Attach 02 QA 08042026 RFQ 70FB7026Q00000028 0001.pdf

PDF 1 MB Posted

Attached to
Provide, Install, Integrate one Lithium-Ion Battery Cabinet with 17 x 2. 04 kWh Battery Modules (Manufacturer Part # LIBSESMG17UL)
Solicitation number
70FB7026Q00000028
Issued by

About this file

This is a Questions and Answers document for RFQ 70FB7026Q00000028 dated 08/04/2026 addressing a battery storage system (BSS) installation project for FEMA.

The project involves installing a second battery cabinet to an existing UPS system located on the 1st Floor of the NRN Equipment Room in building 4420. The existing UPS model is GVMSB225KG65S with battery cabinet model UNC5-10999074. The system converts three-phase incoming building power into single-phase power for FEMA equipment. The new battery cabinet will extend the current runtime of 94 minutes to approximately three hours total when building power fails. Installation scope includes positioning and leveling the cabinet, anchoring it to the floor consistent with existing equipment placement, and connecting it to the existing UPS equipment using contractor-selected cable lengths. The equipment room features a raised floor with reinforced floor joints, open layout with no obstructions, and double-door entry facing the warehouse. Access is available via a loading dock a few hundred feet away or a ramp from the parking lot into the building. No elevator is required as the installation location is on the first floor. Site visits are mandated per RFQ Amendment 0001 pages 7-8. Utility shutdowns may be required at contractor discretion. The document includes photographs showing the current installation location where the new cabinet will be positioned on the right side of the existing rack, the side view of equipment, the raised floor infrastructure, and the warehouse ramp and entrance pathway to the equipment room.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Q&A 08/04/2026__RFQ 70FB7026Q00000028

1. Will there be a site visit for this solicitation?

Yes. See RFQ Amendment 0001 Pages 7-8 for Site Visit details.

2. What is the current floor location of the UPS and battery cabinet (1st floor, 2nd floor)?

See photos below.

3. If the UPS is not on the ground floor, is an elevator available for use?

See photos below.

4. Is there a loading dock available for equipment delivery?

See photos below.

5. Can you provide the model numbers for the current UPS and battery cabinet?

UPS Model GVMSB225KG65S Battery Cabinet: UNC5-10999074

6. Could you please let me know if there will be any plans provided or at least a one-line diagram regarding what kind of inversion will occur on this BSS?

FEMA is adding a second battery cabinet to an already existing UPS system (see attached picture). The already existing UPS converts 3-phase incoming power into a 1-phase power that gets used by FEMA equipment installed at the location

7. We wanted to know if the purpose of this BSS would be for providing single phase or three phase power?

The already existing UPS converts 3-phase incoming building power into a 1-phase power that gets used by FEMA equipment.

8. One additional question is on understanding what the duration is expected for this BSS to supply power?

The current existing UPS provides 94 minutes of runtime when building power fails. This extra BSS addition is expected to double for a total of 3-hrs.

ADDITIONAL INFORMATION

• Location o 1st Floor NRN Equipment Room. It is a few hundred feet from the loading dock to the Equipment Room (see attached pictures)

• Access o Door width into room is double open door (see attached picture) No hallways to get into room as the double door faces the warehouse where the loading dock is o Ramp into equipment room (see attached picture) o Loading dock is available, or ramp from parking lot into 4420 building

• Installation scope o Position and level the cabinet o Anchor cabinet to the floor like the other cabinets from the existing system are placed o Connect to existing UPS equipment

• Existing conditions o Raised floor in equipment room with added floor joints to cover the weight load o Open equipment room o No obstructions in room that will prohibit work from being accomplished

• Electrical information o Existing UPS is already in place. This additional cabinet will connect to the already installed equipment (see attached picture) o Required cables to connect the additional cabinet to the already installed UPS (contractor discretion on length) o Utility shutdowns may occur per contractors’ discretion. This is something that the building is familiar with from past equipment installs

PHOTOS

INSTALL LOCATION CABINET WILL GO ON THE RIGHT SIDE OF RACK

INSTALL LOCATION SIDE VIEW

UNDER THE RAISED FLOOR

RAMP FROM WAREHOUSE INTO EQUIP RM

ENTRANCE INTO EQUIP ROOM FROM TOP OF RAMP

File details come from the government source that posted it. Updated .