Amendment 2 - 210506.pdf
PDF 2 MB Posted
- Attached to
- Video Surveillance System (VSS) at the Edith Green Wendall Wyatt Building in Portland, OR
- Solicitation number
- 70RFPW21QWA000003
View the file
Other files
| File | Type | Posted |
|---|---|---|
| FBO Posting.docx | DOCX document | |
| Amendment 4 210510.pdf | ||
| Amendment 4 210510.pdf | ||
| Amendment 3 210507pdf.pdf | ||
| Amendment 1 05042021.pdf | ||
| 70RFPW21QWA000003-Solicitation Package CO review 210414.pdf | ||
| Synopsis FOB Portland CO review.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70RFPW21QWA000003
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE RECEIVED AT
THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
Auburn WA 98001 Attn: Alyssa Hoffman
OPO/FPS/WEST CCG/R10
400 15th Street SW Ofc of Procurement Operations - FPS U.S. Dept. of Homeland Security DHS/FPS/West CCG/Region 10
Auburn WA 98001 400 15th Street SW
70RFPW
Federal Protective Service Acq. Division Office of Procurement Operations U.S. Dept. of Homeland Security
FPS WEST CCG (70RFPW)
05/04/20210002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
04/12/2021
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not, is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Installation of Video Surveillance System (VSS) at Edith Greed Wendall Wyatt Building in
Portland, Oregon
1. The purpose of this amendment revises and replace page 34 of the Statement of Work
(SOW). This revision specifically revises section F.6 ‘Network Switch Requirements’.
2. Please note, the response date for this solicitation is still in effect and is May 12th, 2021 at 9:00am PST.
3. There are no other changes as a result of this amendment.
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maria Santiago
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR (48 CFR) 53.243
NSN 7540-01-152-8070
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
TEL: EMAIL: 253-876-6840 Maria.Santiago@fps.dhs.gov
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 76
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70RFPW21QWA000003/0002
**Offerors are reminded and encouraged to completely and thoroughly examine all of the RFP package and all amendments that may be issued. **
Attachment:
a. Replacement of current Statement of Work with new version Edith Green Wendall Wyatt VSS May
5th, 2021 (74 pages)
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
FOR OFFICIAL USE ONLY (FOUO)
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO)
Federal Protective Service
U.S. Department of Homeland Security Management Directorate
STATEMENT OF WORK
For
Upgrade of
Video Surveillance System (VSS)
Updated May 5, 2021
Edith Green Wendell Wyatt Federal Building
1220 SW Third Avenue
Portland, OR 97204
General Services Administration Building Number: OR0043
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 2
STATEMENT OF WORK
TABLE OF CONTENTS
A. BACKGROUND
B. PLACE OF PERFORMANCE
C. PERIOD OF PERFORMANCE
D. PURPOSE
D.1 DESCRIPTION OF EXISTING SYSTEM
D.2 EXISTING EQUIPMENT LIST
D.3 DESCRIPTION OF NEW SYSTEM
D.4 CONTRACTOR FURNISHED EQUIPMENT (BASE AND EACH OPTIONAL ITEM MUST BE ON
SEPARATE LINE IN THE CONTRACTOR SUBMITTED PROPOSAL
E. SCOPE
E.1 GENERAL
E.2 INSTALLATION REQUIREMENTS
E.3 LOCKABLE VENTED SERVER RACK ENCLOSURE
E.4 SECURITY DESK (SEE E.2 SALIENT CHARACTERISTICS)
E.5 SECURITY MONITORS (SEE E.3 SALIENT CHARACTERISTICS)
