About this file

This document contains questions submitted in response to a solicitation for National Flood Insurance Program Standard Operations support services. The solicitation seeks a contractor to provide support to Write Your Own insurance companies and the NFIP Direct Contractor in tracking, collecting, disseminating, maintaining, and updating flood insurance information. The contractor must also establish field offices during large-scale flooding events to expedite claims processing and coordination. Key details include the contractor supporting existing web portals and training programs, maintaining records in accordance with SOPs, and providing liaison support in each of the ten FEMA regions. The questions clarify requirements around office capacity, business continuity plans, historical claims volumes, portal responsibilities, and cost proposal assumptions.

View the file

Other files for this federal contract opportunity

Other files attached to National Flood Insurance Program Standard Operations FIMA-15, newest first.
File Type Posted
1.1.3 Attachment 2_FIMA 15 StdOps Statement of Work 6July20 FINAL.pdf PDF
70FA6020R00000004 Final.pdf PDF
Attachment 4 - FIMA 15 Past Performance Questionnaire.pdf PDF
Attachment 1 FIMA 15 Cost Proposal Sheet.xlsx XLSX spreadsheet
Attachment 3.Resume Template.pdf PDF
Attachment 5_SOW Appendix A - FIMA 15 StdOps Deliverables 14May20 FINAL.xlsx XLSX spreadsheet
Attachment 6 Service Contract Act Wage Determination.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Solicitation or Attachments RFQ SectionParagraph No.Page No.(s)Question Category (Contract or Technical)QuestionGovernment Response
1Section 10; Part B; Task 4FRO Capacity23TechnicalIs there past FRO documentation that can be shared to help specify office capacity and related standards for estimation purposes?There is no documentation to share. A Flood Response Office is scaled to support the number of claims within the impacted area. FROs can vary in office size and capacity. The Standard Operations Contractor will propose a solution for each event that requires a Flood Response Office.
2Section 8Business Continuity Plan7Technical“The Business Continuity Plan shall be activated and operational within 24 hours of activation after determining an emergency has occurred.” Does activating the Business Continuity Plan apply only to Contractor resources located in Government controlled space affected by the emergency, or does activating it apply irrespective of impact to the Contractor resources located in Government controlled space affected by the emergency?The activation applies to all Contractors supporting this contract, whether in a Government or Contractor owned space.
3Section 10; Part A; Task 3Records Management10Technical“The Contractor shall develop FEMA-approved SOPs [for Records Management in compliance with FEMA Manual 5400.2]” Do current SOPs exist that the Contractor can review?Yes, the Government has existing SOPs. The SOPs will be distributed at the time of award. The Contractor is responsible for updating the SOPs based on any new guidance, policy, or regulations.
4Section 10; Part A; Task 3.2Records Management10TechnicalThe Contractor shall maintain ten specific document types and scan within 30 days of receipt. 1) What are the anticipated volume rates of these document types and what is the approximate average page count for each? If possible, could you provide historical numbers? For example, page 9 states that the current mailing is 6 million; but not all are returned to be scanned. 2) Are scanned document files to be tagged (e.g., policy number) for future referencing? If so, what are the requiremenets? 3) Are we required to scan using FEMA TRIMS tool or can we propose another solution? 4) Will there be a backlog of files to scan?The Government does not have anticipated volume rates at this time. Historical numbers are currently not available. Scanned documents are expected to be organized for searching purposes. The Government is not seeking any proposed solutions. At this time, there is no backlog anticipated.
5Section 10; Part A; Task 6.1.10Web Portal13Technical“The Contractor is to support the implementation of a Flood insurance Appeals web portal.” Does the NFIP intend to use a different contractor to design, develop, implement, and maintain the portal? Is the Contractor serving a supporting role to that contractor or is the Contractor directly responsible for the design, development, implementation, and maintenance of the portal?The NFIP has another contractor for designing and maintaining the portal. The Offeror is expected to serve as a technical subject matter expert for all activities related to the Standard Operations scope.
6Section 10; Part A; Task 6.1.12NFIP Direct and SOC Contractors13Technical“The Contractor is to support the training of WYOs and NFIP Direct contractor,…” Who is the NFIP Direct contractor and what is the distinction between the roles of the NFIP Direct contractor and the NFIP SOC Contractor?The current NFIP Direct contractor is Torrent. The NFIP Direct contractor supports all activities related to the NFIP Direct Program. The NFIP Standard Operations Contractor supports the both Write Your Own Companies & the NFIP Direct Contractor. The NFIP also has another contractor for training. The SOC will support as an SME for the Standard Operations scope.
