Amendment 70FBR125B00000002-0002.pdf
PDF 94 KB Posted
- Solicitation number
- 70FBR125B00000002
About this file
This document is a Standard Form 30 Amendment of Solicitation/Modification of Contract for a FEMA Region 01 contract (Solicitation No. 70FBR125B00000002). Amendment 0002 modifies Section L (Instructions) and Section M (Evaluation Factors) for a Room 226 Renovation project. Key changes include requiring bidders to: 1) conduct a site visit, 2) submit line-item pricing using Attachment 2 Pricing Template dated 9-15-2025, and 3) submit the signed Standard Form 1447. The bid response deadline is now 1:00 PM ET on Wednesday, September 24, 2025, with questions due by 1:00 PM ET on Tuesday, September 23, 2025. The contract will be awarded on an all-or-none basis to the most advantageous bidder, considering only price, and contingent upon completing the site visit and obtaining all required approvals.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB 70FBR125F00000016 Questions and Answers_9-23-25.xlsx | XLSX spreadsheet | |
| Glass Wall Specs.pdf | ||
| Tiles.JPG | JPG image | |
| Lights 1 of 2.JPG | JPG image | |
| Lights 2 of 2.JPG | JPG image | |
| Brand Name Simplified Acquisitions Below SAT IAW FAR Part 13.106.pdf | ||
| Amendment 70FBR125B00000002-0001.pdf | ||
| Attch 2_Pricing Template FRC Room 226 Renovation_dated 9-15-2025.xlsx | XLSX spreadsheet | |
| Attch 1 FRC Room 226 Renovation SOW dated 9-15-2025.pdf | ||
| IFB 70FBR125B00000002_9-15-25.pdf | ||
| Attch 3_Wage Determination MA20250001_dated 8-1-12025.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(x)
70FBR125B00000002
x x
1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted ; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGEMENT TO BE
RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR
OFFER. If by virtue of this amendment you desire to change an offer already submitted , such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
x
CAMBRIDGE MA 02142
70FBR1
220 BINNEY ST
REGION 1
FEDERAL EMERGENCY MANAGEMENT AGENCY
FEMA REGION 01
CAMBRIDGE MA 02142
70FBR1
220 BINNEY STREET
REGION I
FEDERAL EMERGENCY MANAGEMENT AGENCY
FEMA REGION 01
09/18/20250002
13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS. IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
12. ACCOUNTING AND APPROPRIATION DATA (If required) is not extended.is extended, Items 8 and 15, and returning
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended , by one of the following methods: (a) By completing
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
FACILITY CODE CODE
10B. DATED (SEE ITEM 13)
10A. MODIFICATION OF CONTRACT/ORDER NO.
9B. DATED (SEE ITEM 11)
9A. AMENDMENT OF SOLICITATION NO.
CODE
8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code)
7. ADMINISTERED BY (If other than Item 6)CODE 6. ISSUED BY
PAGE OF PAGES
4. REQUISITION/PURCHASE REQ. NO.3. EFFECTIVE DATE2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO. (If applicable)
1. CONTRACT ID CODE
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
09/15/2025
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority) appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
E. IMPORTANT: Contractor is not is required to sign this document and return __________________ copies to the issuing office.
ORDER NO. IN ITEM 10A.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Amendment 0002- This amendment is issued to change Section L - Instructions, Conditions, and Notices to Bidders and Section M - Evaluation Factors for Award.
As a result of this amendment, bids are now due by 1:00 PM ET on Wednesday, September 24, 2025.
Questions are due by 1:00 PM ET on Tuesday, September 23, 2025.
SECTION L INSTRUCTIONS FROM:
***Bidders are required to submit its line-item pricing using Attch 2_Pricing Template FRC
Room 226 Renovation_dated 9-15-2025 in addition to the signed Standard Form 1447.***
Continued ...
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)15A. NAME AND TITLE OF SIGNER (Type or print)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 15B. CONTRACTOR/OFFEROR 16C. DATE SIGNED
(Signature of person authorized to sign) (Signature of Contracting Officer)
Maurice Randolph
STANDARD FORM 30 (REV. 11/2016)
Prescribed by GSA FAR (48 CFR) 53.243
Previous edition unusable
Except as provided herein, all terms and conditions of the document referenced in Item 9 A or 10A, as heretofore changed, remains unchanged and in full force and effect .
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
NAME OF OFFEROR OR CONTRACTOR
2 2
CONTINUATION SHEET
REFERENCE NO. OF DOCUMENT BEING CONTINUED PAGE OF
(A) (B) (C) (D) (E) (F)
70FBR125B00000002/0002
SECTION L INSTRUCTIONS TO:
***Bidders are required to conduct a site visit.***
***Bidders are required to submit its line-item pricing using Attch 2_Pricing Template FRC Room
226 Renovation_dated 9-15-2025 in addition to the signed Standard Form 1447.***
SECTION M FROM:
The contracting officer shall make a contract award (1) by written or electronic notice, (2) within the time for acceptance specified in the bid or an extension and (3) to that responsible bidder whose bid, conforming to the invitation, will be most advantageous to the Government, considering only price. Award shall not be made until all required approvals have been obtained and the award otherwise conforms with 14.103-2.
Award will be made on an all or none basis.
SECTION M TO:
The contracting officer shall make a contract award (1) by written or electronic notice, (2) within the time for acceptance specified in the bid or an extension and (3) to that responsible bidder whose bid, conforming to the invitation, and completed a site visit, that will be most advantageous to the Government, considering only price. Award shall not be made until all required approvals have been obtained and the award otherwise conforms with 14.103-2. Award will be made on an all or none basis.
NSN 7540-01-152-8067 OPTIONAL FORM 336 (4-86)
Sponsored by GSA
FAR (48 CFR) 53.110
File details come from the government source that posted it. Updated .