E.6 BASE CAMERA
E.7 BASE CAMERA LOCATIONS
E.8 NETWORK SWITCHES (SEE E.6.1 SALIENT CHARACTERISTICS)
E.9 UNINTERRUPTED POWER SUPPLY (UPS) REQUIREMENTS
E.10 OPERATING SYSTEMS UPDATES AND SERVICE PACKS
E.11 GENERAL
F. SYSTEM/EQUIPMENT SALIENT CHARACTERISTICS AND REQUIREMENTS
F.1 IP VIDEO MASTER STATION AND IP VIDEO DOOR STATION (AIPHONE IX-MV7HB AND
AIPHONE IX-DVF OR EQUAL)
F.2 SECURITY DESK
F.3 MONITOR REQUIREMENTS
F.3.1 MINIMUM MONITOR REQUIREMENTS (FOR GUARD BOOTH)
F.3.2 MINIMUM MONITOR REQUIREMENTS (FOR CONTROL CENTER)
F.4 UPS
F.5 CAMERA REQUIREMENTS
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 3
F.6 NETWORK SWITCH REQUIREMENTS
G. ADDITIONAL PROJECT REQUIREMENTS
G.1 DESIGN STANDARDS
G.2 MATERIALS AND EQUIPMENT
G.3 ELECTRICAL AND CABLING REQUIREMENTS
G.4 FINAL INSPECTION AND ACCEPTANCE
G.5 CLEANLINESS, PROTECTION, AND PATCHING
G.6 WARRANTY AND MAINTENANCE
G.7 SAFETY AND HEALTH
G.8 QUALITY CONTROL PLAN
G.9 TRAINING
G.10 CONFIGURATION MANAGEMENT
G.11 COMPONENT/DEVICE CONFIGURATIONS
G.12 NETWORK SETTINGS
G.13 AUDIT AND ACCOUNTABILITY
G.14 IDENTIFICATION AND AUTHENTICATION / ACCESS CONTROL
G.15 DATA PROTECTION
G.16 USER ACCOUNTS
G.17 INCIDENT MANAGEMENT AND DISASTER RECOVERY
G.18 SOFTWARE MAINTENANCE
G.19 ENTERPRISE ARCHITECTURE
H. DELIVERABLES
H.1 GENERAL
H.2 REQUEST FOR QUOTATION (RFQ)
H.3 PRE-INSTALLATION DELIVERABLES
H.4 POST-INSTALLATION DELIVERABLES
I. PROJECT ADMINISTRATION
I.1 WORK AUTHORIZATION
I.2 PERIOD OF PERFORMANCE
I.3 SPECIAL SCHEDULING REQUIREMENTS
I.4 CONTRACTOR ACCESS AND USE OF PREMISES
I.5 SECURITY REQUIREMENTS
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 4
I.6 CONTRACTOR SUITABILITY REQUIREMENTS
I.7 GOVERNMENT ACCEPTANCE PERIOD
J. APPLICABLE STANDARDS
J.1 GENERAL
J.2 SECTION 508 REQUIREMENTS
J.3 INSTRUCTIONS TO OFFERORS
J.4 ACCEPTANCE CRITERIA
K. ACCOUNTABLE PROPERTY:
K.1 DEFINITIONS:
K.2 DELIVERABLES:
K.3 INVOICES:
K.4 PROPERTY ACCOUNTABILITY:
K.5 PHYSICAL INVENTORY:
K.6 PROPERTY DISPOSAL:
K.7 LOST, STOLEN, DAMAGED OR DESTROYED (LDD) PROPERTY:
L. INFORMATION TECHNOLOGY SECURITY
L.1 SECURITY CERTIFICATION/ACCREDITATION
L.2 SECURITY REVIEW AND REPORTING
L.3 CONTINUOUS MONITORING
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 5
A. BACKGROUND
1. The Federal Protective Service (FPS) is the federal law enforcement agency responsible for the protection and security of federal facilities, employees, and visitors. FPS actively works to reduce security vulnerabilities of federal facilities from criminal, terrorist, accidental, and natural disaster threats to ensure properties remain safe, secure, and available to the
American public and employees of the federal Government.
2. The following Statement of Work (SOW) and guidelines have been developed by the
Department of Homeland Security (DHS), Management Directorate, Federal Protective
Service (FPS) to mitigate threats and vulnerabilities pertaining to federal buildings and
Government leased spaces. The SOW and regulations were developed with the notion that the security posture of each federally owned building or Government leased space is unique.
B. Place of Performance
The place of performance is at the Edith Green Wyndell Wyatt Federal Building. Address is 1220 SW Third Avenue Portland, Oregon 97204.
C. Period of Performance
ALL WORK SHALL BE COMPLETED WITHIN 45 BUSINESS DAYS FOLLOWING
CONTRACT AFTER RECEIPT OF NOTICE TO PROCEED.
