamper proof export (encrypted with digital signature)
g) Support of SSH (Secure Shell Tunneling) for remote connectivity
h) Public Key Infrastructure (PKI) certificate handling and use must be supported
i) The VMS shall store/archive video using one of the following techniques:
Internal Disk Storage Direct Attached Storage
j) Storage Area Network
k) The VMS shall include image storage with configurable bitrates, resolutions and frame rates.
l) The VMS shall be compatible with, but not limited to: H.264, H.265, MPEG4, and
MJPEG video compression formats.
m) The VMS shall be capable of system fail-over and redundancy options to eliminate a single point of failure.
n) All components/equipment licensing fees for the newly installed VMS shall be nonrecurring
D.3 Workstation Requirements (If contractor chooses not to use existing workstation)
a) Intel Xeon W-2123 (3.6 GHz, 8.25 MB cache, 2666 MHz memory speed, 4C
CPU), 16 GB (1 x 16 GB) DDR4 2666 DIMM ECC RAM
b) Intel Pro technology for maximized hardware assisted security and manageability.
c) USB Keyboard and mouse
d) 500 GB 7200 RPM SATA 6G, 1st HDD
e) Multi-monitor support NVIDIA Quadro RTX 4000 or NVIDIA Quadro P2200
f) Minimum Client Workstation PC Requirements Operating System Windows 10
(64-bit, Professional
g) Shall meet requirements specified by the NVR Server manufacturer selected for viewing and retrieving recorded video and controlling of the PTZ cameras from a remote location.
RFQ #70RFPW22QWA000004
h) Be able to view live cameras via VMS client application should the NVR have a failure or go offline.
D.4 Description of Cameras and Specifications for Minimum Requirements
D.4.1 Interior/Exterior IP, 1080p PTZ, PoE camera: verify the camera is compatible with the video management system software to ensure full functionality of the camera
1. Minimum 2 mega pixels
2. Full functioning Intelligent Video Analytics while camera is moving
3. 3-year warranty on parts/5 year warranty on electronics
4. Pan-Tilt-Zoom (PTZ) Dome Housing Cameras: (>20’ from ground).
5. Capable of minimum resolution 1920 x 1080 and 60 fps at full resolution.
6. H.264 compression, MPEG-4 and motion JPEG streaming.
7. Optical zoom minimum of 30x.
8. 120dB wide Dynamic Range (WDR).
9. Low light to a minimum of .0077 LUX (Color) .0008 LUX (Mono).
10. Synchronization: Internal.
11. Gain Control: Automatic/Manual.
12. Backlight Compensation: On/Off, selectable.
13. Iris Control: Automatic/Manual.
14. Wide Dynamic Range: On/Off, selectable.
15. Video Focus: Automatic/Manual (near-far).
16. Electronic Image Stabilization (EIS) On/Off, selectable N/A.
17. White Balance: Automatic/Manual; Red/Blue gain adjustable.
18. IP video outputs.
19. Power over Ethernet Plus (PoE+) IEEE 802.3at (Type2 compliant, Class 4 device), Power over Ethernet (PoE) IEEE 802.3af, 24V AC
20. ONVIF Profile S Compliant.
21. Certifications: UL; CE; FCC Class A.
22. Product variance capable of IP66 rated water and dust resistant.
23. Dehumidification for use in various weather conditions.
24. Heater/sun shield for temperature changes of –40 °C ~ +50 °C (–40 °F
~+122 °F) 24 VAC, –30 °C ~ +50 °C (–22 °F ~ 122 °F).
25. IEEE 802.1x compliant.
26. IPv6 addressable.
27. Edge powered pre-compression (camera manufacture developed) analytics on board with separate processor dedicated for processing.
28. Closed OS onboard camera limiting only manufacture signed and authenticated firmware to be installed.
29. Trusted Platform Module (TPM) hardware and Public Key
Infrastructure (PKI) support, providing protection from malicious attacks.
30. Capable of gaining identification of persons at 76 pixels per foot at 20
ft. non-optic zoom and 629 ft. with 30x optic zoom.
31. Capable of gaining recognition of persons at 38 pixels per foot at 41 ft.
non-optic zoom and 1259 ft. with 30x optic zoom.
RFQ #70RFPW22QWA000004
32. Capable of gaining observation at 19 pixels per foot at 81 ft. non-optic zoom and 2517 ft. with 30x optic zoom.
33. Capable of gaining detection at 8 pixels per foot at 193 ft. non-optic zoom and 5978 ft. with 30x optic zoom.
D.4.2 Indoor/Outdoor Fixed IP camera: verify the camera is compatible with the video management system software to ensure full functionality of the camera The contractor shall determine the necessary lens based on the required field of view and lighting for each camera.
