70B03C27R00000003_Attachment 8- NII(MEP_LEP)IDIQ Pricing Template_ (MEP_LEP)_ DRAFT RFP.xlsx

XLSX spreadsheet 98 KB Posted

Attached to
DRAFT RFP-03C27R00003-Large-Scale Fixed Systems (Multi-Energy Portal and Low-Energy Portal) Indefinite Delivery, Indefinite Quantity Contact
Solicitation number
70B03C27R00000003
Issued by

About this file

This is a pricing template (Attachment 8) for an Indefinite Delivery, Indefinite Quantity (IDIQ) contract to establish multiple-award agreements for Large-Scale Fixed Systems, specifically Multi-Energy Portal (MEP) and Low-Energy Portal (LEP) systems for the Department of Homeland Security, U.S. Customs and Border Protection. The contract encompasses a base year plus four option years. The template requires contractors to submit detailed pricing for all Contract Line Item Numbers (CLINs) organized by category: Equipment (MEP or LEP systems with peripheral components), Site Design (program management, travel, and design phases), Civil Works (mobilization, command center construction, earth work, electrical/plumbing/mechanical installation, concrete work, and traffic control), Furniture, Fixtures, and Equipment (analyst and operator stations, power supplies, transformers), Installation (mechanical, electrical, plumbing, system integration), Training, Preventative and Corrective Maintenance, Warranty periods (1-5 years), On-Demand Services, and Indirect Rates. Key assumptions include installation in Southern California with a six-month project completion timeline; the MEP is designated as a two-lane new installation while the LEP is a three-lane new installation. Contractors must not alter quantities in blue-shaded cells and should complete separate pricing tabs for MEP and LEP systems. The template requires contractors to provide justification for proposed pricing and document all assumptions made during proposal development. Currently, only the Furniture and Fixtures CLIN (X403) contains sample populated values ($100,000-$121,550.63 across periods); all other CLINs display zero values, indicating the template is in draft form awaiting contractor completion. Submission requires all calculations to be accurate with functional formulas, and proposals submitted without this attachment completed in full may be deemed non-compliant.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Table 1 Summary (2)

Contractor Name:Summary Table
Solicitation Number:
Task Order Number:
Task Order Title:
Base Period:
Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
Contract Value
DescriptionTotal Price BaseTotal Price Option 1Total Price Option 2Total Price Option 3Total Price Option 452.217-8 ExtensionTotal Price
EQUIPMENT - Multi Energy Portal (MEP)
CLIN 001 MEP$ - 0$ - 0
CLIN 101 Command CenterERROR:#REF!
CLIN 201 Blanking WallERROR:#REF!
CLIN 301 Power ConditionerERROR:#REF!
CLIN 401ERROR:#REF!
CLIN 501ERROR:#REF!ERROR:#REF!
STANDARD LABOR
CLIN 002 EngineeringERROR:#REF!
CLIN 102 Technical TradeERROR:#REF!
CLIN 202 LaborersERROR:#REF!
CLIN 302 MEPERROR:#REF!
CLIN 402 ArchitectureERROR:#REF!
CLIN 502 Systems DesignerERROR:#REF!ERROR:#REF!
GENERAL REQUIREMENTS
CLIN 003 Design$ - 0
CLIN 103 Civil$ - 0
CLIN 203 Site$ - 0
CLIN 303 Systems$ - 0
CLIN 403 Structure$ - 0
CLIN 503 Infrastructure$ - 0$ - 0
TRAINING
CLIN 004 Analyst$ 156,481.00
CLIN 104 Training for Trainers$ - 0
CLIN 204 Operators$ - 0
CLIN 304$ - 0
CLIN 404$ - 0
CLIN 504$ - 0$ 156,481.00
TESTING
CLIN 005 Commissioning$ 3,542,353.00
CLIN 105 SAT$ - 0
CLIN 205 FAT$ - 0
CLIN 305 Systems$ - 0
CLIN 405$ - 0
CLIN 505$ - 0$ 3,542,353.00
DESIGN
CLIN 006 Site Design$ 263,164.00
CLIN 106 Systems Design$ - 0
CLIN 206 Security$ - 0
CLIN 306 OIT$ - 0
CLIN 406 Blanking$ - 0
CLIN 506 Infrastructure$ - 0$ 263,164.00
CIVIL WORKS
CLIN 007 Site Prep$ 8,858,355.00
CLIN 107 Concrete work$ - 0
CLIN 207 Steel Work$ - 0
CLIN 307 Geotech Studies$ - 0
CLIN 308 Infrastructure Install$ - 0
CLIN 407 Site Grading$ - 0
CLIN 507 Saw Cutting$ - 0$ 8,858,355.00
INSTALLATION
CLIN 008 Mechanical$ - 0
CLIN 108 Electrical$ - 0
CLIN 208 Plumbing$ - 0
CLIN 308 Foundations$ - 0
CLIN 308 Command Center$ - 0
CLIN 408 Technology Trenches$ - 0
CLIN 508 Conduit/Junction Boxes$ - 0$ - 0
Grand TotalERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Check
ERROR:#REF!

