70FBR422Q00000006 - Questions 1-20-2022.pdf

PDF 203 KB Posted

Attached to
Amendment 0001-UPS System Replacement Federal contract opportunity
Solicitation number
70FBR422Q00000020
Issued by
Federal Emergency Management Agency Region 4

View the file

Other files for this federal contract opportunity

Other files attached to Amendment 0001-UPS System Replacement, newest first.
File Type Posted
Amendment 0001_70FBR422R00000006_signedVB.pdf PDF
Solicitation 70FBR422R00000006 - SF1442.pdf PDF
Project Experience Questionnaire_Fillable_rev1.pdf PDF
Statement of Work 1-12-22 Thomasville FRC UPS Replacement.pdf PDF
70FBR422R00000006 - PHOTOS - Thomasville UPS.pdf PDF
SAM.gov - Wage Determination.pdf PDF
Access Request Form.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Questions received as of 1/20/2022:

# Page Section Section Description Vendor Question

1. General

How many volumes are required for proposal submission? Section L doesn’t mention volumes, but Section M suggests that there are 3 separate volumes?

RESPONSE: There is no such “volume” mentioned in this Solicitation; Section M refers to Evaluation factors of 1. Technical, 2.

Past Performance, and 3. Price.

2. 32 M 1.Technical -

Will the government please provide a detailed outline of the items required for the Technical volume of this proposal? –

RESPONSE: There is no such “volume” mentioned in this Solicitation; refer to the Submission of Proposals and prepare according to what is described.

3. 32 M 1.Technical - Is there a page count requirement for the Technical volume? –

RESPONSE: There is no such “volume” mentioned in this Solicitation; there is no required page count.

4. 32 M 2. Past Performance

Is the Project Experience Questionnaire required to be included as part of the Past Performance volume? –

RESPONSE: There is no such “volume” mentioned in this Solicitation. Past performance is required as stated.

5. 32 M 2. Past Performance

Will the government please provide a detailed outline of what is required to be included in the Past Performance Volume?

RESPONSE: There is no such “volume” mentioned in this Solicitation; follow what is detailed on the past performance Project Experience Questionnaire.

6. 32 M 2. Past Performance Is there a page count requirement for the Past Performance volume?

RESPONSE: There is no such “volume” mentioned in this Solicitation; no page count required.

7. 32 M 3. Price

Will the government please provide a detailed outline of what is required to be included in the Price Volume?

RESPONSE: There is no such “volume” mentioned in this Solicitation; Price must include a detailed breakout of costs as specified in Section L of the solicitation

8. 32 M 3. Price

Should the contractor include the contract documents (i.g. SF1442 or Section K) as part of the Price volume?

RESPONSE: There is no such “volume” mentioned in this Solicitation; you must submit your documentation in accordance with the instructions included in the Solicitation.

9. General How should the proposal response be submitted to the responsible party, via email or DOD safe link? –

RESPONSE: Via email to the POCs listed.

10. 1-4 A Solicitation/Contract Form

Does the government want the contractor to provide a lump sum amount on page 2 and page 4 of the contract form?

RESPONSE: Yes. NOTE: A complete breakout of costs should be submitted separately according to the terms and conditions.

11. Project Experience Questionnaire

How many extra pages can we include for the description of each project?

RESPONSE: There is no page limit.

12. Project Experience Questionnaire

Can the Prime contractor use Past performance examples of project performed by major subcontractors/team members?

RESPONSE: No. Must be work performed by the Prime contractor.

A. The spec calls out 480 and 208V in different sections. Please verify the voltage.

B. Information on the current battery system

1. buss voltage – Response: see attached photo

2. battery model number - Response: see attached photo

3. current battery over current in the cabinets - Response: will be answered during the site visit.

4. what type of trip on the battery breaker: UVR , shunt trip … Response: will be answered during the site visit.