D. PURPOSE
The purchase, installation, and programming of IP Cameras, UPS, monitors, security desk, IP video intercom system, network switches and all additional equipment and appurtenances necessary for a fully functional IP video surveillance system located at the Edith Green
Wendell Wyatt Federal Building in Portland, OR. The VSS shall monitor vehicle traffic, personnel entry, emergency exits, and the exterior perimeter of the facility. All equipment that is proposed by the contractor shall be in compliance with section 889 of the 2019 John
S. McCain NDAA.
D.1 Description of Existing System
On April 30, 2021 the Edith Green Wendell Wyatt Federal Building in Portland, OR an emergency repair was completed to replace the Exacvision Server and workstation that crashed with a Bosch DIP 7300 Network Video Recorder (NVR) with 192 TB of storage and a Bosch B-MHW-WZ4R4-HEN4 Workstation. The emergency repair also included 56 cameras licenses and adding a three-year Bosch Service Maintenance Agreement for the
Video Management Software (VMS) on the DIP 7300. The rest of the video surveillance system (VSS) consists of Exacvision cameras, four monitors, and IP video intercom system and PoE switches.
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 6
D.2 Existing Equipment List
Brand Model Quantity Location
Recording Device Bosch Bosch DIP 7300 1 Room B068
Workstation Bosch B-MHW-
WZ4R4-HEN4
1 Control Center
IP PTZ Cameras Axis Q6035 19 Various
IP Fix Cameras Axis P3346 20 Various
Pin Hole Cameras Axis P1204 6 Elevator Cabs
Multi Sensor Arecont AV8365DN 1 Lobby
Monitors 4 Control Center
PoE Switch Cisco 5 Various
Intercom System Aiphone 1 Control
Center/Garage
Entry
D.3 Description of New System
D.3.1 The Edith Green Wendell Wyatt Federal Building in Portland, OR VSS will comprise of already installed NVR server and client workstation. The rest of the system will consist of Contractor purchased and installed equipment outlined in this SOW. See section E (salient characteristics) for all minimum requirements for all equipment. All new equipment that is proposed by the contractor shall be in compliance with section
889 of the 2019 John S. McCain NDAA.
D.3.2 Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
D.3.3 If existing cabling is not used and for all new cameras the contractor is responsible for determining and installing the required cabling to each camera. This may require additional conduit to be ran. All cable runs installed shall not exceed 70 percent of manufacture recommended maximum distance specified for each cable run.
D.3.4 This SOW consists of two requirements. A base requirement and two optional requirements. Both the base and optional requiment must be included in the
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 7 contractor’s proposal. The Base and Each Optional Requirement shall be separate line items in the proposal submitted by the contractor.
D.3.5 The Base Requirement of the statement of work is for the purchase, installation, and programming of IP cameras, monitors, switches, IP video intercom system, security desk, decoders, UPS and all other necessary appurtenances for a fully functional IP
VSS. The contractor shall also purchase and install all equipment outlined in section
“D.4 Contractor Furnished Equipment” The Contractor shall ensure that installation of equipment and all programming are per manufacturer specifications. The contractor shall work with the FPS PM or FPS Inspector to determine which cameras will be set for continuous recording and which cameras are to be for motion only. All PTZ cameras shall be programmed to default back to their home location after two (2) minutes of inactivity.
D.3.6 The First Optional Requirement of the statement of work is for the purchase, installation, and programming of a new PTZ camera on the SW corner of the facility
(2nd and Jefferson). This requirement will require some trenching and new conduit.
D.3.7 The Second Optional Requirement of the statement of work is for the purchase, installation, and programming of a new PTZ camera on the rooftop (SE Corner) of the facility. This requirement may require a special mount to allow for the camera to get out far enough from the facility, so the views are not blocked.
D.4 Contractor Furnished Equipment (Base and Each Optional item must be on separate line in the contractor submitted proposal.
BASE ITEMS QUANTITY
UNI
T
32-Inch 4K Monitor 6 EA
15-Inch 4K Monitor 1 EA
Uninterruptable Power Supply
TBD/ Provide
Calculation EA
Decoder 2 EA
IP Fixed Camera 22 EA
IP PTZ Camera 21 EA
IP Pin Hole Cameras 6 EA
Multi Sensor Camera 1
PoE + Network Switches
TBD/ Provide
Calculation EA
Lockable Vented Server Rack Enclosure for Control
Center 1 EA
Security Desk 1 EA
IP Video Master Station and Intercom 1 EA
Additional Camera Licenses TBD EA
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 8
OPTIONAL ITEM # 1 QUANTITY UNIT
PTZ Camera 1 EA
OPTIONAL ITEM # 2 QUANTITY UNIT
PTZ Camera 1 EA
E. SCOPE
E.1 General
E.1.1 As part of the pre-bid process, FPS may have a site visit and all interested
Contractors are invited to attend. The purpose of the site visit is for Contractors to survey the site and review the requirements of this SOW. A site visit will be scheduled by the COR/FPS PM. All questions relevant to this SOW shall be submitted in writing to the FPS Contract Specialist. The Contractor shall not make or assume any changes to this SOW without written approval from the FPS
Contracting Officer.