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Table 1 Summary

Contractor Name:Summary Table
Solicitation Number:
Task Order Number:
Task Order Title:
Base Period:
Option 1:
Option 2:
Option 3:
Option 4:
Option 5:
Contract Value
DescriptionTotal Price BaseTotal Price Option 1Total Price Option 2Total Price Option 3Total Price Option 452.217-8 ExtensionTotal Price
EQUIPMENT - Low Energy Portal (LEP)
CLIN 101 LEP$ - 0$ - 0
CLIN 101 Command CenterERROR:#REF!
CLIN 201 Blanking WallERROR:#REF!
CLIN 301 Power ConditionerERROR:#REF!
CLIN 401ERROR:#REF!
CLIN 501ERROR:#REF!ERROR:#REF!
STANDARD LABOR
CLIN 002 EngineeringERROR:#REF!
CLIN 102 Technical TradeERROR:#REF!
CLIN 202 LaborersERROR:#REF!
CLIN 302 Systems DesignERROR:#REF!
CLIN 402 ArchitectureERROR:#REF!
CLIN 502 MEPERROR:#REF!ERROR:#REF!
GENERAL REQUIREMENTS
CLIN 003 Design$ - 0
CLIN 103 Civil$ - 0
CLIN 203 Site$ - 0
CLIN 303 Systems$ - 0
CLIN 403 Structure$ - 0
CLIN 503 Infrastructure$ - 0$ - 0
TRAINING
CLIN 004 Analyst$ 156,481.00
CLIN 104 Training for Trainers$ - 0
CLIN 204 Operators$ - 0
CLIN 304$ - 0
CLIN 404$ - 0
CLIN 504$ - 0$ 156,481.00
TESTING
CLIN 005 Commissioning$ 3,542,353.00
CLIN 105 SAT$ - 0
CLIN 205 FAT$ - 0
CLIN 305 Systems$ - 0
CLIN 405$ - 0
CLIN 505$ - 0$ 3,542,353.00
DESIGN
CLIN 006 Site Design$ 263,164.00
CLIN 106 Systems Design$ - 0
CLIN 206 Security$ - 0
CLIN 306 OIT$ - 0
CLIN 406 Blanking$ - 0
CLIN 506 Infrastructure$ - 0$ 263,164.00
CIVIL WORKS
CLIN 007 Site Prep$ 8,858,355.00
CLIN 107 Concrete work$ - 0
CLIN 207 Steel Work$ - 0
CLIN 307 Geotech Studies$ - 0
CLIN 308 Infrastructure Install$ - 0
CLIN 407 Site Grading
CLIN 507 Saw Cutting$ - 0$ 8,858,355.00
INSTALLATION
CLIN 008 Mechanical$ - 0
CLIN 108 Electrical$ - 0
CLIN 208 Plumbing
CLIN 308 Foundations$ - 0
CLIN 308 Command Center$ - 0
CLIN 408 Technology Trenches$ - 0
CLIN 508 Conduit/Junction Boxes$ - 0$ - 0
Grand TotalERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!ERROR:#REF!
Check
ERROR:#REF!

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Instructions Attachment 8 serves as the standardized format for submitting pricing information and associated details for all required Contract Line Item Numbers (CLINs). This ensures uniformity across proposals and facilitates efficient evaluation of submissions.

1. Required Information Contractors shall complete the following sections of Attachment 8:

a. Pricing Table: Provide detailed pricing for all required CLINs as specified in the solicitation. Ensure that all costs are clearly itemized and align with the scope of work and technical requirements outlined in the Statement of Work (SOW).