7Section 10; Part A; Task 9.1RO and JFO presence16Technical“The Contractor may be required to sit within one of the Regional Offices or FEMA Joint Field Offices.” Does this mean one out of the 10 Regional Offices, or one in each of the 10 Regional Offices?The NFIP is requiring one liaision per Region for a total of 10 liaisions. The Contractor is not expected to sit in a JFO. However, that Regional liaision may be ask to support JFO activities.
8Section 10; Part A; Task 9.1RO and JFO presence16TechnicalWhat other agencies comprise the FEMA Joint Field Offices?A Joint Field Office is a temporary Federal facility established locally to provide a central point for Federal, State, local, and tribal executives with responsibility for incident oversight, direction, and/or assistance to effectively coordinate protection, prevention, preparedness, response, and recovery actions.
9Section 10; Part A; Task 10.1Other Contractors17Technical“Other contractors may be the lead for development and delivery of some deliverables.” Is the intention that the Contractor will be or may be responsible for developing any or more of the five bulleted documents listed?The Offeror is expected to contribute by providing subject matter expertise, technical editing, proofreading, graphics and formatting support.
10Section 10; Part A; Task 10.5Documentation Certification18TechnicalWhat is the compliance expectation for Microsoft Office Specialist (MOS) Expert, Microsoft Publisher Certification, Adobe Certified Expert (ACE) certification qualification?The Government expects the certificates to be active and current.
11Section 10; Part A; Task 11.1.11Industry Management Tasks18Technical"Weekly provide dashboard with the inventory of each daily task and the oldest receipt date." What is the scope and extent of daily tasks?The Offeror is expected to assess the workload and provide solutions to the dashboard requirement. In addition, this effort is expected to scale up and back as workload and incident-support increase and decrease.
12Section 10; Part A; Task 13.1Duplication Definition20Technical“Reporting requirements shall be subjected to regular review for duplication and utility by the Contractor.” Does duplication mean submission of an old report as if it were a new report, or other?Duplication means similar reports or requirements.
14Section 10; Part B; Task 2.1.1Volume of re-inspections22TechnicalWhat is the sample ratio that determines the volume of re-inspections? Has the WYO Control Plan been updated?Less than 5% of claims will reinspected under RCQC. The WYO Financial Control Plan is currently being updated.
15Section 10; Part B; Task 4.1Establishing FROs23TechnicalFlood Response Office operations include recommending areas for a Flood Regional Office and research up to three potential office locations. Is this activity expected irrespective of a disaster, or in response to an actual disaster?This activity is in response to an actual disaster (flood event).
16Section 13Citizenship/Legal Permanent Residents27Technical“All individuals will be U.S. Citizens.” Are Legal Permanent Residents (green card holders) prohibited from working for the Contractor?Please search acquisition.gov site and look for 3052.204-71 Contractor employee access.
17Section 14Paragraph (e) - ATO scope32Technical“The Contractor shall not input, store, process, ... within a Contractor IT system without an Authority to Operate signed by the Headquarters…” Does the ATO requirement apply to the Contractor’s subcontractors? If so, what is the exception standard exempting from this requirement, e.g. a particular subcontractor’s size or role?The ATO requirements applies to all Contractors and subcontractors on this contract. There are no exemptions.
18AttachmentsAppendix 5 Deliverables TableContractShould the Standard Operating Procedures Package deliverable reference SOW Task 3 rather than SOW Task 1?No.
19Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractWhat is the meaning of the reference to a Letter of Credit and how does it apply to these four items (expense description)?A Letter of Credit is a Government funding mechanism. Approved expenses are paid through the Letter of Credit.
20Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractWhat is the size requirement for a Flood Response Office?A Flood Response Office is scaled to support the number of claims within the impacted area. The Standard Operations Contractor will propose a solution for each event that requires a Flood Response Office.
21Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractOffices in different states/regions will have different rental rates, are we to propose an average rate that will be negotiated at time of response based on actual location?Offerors should develop a cost proposal using average rates and provide a basis of estimation. Eligible incurred costs are reimbursable and will be negotiated at time of disaster response based on actual location.
22Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractLabor in different states/regions will have different rental rates, are we to propose an average rate that will be negotiated at time of response based on actual location? How many individuals should be included in the monthly rate?Offerors should develop a cost proposal using average rates and provide a basis of estimation. Eligible incurred costs are reimbursable and will be negotiated at time of disaster response based on actual location.
23Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractTravel to different states/regions will have different rental rates, are we to propose an average rate that will be negotiated at time of response based on actual destination? Should this include transportation and per diem?Offerors should develop a cost proposal using average rates and provide a basis of estimation. Eligible incurred costs are reimbursable and will be negotiated at time of disaster response based on actual location.
24Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractFor NFIP Mailings, how many per month and is this to only include the cost of postage?FEMA will reimburse postage costs.
25Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractShould the monthly price assume price per disaster? Monthly prices will be higher if there is more than one response active, how should this be addressed in the quote?Offerors should develop a cost proposal using average rates and provide a basis of estimation. Eligible incurred costs are reimbursable and will be negotiated at time of disaster response based on actual location.
26Attachment 1 - Cost Proposal SheetN/ALetter of Credit TabContractShould yearly price be calculated at monthly times twelve with escalation in the option years?Offerors should develop a cost proposal using average rates and provide a basis of estimation. Eligible incurred costs are reimbursable and will be negotiated at time of disaster response based on actual location.
27Attachment 1 - Cost Proposal SheetN/AODC TabContractWhat is the square footage of the current warehouse facility?Unknown.
28Attachment 1 - Cost Proposal SheetN/AODC TabContractWhat size and how many courier vans are currently leased?There is one van currently being leased. The NFIP is requiring a small compact courier van (minimum of 120 ft of cargo capacity).
29Attachment 1 - Cost Proposal SheetN/AODC TabContractWhat is the monthly volume of shredding?Unknown.
30Attachment 1 - Cost Proposal SheetN/AODC TabContractShould yearly price be calculated at monthly times twelve with escalation in the option years?Prices should be calculate based on your company's standard accounting practices and the basis for that calcuation provided in your proposal.
31Attachment 1 - Cost Proposal SheetN/APrice Source & Assumptions TabContractPlease clarify the intent of the Price Sourced and Assumptions tab?
32Attachment 1 - Cost Proposal SheetN/AN/AContractPlease confirm that this is not a GSA solicitation and offerors are not limited to approved GSA rates?This not a GSA solicitation and offerors are not limited to approved GSA rates.
3370FA6020R00000004 FinalSection E - Solicitation Provisions60ContractIs the fourth bullet on Phase 1 Factor 1: Demonstrated Relevant Prior Experience, "offeror shall provide contract number…" part of the 6 page written submission? How do we ensure compliance when stating this?Demonstrated relevant experience speaks to the same thing but there is a Past Performance Questionare that must be provided at the appropriate time. Relavant experience should be explaned in Phase 1, as well as provide the details outlined in the solicitation.
34Solicitation-Task 6/SOW TOC/ SOW Task 6-Policy Appeals1TOC SOW/page 11-SOW/Page 1-Solicitation/TechnicalRecommend changing Task 6 Policy Appeals found in Section B, Part A Standard Operations to Appeals identified in the SOW TOC and the body of the document.Noted.
35Solicitation Part A/ SOW TOC Task 4-Flood Adjuster Registration ManagementTOC2TechnicalIn the RFP TOC Flood adjuster management is listed in Part b task 4. In the SOW Flood response is task 4 under part b. Flood adjuster management is not shown in part b but is not list under task 7.7. Please clarify.For information regarding Flood Adjuster Registration Management, refer to 7.7 Flood Adjuster Registration Management.
36Solicitation, Instructions for Offerors-6. Page Size and Font641TechnicalThe font size for Phase 1 submission is listed as 12 point, would the government consider reducing the font to 11 pt.?No.
37SOW Section, Appendix A Deliverables17TechnicalSeveral deliverables in SOW Appendix A show N/A as the SOW task. Please clarify which task these deliverables should be estimated against?Offerers should estimate the entire list of deliverables in Appendix A.
38Solicitation-Proposal EvaluationE.1061TechnicalBased on the submission requirements, it seems like the government is requesting similar information for Factor 1 and Factor 4. Can the government please clarify what is the difference in the evaluation criteria for Factor 1 and Factor 4?
Factor 1 and 4 are separate requirements. Factor 1 provides a snapshot of a contractors performance in the flood insurance industry. Providing specific contract details will give the Government a better understanding of the contractor. Factor 4 is specific to contracts in order to allow the Government to verify references and review CPARS as required.
39
40

&"Calibri"&10&K737373Serco Business&1#

Sheet2

&"Calibri"&10&K737373Serco Business&1#

Sheet3

&"Calibri"&10&K737373Serco Business&1#

File details come from the government source that posted it. Updated .