E.1.2 The Contractor shall be responsible for the removal, inventory, packaging for storage, and return of all removed equipment to the FPS PM. All currently installed wire, cable, and fiber, which is not designated for reuse, shall be completely removed by the Contractor, and properly disposed of.
E.1.3 The existing system shall remain fully functional and operational to the extent possible during the installation of the new surveillance system. The contractor shall cut over from the existing system to the new system in stages to minimize the number and duration of outages. The Contractor shall submit a system cutover plan in accordance with Section F Deliverables. The cutover plan shall be reviewed and approved in writing by the FPS PM.
E.1.4 The Contractor shall provide and install and configure the system as described and/or shown herein. The system shall include all connectors, adapters, terminators, and appurtenances to interconnect all equipment. The Contractor shall also supply all miscellaneous materials necessary to interconnect all equipment installed in accordance with this SOW.
E.1.5 The Contractor shall be required to be familiar with all applicable codes while carrying out the work outlined in this SOW. The Contractor shall complete the work pursuant to this SOW following all applicable codes and standards including, but not limited to: Occupational Safety and Health Administration (OSHA), Underwriters Laboratories (UL), National Fire Protection Association (NFPA), National Electrical Code (NEC), and any additional federal, state and local codes and policies.
E.1.6 The Contractor shall furnish all tools and equipment necessary to complete all work outlined in this SOW. By no means shall the Contractor be authorized the use of
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 9
Government owned property, tools, or equipment, to complete work in accordance with this SOW, unless otherwise specified.
E.1.7 In the event any operational system or utility (e.g. fire, IDS, HVAC) is required to be disabled or turned off, forty-eight (48) hour notice shall be required and approved by the GSA Building Manager, FPS Inspector, and/or FPS PM prior to deactivation.
a) The Contractor, prior to departing for the day, shall ensure all system(s) previously disabled or turned off are functioning properly. A basic functional test shall be required to determine proper functionality of the system(s) and should be reported to the FPS PM.
b) In the event a system is non-functional once enabled or turned on, it shall be the responsibility of the Contractor, at no additional cost to the Government, to restore the system(s) prior to departure from the site.
c) If the Contractor fails to restore all system(s) before departing, they shall be liable for all costs incurred by the Government to restore system(s) functionality.
E.1.8 All personnel engaged in installation activities pursuant to this SOW shall be licensed by the state, local authority, and/or the city local authority in the required trades or professions which require licensing by such jurisdictions. The type and level of license shall be consistent with requirements of the jurisdictions and work to be performed by this SOW.
E.1.9 It shall be the sole responsibility of the contractor to employ personnel licensed and qualified to carry out all tasks outlined in this SOW. At no time during the installation shall the contractor require Government personnel to complete tasks required to be completed by the contractor as covered by this SOW.
E.1.10 The Contractor shall be solely responsible for ensuring their employees and subcontractors abide by all requirements of the contract. At all times while work is being performed in accordance with this contract, the Contractor shall have a supervisory representative available to answer questions, resolve issues, supervise company employee(s), and subcontractor(s).
E.1.11 The Contractor shall provide a daily access schedule to coordinate installation activities. The schedule shall be submitted as part of the project plan.
E.1.12 The Contractor shall maintain a separate set of drawings, schematics, and wiring diagrams of the VSS to be used for creating as-built drawings. This set shall be accurately kept up to date by the Contractor, noting all changes and additions to the
VSS and shall be available for the final inspection walkthrough.
E.1.13 The Contractor may be required to attend installation construction meetings.