I. You will notice there are several sub-CLINs under the main CLIN structure. CBP will factor the estimates included in the sub-CLINs into the main CLIN. Vendors will not be limited due to these sub-SLINs, however, the intent is to make sure all aspect of these CLINs are being considered, estimated, and proposed to. If vendors feel some of the sub-CLINs should not be proposed to, then refrain from providing an estimate. If vendors feel like a sub-CLIN is missing from consideration, please add the additional sub-CLIN and provide an estimate.

II. The Civil Works sub-CLINs will be evaluated based on the provided cost elements at the provided quantities. Please assume the following when completing the CLIN price proposal:

* The installation site is in Southern California

* The MEP is a 2 lane new installation project while the LEP is a 3 lane new installation project

* Do not change quantities provided. Cells highlighted in blue are locked and calculated using cells below.

* The project is to be completed in 6 months

* Please refer to the notes included in column B for additional details

Note: Furniture and Fixtures is a fixed budetary line for items needed unknown at the time of proposal. This can include, but not limited to, additional tables, chairs, light fixtures, refridgerators, etcetera.

b. Justification Tab: Use this tab to provide a detailed explanation of the proposed pricing. Include any supporting rationale, such as cost breakdowns, market research, or other relevant data that substantiates the proposed costs.

c. Assumptions Tab: Clearly outline any assumptions made during the development of the proposal. These may include technical, operational, or logistical considerations that impact pricing or performance.

2. Formatting Requirements All entries in Attachment 8 must be completed electronically using the provided template. Do not alter the structure or format of the pricing table or tabs. If additional information is necessary, include it as supplemental documentation and reference it in the justification tab. Ensure all calculations are accurate and formulas within the pricing table are functional.

3. Submission Guidelines Proposals must be submitted in accordance with the timeline and instructions provided in the solicitation.

Ensure Attachment 8 is included as part of the proposal package. Proposals submitted without Attachment 8 completed in full may be deemed non-compliant and excluded from consideration.

5. Evaluation Considerations Proposals will be evaluated based on the accuracy, completeness, and reasonableness of the pricing provided in Attachment 8, as well as the clarity and validity of the justification and assumptions. Contractors are encouraged to provide detailed and transparent information to facilitate the evaluation process.

6. Questions and Clarifications If contractors have questions regarding the use of Attachment 8 or require clarification on any aspect of the pricing table template, they should submit inquiries in writing to the Contracting Officer prior to the proposal Question and Answer deadline.

MEP CLINs1

Contractor Name:
Solicitation Number:
Task Order Number:
Task Order Title:
* The installation site is in Southern California
* The MEP is a 2 lane new installation project.
* Don't change the provided quantities in the blue shaded cells
* The project is to be completed in 6 months
* Please refer to the notes included in column B for additional details
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
EQUIPMENT - MULTI-ENERGY PORTAL SYSTEM (FFP)CLIN 010CLIN 110CLIN 210CLIN 310CLIN 410
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X100MEP System2$0.002$0.002$0.002$0.00$0.002$0.00$0.00
X104UVBx2$0.002$0.002$0.002$0.00$0.002$0.00$0.00
X105Peripheral Sensors$0.00$0.00$0.00$0.00$0.00$0.00$0.00

Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
SITE DESIGN (FFP)CLIN 020CLIN 120CLIN 220CLIN 320CLIN 420
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X200Program Management and Operations Labor- Fully Burdened1$0.001$0.001$0.00$0.001$0.001$0.00$0.00
X201Travel1$0.001$0.001$0.00$0.001$0.001$0.00$0.00
X202Site Design1$0.001$0.001$0.00$0.001$0.001$0.00$0.00
X203Concept Review
X20450% Design
X20595% Design
X206Issued for Construction Drawings
Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00$0.00
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
CIVIL WORKS (FFP)CLIN 030CLIN 130CLIN 230CLIN 330CLIN 430
Sub - CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X300Mobilization and Site Preparations, Securing the site, Demobilization

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume project location is in Southern California. Construction will be completed over 6 months. Site prep includes all steps required to activiate the site to include, but not limited to, field office, site supervison personnel, equipment rental, concrete testing...1$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
X301Command Center-New Construction

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume new all-steel modular building 14'x40'x10'. Including shipping but not installation

1$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
X302Command Center-Retrofit0$ - 00$0.00$ - 00$0.00$ - 00$0.00$ - 00$0.00$ - 0$ - 0
X303Clearing/Grubbing, Earth Work , Compaction, Drainage