1. Provide motorized Pan, Tilt, Roll and Zoom (PTRZ) for remote (re-) commissioning 6MP (H x V) 3264 x 1840 effective picture elements
2. 5 year warranty
3. Provide a 1/1.8-inch CMOS image sensor with the following minimum capabilities:
a. 3264x1840 (6 MP) effective picture elements.
b. Sensitivity down to 0.0059 lux (3.9-10 mm lens) and 0.0135 lux
(12-40 mm lens)
c. High Dynamic Range (HDR) multi-exposure at 5.3 MP resolution
4. Offer both Automatic Varifocal (AVF) lens with P-iris control and a focal length of 3.9 to 10 mm. and 12 to 40 mm
5. Direct network connection using H.265, H.264 and –M-JPEG compression and bandwidth throttling to efficiently manage bandwidth and storage requirements while delivering outstanding image quality.
6. High Dynamic Range of 120 dB for clear images in extreme high-contrast environments.
7. Support both 16:9 - wide screen and 9:16 - upright aspect ratios.
8. Be able to be direct surface mounted to a wall or ceiling
9. Support the following redundant power options: PoE (IEEE 802.3at class 3, 24 VAC and 12-26 VDC.
10. Shall default to use PoE power.
11. Shall witch with no interruption on camera operation to the 24 VAC/
12-26VDC power supply if power from PoE power supply is lost
12. Capable of operating in an indoor or outdoor environment.
13. Offer IP66 environmental protection
14. Anti-fog image feature that assists the camera in registering a useable image through heavy fog
15. ONVIF Profile S; G and T
16. FIPS 140-2 level 3 compliant
D.4.3 Indoor/Outdoor 20 MP IP multi-sensor camera. Verify compatible with the existing video management system software to ensure full functionality of the camera.
a. Four independent 5 MP imagersWeather protection IP66 NEMA Type 4X
b. One camera on a single IP address
c. Four motorized zoom/focus lenses
d. Wide Dynamic Range 120 dB WDR
RFQ #70RFPW22QWA000004
e. Lens 3.7 -7.7mm F1.9
f. Day Night Auto (adjustable switch point) color, monochrome
g. Video compression H.265; H2.64; M-JPEG
h. Tamper detection
i. Password protected
j. Frame Rate user selectable up to 30 fps
D.5 Uninterrupted Power Supply (UPS)
D.5.1 At a minimum, the UPS shall possess the following salient characteristics;
1. Heavy duty surge protector
2. Rack Mountable
3. Provide at least four (4) hours of back up battery power
4. Online UPS with an always active battery
D.6 PoE Network Extender (Veracity Outreach Max or equivalent)
1. No local power required
2. Power consumption 1.3 watts via PoE
3. Full unrestricted network bandwidth
4. Extends PoE and PoE Plus up to 90 watts
5. Univeral 10/100 campatibility
6. Doubles range to 200 meters
D.7 Monitors (LG24UD58 or equivalent)
1. 24 inch
2. 3840 x 2160 pixels
3. 3 year warranty
4. Aspect Ratio 16:9
D.8 Network Switch Requirements
D.8.1 Network Switch (Planet GS-4210-24UP4C or equal)
1. Total power budget up to 720 watts
2. Capable to source up to 95 watts of power by using all the four pairs of standard
Cat5e/6 ethernet cabling
3. Intelligent powered device alive check
4. 8 PoE ports with built-in 802.3bt type-4 PoE 90W or ultra PoE 95-watt injector function (Ports 1 to 8)
5. 16 PoE ports with built-in 802.3bt type-3 PoE 60W or ultra PoE 72-watt injector function (Ports 9 to 24)
6. 24-Port IEEE 802.3af PoE/802.3at PoE+/802.3bt PoE++
7. 4 100/1000BASE-X mini-GBIC/SFP slots
8. 24 10/100/1000BASE-T ports featuring 95-watt 802.3bt type-4 PoE++ injector ports and 4 additional Gigabit TP/SFP combo ports.
9. 802.3bt PoE++ and Advanced PoE Power Output Mode Management
10. Rack Mountable
RFQ #70RFPW22QWA000004
E. ADDITIONAL PROJECT REQUIREMENTS
E.1 Design Standards
E.1.1 Design Limitations – During design and planning activities, the Contractor shall advise the FPS PM of all functional incompatibility issues and/or system interoperability limitations of any equipment to be installed. This shall include, but is not limited to, limitations as a result of insufficient heating, ventilation and HVAC, power, rack, console, and space requirements.
E.1.2 Infrastructure Design – The system design shall include all conduit, junction boxes, cabling, fiber, network topology, and HVAC and power requirements for the proposed Network Video Management System (NVMS).
E.1.3 Equipment Selection – The Contractor shall use commercial off the shelf (COTS) components in system design.
E.1.4 Wiring Schematics – The Contractor shall provide complete system design wiring schematic diagrams representing planned device terminations to and between system equipment and components.
E.1.5 Riser Diagrams – The Contractor shall supply a system riser diagram. The diagram shall indicate the location of all associated system components.
E.1.6 This building is on the National Register of Historic Places. As such, projects in the building are required to follow the following guidelines set forth in the following publications. No penetrations of or attachments to historic materials (such as marble, granite, bronze, wood) is permitted without express written permission from the GSA Regional Historic Preservation Officer if not using an existing penetration.
Attachments should be limited to non-historic materials such as ceiling grids and tiles, gypsum board, and cinder block.
All work and workers must comply…