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 10
E.2 Installation Requirements
E.2.1 Installers shall be trained and certified, by the current Manufacturer to install, integrate, test, commission the system and perform all warranty work. The contractor shall provide and submit with their proposal documentation from the manufacture stating that they are certified by the Manufacturer to install, integrate, test, commission the system and perform all warranty work. The date of the certification or recertification shall be within the last two years of the submittal date.
E.2.2 A three-year Bosch Service Maintenance Agreement for the Video Management
Software (VMS) was installed on the DIP 7300 as part of the emergency repair on
April 30th. In order for the Government to maintain the full Service Maintenance
Agreement (SMA) for the VMS this requires the servicing contractor to be certified in the Bosch VMS. The contractor shall provide and submit with their proposal their certification that they are trained at either the expert or master level of the Bosch VMS platform.
E.2.3 56 cameras licenses were purchased as part of the emergency repair on April 30th.
If additional camera licenses are needed the contractor shall include them in their proposal.
E.2.4 The newly installed cameras and switches will need to be programmed to NVR.
E.2.5 All new and existing cabling shall be neat and properly labeled at the NVR at the
NVR, client workstation and switches.
E.2.6 All cameras and equipment will be powered by a UPS with a minimum 4-hour runtime when generator powered outlets are not available or UPS with 15-minute minimum runtime when connected to generator powered outlets. PoE budget for cameras and PoE powered devices connected to the switch shall not to exceed 70 percent of the PoE budget of the switch.
E.2.7 For all cameras requiring new cabling. The contractor is responsible for determining and installing the required cabling to each of those cameras. This may require additional conduit to be ran. IP camera data transport method shall not exceed 70 percent of manufacture recommended maximum distance spec.
E.2.8 Some of the interior cameras may require a lift to reach. The contractor may use the facility lift if available. Will need to coordinate the use with the FPS Project
Manager. If the contractor decides to use their own lift the cost shall be included in their proposal. Regardless of which lift is used the contractor shall have the proper training and the appropriate safety equipment to operate the lift. If a lift is used in the main lobby the contractor shall put down masonite/hardboard on the terrazzo.
There is a pallet of masonite/hardboard stored in the garage for this purpose. The contractor shall not use more than three sheets at a time. The contractor can
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 11 leapfrog the three sheets. For safety purposes the contractor shall not make a masonite/hardboard highway through the lobby/public areas.
E.2.9 If available, the facility has a baker scaffold the contractor may borrow which provides the contractor more platform to work on. If used the contractor shall have the appropriate training and safety equipment.
E.2.10 There may or may not be onsite parking. The contractor should plan on unloading materials and then finding parking offsite.
E.2.11 The Contractor shall install all system components and appurtenances in accordance with manufacturer’s instructions following all applicable local, state, and federal codes and policies. All appurtenances, such as, but not limited to connectors, terminators, and mounting hardware shall be supplied by the
Contractor, as well as, all adjustments, alignments, programming, and configuration required for a complete and operational VSS.
E.2.12 The Contractor shall provide and install a complete IP based VSS to include, but not limited to cameras, monitors, switches and any other equipment necessary for fully functional VSS. Provide and install other appurtenances, premise wiring, and system hardware as required for a complete and fully operational system as specified in this SOW. The installed system shall easily be expandable for future growth.
E.2.13 The Contractor, for all equipment/device(s) requiring licensing, shall purchase/install license(s) as required by the manufacturer. All licensing fees shall be nonrecurring.
E.2.14 The Contractor, for all equipment/device(s) requiring software, shall purchase/install new current software as required by the manufacturer.
E.2.15 The Contractor shall be responsible to provide the necessary ladders and all other equipment and tools to access all equipment which is not accessible by ladder.
E.2.16 All measurements and equipment locations are approximate and shall be verified by the Contractor for accuracy and installation feasibility. The Government shall not be held responsible for any error or variation in any measurements or other data listed, nor shall the Contractor, because of an error or variation in any measurement listed, be relieved of the responsibility to carry out the requirements in accordance with the true intent and meaning of the specifications without additional cost to the
Government.
E.2.17 All ceiling tiles removed to accommodate installation shall be returned at the end of the workday. Any and all damaged ceiling tiles will be replaced at the expense of contractor.
E.2.18 The Contractor shall remove and haul debris from the project site daily and dispose
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 12 of in a proper, acceptable manner in accordance with all federal, state, and local laws and regulations, from the job site property. The debris created from this project shall not be disposed of at the job site, in Government dumpsters, or on
Government property.