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

To include trenching, excavating, backfilling and compacting,1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Excavating, trench or continuous footing

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in C.Y.3623$ - 0
Backfill and compact

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in C.Y.3623$ - 0
Fixed end caisson piles, open style in stable ground, to 50' deep, 18" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in L.F.984$ - 0
Cycle hauling

SHEYYAB, ALLA S: SHEYYAB, ALLA S

Units in C.Y.3461$ - 0
Demolition/Removal

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume removing 4" thick pavement. Qty in Sq. Yard units2478$ - 0
Saw Cut

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume saw cutting concrete pavement 4" deep. Qty in L.F. units

624$ - 0
X304Electrical/Plumbing/Mechanical1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Man holes

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

precast w/iron racks & pulling irons, C.I. frame and cover, 2' x 2' x 2.6' deep, excludes excavation, backfill and cast in place concrete17$ - 0
Fiber optic cable, 48 strand, single mode, indoor/outdoor

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in thousand L.F.10$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 277/480 V, 225 amp, 30 circuits, NF, incl 20 A 1 pole bolt-on breakers2$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 125 amp, 24 circuits, NQ, incl 20 A 1 pole bolt-on breakers2$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 277/480 V, 225 amp, 30 circuits, NF, incl 20 A 1 pole bolt-on breakers1$ - 0
Panelboards, 1 phase 3 wire, main circuit breaker, 120/240 V, 100 amp, 20 circuits, NQ, incl 20 A 1 pole bolt-on breakers1$ - 0
Electrical underground PVC conduit with coupling, 2" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete5564$ - 0
Electrical underground PVC conduit with coupling, 3" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete1844$ - 0
Electrical underground PVC conduit with coupling, 4" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete2344$ - 0
Electric metallic tubing (EMT), 4" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF730$ - 0
X305Concrete/Asphalt/Footers/Foundations/Lanes of Traffic1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
12" thick (4000 psi) SOG above the gravel vehicle station three rows

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in Cubic Ft. Grade 60 rebar, concrete (Portland cement Type I), placing and finishing10356$ - 0
Expansion joint, premolded, bituminous fiber, 1" x 12"

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. units2676$ - 0
Pump, pedestal sump, single stage, 25 GPM, 1 H.P., 1-1/2" discharge6$ - 0
Concrete surface treatment, curing, sprayed membrane compound

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in Sq.Ft.265$ - 0
X306Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signage1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Metal parking bumpers, pipe bollards, concrete filled/painted, 8' L x 4' D hole, 6" diam.24$ - 0
Vehicle guide rails, guide/guard rail, Rub Rail

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. steel, galv, steel posts (not included), 2m OC,996$ - 0
Security vehicle barriers, pipe bollards, steel, concrete filled/painted, 8' L x 4' D hole, 8" diam.24$ - 0
Security vehicle barriers, concrete barrier, jersey, 10' L x 2' by 6" W x 32" H66$ - 0
X307Site Survey1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X308SWPPP, Permitting1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X309Lodging & Boarding PerDiem1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X310Adjustment Factor (Construction Contingency, Scraps…)1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
FURNITURE, FIXTURES, AND EQUIPMENT (FFP)CLIN 040CLIN 140CLIN 240CLIN 340CLIN 440
Sub - CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X400Analyst Station1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X401Operator Station1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X402Situational Wall1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X403Furniture and fixtures1$100,000.00$ 100,000.001$105,000.00$ 105,000.001$110,250.00$ 110,250.001$115,762.50$ 115,762.501$121,550.63$ 121,550.63$ 552,563.13
X404Generators1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (75 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (125 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (150 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in Cubic Ft. Grade 60 rebar, concrete (Portland cement Type I), placing and finishing

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. units

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in Sq.Ft.

