70CNR-S3689 Q and A Response Amendment No 2_03042026.xlsx

XLSX spreadsheet 10 KB Posted

Attached to
Tahoe Meadows Winter Safety Management Strategic Plan (WSMSP)
Solicitation number
70CNR-S3689
Issued by
Washoe County, Nevada

About this file

This is a Questions and Answers Response Amendment document for Nevada State Purchasing Division RFP 70CNR-S3689, regarding the Tahoe Meadows Winter Safety Management Strategic Plan project. The amendment addresses three clarification questions submitted by TDAVIDSON concerning Scope of Work requirements. Regarding mapping of public and private land and right-of-ways (item 3.7), the Nevada Division of Outdoor Recreation (NDOR) clarified that no boundary survey is required; consultants may utilize existing GIS parcel information, maps, deeds, and surveys held by the state or county. For the transportation and parking assessment (item 3.8), which includes coordination with the Nevada Department of Transportation and local municipalities, NDOR indicated that previously collected traffic study data will suffice rather than commissioning new technical transportation studies, noting that two parcels for parking are already designated through Q1/Conserve Nevada funding with an implementation partner identified for a five-acre parking lot design. Regarding survey models from other locations (item 3.10), NDOR clarified that this requirement does not apply to this project, as NDOR has already conducted user surveys and will provide results to the consultant, eliminating the need for new survey planning as part of the scope of work.

The Q&A Response Amendment provides critical guidance for proposal development without addressing pricing terms, set-asides, or incumbent contractor information. The amendment demonstrates NDOR's intent to leverage existing data collection and infrastructure partnerships to streamline the six-month strategic planning engagement, with the project scheduled to commence May 12, 2026, following Nevada State Board of Examiners approval. The clarifications reduce consultant scope by eliminating survey work, boundary surveys, and new traffic studies, allowing vendors to focus resources on gap analysis, master planning, stakeholder engagement with 19 identified partner groups, and development of the comprehensive Winter Safety Management Strategic Plan with 1-, 3-, and 5-year implementation timelines.

View the file

Other files

File Type Posted
Quote Instructions.pdf PDF
70CNR-S3689 RFP for Tahoe Meadows_REVISED 02232026.pdf PDF
ADSD Work Plan Template Form~1.docx DOCX document
Attachment 3_TM Winter Recreation situation assessment SCOPE 8.4C.pdf PDF
70CNR-S3689 Reference-Questionnaire.docx DOCX document
70CNR_S3689 RFP for Tahoe Meadows_Certification-regarding-lobbying.pdf PDF
Attachment 12_TM IVGID survey map Scope 8.5F.pdf PDF
Attachment 7_Tahoe Meadows SB 426 for TRPA - scope 8.5B.pdf PDF
70CNR-S3689 RFP for Tahoe Meadows_FINAL~1.pdf PDF
Attachment 2_NDOR Division Description 8.4B.pdf PDF
Attachment 8_Tahoe Meadows scope 8.5C IVGID Deed Restriction and Funding Agreement..pdf PDF
Attachment 1_8.4A_TM Winter Safety USFS HISTORY.pdf PDF
70CNR-S3689 - Insuranace Schedule.pdf PDF
Attachment 9_TM SCOPE 8.5 H-1 NTCD-TahoeMdwsSouth-ProjectOverview.pdf PDF
Attachment 4_TM 8.4 D Tahoe_Meadows_Assessment_Report_2025-12-15_FINAL.pdf PDF
Attachment 10_TM SCOPE 8.5D Non Revocable Deed Restriction Tahoe Meadows IVGID.pdf PDF
70CNR-S3689 RFP for Tahoe Meadows-Vendor-Information-Response.pdf PDF
70CNR-S3689 RFP for Tahoe Meadows_Terms-and-conditions-for-services.pdf PDF
Attachment 14_TM South Sustainable Recreation and Pedestrian Safety Project - IVGIG Q1-8.5H.pdf PDF
Attachment 5_Tahoe Meadows summary with map SCOPE 8.4-E.pdf PDF
Attachment 13_TM -IVGID Incline Lake FT ASCOPE 8.5 G.pdf PDF
Attachment 11_TM 8.5E IVGID Funding Agreement Tahoe Meadows.pdf PDF
Attachment 6_TM RFP 8.5 other attachment docs - maps.pdf PDF
70CNR-S3689 Standard-form-contract.pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Bid Q&A for Export Report

Bid Q & A 70CNR-S3689
QUESTION_NBRCREATED_BYQUESTION_SUBJECTQUESTION_TEXTANSWER_TEXT
1TDAVIDSONMapping of Public and Private landScope of Work item 3.7 Research and provide mapping of public and private land, including but not limited to right of ways (ROW). Does NDOR envision a full survey of the project area? Or is there an expectation of a boundary survey? Or can the Consultant assume the use of available GIS parcel information and survey information that is provided by NDOR or stakeholders.We do not expect a boundary survey, and the contractor is welcome to use any and all maps, deeds, and current survery's held by the states or the county.
2TDAVIDSONTransportation and Parking AssessmentScope of Work item 3.8 The transportation and parking assessment to include maps and meetings with Nevada Department of Transportation (NDOT), and municipalities or private entities who provide road or ROW access. What type of transportation and parking assessment is NDOR envisioning? Is there a desire for counts and technical evaluation of roadside parking or other technical transportation studies related to travel time delays/congestion in winter? Or is the intent to use the previously collected transportation/parking related information and identify solutions for designated off-highway parking, signage, etc.?NDOT already has traffic studies so I don't think there is a need for the consultant to contract for this, therefore, previously collected data and current assestments will be used in this first phase - there are already 2 parcels delegated to parking through Q1/Conserve Nevada funding, and a partner in place for the smaller, 5 acre parcel parking lot design and implementation.
3TDAVIDSONSurvey models used in other locationsWhat is meant in Scope of Work item 3.10 Provide survey models used in other locations to address similar issues? In our other project work, we have conducted user surveys to understand travel patterns, issues, needs, and supported opportunities. We recognize that the project would start in the summer and user (in-corridor) surveys would not be possible until next year. Would NDOR like the consultant to plan for a user survey as part of the scope of work?This is a blanket question in the RFP and does not apply to this project. We have already conducted a survey and have the results to share.