E.2.19 The Contractor shall install and configure cameras in accordance with manufactures recommendations and industry best practices for optimal live view and recording.
E.2.20 The Contractor shall verify all camera views with the FPS PM prior to installation.
E.2.21 The Contractor, when removing any existing interior or exterior cameras, cabling, and appurtenances in accordance with this SOW, shall ensure all openings or penetrations are sealed and/or patched accordingly to protect against weather exposure, unless otherwise designated for reuse. All openings or penetrations that are designated for reuse shall be sealed and/or patched accordingly to protect against weather exposure at the completion of installation. All penetrations that become exposed to weather during installation shall be protected from exposure and damage throughout the installation period.
E.2.22 No security head screws shall be introduced into the equipment wire raceways, cable ducts, box mounting, etc. except as provided by the manufacturer of the equipment with the proper driver/bit.
E.2.23 The Contractor shall take all necessary precautions in protecting this facility, its occupants, and visitors during the installation.
E.2.24 The Contractor shall maintain the existing facility in a safe and weather-tight condition throughout the installation.
E.2.25 Facility and furnishings shall be covered with plastic or clean drop cloth if there is any potential for dust. Contractors shall bring their own vacuum cleaner and cleaning tools; none shall be provided by GSA or FPS. Contractor, employees, and
Sub-Contractor employees shall not be permitted to work and shall be asked to leave if the proper equipment is not on site.
E.2.26 When required, the Contractor shall provide necessary barrier and direction signs so that pedestrian and vehicle traffic is routed around the area while work is in progress.
E.2.27 The installation site shall always be kept clean and orderly. No equipment, packaging or tools shall be left out when not in use.
E.2.28 Worksite shall always be kept clean and trash shall be removed daily. No use of the buildings trash facilities shall be allowed.
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 13
E.3 Lockable Vented Server Rack Enclosure
E.3.1 The contractor shall purchase and install a lockable server rack with a cooling fan. The server rack shall be large enough to house and support the weight of the switches, UPS and other VSS equipment. The new rack shall be installed in room G110 (Control
Center).
E.4 Security Desk (See E.2 Salient Characteristics)
E.4.1 The contractor shall purchase and install a new security desk in the control center. (see
D.2 for salient characteristics)
E.5 Security Monitors (See E.3 Salient Characteristics)
E.5.1 The Contractor shall purchase and install six new 4K 32-inch monitors. They are to be attached to the contractor provided security desk.
E.5.2 The Contractor shall purchase and install a new 4k 15-inch monitor inside the guard booth next to the garage entrance. There is not a current monitor at this location.
E.5.3 The camera views and controls shall be split between the new and existing monitors.
The contractor shall work with the FPS PM to determine which cameras go on each monitor. See Section D.3 for minimum monitor requirements.
E.6 BASE CAMERAS
E.6.1 For security reasons the current exterior cameras color match the existing fixture/pole.
All new exterior cameras shall also color match the new exterior housing to the mounting fixture.
E.6.2 All cameras shall be IK-10 Rated for vandalism resistance.
E.6.3 All exterior PTZ cameras shall have built-in heater-blower system.
E.6.4 All new and existing cabling shall be neat and properly labeled at the NVR, client workstation and switches.