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. steel, galv, steel posts (not included), 2m OC,1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X406Power Conditioners1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X407Operator Booth (8'x12')1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X408Operator Booth (12'x16')1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X409Laptops1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X410Transformer, dry-type, 3 phase 480 V primary 120/208 V secondary, 150 kVA, K-13 rated1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total FF&E $ 100,000.00 Total Construction $ 105,000.00 Total Construction $ 110,250.00 Total Construction $ 115,762.50 Total Construction $ 121,550.63 $ 552,563.13

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
INSTALLATION (FFP)CLIN 050CLIN 150CLIN 250CLIN 350CLIN 450
Sub - CLINDescriptionRateAmountRateAmountRateAmountRateAmountRateAmountTotal
X500Installation2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X501Integration2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X502Radiation Blanking Solution2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X503System Testing2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X505License Plate Reader (LPR)2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X506Pan-Tilt-Zoom (PTZ) Camera2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X507Optical Character Recognition System2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0
X508Traffic Control System2$ - 02$ - 02$ - 02$ - 02$ - 0$ - 0

Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
TRAINING (FFP)CLIN 060CLIN 160CLIN 260CLIN 360CLIN 460
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X600Training Development1$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0

Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
PREVENTATIVE MAINTENANCE OPTIONS (FFP)CLIN 070CLIN 170CLIN 270CLIN 370CLIN 470
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X700MEP Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X701UVBx Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
CORRECTIVE MAINTENANCE OPTIONS (FFP) (parts, labor, diagnostics, and repair)CLIN 080CLIN 180CLIN 280CLIN 380CLIN 480
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X800MEP Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X801UVBx Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
WARRANTY PERIODS (FFP)CLIN 090CLIN 190CLIN 290CLIN 390CLIN 490
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X110MEP-Required Comprehensive Base Warranty (1 Year)1$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0
X111MEP-Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X112MEP-Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X113MEP-Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X114MEP-Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X115UVBx-Required Comprehensive Base Warranty (1 Year)1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X116UVBx-Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X117UVBx-Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X118UVBx-Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X119UVBx-Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Warranty $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
ON-DEMAND SERVICES (FFP)CLIN 100CLIN 200CLIN 300CLIN 400CLIN 500
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X120On-Demand Services1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Engineering Services
Ad Hoc Reports
Site Surveys
Provisioning Support
Retrofit Support
Relocation Services
Site Work
Disposal
Emergency Services
Special Events
Training Activities
Total On-Demand$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
INDIRECT RATES
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X142G&A11111
X143M&H11111
X144Profit11111

Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0

INCENTIVE POOL
Sub-CLINDescription (would need a CLIN for each Option Year)QtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
Year 1 Incentives: Equipment CLIN1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00$ - 0
Year 1 Incentives: Warranty CLIN1$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.001$0.00$0.00$ - 0
Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00$0.00
Total Price Per Period$100,000.00$105,000.00$110,250.00$115,762.50$121,550.63$ 552,563.13
Check
ERROR:#REF!

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

LEP CLINs

Contractor Name:
Solicitation Number:
Task Order Number:
Task Order Title:* The installation site is in Southern California
* The LEP is a 3 lane new installation project
* Don't change the provided quantities in the blue shaded cells
* The project is to be completed in 6 months
* Please refer to the notes included in column B for additional details
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
EQUIPMENT - LOW ENERGY PORTAL SYSTEM (FFP)CLIN 010CLIN 110CLIN 210CLIN 310CLIN 410
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X104LEP-Type 11$0.001$0.001$0.001$0.001$0.00$0.00
X108LEP-Type 21$0.001$0.001$0.001$0.001$0.00$0.00
X112LEP-Type 31$0.001$0.001$0.001$0.001$0.00$0.00
X116UVBx3$0.003$0.003$0.003$0.003$0.00$0.00

Total Equipment $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 Total Equipment Management $0.00 $0.00

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
SITE DESIGN (FFP)CLIN 020CLIN 120CLIN 220CLIN 320CLIN 420
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X200Program Management and Operations Labor- Fully Burdened1$0.001$0.001$0.001$0.001$0.00$0.00
X201Travel1$0.001$0.001$0.001$0.001$0.00$0.00
X202Site Design1$0.001$0.001$0.001$0.001$0.00$0.00
X203Concept Review$0.00
X20450% Design$0.00
X20595% Design$0.00
X206Issued for Construction Drawings$0.00
Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00Total Site Design$0.00$0.00
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
CIVIL WORKS (FFP)CLIN 030CLIN 130CLIN 230CLIN 330CLIN 430
Sub - CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X300Mobilization and Site Preparations, Securing the site, Demobilization1$ - 01$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
X301Command Center-New Construction1$ - 01$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
X302Command Center-Retrofit1$ - 01$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
X303Clearing/Grubbing, Earth Work , Compaction, Drainage

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

To include trenching, excavating, backfilling and compacting,1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Excavating, trench or continuous footing

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in C.Y.3623$ - 0
Backfill and compact

