70B03C25Q00000152 - SOW Building Data Sheets.xls

XLS spreadsheet 44 KB Posted

Attached to
US Border Patrol Spokane Sector - Curlew Station Janitorial/Grounds/Pest Control and Trash Services
Solicitation number
70B03C25Q00000152
Issued by

About this file

This document is a Building Data Sheet attachment detailing the physical specifications of the Curlew Border Patrol Station in Washington state. The facility consists of five buildings spread across approximately 4 acres, with 7,438 square meters of land maintenance area. The main buildings include: a two-story Main Building (3,074 sq ft) with 5-6 offices, restrooms, equipment area, muster room, and kitchen; a Garage Annex (2,790 sq ft) with exercise room, training area, storage/weapons cleaning area, and vehicle storage; a historical Locker Room building (1,750 sq ft); and a Processing Trailer (844 sq ft) with holding cell.

The document specifies that work at all buildings must be performed five days per week between 7:00 am and 4:00 pm, though the facility operates 24/7 year-round. This building data sheet supports solicitation 70B03C25Q00000152 for janitorial, grounds maintenance, pest control, and trash services at the Curlew Border Patrol Station, which has a quote submission deadline of February 14, 2025, at 1500 EST and is set aside for small businesses under NAICS code 561720.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT A
General Building Entity information
1.1Building Entity (BE):WA
Location Name:Curlew BPS Station
Location Address:Curlew WA 99118-9659
Hours of Operation:Seven days a week, 24 hours per day, 365 days per year
Compund / Perimeter Square Footage:Approximately 4 acres
Land/Ground Maintenance SF:7,438 +- sq meters`
Number of Buildings:5
Building Names:Main Building, Garage Annex, Locker Room/Bldg, Processing Trailer
General Building Entity information
1.1.1Building Unit (BU):WA
Building Name:Main Building
Square Footage per Building:3,074 +/- Sq ft
Schedule of Work Performance:All work shall be performed five (5) days a week between the hours of 7:00 am to 4:00 pm.
Location Description:Curlew BPS facility is a 30 Agent two story structures with approximate gross area of 3,074 SF. This location has (5-6) offices, Male and Female Restrooms, Equipment area, muster room, kitchen area.
Building /Land Statistics:
General Building Entity information
1.1.2Building Unit (BU):WA
Building Name:Garage Annex
Square Footage per Building:2,790 +/- Sq ft
Schedule of Work Performance:All work shall be performed five (5) days a week between the hours of 7:00 am to 4:00 pm.
Location Description:The one story old wooden garage that was aprox 5 working bays. Now it has 4 areas. An exercise room; training area; storage/weapons cleaning area; general vehicle equipment storage area.
Building /Land Statistics:Building aproximatel 30' x 100' with concrete floors. The exercise area has ceramic tile and exercise pads covering the floor. One (1) bathroom is in the exercise area.
General Building Entity information
1.1.3Building Unit (BU):WA
Building Name:Locker Room (old house)
Square Footage per Building:1,750 +/- Sq ft
Schedule of Work Performance:All work shall be performed five (5) days a week between the hours of 7:00 am to 4:00 pm.
Location Description:Historical old home used as a locker room.
Building /Land Statistics:
1.1.4Building Unit (BU):WA
Building Name:Processing Trailer
Square Footage per Building:844+/- Sq ft
Schedule of Work Performance:All work shall be performed five (5) days a week between the hours of 7:00 am to 4:00 pm.
Location Description:Office type trailer with holding cell. Used to process persons being detained.
Building /Land Statistics:Tile floors.

&C&"Times New Roman,Bold"&12Attachment A &14Worksite Identification - Fact Sheet &12 &"Times New Roman,Regular"U.S. Customs and Border Protection

File details come from the government source that posted it. Updated .