E.6.5 For all new and existing cabling, the contractor must test with a cable analyzer and certify that it’s connected correctly, and the communication strength between the camera and the final destination. If the contractor determines the cabling is unusable the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7 BASE CAMERAS LOCATIONS
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 14
E.7.1 The contractor shall replace the existing Garage Loading Dock camera with a new interior IP PTZ camera. The existing camera is an Axis Q6035. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7.2 The contractor shall replace the existing Basement NE camera with a new interior IP fixed camera. The existing camera is an Axis P3346. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7.3 The contractor shall replace the existing Basement NW camera with a new interior IP mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.4 The contractor shall replace the existing Basement SE camera with a new interior IP mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.5 The contractor shall replace the existing Basement SW camera with a new interior IP mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 15
E.7.6 The contractor shall replace the existing Basement West Entry camera with a new interior IP fixed camera. The existing camera is an Axis P3346. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.7 The contractor shall replace the existing Club Fed camera (Axis P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork. The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7.8 The contractor shall replace the existing Elevator Cab #1 camera with a new interior
IP pin hole camera. The existing camera is an Axis P1204. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.9 The contractor shall replace the existing Elevator Cab #2 camera with a new interior mounted in the same manner and place as the current camera. See Section E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 16
E.7.10 The contractor shall replace the existing Elevator Cab #3 camera with a new interior
IP pin hole camera. The existing camera is an Axis P1204. The new camera shall be mounted in the same manner and place as the current camera. See Section See Section
E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7.11 The contractor shall replace the existing Elevator Cab #4 camera with a new interior mounted in the same manner and place as the current camera. See Section E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.12 The contractor shall replace the existing Elevator Cab #5 camera with a new interior mounted in the same manner and place as the current camera. See Section E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.13 The contractor shall replace the existing Elevator Cab #6 camera with a new interior mounted in the same manner and place as the current camera. See Section E.5.3 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.14 The contractor shall replace the existing multi sensor camera (Arecont AV8365DN ) that views the elevator panel, magnetometer, and main exit with a new IP multi sensor camera. See section E.5.4 for minimum camera specifications. The contractor may use the existing Cat5 cabling for one of the two new cameras or run two new Cat5 cables. Prior to using the old cable, the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 17 it shall be warrantied including labor for 12 months. If the contractor determines the
E.7.15 The contractor shall replace the existing Garage Exit Door to TSP camera with a new
IP fixed camera. The existing camera is an Axis P3346. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.16 The contractor shall replace the existing Garage Lower Level 1 camera with a new IP
PTZ camera. The existing camera is an Axis Q6035. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.17 The contractor shall replace the existing Garage Lower Level 1 camera with a new IP mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.18 The contractor shall replace the existing Garage Lower Level Ramp camera with a new IP PTZ camera. The existing camera is an Axis Q6035. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.19 The contractor shall replace the existing Garage Plaza Level 2 camera with a new IP
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 18 mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.20 The contractor shall replace the existing Garage Plaza Level 2 camera with a new IP mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.21 The contractor shall replace the existing Garage Plaza Level 2 camera with a new IP mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.22 The contractor shall replace the existing fixed Ground East Entry camera (Axis
P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork.
The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor shall remove the old cabling and provide and install new cabling in the same manner as the old.
E.7.23 The contractor shall replace the existing Ground Loading Dock GSA camera with a new interior IP fixed camera. The existing camera is an Axis P3346. The new camera shall be mounted in the same manner and place as the current camera. See Section
E.5.2 for minimum camera specifications. Contractor may use the existing Cat5
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 19 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is
E.7.24 The contractor shall replace the existing fixed Ground NE camera (Axis P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork. The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the
E.7.25 The contractor shall replace the existing fixed Ground NW camera (Axis P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork. The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the
E.7.26 The contractor shall replace the existing fixed Ground SE camera (Axis P336) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork. The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 20
E.7.27 The contractor shall replace the existing fixed Ground SW camera (Axis P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork. The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractors chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor
E.7.28 The contractor shall replace the existing fixed Ground West Entry camera (Axis
P3346) with a new interior IP fixed camera. This camera is concealed behind a wood facade. The contractor can bevel the wood from behind, so the dome only slightly protrudes through the wood. If the contractor causes any damage to the wood facade it’s the contractor’s responsibility to pay for the damage and replacing the woodwork.
The contractor can choose to use the existing mounting equipment if it works with the new camera. See Section E.5.2 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or choose not to use the old cabling the contractor
E.7.29 The contractor shall replace the existing Park Northwest camera with a new IP
Exterior PTZ camera. The existing camera is an Axis Q6035. The new camera shall be mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.30 The contractor shall replace the existing Park Southeast camera with a new IP Exterior mounted in the same manner and place as the current camera. See Section See Section
E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is
Law Enforcement Sensitive (LES) / For Official Use Only (FOUO) 21
E.7.31 The contractor shall replace the existing Park Southwest camera with a new IP mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling. Prior to using the contractor must test with a cable analyzer and certify prior to using the existing cabling. If contractor chooses to use existing cabling it shall be warrantied including labor for 12 months. If the contractor determines the cabling is unusable or
E.7.32 The contractor shall replace the existing Parking Exit Ramp camera with a new IP mounted in the same manner and place as the current camera. See Section E.5.1 for minimum camera specifications. Contractor may use the existing Cat5 cabling.