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in C.Y.3623$ - 0
Fixed end caisson piles, open style in stable ground, to 50' deep, 18" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units are in L.F.984$ - 0
Cycle hauling

SHEYYAB, ALLA S: SHEYYAB, ALLA S

Units in C.Y.3461$ - 0
Demolition/Removal

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume removing 4" thick pavement. Qty in Sq. Yard units2478$ - 0
Saw Cut

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Assume saw cutting concrete pavement 4" deep. Qty in L.F. units

624$ - 0
X304Electrical/Plumbing/Mechanical1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Man holes

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

precast w/iron racks & pulling irons, C.I. frame and cover, 2' x 2' x 2.6' deep, excludes excavation, backfill and cast in place concrete17$ - 0
Fiber optic cable, 48 strand, single mode, indoor/outdoor

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in thousand L.F.10$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 277/480 V, 225 amp, 30 circuits, NF, incl 20 A 1 pole bolt-on breakers2$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 120/208 V, 125 amp, 24 circuits, NQ, incl 20 A 1 pole bolt-on breakers2$ - 0
Panelboards, 3 phase 4 wire, main circuit breaker, 277/480 V, 225 amp, 30 circuits, NF, incl 20 A 1 pole bolt-on breakers1$ - 0
Panelboards, 1 phase 3 wire, main circuit breaker, 120/240 V, 100 amp, 20 circuits, NQ, incl 20 A 1 pole bolt-on breakers1$ - 0
Electrical underground PVC conduit with coupling, 2" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete5564$ - 0
Electrical underground PVC conduit with coupling, 3" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete1844$ - 0
Electrical underground PVC conduit with coupling, 4" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete2344$ - 0
Electric metallic tubing (EMT), 4" diameter

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF730$ - 0
X305Concrete/Asphalt/Footers/Foundations/Lanes of Traffic1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
12" thick (4000 psi) SOG above the gravel vehicle station three rows

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in Cubic Ft. Grade 60 rebar, concrete (Portland cement Type I), placing and finishing10356$ - 0
Expansion joint, premolded, bituminous fiber, 1" x 12"

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. units2676$ - 0
Pump, pedestal sump, single stage, 25 GPM, 1 H.P., 1-1/2" discharge6$ - 0
Concrete surface treatment, curing, sprayed membrane compound

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in Sq.Ft.265$ - 0
X306Traffic Control Measures, Jersey Barriers, Speed bumps, striping, signage1$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 01$0.00$ - 0$ - 0
Metal parking bumpers, pipe bollards, concrete filled/painted, 8' L x 4' D hole, 6" diam.24$ - 0
Vehicle guide rails, guide/guard rail, Rub Rail

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. steel, galv, steel posts (not included), 2m OC,996$ - 0
Security vehicle barriers, pipe bollards, steel, concrete filled/painted, 8' L x 4' D hole, 8" diam.24$ - 0
Security vehicle barriers, concrete barrier, jersey, 10' L x 2' by 6" W x 32" H66$ - 0
X307Site Survey1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X308SWPPP, Permitting1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X309Lodging & Boarding PerDiem1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X310Adjustment Factor (Construction Contingency, Scraps…)1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 Total Civil Works $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
FURNITURE, FIXTURES, AND EQUIPMENT (FFP)CLIN 040CLIN 140CLIN 240CLIN 340CLIN 440
Sub - CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X400Analyst Station1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X401Operator Station1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X402Situational Wall1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X403Furniture and fixtures1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X404Generators1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (75 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (125 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X405Uninterrupted Power Supplies (150 kVA)

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Including installation

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. schedule 40, installed by direct burial in slab or duct bank, excludes excavation, backfill and cast in place concrete

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in L.F. to 10' high, incl 2 terminations, 2 elbows, 11 beam clamps, and 11 couplings per 100 LF

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Units in Cubic Ft. Grade 60 rebar, concrete (Portland cement Type I), placing and finishing1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X406Power Conditioners1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X407Operator Booth (8'x12')1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X408Operator Booth (12'x16')1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X409Laptops1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X410Transformer, dry-type, 3 phase 480 V primary 120/208 V secondary, 150 kVA, K-13 rated1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total FF&E $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 Total Construction $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
INSTALLATION (FFP)CLIN 050CLIN 150CLIN 250CLIN 350CLIN 450
Sub - CLINDescriptionRateAmountRateAmountRateAmountRateAmountRateAmountTotal
X500Installation3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X501Integration3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X502Blanking Solution3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X503System Testing3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X505License Plate Reader (LPR)3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X506Pan-Tilt-Zoom (PTZ) Camera3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X507Optical Character Recognition System3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X508Traffic Control System3$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 Total Installation $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
TRAINING (FFP)CLIN 060CLIN 160CLIN 260CLIN 360CLIN 460
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X600Training Development1$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0

Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 Total Training $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
PREVENTATIVE MAINTENANCE OPTIONS (FFP)CLIN 070CLIN 170CLIN 270CLIN 370CLIN 470
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X700LEP Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X701UVBx Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0Total Preventative Maintenance (UVBx)$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
CORRECTIVE MAINTENANCE OPTIONS (FFP)CLIN 080CLIN 180CLIN 280CLIN 380CLIN 480
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X800LEP Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X801UVBx Service0$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0Total Corrective Maintenance (UVBx)$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
WARRANTY PERIODS (FFP)CLIN 090CLIN 190CLIN 290CLIN 390CLIN 490
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X110LEP-Required Comprehensive Base Warranty (1 Year)1$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0
X126LEP-Type 1 Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X127LEP-Type 1 Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X128LEP Type 1 Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X129LEP Type 1 Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X130LEP-Type 2 Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X131LEP-Type 2 Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X132LEP Type 2 Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X133LEP Type 2 Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X134LEP-Type 3 Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X135LEP-Type 3 Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X136LEP Type 3 Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X137LEP Type 3 Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X115UVBx-Required Comprehensive Base Warranty (1 Year)1$ - 00$ - 00$ - 00$ - 00$ - 0$ - 0
X138UVBx-Two Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X139UVBx-Three Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X140UVBx-Four Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X141UVBx-Five Years of Warranty1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Warranty $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 Total General Requirements $ - 0 $ - 0

Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
ON-DEMAND SERVICES (FFP)

tc={E7390B8D-EE95-4665-A268-9E4FDA9CD2C5}: [Threaded comment]

Your version of Excel allows you to read this threaded comment; however, any edits to it will get removed if the file is opened in a newer version of Excel. Learn more: https://go.microsoft.com/fwlink/?linkid=870924

[Tasks]

There is a task anchored to this comment that cannot be viewed in your client.

Comment:

@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.

Reply:

My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred name

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. units

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in Sq.Ft.

SHEYYAB, ALLA S: SHEYYAB, ALLA S:

Qty in L.Ft. steel, galv, steel posts (not included), 2m OC,CLIN 100CLIN 200CLIN 300CLIN 400CLIN 500
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountTotal
X126On-Demand Services (On-demand system repair)1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Engineering Services1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Ad Hoc Reports1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Site Surverys1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Provisioning Support1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Retrofit Support1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Relocation Services1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Site Work1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Disposal1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Emergency Services1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Special Events1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Training Activities1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
Total On-Demand$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0Total General Requirements$ - 0$ - 0
Base YearOrdering Period 1Ordering Period 2Ordering Period 3Ordering Period 4
INDIRECT RATES
Sub-CLINDescriptionQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
X142G&A1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X143T&M1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0
X144Profit1$ - 01$ - 01$ - 01$ - 01$ - 0$ - 0

Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 Total Indirect Rates $ - 0 $ - 0

INCENTIVE POOL
Sub-CLINDescription (would need a CLIN for each Option Year)QtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmountQtyRateAmount
Year 1 Incentives: Equipment CLIN
Year 1 Incentives: Warranty CLIN
Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00Total General Requirements$0.00$ - 0
Total Price Per Period$0.00$0.00$0.00$0.00$0.00$ - 0
Check
ERROR:#REF!

@SHEYYAB, ALLA S I added an on-demand services section here we will need to work on completing.

My understanding is this line is for on-demand repair services (at least that’s my understanding from ILD spreadsheet). Some of the sub-CLINs here, such as “site work” are covered under civil works. It’s close to impossible to try and break the site work cost out of the civil works CLIN. I recommend renaming the “Civil works” CLIN if on-demand services is the preferred name

&1#&"Times New Roman"&10&K000000SENSITIVE BUT UNCLASSIFIED

Price Justification Price Justification

Assumptions

Project/Price Assumptions
Allowances, Assumptions, Exclusions and Exceptions:

File details come from the government source that posted it. Updated .