Questions-Responses.pdf
PDF 99 KB Posted
- Attached to
- Thomasville Exit Gate Replacement Federal contract opportunity
- Solicitation number
- 70FBR422R00000008
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ATTACHMENT 2 - SOW Thomasville Exit Gate Replacement.pdf | ||
| SOLICITATION - 70FBR422R00000008.pdf | ||
| ATTACHMENT 3 - Project Experience Questionnaire.pdf | ||
| ATTACHMENT 1 - General Decision No. GA20210166.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Thomasville Exit Gate Replacement Notice ID:70FBR422R00000008
Questions from Contractors:
Question #1: Do you know the thickness of the concrete foundation 8", 12", 18" or 24"?
Response #1: Existing concrete thickness is not known. New concrete shall be installed per manufacturer requirements to maintain gate rating. That information can be found in the installation guide for the new barrier gate.
Question #2: What is the supply voltage to the Existing Gate operator Equipment and the required voltage for M30 P1 operator or this will be determined after award. it is not mentioned/listed in the requirement.
Response #2: 240 VAC Circuit # 32,34 in the electrical panel located within the guard shack.